ckg architects porfolio

58
Lennox A Lennox A Caruth Caruth Sr Sr AIA NCARB AIA NCARB 36 + Years Experience 36 + Years Experience Francis Francis Cuthbertson Cuthbertson Jr Jr RA RA NCARB NCARB 26 + Years Experience

Upload: ckgarchitects

Post on 19-May-2015

3.997 views

Category:

Design


2 download

TRANSCRIPT

Page 1: CKG Architects Porfolio

Lennox A Lennox A CaruthCaruth SrSr AIA NCARBAIA NCARB36 + Years Experience36 + Years Experience

Francis Francis CuthbertsonCuthbertson JrJr RA RA NCARBNCARB26 + Years Experience

Page 2: CKG Architects Porfolio

22

CKG ARCHITECTS STAFFCKG ARCHITECTS STAFF(3) REGISTRED ARCHITECTS/(3) PROJECT ARCHITECTS/(1) (3) REGISTRED ARCHITECTS/(3) PROJECT ARCHITECTS/(1) CaddCadd

Drafter/(1) ADMINISTRATIVE ASSISTANTDrafter/(1) ADMINISTRATIVE ASSISTANT

Lennox A Caruth Sr AIA-NCARB

Principal

Joseph McCarthyConstruction

AdministrationRA

Cynthia AyarzaProject Architect

Douglas PooleSenior Project

Architect

Ola AlhaffarProject Architect

Joseph CrumlishAuto Cadd Drafter

Peggy MerryAdministrative

Assistant

Francis C Cuthbertson Jr

RA-NCARB Principal

Page 3: CKG Architects Porfolio

33

CKG SERVICESCKG SERVICES

NAICS CodesArchitectural Services-541310

Interior Design Services -541410

Page 4: CKG Architects Porfolio

44

CKG SERVICESCKG SERVICES

Architectural Design/PlanningInterior Design

Interior Space Planning Building Assessment StudiesResolve Zoning Code IssuesConstruction Management

Page 5: CKG Architects Porfolio

55

CKG FEDERAL CERTIFICATIONSCKG FEDERAL CERTIFICATIONS

CCR Cage Code No. 3DJN2 (Valid to 11-19-2010)

Small Business 8(a)-PendingGSA Schedule-Pending

Page 6: CKG Architects Porfolio

66

PROJECTS by TYPEPROJECTS by TYPE

Office/Commercial/Government Office/Commercial/Government

Sports/Entertainment Sports/Entertainment

Mass Transit Mass Transit

MultiMulti--Family/Residential Family/Residential

Educational/Institutional/DaycareEducational/Institutional/Daycare

Religious Religious

Page 7: CKG Architects Porfolio

77

CKG PERFORMED IN THE CKG PERFORMED IN THE FOLLOWING ROLES:FOLLOWING ROLES:

Prime ArchitectPrime Architect=Performed all Architectural =Performed all Architectural Duties directly for the ClientDuties directly for the Client

SoleSole ArchitectArchitect=Teamed=Teamed with an Engineering Firm, with an Engineering Firm, Performing all Architectural Duties directly for the ClientPerforming all Architectural Duties directly for the Client

SubSub--ConsultantConsultant ArchitectArchitect=Under contract by =Under contract by an Engineering or Architectural Firm, sharing an Engineering or Architectural Firm, sharing Architectural DutiesArchitectural Duties

Page 8: CKG Architects Porfolio

88

OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT

Greater Philadelphia Health Action Greater Philadelphia Health Action –– Construction Value = $1.5 millionConstruction Value = $1.5 million–– CKG Design Fee=$50,000.00CKG Design Fee=$50,000.00–– Design ScheduleDesign Schedule--July 2009July 2009--May 2010May 2010–– Project ResponsibilityProject Responsibility--Architectural Design for an existing 10,500 Architectural Design for an existing 10,500

square foot building into a full service Healthcare Facility. square foot building into a full service Healthcare Facility. –– Design Team RoleDesign Team Role--Prime Architect Prime Architect

Page 9: CKG Architects Porfolio

99

OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT

BristolBristol--MeyersMeyers--Squibb Computer Room Entry Squibb Computer Room Entry –– Construction Value = $125,000.00Construction Value = $125,000.00–– CKG Design Fee=$22,000.00CKG Design Fee=$22,000.00–– Design ScheduleDesign Schedule--JuneJune--September 2009September 2009–– Project ResponsibilityProject Responsibility--Architectural Design for the upgrade of an Architectural Design for the upgrade of an

existing minimum security computer room entry area existing minimum security computer room entry area –– Design Team RoleDesign Team Role--SoleSole ArchitectArchitect

No Photos or Drawings Allowed due to Security Guidelines by the No Photos or Drawings Allowed due to Security Guidelines by the OwnerOwner

