cleco transmission planning summit 2013
DESCRIPTION
Cleco Transmission Planning Summit 2013. Coughlin Transmission Operations Center. May 9, 2013. 10:00 – 11:00am. Introduction. Welcome. Terry Whitmore, Mgr- Trans Strategy & Support James Simms, Lead Engineer- Transmission Strategy Chris Thibodeaux, Lead Engineer- Transmission Strategy - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/1.jpg)
Cleco Transmission Planning Summit 2013Coughlin Transmission Operations Center
May 9, 2013
10:00 – 11:00am
![Page 2: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/2.jpg)
Welcome
Terry Whitmore, Mgr- Trans Strategy & Support
James Simms, Lead Engineer- Transmission Strategy
Chris Thibodeaux, Lead Engineer- Transmission Strategy
Linh Tran, Associate Engineer- Transmission Strategy
Cindy Guillot, Director Trans Policy and Contracts
Introduction
![Page 3: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/3.jpg)
Agenda
• Introduction
• Economic Planning Studies
• Acadiana Load Pocket Update
• 2013 Transmission Construction Plan
• Model Review
• 2013 SPP Model ACCC Results
• MISO Discussion
• Stakeholder Business
• Final Questions
• Adjourn
![Page 4: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/4.jpg)
Agenda
• Introduction
• Economic Planning Studies
• Acadiana Load Pocket Update
• 2013 Transmission Construction Plan
• Model Review
• 2013 SPP Model ACCC Results
• MISO Discussion
• Stakeholder Business
• Final Questions
• Adjourn
![Page 5: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/5.jpg)
Economic Planning Studies
None were requested for 2013
![Page 6: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/6.jpg)
Agenda
• Introduction
• Economic Planning Studies
• Acadiana Load Pocket Update
• 2013 Transmission Construction Plan
• Model Review
• 2013 SPP Model ACCC Results
• MISO Discussion
• Stakeholder Business
• Final Questions
• Adjourn
![Page 7: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/7.jpg)
Acadiana Load Pocket
![Page 8: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/8.jpg)
Acadiana Load Pocket ProjectYear 2013 Progress Report
• Cleco Upgrades– New 230 kV transmission line from Wells to Labbe (Complete)– Add a Second 500/230 kV Transformer at Wells (Complete)– Reconductor Segura – Hopkins 138KV transmission line (Complete)
• Entergy Upgrades– New 230 kV transmission line from Sellers Rd to Labbe (Complete)
• Lafayette Upgrades– New 230 kV transmission line from Labbe to Bonin (Complete)– 2nd 230/138 kV Autotransformer at Bonin (Complete)
![Page 9: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/9.jpg)
Acadia PB2 Purchase Affected System Upgrades
• Cleco Upgrades– New 230/138 kV Autotransformer at Rork (Complete)– Reconductor Acadia to Richard Ckt 2 (Complete)– Redirect Line 1 to connect to the Rork 230/138 kV autotransformer (Complete)
• Entergy Upgrades– Reconductor Acadia to Richard Ckt 3 and 4 (Complete)– Reconductor Hopkins to Moril 138 kV line (Complete)– Tap the existing Scanlin to Scott 138 kV line and add a new substation Bosco
with a 5 ohm Reactor at Bosco (Complete)– Build a new 138 kV line from Bosco to Bloomfield (Tapped between East
Opelousas and Vatican)(Complete)– Change Normally Open breakers at Richard and Scott(Complete)
![Page 10: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/10.jpg)
ALP Project & Affected System Upgrades Complete
![Page 11: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/11.jpg)
Acadiana Load Pocket Update
Questions ?
![Page 12: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/12.jpg)
Agenda
• Introduction
• Economic Planning Studies
• Acadiana Load Pocket Update
• 2013 Transmission Construction Plan
• Model Review
• 2013 SPP Model ACCC Results
• MISO Discussion
• Stakeholder Business
• Final Questions
• Adjourn
![Page 13: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/13.jpg)
Cleco 2013 Transmission Construction Plan
![Page 14: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/14.jpg)
2013 Transmission Construction Plan
![Page 15: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/15.jpg)
Cleco 2013 Transmission Construction Plan
Budgeted Projects
• 2nd Cocodrie Autotransformer• Cooper Capacitor Banks • Strung Bus replacement at Plaisance• Many Capacitor Banks
2013
• 2nd Pineville Autotransformer
2014
![Page 16: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/16.jpg)
2013 Transmission Construction Plan2nd Cocodrie 230/138 kV Autotransformer
![Page 17: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/17.jpg)
2013 Transmission Construction Plan
Project: Second 230/138KV Autotransformer at Cocodrie Substation
In-service Date: April 2013
Transmission Project Justification:• This project relieves the potential overload on the existing
Cocodrie Autotransformer FTLO Cocodrie to Ville Platte 230 kV line. This project also eliminates the contingency of the existing Auto-transformer causing overloads on Coughlin to Shady Oaks 138 kV line.
