civic + government brochure

Upload: jeremyloeb

Post on 06-Jul-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/17/2019 Civic + Government Brochure

    1/18

    CIV IC + GOVE RNMENTF IRM INTRODUCTION

  • 8/17/2019 Civic + Government Brochure

    2/18

    s a c r a m e n t o |   l o s a n g e l e s |   b a y a r e a |   r e n o e n g i n e e r i n g e x c e l l e n c e & e x c e p t i o n a l s e r v i c e » s i n c e 1 9 47  

    Company Overview

    PROFESSIONAL EXPERIENCE AND SERVICES

    Capital offers a diverse practice, while remaining client-focused and market-driven. We foster long-term client relationships by providing personal service with deep market expertise delivered with

    passion in a collaborative and integrated approach. Our expertise includes the following services: » Mechanical Engineering

     » Plumbing Engineering

     » Fire Sprinkler Design

     » Foodservice Consulting and Design

     » Facility Standards and Master Specifications

     » Sustainable Design and Green Engineering

     » Site Utilities and Infrastructure

     » LEED Consulting and Project Management

     » Whole Building Commissioning

     » Energy Modeling and Life-Cycle Cost Analysis

     » Energy Management Control Systems

     » Cogeneration and Renewable Energy

    Capital holds extensive experience in the following primary and specialty markets:

     » K-12 Education

     » Higher Education

     » Science and Technology

     » Healthcare, Acute and Non-Acute » Laboratories, Commercial, and Research

     » Central Plants and Site Distribution

     » Critical Environments

    » Civic and Government

     » Criminal Justice, Detention, and Courthouses

    » Transportation, Maintenance, and Industrial

    » Commercial Office, Administrative, and Retail » Cultural and Historical

     » Housing and Long-Term Care

     » Hospitality

    STAFFING AND RESOURCES

    Capital is structured in teams that focus on primary market sectors, offering full production capacity and construction administrationsupport, with the ability to draw upon the resources of other teams should the need arise:

     » K-12 Education: led by Mike Minge

     » Higher Education: led by Tom Duval

     » Civic and Justice: led by Anthony Colacchia and Kevin Stillman

     » Science and Technology: led by Steve Myers

     » Healthcare: led by Bryan Johnson and Alberto de Barrena-Sarobe

     » Transpor tation: led by John Lionakis

     » Foodservice Consulting: led by Art Davis

     » Bui lding Optimization: led by Chuck Shinneman

    Capital maintains a staff of 48 including 16 registered professional engineers, 2 certified commissioning authorities, 12 LEED AccreditedProfessionals and several LEED-trained, 2 certified plumbing engineers, 6 field services personnel, technicians and support staff.

    Our cross-market Building Optimization Team provides high performance modeling, sustainability consulting, and whole buildingcommissioning. Capital also offers BIM development and management resources, construction support personnel, and the best-of-classsoftware for drawing production, design and coordination. We offer state of the art video conferencing and visualization capabilities toexpedite communication between project locations and teams within multiple offices.

    INTRODUCTION

    Capital has provided engineering consulting and designservices since 1947, developing into one of the leadingmechanical engineering firms in the western United States.

    We maintain a client base of over 600 architects, contractors,construction managers, and other industry professionals,many stretching back 50 years. The firm has growngeographically with offices serving Sacramento, SanFrancisco, Los Angeles, and Reno.

  • 8/17/2019 Civic + Government Brochure

    3/18

    s a c r a m e n t o |   l o s a n g e l e s |   b a y a r e a |   r e n o e n g i n e e r i n g e x c e l l e n c e & e x c e p t i o n a l s e r v i c e » s i n c e 1 9 47  

    Firm BiographyCivic + Government 

    INTRODUCTION

    Capital has provided professional mechanical engineering services since 1947. For over six decades, Capital has developed strongpartnerships with architects, owners, construction managers, and contractors in the design and construction of civic and government

    projects.

    CIVIC AND GOVERNMENT EXPERIENCE

    Capital has designed mechanical systems for civic buildings of all types, including community centers, libraries, city halls, postalfacilities, public safety buildings such as 911 call centers, police and fire stations, and various transportation facilities. Other projectsin the public arena include city/county/state governmental centers throughout California, military facilities, as well as parks andrecreational facilities.