Page 10: CKG Architects Porfolio

1010

OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT

Williamsport Readiness CenterWilliamsport Readiness Center–– Construction Value = $18 millionConstruction Value = $18 million–– CKG Design Fee=$40,000.00CKG Design Fee=$40,000.00–– Design ScheduleDesign Schedule--MarchMarch--September 2009September 2009–– Project ResponsibilityProject Responsibility--Assisted with the Architectural Design for Assisted with the Architectural Design for

the Toilet, Locker & Shower Rooms for two new Air National the Toilet, Locker & Shower Rooms for two new Air National Guard Readiness CentersGuard Readiness Centers

–– Design Team RoleDesign Team Role--SubSub--Consultant Architect Consultant Architect

Page 11: CKG Architects Porfolio

1111

OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT

City of Philadelphia Firehouse and Police Roof Renovation City of Philadelphia Firehouse and Police Roof Renovation ProjectProject–– Construction Value = $1.2 millionConstruction Value = $1.2 million–– CKG Design Fee=$30,000.00CKG Design Fee=$30,000.00–– Design ScheduleDesign Schedule--FebruaryFebruary--June 2009June 2009–– Project ResponsibilityProject Responsibility--Field surveys and assistance with Field surveys and assistance with

Architectural Design Architectural Design –– Design Team RoleDesign Team Role--SubSub--Consultant Architect Consultant Architect

Page 12: CKG Architects Porfolio

1212

OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT

PRWT Services, Inc. PRWT Services, Inc. -- Interior Office RenovationsInterior Office Renovations–– Construction Value = $275,000.00Construction Value = $275,000.00–– CKG Design Fee=$35,000.00CKG Design Fee=$35,000.00–– Design ScheduleDesign Schedule--JulyJuly--October 2007October 2007–– Project ResponsibilityProject Responsibility--Architectural Design for a 4500 square foot Architectural Design for a 4500 square foot

interior office and Elevator Lobby renovationinterior office and Elevator Lobby renovation–– Design Team RoleDesign Team Role--PrimePrime ArchitectArchitect

Page 13: CKG Architects Porfolio

1313

OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT

Renovations to Philadelphia City Hall Room 153Renovations to Philadelphia City Hall Room 153–– Construction Value = $1.1 millionConstruction Value = $1.1 million–– CKG Design Fee=$38,000.00CKG Design Fee=$38,000.00–– Design ScheduleDesign Schedule--November 2007 JuneNovember 2007 June--20092009–– Project ResponsibilityProject Responsibility--Construction documents for a 5600 square Construction documents for a 5600 square

foot interior renovation foot interior renovation –– Design Team RoleDesign Team Role--SoleSole ArchitectArchitect

Page 14: CKG Architects Porfolio

1414

OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT

BristolBristol--MeyersMeyers--Squibb Central Monitoring RoomSquibb Central Monitoring Room–– Construction Value = $650,000.00Construction Value = $650,000.00–– CKG Design Fee=$30,000.00CKG Design Fee=$30,000.00–– Design ScheduleDesign Schedule--AugustAugust--December 2008December 2008–– Project ResponsibilityProject Responsibility--Construction documents for a 1100 square Construction documents for a 1100 square

foot Security Monitoring room in an existing buildingfoot Security Monitoring room in an existing building–– Design Team RoleDesign Team Role--Sole ArchitectSole Architect

No Photos or Drawings Allowed due to Security Guidelines by the No Photos or Drawings Allowed due to Security Guidelines by the OwnerOwner

Page 15: CKG Architects Porfolio

1515

OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT

Oxford Valley Mall Toilet Room Oxford Valley Mall Toilet Room –– Construction Value = $200,000.00Construction Value = $200,000.00–– CKG Design Fee=$12,500.00CKG Design Fee=$12,500.00–– Design ScheduleDesign Schedule--AugustAugust--December 2008December 2008–– Project ResponsibilityProject Responsibility--Construction documents for designing new Construction documents for designing new

Floor, Wall and Ceiling finishes in four public restroomsFloor, Wall and Ceiling finishes in four public restrooms–– Design Team RoleDesign Team Role--PrimePrime ArchitectArchitect

Page 16: CKG Architects Porfolio

1616

OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT

Dr. Warren E. Smith Health Centers Dr. Warren E. Smith Health Centers -- 25142514--18 N. Broad 18 N. Broad StrStr..–– Construction Value = $1.3 millionConstruction Value = $1.3 million–– CKG Design Fee=$45,500.00CKG Design Fee=$45,500.00–– Design ScheduleDesign Schedule--JanuaryJanuary--September 2006September 2006–– Project ResponsibilityProject Responsibility--Construction documents for a 1400 square Construction documents for a 1400 square

foot Behavioral Health Clinicfoot Behavioral Health Clinic–– Design Team RoleDesign Team Role--Prime Architect Prime Architect

