CLEAN CONSTRUCTION -Tips for
controlling infection risks during construction projects
![Page 2: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/2.jpg)
Presenters
James P. Loveland, P.E.
Minnesota Department of Health
Engineering Services Section
![Page 3: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/3.jpg)
Patrick Sheehan, Supervisor
Health Care & Corrections Fire Inspections
Minnesota State Fire Marshal Division
![Page 4: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/4.jpg)
While generally thought to be an issueassociated only with acute care settings (i.e. hospitals), it is really an issue in any health care facility
![Page 5: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/5.jpg)
Over the last decade, specific requirements applicable to hospitals have become increasingly sophisticated. While not yet “requirement”, these same tools can be used in other health care facilities, such as nursing homes and supervised living facilities
![Page 6: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/6.jpg)
Regardless of the setting, whenever a company’s operations causes harm to someone whose presence is foreseeable, there is a risk of legal liability
![Page 7: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/7.jpg)
The best way to avoid this liability is to take proactive measures to prevent the harm. In this case, an ounce of prevention is worth apound of cure
![Page 8: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/8.jpg)
The first step in this process requires that the infection control risk needs to be identified
Construction projects do not all present the same level of risk
![Page 9: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/9.jpg)
Tools that have been developed to assistfacility and construction staff divide “construction” into four basic types andpatient/resident risk groups into four basic groups
![Page 10: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/10.jpg)
We are not going to discuss the Infection Control Risk Assessment beyond identifying the types and groups
![Page 11: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/11.jpg)
Type A involves non-invasive inspection or minor repair work taking less than ½ hour
Examples include, but are not limited to; painting (with no sanding), wall covering, electrical trim work, minor plumbing, and other activities that do not generate dust
![Page 12: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/12.jpg)
Type B involves small scale, short duration maintenance and repair and component installation activity taking less than 2 hours
Examples include, but are not limited to, installation of communication cabling or cutting a wall or ceiling where the spread of dust can be controlled
![Page 13: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/13.jpg)
Type C involves work that generates considerable amounts of dust, requires demolition, or removal of fixed building components or assemblies
Examples include new wall construction, sanding of walls for painting or wall covering,removal of floor coverings, ceiling tiles, and casework
![Page 14: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/14.jpg)
Type D involves major demolition and majorconstruction projects
Examples include construction of additions to a building, or complete reconstruction of a floor or wing of a building
![Page 15: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/15.jpg)
The LOW RISK group involves only
administrative and support offices
![Page 16: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/16.jpg)
The MEDIUM RISK group includescardiologyechocardiographyendoscopynuclear medicinephysical therapy radiology/MRIand respiratory therapy
![Page 17: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/17.jpg)
The HIGH RISK group includes
CCU emergency roomlabor and deliverylaboratories handling specimensnewborn nursery
![Page 18: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/18.jpg)
The HIGH RISK group (cont.)
outpatient surgery pediatrics pharmacyPACU and surgical units
![Page 19: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/19.jpg)
The HIGHEST RISK group includes ANY
immunocompromised patients/residents
burn unit
cardiac cath lab
central sterile supply
ICU
![Page 20: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/20.jpg)
The HIGHEST RISK group (cont.)
isolation rooms
oncology
OR’s, including C-section rooms
medical unit
![Page 21: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/21.jpg)
Plugging these parameters into the IC Matrix identifies the required Class of Precautions
![Page 22: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/22.jpg)
What actions should we think about conducting?
![Page 23: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/23.jpg)
First and foremost is SEPARATION.
The type of separation is generally dictated by the scope of the project. Separation can be as simple as closing the door to the roomwhere you are painting or as complex as constructing full-height rated walls between the construction zone and living spaces
![Page 24: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/24.jpg)
Fire Safety and Construction Projects
NFPA 241, Safeguarding Construction, Alteration and
Demolition Projects
![Page 25: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/25.jpg)
NFPA 241
For CMS, the 1996 Edition applies.
For the Minnesota State Fire Code (MSFC), the 2000 Edition applies
They are basically the same
![Page 26: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/26.jpg)
NFPA 241 HighlightsOnly noncombustible, flame resistant and fire retardant materials shall be used for construction area separationsFire extinguishers shall be available in all construction areasNo smoking Waste material shall be removed after each shift, or more often as necessary
![Page 27: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/27.jpg)
NFPA 241 Highlights cont.
Flammable and combustible liquids shall be properly storedTemporary wiring shall be removed once it is no longer neededSite security shall be maintainedFirefighting access shall be maintained
![Page 28: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/28.jpg)
NFPA 241 Highlights cont.
Construction projects may not obstruct required exits from the facilityTemporary exits may need to be constructed
![Page 29: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/29.jpg)
NFPA 241 Highlights cont.
