Clallam County Shoreline Master Program

Presented to the Dungeness River Management TeamMarch 2010

Bogachiel, Sol Duc, and Quillayute Rivers, 2007Miller Peninsula

Page 2: Clallam County Shoreline Master Program Presented to the Dungeness River Management Team March 2010 Bogachiel, Sol Duc, and Quillayute Rivers, 2007 Miller

To all 39 counties and more than 200 cities that have "shorelines of the state" [RCW 90.58.030 (2)] within their jurisdictional boundaries. Shorelines of the State means:

• All Marine waters;

• Streams greater than 20 cubic feet per second mean annual flow;

• Lakes 20 acres or larger;

• Shorelands - Upland areas extending 200 feet landward from the edge of these waters;

And…

Shoreline Master Program applies:

Dickey Lake, 2006

Page 3: Clallam County Shoreline Master Program Presented to the Dungeness River Management Team March 2010 Bogachiel, Sol Duc, and Quillayute Rivers, 2007 Miller

…the following areas when they are associated with one of the above:

• Some or all of the 100-year floodplain • All wetlands within 100-year floodplain• Wetlands• River deltas

Shoreline Master Program applies: cont.

Hoko Mouth, 2006

Page 4: Clallam County Shoreline Master Program Presented to the Dungeness River Management Team March 2010 Bogachiel, Sol Duc, and Quillayute Rivers, 2007 Miller

Clallam County Shoreline Master Program:

In effect for over 40 years, with nine revisions.

Page 5: Clallam County Shoreline Master Program Presented to the Dungeness River Management Team March 2010 Bogachiel, Sol Duc, and Quillayute Rivers, 2007 Miller

• Help protect water quality for our marine waters, lakes, and stream systems.

• Increase protection of lives and property from flood and landslide damage.

• Protect critical habitat as well as fish and wildlife.• Promote recreational opportunities and public access in

shoreline areas.

Significance

Sol Duc, 2002

Page 6: Clallam County Shoreline Master Program Presented to the Dungeness River Management Team March 2010 Bogachiel, Sol Duc, and Quillayute Rivers, 2007 Miller

• Reserve appropriate areas for water-oriented uses• Promote public access opportunities• Identify areas appropriate for restoration and preservation • Help local governments avoid or lessen environmental damage as shoreline areas are developed

Shoreline Master Program Purpose

Sekiu, 2006

Page 7: Clallam County Shoreline Master Program Presented to the Dungeness River Management Team March 2010 Bogachiel, Sol Duc, and Quillayute Rivers, 2007 Miller

Current Science

“No Net Loss” of ecological functions

Assessment of “reasonably foreseeable” cumulative impacts

Restoration Planning

New Key Standards

Elwha Fish Survey, 2001

DRMT field trip, 2004

Page 8: Clallam County Shoreline Master Program Presented to the Dungeness River Management Team March 2010 Bogachiel, Sol Duc, and Quillayute Rivers, 2007 Miller

Public ParticipationBOCC considers Public Participation Strategy on March 16, 2010

Stakeholders:Maintain Interested Party Contact List

Media:Articles; Press Releases; Legal Notices

Regional Forums:Regular Public Outreach Forums

Designated SMP Email Address:[email protected]

Designated SMP Website:Ecology Website— www.ecy.wa.gov/programs/sea/sma/index.htmlCounty Website—www.clallam.net/RealEstate/html/shoreline_management.htm

Morse Creek, 2009

Page 9: Clallam County Shoreline Master Program Presented to the Dungeness River Management Team March 2010 Bogachiel, Sol Duc, and Quillayute Rivers, 2007 Miller

SMP Update Process Flow Chart

Review Current County SMP

Review Current County SMP

Ecology SMP Update Mandate

Ecology SMP Update Mandate

EcologyEcology

Board of County CommissionersBoard of County Commissioners

Planning CommissionPlanning Commission

Policy/Technical Advisory Group-WRIA 20:Forks Planning CommissionCoastal Marine Resources CommitteeWatershed Planning Unit – WRIA 20North Pacific Coast Lead Entity

 

Policy/Technical Advisory Group-WRIA 18/19:Clallam Ecosystem Recovery NetworkClallam Marine Resources CommitteeWRIA 18-19 Watershed Planning Units (DRMT, EMMT, WRIA 19)North Olympic Peninsula Lead EntityClallam Bay-Sekiu & Crescent Community Advisory Councils

Page 10: Clallam County Shoreline Master Program Presented to the Dungeness River Management Team March 2010 Bogachiel, Sol Duc, and Quillayute Rivers, 2007 Miller

Clallam County 3-Year Task Outline and Timeline

Page 11: Clallam County Shoreline Master Program Presented to the Dungeness River Management Team March 2010 Bogachiel, Sol Duc, and Quillayute Rivers, 2007 Miller

Next steps in Dungeness planning area: Visioning – Summer 2010

Shoreline inventory and characterization – Summer/fall 2010Preliminary shoreline designations and goals – 2010-2011

Clallam County requests River Restoration Workgroup to convene to help develop preliminary technical recommendations for inventory,

characterization, designation, and goals.

Page 12: Clallam County Shoreline Master Program Presented to the Dungeness River Management Team March 2010 Bogachiel, Sol Duc, and Quillayute Rivers, 2007 Miller

Shoreline Designations• shall be based on the existing use pattern, the biological and physical

character of the shoreline, and the goals and aspirations of the community as expressed through comprehensive plans as well as the criteria in this section. Each master program's classification system shall be consistent with that described in WAC 173-26-211 (4) and (5) unless the alternative proposed provides equal or better implementation of the act.

Page 13: Clallam County Shoreline Master Program Presented to the Dungeness River Management Team March 2010 Bogachiel, Sol Duc, and Quillayute Rivers, 2007 Miller

Port Angeles Waterfront and Ferry Terminal, 2006

Clallam County Shoreline Designations

Page 14: Clallam County Shoreline Master Program Presented to the Dungeness River Management Team March 2010 Bogachiel, Sol Duc, and Quillayute Rivers, 2007 Miller

ShorelineDesignations in Dungeness Planning Area•New reaches•Current designations: still appropriate?

Page 15: Clallam County Shoreline Master Program Presented to the Dungeness River Management Team March 2010 Bogachiel, Sol Duc, and Quillayute Rivers, 2007 Miller

PROJECT MANAGER:Steve Gray – [email protected]; 360.417.2520

PROCESS, PROJECT STUDIES, & PRODUCTS: Cathy Lear – [email protected]; 360.417.2361

MAPPING: Chad Theismann – [email protected]; 360.417.2239

PUBLIC OUTREACH: Hannah Merrill – [email protected]; 360.417.2563

http://www.clallam.net/RealEstate/html/shoreline_management.htm

Email: [email protected]

Clallam SMP Contact ListWest Twin “Mole“ 2010

Page 16: Clallam County Shoreline Master Program Presented to the Dungeness River Management Team March 2010 Bogachiel, Sol Duc, and Quillayute Rivers, 2007 Miller

Questions?

Thank you

Dungeness River at Audubon Center and Trestle Bridge, 2007