Page 17: CKG Architects Porfolio

1717

OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT

HaddingtonHaddington Progress PlazaProgress Plaza–– Construction Value = $275,000.00Construction Value = $275,000.00–– CKG Design Fee=$22,500.00CKG Design Fee=$22,500.00–– Design ScheduleDesign Schedule--July 2004July 2004--November 2005November 2005–– Project ResponsibilityProject Responsibility--Construction documents for refurbishing an Construction documents for refurbishing an

existing shopping centerexisting shopping center–– Design Team RoleDesign Team Role--Prime Architect Prime Architect

Page 18: CKG Architects Porfolio

1818

OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT

2121stst Century Office Interior Century Office Interior FitoutFitout ProjectProject–– Construction Value = $780,000.00Construction Value = $780,000.00–– CKG Design Fee=$35,500.00CKG Design Fee=$35,500.00–– Design ScheduleDesign Schedule--JanuaryJanuary--May 2002May 2002–– Project ResponsibilityProject Responsibility--Construction documents for the Interior Construction documents for the Interior

design of a new 8500 square foot tenant spacedesign of a new 8500 square foot tenant space–– Design Team RoleDesign Team Role--PrimePrime Architect Architect

Page 19: CKG Architects Porfolio

1919

SPORTS and ENTERTAINMENTSPORTS and ENTERTAINMENT

New Meadowlands Stadium, East Rutherford, NJNew Meadowlands Stadium, East Rutherford, NJ–– Construction Value = $850 millionConstruction Value = $850 million–– CKG Design Fee=$162,000.00CKG Design Fee=$162,000.00–– Design ScheduleDesign Schedule--April 2007April 2007--December 2009December 2009–– Project ResponsibilityProject Responsibility--Exterior wall components and partial Exterior wall components and partial

interior workinterior work–– Design Team RoleDesign Team Role--SubSub--Consultant Architect Consultant Architect

Page 20: CKG Architects Porfolio

2020

SPORTS and ENTERTAINMENTSPORTS and ENTERTAINMENT

FoxwoodsFoxwoods Casino, Philadelphia, PACasino, Philadelphia, PA–– Construction Value = $275 millionConstruction Value = $275 million–– CKG Design Fee=$275,000.00CKG Design Fee=$275,000.00–– Design ScheduleDesign Schedule--March 2007March 2007--June 2008June 2008–– Project ResponsibilityProject Responsibility--Interior Rest Room Finishes, Stair Well Interior Rest Room Finishes, Stair Well

layouts, Loading Dock design. layouts, Loading Dock design. –– Design Team RoleDesign Team Role--SubSub--Consultant Architect Consultant Architect

Page 21: CKG Architects Porfolio

2121

SPORTS and ENTERTAINMENTSPORTS and ENTERTAINMENT

–– Example of CKG Work on Example of CKG Work on FoxwoodsFoxwoods

Roof Core & Shell Column Enclosure Details

Page 22: CKG Architects Porfolio

2222

SPORTS and ENTERTAINMENTSPORTS and ENTERTAINMENT

Citizens Bank Park, Philadelphia, PACitizens Bank Park, Philadelphia, PA–– Construction Value = $335 millionConstruction Value = $335 million–– CKG Design Fee=$390,000.00CKG Design Fee=$390,000.00–– Design ScheduleDesign Schedule--April 2000April 2000--June 2001June 2001–– Project ResponsibilityProject Responsibility--Interior Design support of Interior Design support of PhilliesPhillies

Administrative Offices, Concourse and Luxury SuitesAdministrative Offices, Concourse and Luxury Suites–– Design Team RoleDesign Team Role--SubSub--Consultant Architect Consultant Architect

Page 23: CKG Architects Porfolio

2323

SPORTS and ENTERTAINMENTSPORTS and ENTERTAINMENT

Citizens Bank Park, Philadelphia, PACitizens Bank Park, Philadelphia, PA–– Example of CKG Work on Citizens Bank ParkExample of CKG Work on Citizens Bank Park

Luxury Box MockLuxury Box Mock--UpsUpsCeiling Ceiling Luxury Box Luxury Box FinishesFinishes FinishesFinishesMockMock--UpsUps

Page 24: CKG Architects Porfolio

2424

MASS TRANSITMASS TRANSIT

SEPTA: MargaretSEPTA: Margaret--Orthodox Station RenovationsOrthodox Station Renovations–– Construction Value = $20 millionConstruction Value = $20 million–– CKG Design Fee=$250,000.00CKG Design Fee=$250,000.00–– Design ScheduleDesign Schedule--August 2008August 2008--March 2010March 2010–– Project ResponsibilityProject Responsibility--Full Mass Transit Station Renovation Full Mass Transit Station Renovation

including ADA upgrades. including ADA upgrades. –– Design Team RoleDesign Team Role--Sole Architect Sole Architect