Fire separations are required.Walls must have 1-hour fire resistance ratingSteel studs with sheet-rock on construction sideDoors must have a 45 minute fire rating
Can be non-rated when a fully functioning fire sprinkler system protects the construction area
![Page 30: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/30.jpg)
NFPA 51B, 1999 Standard for Fire Prevention
During…..Hot Work
Combustibles should be 35’ away from any hot work
A fire watch shall be maintained for at least ½ hour after completion of hot work to watch for and extinguish fires
![Page 31: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/31.jpg)
Managing FOOT TRAFFIC
Define construction crew path of entry into and exit from the building. Assure that construction crew is using only the designated route(s)
Sign the route(s) to keep patients/residents, visitors and facility staff away from construction route(s) and area
![Page 32: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/32.jpg)
Dedicate one elevator (if needed) to construction workers and key off this elevator from all others
This will require an anteroom on the construction floor to prevent contaminationof the shaft
![Page 33: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/33.jpg)
Place and maintain tacky mats at the entrance to the construction anteroom and construction zone
![Page 34: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/34.jpg)
Managing the FLOW AND QUALITY OF AIRis extremely important
This can be as simple as installing an outbound fan in the window or as complex as a HEPA filtration system
![Page 35: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/35.jpg)
Make sure that the HVAC systems in the anteroom and construction zone have been isolated from the rest of the system
This includes both supply and return diffusers. If not isolated, exhausts will require cleaning prior to occupancy followingconstruction
![Page 36: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/36.jpg)
Depending on scope of the project, background and ongoing indoor air quality testing of adjacent spaces may be indicated
![Page 37: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/37.jpg)
Managing WASTE includes
thinking about a convenient location for the construction dumpsterfinding a short route from the construction zone to the outside and the use of covered carts to transport waste
![Page 38: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/38.jpg)
New materials entering the building should also be covered until delivery to the construction zone
![Page 39: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/39.jpg)
Managing the CLEAN-UP following completion of the project
Assure removal of all debris and construction dust in concealed spaces using a HEPA filtered vacuum
![Page 40: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/40.jpg)
Clean all exposed surfaces in the construction zone using a HEPA filteredvacuum
As indicated, conduct final indoor air quality assessment in both adjacent spaces and the construction zone
![Page 41: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/41.jpg)
Has your facility planned for a utility outage of 96 hours (4 days)?
If your hospital is accredited by the Joint Commission, this planning is now required
![Page 42: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/42.jpg)
Emergency Management Standard EM.02.01.01 states; “The hospital has an Emergency Operations Plan.”
Emergency Management (EM), Elements of Performance for EM.02.01.01, paragraph 3 states; “The Emergency Operations Plan identifies the hospital’s capabilities and establishes response procedures for
![Page 43: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/43.jpg)
when the hospital cannot be supported by the local community in the hospital’s efforts to provide communications, resources and assets, security and safety, staff utilities, or patient care for at least 96 hours.”
![Page 44: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/44.jpg)
Emergency Management Standard EM.02.02.09 states; “As part of its Emergency Operations Plan, the hospital prepares for how it will manage utilities during an emergency.”
![Page 45: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/45.jpg)
Emergency Management (EM), Elements of Performance for EM.02.02.09, states; “As part of its Emergency Operation Plan, the hospital identifies alternative means of providing the following (EPs 2-7):
![Page 46: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/46.jpg)
EP3 states; “Water needed for consumption and essential care activities.”
EP4 states; “Water needed for equipment and sanitary purposes.”
![Page 47: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/47.jpg)
How much water is consumed at a particular health care facility is as individualized as each person in this room
![Page 48: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/48.jpg)
A very comprehensive planning document from New York City indicates that a hospital consumes 300 gallons per day/bed (domestic use) and .17 gallons per day for air conditioning
The Minnesota Plumbing Code indicates a consumption of from 150 to 250 gallons per day/bed
![Page 49: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/49.jpg)
Each hospital should know their water demand. This is easily obtained either from the municipal meter(s) installed at the facility or by contacting the municipal water utility. This figure can be sub-divided in many different ways (e.g. by bed, by occupant, etc.)
![Page 50: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/50.jpg)
Facility staff must determine what water consuming occupants and equipment will be eliminated during an emergency
For example, will bathing of patients be suspended; will admissions be restricted (reducing occupant load), will food service continue and at what level
![Page 51: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/51.jpg)
One much more precise method is to conduct a comprehensive water consumption study at your facility
This determines exact usage of each function, including usage of each water closet and lavatory and then makes assumptions regarding how many times each occupant flushes a toilet or runs a lavatory to wash their hands, etc
![Page 52: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/52.jpg)
Copies of actual studies at hospitals are available on the web
![Page 53: CLEAN CONSTRUCTION - Tips for controlling infection … · controlling infection risks during construction projects. ... NFPA 241 Highlights cont. ... NFPA 51B, 1999](https://reader031.vdocuments.mx/reader031/viewer/2022022017/5b8582657f8b9a4a488e6db2/html5/thumbnails/53.jpg)