![Page 18: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/18.jpg)
2013 Transmission Construction PlanCooper Capacitor Banks
![Page 19: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/19.jpg)
2013 Transmission Construction Plan
Project: Cooper capacitor 2- 36 MVAR bank addition
In-service Date: March 2013
Transmission Project Justification:• This project was approved to allow for maintenance on the
Cooper to Leesville and Cooper to Derrider double circuit 138 kV lines and improve the voltage in the Leesville/ Derrider areas. Operationally there is no way to get an outage on these lines with out risking low voltage for the loss of the Cooper to Penton 230 kV line.
![Page 20: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/20.jpg)
2013 Transmission Construction PlanMany Capacitor Bank
![Page 21: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/21.jpg)
2013 Transmission Construction Plan
Project: Many capacitor 23.4 MVAR bank addition
In-service Date: June 2013
Transmission Project Justification:• This project was approved to mitigate potential low voltages
seen in the powerflow models during summer peak conditions at Many 138 kV Substation for the loss of the Many to Fisher 138 kV line.
![Page 22: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/22.jpg)
2013 Transmission Construction PlanCoughlin to Plaisance 138 kV line Rating upgrade
![Page 23: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/23.jpg)
2013 Transmission Construction Plan
Project: Transmission element replacements on Plaisance – Coughlin 138KV transmission line (Replace Strung bus at Plaisance)
In-service Date: March 2013
Transmission Project Justification:• This project increases the Plaisance to Coughlin 138 kV line
rating to prevent overloads FTLO Cocodrie to Ville Platte 230 kV line.
• Increase the rating to 360 MVA
![Page 24: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/24.jpg)
2013 Transmission Construction PlanPineville 230/138 kV Auto #2
![Page 25: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/25.jpg)
2013 Transmission Construction Plan
Project: Pineville 230/138 kV Auto #2
In-service Date: June 2014
Transmission Project Justification:• This project prevents pre-contingent load shed as a result of
a extended outage of either the Pineville or Twin Bridges 230/138 kV Autotransformers. Operationally with one of these transformers out of service loss of the other autotransformer would lead to low voltage in the Pineville/Alexandria areas and thermal overloads on lines in that region.
![Page 26: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/26.jpg)
2013 Transmission Construction Plan
Questions ?
![Page 27: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/27.jpg)
Agenda
• Introduction
• Economic Planning Studies
• Acadiana Load Pocket Update
• 2013 Transmission Construction Plan
• Model Review
• 2013 SPP Model ACCC Results
• MISO Discussion
• Stakeholder Business
• Final Questions
• Adjourn
![Page 28: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/28.jpg)
• Remove zero Impedance ties• Valley Load Change• Demco Transaction• Removed the Wells Reactor• Messick 500 kV Tap
Model Review
![Page 29: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/29.jpg)
Removed Zero Impedance Ties
• SPP wants to remove the zero impedance ties from the Powerflow models.
• Changed the way we model load connected to external systems which traditionally modeled with a Cleco load on a Cleco bus.
• Now the load ID is Cleco however it is connected to an external bus
Valley Load Change
• Changed the Valley load to be AEP load instead of Cleco load.
• Set up a transaction in the powerflow models for the remainder of the time Cleco is serving the load.
Model Review
![Page 30: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/30.jpg)
Demco Transaction
• Set up a transaction from Cleco to Lagn to serve the Demco load starting in 2014.
Removed Wells Reactor
• With the completion of the ALP project and the addition of the second Wells 500/230 kV Autotransformer the Wells reactor was no longer needed to restrict flow into the ALP.
• Cleco went through the approval processes within SPP to remove the Wells SPS and removed the reactor from the models.
• Reactors remain at wells however are not connected.
Model Review
![Page 31: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/31.jpg)
Messick 500 kV Tap
• The final SPP models have the Mount Olive to Hartsburg 500 kV line tapped near Messick substation in the 2019 and 2024 models. However the models do not include a 500/230 kV Auto.
• This project is currently being jointly studied by AEP, Cleco, Entergy, SPP and MISO?
• No firm commitment to build has been established at this point.
Model Review
![Page 32: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/32.jpg)
Model Review
![Page 33: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/33.jpg)
Model Review
Questions ?