Page 25: CKG Architects Porfolio

2525

MASS TRANSITMASS TRANSIT

SEPTA: SEPTA: BerridgeBerridge--Wyoming Roof ReplacementWyoming Roof Replacement–– Construction Value = $10 millionConstruction Value = $10 million–– CKG Design Fee=$130,000.00CKG Design Fee=$130,000.00–– Design ScheduleDesign Schedule--August 2009August 2009--May 2010May 2010–– Project ResponsibilityProject Responsibility--Construction Documents for a 100,000+ Construction Documents for a 100,000+

Square Foot Full Roof Replacement. Square Foot Full Roof Replacement. –– Design Team RoleDesign Team Role--Sole Architect Sole Architect

Page 26: CKG Architects Porfolio

2626

MASS TRANSITMASS TRANSIT

SEPTA: Smart Stations Phase 1SEPTA: Smart Stations Phase 1–– Construction Value = $25 millionConstruction Value = $25 million–– CKG Design Fee=$569,000.00CKG Design Fee=$569,000.00–– Design ScheduleDesign Schedule--September 2004September 2004--March 2006March 2006–– Project ResponsibilityProject Responsibility--Construction Documents for 21 Mass Construction Documents for 21 Mass

Transit Smart Station RenovationsTransit Smart Station Renovations–– Design Team RoleDesign Team Role--Sole Architect Sole Architect

Page 27: CKG Architects Porfolio

2727

MASS TRANSITMASS TRANSIT

SEPTA: Smart Stations Phase 2SEPTA: Smart Stations Phase 2–– Construction Value = $36 millionConstruction Value = $36 million–– CKG Design Fee=$890,000.00CKG Design Fee=$890,000.00–– Design ScheduleDesign Schedule--June 2006June 2006--December 2007December 2007–– Project ResponsibilityProject Responsibility--Construction Documents for 36 Mass Construction Documents for 36 Mass

Transit Smart Station RenovationsTransit Smart Station Renovations–– Design Team RoleDesign Team Role--Sole Architect Sole Architect

Page 28: CKG Architects Porfolio

2828

MASS TRANSITMASS TRANSIT

SEPTA: 69SEPTA: 69thth Street Station Motor Shop Window Street Station Motor Shop Window ReplacementsReplacements–– Construction Value = $500,000.00Construction Value = $500,000.00–– CKG Design Fee=$31,000.00CKG Design Fee=$31,000.00–– Design ScheduleDesign Schedule--JanuaryJanuary--May 2009May 2009–– Project ResponsibilityProject Responsibility--Construction Documents for the Construction Documents for the

Replacement of Windows for a Motor Shop BuildingReplacement of Windows for a Motor Shop Building–– Design Team RoleDesign Team Role--SoleSole ArchitectArchitect

Page 29: CKG Architects Porfolio

2929

MASS TRANSITMASS TRANSIT

SEPTA: Midvale Yard Site ImprovementsSEPTA: Midvale Yard Site Improvements–– Construction Value = $45 millionConstruction Value = $45 million–– CKG Design Fee=$40,000.00CKG Design Fee=$40,000.00–– Design ScheduleDesign Schedule--OctoberOctober--January 2009January 2009–– Project DescriptionProject Description--Schematic Design Documents for a 46,000 Schematic Design Documents for a 46,000

and 105,000 square foot Maintenance and Storage Facility and 105,000 square foot Maintenance and Storage Facility buildingsbuildings

–– Design Team RoleDesign Team Role--SoleSole Architect Architect

Page 30: CKG Architects Porfolio

3030

MASS TRANSITMASS TRANSIT

PATCO: WalnutPATCO: Walnut--Locust Stations Interior RenovationsLocust Stations Interior Renovations–– Construction Value = $450,000.00Construction Value = $450,000.00–– CKG Design Fee=$35,000.00CKG Design Fee=$35,000.00–– Design ScheduleDesign Schedule--September 1996September 1996--March 1997March 1997–– Project ResponsibilityProject Responsibility--Construction Administration services for the Construction Administration services for the

Platform Floor, Wall & Ceiling Finishes and Railing installationPlatform Floor, Wall & Ceiling Finishes and Railing installation–– Design Team RoleDesign Team Role--SoleSole Architect Architect

Page 31: CKG Architects Porfolio

3131

MASS TRANSITMASS TRANSIT

SEPTA: YorkSEPTA: York--DauphinDauphin--Tioga & Somerset Station RenovationsTioga & Somerset Station Renovations–– Construction Value = $25 millionConstruction Value = $25 million–– CKG Design Fee=$225,000.00CKG Design Fee=$225,000.00–– Design ScheduleDesign Schedule--June 1993June 1993--January 1995January 1995–– Project ResponsibilityProject Responsibility--Construction Administration services for Construction Administration services for

three Mass Transit Station Renovations including ADA upgrades. three Mass Transit Station Renovations including ADA upgrades. –– Design Team RoleDesign Team Role--SoleSole ArchitectArchitect

