Page 1: Clean Water Integrated Plan

Clean Water Integrated Plan

Spokane River ForumMarch 26, 2013

Page 2: Clean Water Integrated Plan

Water Quality+

Innovation+

Regulation+

Finances=

Opportunity

The Next Phase

Page 3: Clean Water Integrated Plan

Largest infrastructure investment in City’s history

Balance environmental & financial constraints

Responsible use of the public’s money Add stormwater Allow innovation Leverage our investment into better

neighborhoods, a better City, a healthier economy

The Opportunity

Page 4: Clean Water Integrated Plan

◦WET WEATHER Discharges to the River Stormwater and CSO

◦COMPREHENSIVE SOLUTION Regulatory requirement Stakeholder engagement Best value for our investment

Integrated Plan

Page 5: Clean Water Integrated Plan

We want a cleaner River faster.◦ Prioritize work that has a greater

impact on pollutants.

We want to implement cost-effective and innovative technologies.◦ Add “green” technologies.

We want holistic integration with other critical infrastructure.◦ Solve multiple problems◦ Better streets, new water mains, better parks…

The Plan’s Goals

Page 6: Clean Water Integrated Plan

Prioritize by greatest reduction of pollutants◦Volume versus frequency◦Adding Stormwater

Cleaner River Faster

Initial look: Removing prioritizing stormwater greater pollutant reduction over smaller CSO basin for:

TSSHeavy metalsEven phosphorus

Page 7: Clean Water Integrated Plan

Media Filtra-tion

26 34 24 & 25 33 6 12 23 41 14 & 15 7 22 190

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

342,895

27,97622,296

13,067 10,467 7,898 5,807 2,169 568 558 471 45 0

TSSA

vera

ge A

nnual P

olluta

nt

Rem

oval (l

bs/y

r)

Page 8: Clean Water Integrated Plan

Media Filtra-tion

26 34 24 & 25 33 6 12 23 41 14 & 15 7 22 190

1

1

0.27

0.14

0.11

0.07 0.05 0.04 0.03 0.01 0.003 0.003 0.002 0.0002 0.000002

Total CadmiumA

vera

ge A

nnual P

olluta

nt

Rem

oval (l

bs/y

r)

Page 9: Clean Water Integrated Plan

Media Filtra-tion

26 34 24 & 25 33 6 12 23 41 14 & 15 7 22 190

5

10

15

20

25

30

35

32.0

4.8

3.9

2.3 1.8 1.4 1.00.4 0.1 0.1 0.1 0.0 0.000

Total CopperA

vera

ge A

nnual P

olluta

nt

Rem

oval (l

bs/y

r)

Page 10: Clean Water Integrated Plan

Media Filtra-tion

26 34 24 & 25 33 6 12 23 41 14 & 15 7 22 190

50

100

150

200

250

300

350

290.2

14.211.3 6.6 5.3 4.0 2.9 1.1 0.3 0.3 0.2 0.0 0.00

Total ZincA

vera

ge A

nnual P

olluta

nt

Rem

oval (l

bs/y

r)

Page 11: Clean Water Integrated Plan

Media Filtra-tion

26 34 24 & 25 33 6 12 23 41 14 & 15 7 22 190

5

10

15

20

25

30

27.13

5.35

4.27

2.50 2.00 1.51 1.110.41 0.11 0.11 0.09 0.01 0.0001

Total LeadA

vera

ge A

nnual P

olluta

nt

Rem

oval (l

bs/y

r)

Page 12: Clean Water Integrated Plan

Media Filtra-tion

26 34 24 & 25 33 6 12 23 41 14 & 15 7 22 190

50

100

150

200

250

300

350

303.8

86.0

68.5

40.232.2

24.317.8

6.7 1.7 1.7 1.4 0.1 0.0

Total PhosphorusA

vera

ge A

nnual P

olluta

nt

Rem

oval (l

bs/y

r)

Page 13: Clean Water Integrated Plan

26 34

24 &

25 33 6 12 23 41

14 &

15

Media

Filt

ratio

n 7 22 190

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

450,000

418,935

333,888

195,679

156,739

118,276

86,957

32,477

8,499 8,358 7,365 7,047 678 5

Fecal ColiformA

vg.

Annual P

olluta

nt

Rem

oval (B

illions o

f C

FU

/yr)

Page 14: Clean Water Integrated Plan

Design Criteria Basin Prioritization Right-sizing CSO storage Green solutions Alternatives strategies

The Method

Page 15: Clean Water Integrated Plan

Methodical selection process Ranking based on goals Policy maker and project team interface Communication with stakeholders

Structured Decision Criteria

MODAMultiple objective decision analysis

Page 16: Clean Water Integrated Plan

GOAL:Decide upon the best mix of CSO and stormwater projects that will remove as many pollutant as rapidly as possible with the highest additional public benefit at the lowest long-term life cycle cost.

Criteria:◦ System benefits and risks ◦ Environmental outcomes◦ Community outcomes◦ Operations & maintenance considerations◦ Life cycle costs

Decision Criteria

Page 17: Clean Water Integrated Plan

Accelerate work in 3 basins that have the greatest impact.

Basin Prioritization

THE BIG 3•CSO Basin 26

•CSO Basin 34

•COCHRAN STORMWATER BASIN

Page 18: Clean Water Integrated Plan

Next Steps--Prioritize:

•Remaining CSO Basins

•Large Stormwater Basins

Page 19: Clean Water Integrated Plan

Status-BIG 3: CSO Basin 34

•Constructing two tanks in 2013

•Evaluating remaining storage needs

Page 20: Clean Water Integrated Plan

◦Preliminary design◦Evaluating sites

Status-BIG 3: CSO Basin 26

Page 21: Clean Water Integrated Plan

Evaluating projects Analyzing flow

Status-BIG : Cochran Basin

Page 22: Clean Water Integrated Plan
Page 23: Clean Water Integrated Plan

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 -

2,000,000

4,000,000

6,000,000

8,000,000

10,000,000

12,000,000

2,974,791 3,194,870

8,444,710

5,294,018

7,562,910

4,528,233

2,830,294

8,465,920

1,889,009 2,376,078

4,582,487

CSO Basin 34 Largest CSOs2002-2012

Largest Second Third Fourth Fifth

CSO

Event

Volu

me (

gallons)

Current DesignVolume: 11.4 MG

Right-sizing CSO StorageOne overflow per year

based on a 20-year moving average

Page 24: Clean Water Integrated Plan

We want to implement cost-effective and innovative technologies.

We want holistic integration with other critical infrastructure

Innovative & Holistic

Integrate:StreetsParksWaterWastewaterSidewalksPed / BikeGolf CoursesGreenwaysStreet Trees

Page 25: Clean Water Integrated Plan
Page 26: Clean Water Integrated Plan

Deliver plan by December 2013 Construct BIG 3 by 2017 AND as many more basins as we can

Timeline

Deliver Integrated Plan

Dec. 2013

2017Today

Page 27: Clean Water Integrated Plan

Thank you!More to come