![Page 34: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/34.jpg)
Agenda
• Introduction
• Economic Planning Studies
• Acadiana Load Pocket Update
• 2013 Transmission Construction Plan
• Model Review
• 2013 SPP Model ACCC Results
• MISO Discussion
• Stakeholder Business
• Final Questions
• Adjourn
![Page 35: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/35.jpg)
2013 SPP Model ACCC Results
• SPP 2013 Models
• 2013 (Spring, Summer Shoulder,
Summer, Fall, Winter)
• 2014(Spring, Low load, Summer
Shoulder, Summer, Fall, Winter)
• 2015 (Spring, Summer, Winter)
• 2019 (Low load, Summer, Winter)
• 2024 (Summer, Winter)
![Page 36: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/36.jpg)
2013 SPP Model ACCC Results
• International Paper to Mansfield 138kV transmission line thermal overload
• Powerflow models: 2013, 2014 and 2015 Summer and 2014 Winter peak models
• Contingency: Dolet Hills to S.W.Shreveport 345 kV transmission tie line
• Resolution: The Dolet Hills Operating Guide addresses this outage and resulting overload. The Dolet Hills Plant would be reduced to a level such that the flow on the IP to Mansfield 138 kV transmission line is within limits.
![Page 37: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/37.jpg)
2013 SPP Model ACCC Results
• International Paper to Wallace Lake 138kV transmission tie line thermal overload
• Powerflow models: 2013, 2014 and 2015 Summer peak models
• Contingency: Dolet Hills to S.W.Shreveport 345 kV transmission tie line
• Resolution: The Dolet Hills Operating Guide addresses this outage and resulting overload. The Dolet Hills Plant would be reduced to a level such that the flow on the IP to Mansfield 138 kV transmission line is within limits.
![Page 38: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/38.jpg)
2013 SPP Model ACCC Results
Contingent Element:Dolet Hills to S.W. Shreveport 345 kV line
IP Mansfield to Wallace Lake 138 kV line 110%
Mansfield to IP Mansfield 138 kV line 105%
Mitigation: Implement the Dolet Hills operating guide
![Page 39: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/39.jpg)
2013 SPP Model ACCC Results
• Champagne to Plaisance 138 kV transmission line thermal overload
• Powerflow models: 2014 (Fall, Spring, Summer, Summer Shoulder, Winter), 2015 Winter, 2019 Winter, 2024 (Summer and Winter) models
• Contingency: Cocodrie to Ville Platte 230 kV transmission line
• Resolution: The terminal equipment at Champagne was upgraded to 287 MVA which eliminates this overload condition.
![Page 40: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/40.jpg)
2013 SPP Model ACCC Results
Contingent Element:Cocodrie to Ville Platte 230 kV line
Champagne to Plaisance 138 kV line 121% (231 MVA)
Mitigation: Line rating already upgraded to 287 MVA
![Page 41: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/41.jpg)
2013 SPP Model ACCC Results
Questions ?
![Page 42: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/42.jpg)
Agenda
• Introduction
• Economic Planning Studies
• Acadiana Load Pocket Project Update
• 2013 Transmission Construction Plan
• Model Review
• 2013 SPP Model ACCC Results
• MISO Discussion
• Stakeholder Business
• Final Questions
• Adjourn
![Page 43: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/43.jpg)
MISO Discussion
• June 1st MISO becomes Cleco’s RC.
• Cleco begins participating in MTEP 14 June 1st
• Cleco has filed with FERC for Order 1000 Regional requirements under MISO tariff. Ferc has approved this filing.
![Page 44: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/44.jpg)
MISO Discussion
• Cleco plans to file with FERC to meet Order 1000 Inter-regional planning under MISO.
• Cleco will administer its tariff until Dec 19, 2012 including:
- Transmission Service Request - Generator Interconnection Queue (Small & Large)
![Page 45: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/45.jpg)
MISO Discussion
Questions ?
![Page 46: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/46.jpg)
Agenda
• Introduction
• Economic Planning Studies
• Acadiana Load Pocket Project Update
• 2012 Transmission Construction Plan
• Model Review
• 2012 SPP Model ACCC Results
• MISO Discussion
• Stakeholder Business
• Final Questions
• Adjourn
![Page 47: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/47.jpg)
Stakeholder Business
• Chance for Stakeholders to bring issues up for discussion
![Page 48: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/48.jpg)
Agenda
• Introduction
• Economic Planning Studies
• Acadiana Load Pocket Project Update
• 2013 Transmission Construction Plan
• Model Review
• 2013 SPP Model ACCC Results
• MISO Discussion
• Stakeholder Business
• Final Questions
• Adjourn
![Page 49: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/49.jpg)
Final Questions?
![Page 50: Cleco Transmission Planning Summit 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062519/56814d62550346895dbab08d/html5/thumbnails/50.jpg)
2013 Cleco Transmission Planning Summit
• Oasis
• http://www.oatioasis.com/clec/index.html
• Trueshare
• http://www.trueshare.com/
• Contact info:
Cindy Guillot
Director of Transmission Policy & Contracts
318 838 3166