Page 32: CKG Architects Porfolio

3232

RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY

5135 Judson Drive 5135 Judson Drive –– Construction Value = $75,000.00Construction Value = $75,000.00–– CKG Design Fee=$6,000.00CKG Design Fee=$6,000.00–– Design ScheduleDesign Schedule--JulyJuly--December 2009December 2009–– Project ResponsibilityProject Responsibility--Zoning and construction documentation for Zoning and construction documentation for

adding 800 square feet with existing interior renovations to anadding 800 square feet with existing interior renovations to anexisting single family home existing single family home

–– Design Team RoleDesign Team Role--PrimePrime Architect Architect

Page 33: CKG Architects Porfolio

3333

RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY

Manor Heights Housing ComplexManor Heights Housing Complex–– Construction Value = $8,000,000.00Construction Value = $8,000,000.00–– CKG Design Fee=$55,000.00CKG Design Fee=$55,000.00–– Design ScheduleDesign Schedule--December 2005December 2005--July 2006July 2006–– Project ResponsibilityProject Responsibility--Construction Administration servicesConstruction Administration services–– Design Team RoleDesign Team Role--SubSub--Consultant Architect Consultant Architect

Page 34: CKG Architects Porfolio

3434

RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY

Philadelphia Housing Authority Philadelphia Housing Authority --Blumberg ApartmentsBlumberg Apartments–– Construction Value = $675,000.00Construction Value = $675,000.00–– CKG Design Fee=$25,000.00CKG Design Fee=$25,000.00–– Design ScheduleDesign Schedule--OctoberOctober--December 2006December 2006–– Project ResponsibilityProject Responsibility--Schematic documentation and cost Schematic documentation and cost

estimate for replacing three existing Guard Booths with one estimate for replacing three existing Guard Booths with one central Guard Boothcentral Guard Booth

–– Design Team RoleDesign Team Role--SoleSole Architect Architect

Page 35: CKG Architects Porfolio

3535

RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY

12211221--23 23 ShackamaxonShackamaxon CourtCourt–– Construction Value = $875,000.00Construction Value = $875,000.00–– CKG Design Fee=$35,000.00CKG Design Fee=$35,000.00–– Design ScheduleDesign Schedule--January 2005January 2005--December 2006December 2006–– Project ResponsibilityProject Responsibility--Zoning and construction documentation for Zoning and construction documentation for

six six townhometownhome style condominiumsstyle condominiums–– Design Team RoleDesign Team Role--PrimePrime Architect Architect

Page 36: CKG Architects Porfolio

3636

RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY

Trenton Housing Authority Trenton Housing Authority --Scattered Renovations to 39 Scattered Renovations to 39 UnitsUnits–– Construction Value = $560,000.00Construction Value = $560,000.00–– CKG Design Fee=$51,000.00CKG Design Fee=$51,000.00–– Design ScheduleDesign Schedule--September 2004September 2004--May 2005May 2005–– Project ResponsibilityProject Responsibility--Construction documentation for renovating Construction documentation for renovating

the kitchens, bathrooms and living spaces for 39 unitsthe kitchens, bathrooms and living spaces for 39 units–– Design Team RoleDesign Team Role--PrimePrime Architect Architect

Page 37: CKG Architects Porfolio

3737

RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY

Philadelphia Housing Authority Philadelphia Housing Authority --WestparkWestpark ApartmentsApartments–– Construction Value = $1.2 millionConstruction Value = $1.2 million–– CKG Design Fee=$55,000.00CKG Design Fee=$55,000.00–– Design ScheduleDesign Schedule--August 2004August 2004--February 2005February 2005–– Project ResponsibilityProject Responsibility--Schematic documentation and cost Schematic documentation and cost

estimate for renovating three entry area Elevator Lobbiesestimate for renovating three entry area Elevator Lobbies–– Design Team RoleDesign Team Role--SoleSole Architect Architect

Page 38: CKG Architects Porfolio

3838

RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY

Trenton Housing Authority Trenton Housing Authority --Campus Utility StudyCampus Utility Study–– Construction Value = $750,000.00Construction Value = $750,000.00–– CKG Design Fee=$28,000.00CKG Design Fee=$28,000.00–– Design ScheduleDesign Schedule--May 2004May 2004--September 2004September 2004–– Project ResponsibilityProject Responsibility--Coordination for a report of the existing Coordination for a report of the existing

utility distribution for a Public Housing Complexutility distribution for a Public Housing Complex–– Design Team RoleDesign Team Role--PrimePrime ArchitectArchitect

Page 39: CKG Architects Porfolio

3939

RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY

13021302--12 West Cumberland Street12 West Cumberland Street–– Construction Value = $850,000.00Construction Value = $850,000.00–– CKG Design Fee=$40,000.00CKG Design Fee=$40,000.00–– Design ScheduleDesign Schedule--January 2004January 2004--September 2004September 2004–– Project ResponsibilityProject Responsibility--Zoning and construction documentation for Zoning and construction documentation for

renovating an existing warehouse into 17 condominium unitsrenovating an existing warehouse into 17 condominium units–– Design Team RoleDesign Team Role--PrimePrime Architect Architect