    STAFF

    Capital maintains a staff of 48 including 16 registered professional engineers, 2 certified commissioning authorities, 12 LEED Accredited

    Professionals and several LEED-trained, 2 certified plumbing engineers, 6 field services personnel, technicians and support staff.

    SERVICES

    Capital offers the following standard and signature services:

     » Mechanical Engineering

     » Plumbing Engineering

     » Fire Sprinkler Design

     » Foodservice Consulting and Design

     » Facility Standards and Master Specifications

     » Sustainable Design and Green Engineering

     » Site Utilities and Infrastructure

     » LEED Consulting and Project Management

     » Whole Building Commissioning

     » Energy Modeling and Life-Cycle Cost Analysis

     » Energy Management Control Systems

     » Cogeneration and Renewable Energy Solutions

    MEMBERSHIPS AND PROFESSIONAL AFFILIATIONS

    Our staff is active on various boards, commissions and committees, including:» American Consulting

    Engineers Council

     » American Society of Heating,Refrigerating and Air-Conditioning Engineers

     » American Society ofPlumbing Engineers

     » Associated Air Balance Council:Building Commissioning

     » Association of Energy Engineers

     » Building Seismic Safety Council

     » California Building StandardsCommission: HealthFacilities Code Advisory

     » California Office of StatewideHealth Planning and Development:Hospital Building Safety Board

     » Coalition for AdequateSchool Housing

     » Construction Specifications Institute

     » Consulting Engineers and LandSurveyors of California

     » Division of the StateArchitect Advisory Board

     » National Institute ofBuilding Sciences

     » State of California FieldAct Advisory Board

     » State of California SeismicSafety Commission

     » The Collaborative for HighPerformance Schools

     » U.S. Green Building Council

    Placer Co. Planning Services Building, Auburn Capitol East End Complex, Sacramento State Capitol, Sacramento

  • 8/17/2019 Civic + Government Brochure

    4/18

    s a c r a m e n t o |   l o s a n g e l e s |   b a y a r e a |   r e n o e n g i n e e r i n g e x c e l l e n c e & e x c e p t i o n a l s e r v i c e » s i n c e 1 9 47  

    Project ListCivic + Government 

    REPRESENTATIVE PROJECT EXPERIENCE

    Capital has provided professional engineering consulting services throughoutCalifornia and Northern Nevada since 1947. Over the past 6 decades, Capital hasdeveloped strong relationships with architects, owners, construction managers,and contractors involved in the design and construction of civic and governmentfacilities.