Page 40: CKG Architects Porfolio

4040

RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY

Philadelphia Housing Authority Philadelphia Housing Authority --Germantown House Germantown House ApartmentsApartments–– Construction Value = $13 millionConstruction Value = $13 million–– CKG Design Fee=$56,000.00CKG Design Fee=$56,000.00–– Design ScheduleDesign Schedule--AprilApril--August 2003August 2003–– Project ResponsibilityProject Responsibility--Schematic documentation and cost Schematic documentation and cost

estimate for upgrading 240 studio units into 141 ADA compliant estimate for upgrading 240 studio units into 141 ADA compliant unitsunits

–– Design Team RoleDesign Team Role--SoleSole Architect Architect

Page 41: CKG Architects Porfolio

4141

RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY

University of PennsylvaniaUniversity of Pennsylvania--Kings Court ApartmentsKings Court Apartments–– Construction Value = $275,000.00Construction Value = $275,000.00–– CKG Design Fee=$25,000.00CKG Design Fee=$25,000.00–– Design ScheduleDesign Schedule--MayMay--September 2002September 2002–– Project ResponsibilityProject Responsibility--Construction documentation for the Construction documentation for the

renovation of a one bedroom apartmentrenovation of a one bedroom apartment–– Design Team RoleDesign Team Role--SoleSole Architect Architect

Page 42: CKG Architects Porfolio

4242

RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY

Neighborhood Transformation Initiative (NTI), Philadelphia, Neighborhood Transformation Initiative (NTI), Philadelphia, PAPA–– Construction Value = $125 millionConstruction Value = $125 million–– CKG Design Fee=$225,000.00CKG Design Fee=$225,000.00–– Design ScheduleDesign Schedule--August 2001August 2001--November 2005November 2005–– Project ResponsibilityProject Responsibility--OnOn--Call Architect for supporting General Call Architect for supporting General

Contractor in the field demolition and clearing of vacant Contractor in the field demolition and clearing of vacant propertiesproperties

–– Design Team RoleDesign Team Role--SubSub--ConsultantConsultant Architect Architect

Page 43: CKG Architects Porfolio

4343

EDUCATIONAL/INSTITUTIONAL/DAYCAREEDUCATIONAL/INSTITUTIONAL/DAYCARE

Pennsylvania Hospital OnPennsylvania Hospital On--Call Services Call Services –– Construction Value = $275,000.00Construction Value = $275,000.00–– CKG Design Fee=$25,000.00CKG Design Fee=$25,000.00–– Design ScheduleDesign Schedule--MayMay--September 2002September 2002–– Project ResponsibilityProject Responsibility--Maintain base plans for all buildings on the Maintain base plans for all buildings on the

Hospital CampusHospital Campus–– Design Team RoleDesign Team Role--SubSub--Consultant Architect Consultant Architect

Page 44: CKG Architects Porfolio

4444

EDUCATIONAL/INSTITUTIONAL/DAYCAREEDUCATIONAL/INSTITUTIONAL/DAYCARE

AfricanAfrican--American MuseumAmerican Museum–– Construction Value = $750,000.00Construction Value = $750,000.00–– CKG Design Fee=$45,000.00CKG Design Fee=$45,000.00–– Design ScheduleDesign Schedule--November 2009November 2009--May 2010May 2010–– Project ResponsibilityProject Responsibility--Construction documentation for a full Construction documentation for a full

Museum RenovationMuseum Renovation–– Design Team RoleDesign Team Role--SoleSole Architect Architect

Page 45: CKG Architects Porfolio

4545

EDUCATIONAL/INSTITUTIONAL/DAYCAREEDUCATIONAL/INSTITUTIONAL/DAYCARE

Temple University BioTemple University Bio--Life Sciences LibraryLife Sciences Library–– Construction Value = $450,000.00Construction Value = $450,000.00–– CKG Design Fee=$25,000.00CKG Design Fee=$25,000.00–– Design ScheduleDesign Schedule--August 2005August 2005--January 2006January 2006–– Project ResponsibilityProject Responsibility--Construction documentation for full reConstruction documentation for full re--

design of a Main Entry Lobby design of a Main Entry Lobby –– Design Team RoleDesign Team Role--PrimePrime Architect Architect

Page 46: CKG Architects Porfolio

4646

EDUCATIONAL/INSTITUTIONAL/DAYCAREEDUCATIONAL/INSTITUTIONAL/DAYCARE

West Grove Daycare CenterWest Grove Daycare Center–– Construction Value = $385,000.00Construction Value = $385,000.00–– CKG Design Fee=$25,000.00CKG Design Fee=$25,000.00–– Design ScheduleDesign Schedule--JanuaryJanuary--July 2006July 2006–– Project ResponsibilityProject Responsibility--Construction documentation for renovation of a Construction documentation for renovation of a

Church into a Daycare CenterChurch into a Daycare Center–– Design Team RoleDesign Team Role--PrimePrime Architect Architect

Page 47: CKG Architects Porfolio

4747

EDUCATIONAL/INSTITUTIONAL/DAYCAREEDUCATIONAL/INSTITUTIONAL/DAYCARE

Philadelphia School District Buildings Assessment StudyPhiladelphia School District Buildings Assessment Study–– Construction Value = $94 millionConstruction Value = $94 million–– CKG Design Fee=$97,000.00CKG Design Fee=$97,000.00–– Design ScheduleDesign Schedule--JanuaryJanuary--November 2004November 2004–– Project ResponsibilityProject Responsibility-- Participated in the general construction Participated in the general construction

assessment for all City of Philadelphia Public Schoolsassessment for all City of Philadelphia Public Schools–– Design Team RoleDesign Team Role--SubSub--ConsultantConsultant Architect Architect

Page 48: CKG Architects Porfolio

4848

EDUCATIONAL/INSTITUTIONAL/DAYCAREEDUCATIONAL/INSTITUTIONAL/DAYCARE

Philadelphia School District Renaissance Charter SchoolPhiladelphia School District Renaissance Charter School–– Construction Value = $1.5 millionConstruction Value = $1.5 million–– CKG Design Fee=$65,000.00CKG Design Fee=$65,000.00–– Design ScheduleDesign Schedule--MarchMarch--September 2002September 2002–– Project ResponsibilityProject Responsibility--Construction Documents for an interior Construction Documents for an interior

fitoutfitout of converting for a private Charter Schoolof converting for a private Charter School–– Design Team RoleDesign Team Role--PrimePrime Architect Architect

Page 49: CKG Architects Porfolio

4949

Religious InstitutionsReligious Institutions

Williams Temple CME ChurchWilliams Temple CME Church–– Construction Value = $2 millionConstruction Value = $2 million–– CKG Design Fee=$120,000.00CKG Design Fee=$120,000.00–– Design ScheduleDesign Schedule--MayMay--AugustAugust--20102010–– Project ResponsibilityProject Responsibility--Architectural Design for a new 12,500 Architectural Design for a new 12,500

square foot Church with a Worship Space, Offices, Meeting square foot Church with a Worship Space, Offices, Meeting Room, and Classrooms all meeting current ADA guidelines.Room, and Classrooms all meeting current ADA guidelines.

–– Design Team RoleDesign Team Role--PrimePrime Architect Architect

Page 50: CKG Architects Porfolio

5050

Religious InstitutionsReligious Institutions

Zion Baptist ChurchZion Baptist Church–– Construction Value = $155,000.00Construction Value = $155,000.00–– CKG Design Fee=$22,000.00CKG Design Fee=$22,000.00–– Design ScheduleDesign Schedule--MayMay--AugustAugust--20092009–– Project ResponsibilityProject Responsibility--Architectural Design for a 5000 square foot Architectural Design for a 5000 square foot

Roof Renovation.Roof Renovation.–– Design Team RoleDesign Team Role--PrimePrime Architect Architect

Page 51: CKG Architects Porfolio

5151

Religious InstitutionsReligious Institutions

Mt. Airy Presbyterian ChurchMt. Airy Presbyterian Church–– Construction Value = $40,000.00Construction Value = $40,000.00–– CKG Design Fee=$10,000.00CKG Design Fee=$10,000.00–– Design ScheduleDesign Schedule--OctoberOctober--NovemberNovember--20092009–– Project ResponsibilityProject Responsibility--Architectural Design for the replacement Architectural Design for the replacement

of an existing railing on an ADA compliant Ramp. of an existing railing on an ADA compliant Ramp. –– Design Team RoleDesign Team Role--PrimePrime Architect Architect

Page 52: CKG Architects Porfolio

5252

Religious InstitutionsReligious Institutions

Mt. Calvary ChurchMt. Calvary Church–– Construction Value = $150,000.00Construction Value = $150,000.00–– CKG Design Fee=$20,000.00CKG Design Fee=$20,000.00–– Design ScheduleDesign Schedule--FebruaryFebruary--JuneJune--20082008–– Project ResponsibilityProject Responsibility--Architectural Design for the replacement Architectural Design for the replacement

of an existing railing on an ADA compliant Ramp. of an existing railing on an ADA compliant Ramp. –– Design Team RoleDesign Team Role--PrimePrime Architect Architect

Page 53: CKG Architects Porfolio

5353

Religious InstitutionsReligious Institutions

Buddhist Temple Buddhist Temple –– Construction Value = $750,000.00Construction Value = $750,000.00–– CKG Design Fee=$41,000.00CKG Design Fee=$41,000.00–– Design ScheduleDesign Schedule--NovemberNovember--20052005--AugustAugust--20062006–– Project ResponsibilityProject Responsibility--Architectural Design for the renovation of Architectural Design for the renovation of

an existing Church into a Buddhist Temple.an existing Church into a Buddhist Temple.–– Design Team RoleDesign Team Role--PrimePrime Architect Architect