     » American Canyon Library,American Canyon

     » California Department of Foodand Agriculture, Sacramento

     » California Department of Transportation, Redding, San Jose,and Susanville

     » California Highway Patrol,Sacramento

     » California State Office Building 8and 9, Sacramento

     » CalPERS Headquarters Complex,Sacramento

     » CalPERS Lincoln Plaza North,Sacramento

     » City of Coalinga Police andAdministration Building

     » City of Davis City Hall

     » City of Livermore City Hall

     » City of Ridgecrest MunicipalCenter

     » City of Sacramento 911 Call Center » City of Sacramento City Hall

     » City of Walnut Creek City Hall

     » City of West Sacramento DataCenter

     » Del Norte Airport, Crescent City

     » Department of General Services,Sacramento

     » Department of Motor VehiclesHeadquarters, Sacramento

     » El Dorado Irrigation DistrictHeadquarters, Placerville

     » Folsom City Hall and Community

    Center » Folsom Public Library

     » Franchise Tax Board, Sacramento

     » Jackson Rancheria Public SafetyBuilding, Jackson

     » Placer County CommunityDevelopment Resources Agency,Auburn

     » Presidio of San Francisco

     » Robert T. Matsui FederalCourthouse, Sacramento

     » Sacramento City Hall Building

     » Sacramento Convention CenterMemorial Auditorium

     » Sacramento County 911 CallCenter

     » Sacramento County ForensicScience Lab and Coroners Facility

     » Sacramento County RecorderOffice

    » Sacramento County RegionalWater Resources Control Board

     » Sacramento County Sheriff’sDepartment

     » Sacramento International Airport,Sacramento

     » Sacramento Office of EmergencyServices

     » Sacramento Regional County

    Sanitation District, Auburn » Sacramento Regional Transit

    District

     » Santa Clara County Office ofEducation, San Jose

     » ShasCom-911, Redding

    » Solano County Government,Fairfield

     » Stanislaus County Social ServicesAgency, Modesto

     » State Capitol Building, Sacramento

     » State Compensation InsuranceFund, San Jose

     » State of California Central UtilityPlant, Sacramento

     » Truckee Government Center

     » West Sacramento Main Post OfficeMaintenance Facility

  • 8/17/2019 Civic + Government Brochure

    5/18

    s a c r a m e n t o |   l o s a n g e l e s |   b a y a r e a |   r e n o e n g i n e e r i n g e x c e l l e n c e & e x c e p t i o n a l s e r v i c e » s i n c e 1 9 47  

    Project ListCivic + Government 

    Community Centers

    REPRESENTATIVE PROJECT EXPERIENCE

    Capital has provided professional engineering consulting services throughoutCalifornia and Northern Nevada since 1947. Over the past 6 decades, Capital hasdeveloped strong relationships with architects, owners, construction managers,and contractors involved in the design and construction of community centerfacilities.

     » Adorni Recreation Center, Eureka

     » Cathedral City Civic Center,Cathedral City

     » City of Downey CommunityCenter, Sacramento

     » Claire Graham of Spiritus Center,Sacramento

     » Colusa Indian Community

    Wellness Center, Colusa » Elk Grove Community Center,

    Elk Grove

     » Florin Creek Recreation Center,Sacramento

     » Folsom City Hall MunicipalComplex, Folsom

     » Folsom Community Center,Folsom

     » Groveland Community Center,Groveland

     » Hilltop Family YMCA, Richmond

     » Johnson Community Center,

    Sacramento » Jose P. Rizal Community Center,

    Sacramento

     » Lincoln Community Center,Lincoln

     » Moreland Community Center,San Jose

    » North Central Community Center,Roseville

     » North Coast Premier SoccerComplex, Lodi

     » Presidio of Monterey

     » Ridgecrest Civic Center, Ridgecrest

     » Sacramento Convention Center,Sacramento

     » Samuel Pannell MeadowviewCommunity Center, Sacramento

     » South Lake Tahoe RecreationCenter, South Lake Tahoe

     » South Natomas CommunityCenter, Sacramento

     » Southgate Community Center,Sacramento

     » Southgate Recreation and ParkDistrict, Sacramento

     » The Salvation Army CorpsCommunity Center, Suisun City

    » Town of Danville Town Meeting

    Hall, Danville » Travis Fitness Center, Travis AFB

     » West Contra Costa YMCA,Richmond

     » Whisman Sports Center,Mountain View

  • 8/17/2019 Civic + Government Brochure

    6/18

    s a c r a m e n t o |   l o s a n g e l e s |   b a y a r e a |   r e n o e n g i n e e r i n g e x c e l l e n c e & e x c e p t i o n a l s e r v i c e » s i n c e 1 9 47  

    Project ListCivic + Government 

    Libraries

    REPRESENTATIVE PROJECT EXPERIENCE

    Capital has provided professional engineering consulting services throughoutCalifornia and Northern Nevada since 1947. Over the past 6 decades, Capital hasdeveloped strong relationships with architects, owners, construction managers,and contractors involved in the design and construction of libraries.

     » Alicia Middle School Library,Marysville Joint Unified SchoolDistrict

     » Altimira Middle School LibraryModernization, Sonoma ValleyUnified School District

     » American Canyon Library

     » American River College LibraryExpansion and Remodel, Sacramento

     » Arboga Elementary School Library,Marysville Joint Unified School District

     » Armijo High School Library,Fairfield Suisun Unified SchoolDistrict

     » Arroyo Seco, Rancho LasPositas and Sunset SchoolLibraryAdditions, Livermore ValleyUnified School District