Page 54: CKG Architects Porfolio

5454

Religious InstitutionsReligious Institutions

Hope Church Christian School Hope Church Christian School –– Construction Value = $50,000.00Construction Value = $50,000.00–– CKG Design Fee=$27,000.00CKG Design Fee=$27,000.00–– Design ScheduleDesign Schedule--NovemberNovember--20042004--SeptemberSeptember--20052005–– Project ResponsibilityProject Responsibility--Architectural Report for the legalization of Architectural Report for the legalization of

the School Certificate of Occupancy.the School Certificate of Occupancy.–– Design Team RoleDesign Team Role--PrimePrime Architect Architect

Page 55: CKG Architects Porfolio

5555

Religious InstitutionsReligious Institutions

Zion Baptist Church Bell Tower Renovation Zion Baptist Church Bell Tower Renovation –– Construction Value = $60,000.00Construction Value = $60,000.00–– CKG Design Fee=$8,000.00CKG Design Fee=$8,000.00–– Design ScheduleDesign Schedule--NovemberNovember--20092009--FebrauryFebraury--20102010–– Project ResponsibilityProject Responsibility--Architectural Report and Design for the Architectural Report and Design for the

stabilization of roof top Stone Bell Tower.stabilization of roof top Stone Bell Tower.–– Design Team RoleDesign Team Role--PrimePrime Architect Architect

Page 56: CKG Architects Porfolio

5656

CKG HAS TEAMED WITH THE CKG HAS TEAMED WITH THE FOLLOWING FIRMSFOLLOWING FIRMS

Ewing ColeEwing Cole–– Citizens Bank ParkCitizens Bank Park–– FoxwoodsFoxwoods CasinoCasino–– New York Giants StadiumNew York Giants Stadium

Gillian & HartmannGillian & Hartmann–– Room 153 City HallRoom 153 City Hall–– PhilaPhila. Prison Multi. Prison Multi--Purpose CenterPurpose Center–– PhilaPhila. Prison Mezzanine . Prison Mezzanine

CSA GroupCSA Group–– AMTRAK Coatesville StationAMTRAK Coatesville Station–– SEPTA YorkSEPTA York--Dauphin, Tioga & Dauphin, Tioga &

Somerset Stations Somerset Stations –– Philadelphia Housing Authority; Philadelphia Housing Authority;

Germantown HouseGermantown HouseBlumberg ApartmentsBlumberg ApartmentsWest Park ApartmentsWest Park Apartments

–– Trenton Housing Authority;Trenton Housing Authority;39 Scattered Units39 Scattered UnitsUtility StudyUtility Study

Hill InternationalHill International–– Neighborhood Transformation Neighborhood Transformation

Initiative Initiative

Maida EngineersMaida Engineers–– BristolBristol--MeyersMeyers--Squibb;Squibb;

Central Monitoring RoomCentral Monitoring RoomComputer Entry Computer Entry

Parsons Transportation GroupParsons Transportation Group–– SEPTA Phase 1 & 2 ProjectsSEPTA Phase 1 & 2 Projects–– SEPTA MargaretSEPTA Margaret--Orthodox StationOrthodox Station

The The IngermannIngermann GroupGroup–– Manor Heights ProjectManor Heights Project

The Burns GroupThe Burns Group–– Midvale Midvale –– 6969thth Street Motor Shop Street Motor Shop –– BerridgeBerridge Roof Roof

L. Robert Kimball & AssociatesL. Robert Kimball & Associates–– Williamsport Readiness Center Williamsport Readiness Center

NTH Consultants GroupNTH Consultants Group–– Nine (9) Firehouse & Police Roof Nine (9) Firehouse & Police Roof

Renovations Renovations Highland AssociatesHighland Associates

–– Philadelphia School DistrictPhiladelphia School District--Field Field Survey of existing BuildingsSurvey of existing Buildings

Page 57: CKG Architects Porfolio

5757

MEASURE of SUCCESSMEASURE of SUCCESS

CKG Architects measures its success by:CKG Architects measures its success by:

–– RecurringRecurring alliances it has established alliances it has established with reputable Engineering firms and with reputable Engineering firms and Architectural firmsArchitectural firms

–– RepeatRepeat businessbusiness–– ReferralsReferrals

Page 58: CKG Architects Porfolio

5858

THANK YOUTHANK YOU

CKG ARCHITECTSCKG ARCHITECTS5443 Germantown Avenue5443 Germantown AvenueFirst FloorFirst FloorPhiladelphia, PA 19144Philadelphia, PA 19144--22152215215215--844844--5191 (ph) 5191 (ph) 215215--844844--5196 (fax)5196 (fax)[email protected]@aol.com (email)(email)