     » Arthur F. Turner Community Library

     » California State University Library,Sacramento

     » Calistoga Elementary SchoolLibrary Modernization, Calistoga

    Joint Unified School District » Castro Valley High School Library,

    Castro Valley Unified School District

     » City of Livermore Public Library

     » City of Roseville Public Library

     » Copperopolis Elementary SchoolLibrary, Mark Twain Union SchoolDistrict

     » Cordova High School Library,Folsom-Cordova Unified SchoolDistrict

     » Cosumnes River College Library,Sacramento

     » Davis High School Library, DavisSchool District

     » Diablo Vista Middle School Library,San Ramon Valley Unified District

     » Dry Creek Elementary Library,Dry Creek Joint Elementary SchoolDistrict

     » Eastside Elementary LibraryBuilding, Eastside Union SchoolDistrict

     » El Dorado High School Library, ElDorado Union High School District

     » El Roble Elementary SchoolLibrary Media Center, ClaremontUnified School District

     » Evergreen Elementary SchoolLibrary Conversion, EvergreenSchool District

     » Fairfield High School Library

    Remodel, Fairfield-Suisun UnifiedSchool District

     » Farmar Elementary Library,Benicia Unified School District

     » Feickert Elementary Library,Elk Grove Unified School District

     » Folsom Public Library

     » Foothill High School Library, Twin Rivers Unified School District

     » Franklin High School Library,Elk Grove Unified School District

     » Fremont High School LibraryMedia Center, Fremont UnionHigh School District

     » Gavilan College Library, Gilroy

     » Gehringer Elementary SchoolLibrary Modification, Oakley UnionElementary School District

     » Gerber Elementary School Library,Gerber Elementary School District

     » Glen View Elementary SchoolLibrary Media Center, GlenviewPublic School District

     » Greenhills Elementary SchoolLibrary, Millbrae School District

     » Guadalupe Elementary SchoolLibrary and Media Center,

    Guadalupe School District » Holmes Elementary School Library

    and Media Center, Rio LindaUnified School District

     » Irvington High School Library,Fremont Unified School District

     » Jackson Ave Elementary SchoolLibrary Modernization, LivermoreValley Joint Unified School District

  • 8/17/2019 Civic + Government Brochure

    7/18

    s a c r a m e n t o |   l o s a n g e l e s |   b a y a r e a |   r e n o e n g i n e e r i n g e x c e l l e n c e & e x c e p t i o n a l s e r v i c e » s i n c e 1 9 47  

    Project ListCivic + Government 

    Libraries

     » James A. McKee Elementary

    School Library Modifications,Elk Grove Unified School District

     » Joe Mitchell School LibraryModernization, Valley JointUnified School District

     » Kaiser Permanente Library, Arden

     » Kings Beach Elementary SchoolLibrary, Tahoe Truckee UnifiedSchool District

     » Latrobe Public Library BuildingAssessment

     » Lincoln High School LibraryAddition, Western Placer UnifiedSchool District

     » Linden High School LibraryConversion, Linden Unified SchoolDistrict

     » Los Altos High School Library,Mountain View-Los Altos UnifiedSchool District

     » Los Gatos High School LibraryRenovation, Los Gatos-SaratogaJoint Union High School District

     » Lynbrook High School Library,Fremont Union High SchoolDistrict

     » Madison Elementary SchoolLibrary Media Center, Rio LindaUnified School District

     » Mesa Verde High School Library,San Juan Unified School District

     » Metropolitan State HospitalLibrary, Norwalk 

     » Mission San Jose ElementarySchool Library Conversion,Mission San Jose ElementarySchool District

     » Monte Vista High School Library,Newport Mesa Unified School District

     » Mountain View High SchoolLibrary, Los Altos Union High

    School District » Natomas High School Library,

    Natomas Unified School District

     » Nevada Union High School LibraryMedia Center, Nevada Joint UnionHigh School District

     » Newman Middle School Library,Newman Unified School District

     » Norwood Creek Library, NorwoodCreek School District

     » Orchard Elementary School

    Library Media Center, OrchardSchool District

     » Oroville High School Library,Oroville Union High School District

     » Ponderosa High School LibraryRemodel, El Dorado Union HighSchool District

     » Portola School LibraryModernization, Portola ValleySchool District

     » Prairie Elementary School Library,Elk Grove Unified School District

     » Rio Linda Elementary SchoolLibrary Conversion, Rio Linda

    Union Elementary School District » Sacramento Public Library, Antelope

     » San Joaquin Delta CollegeGoleman Library, Stockton

     » San Leandro High School LibraryExpansion, San Leandro UnifiedSchool District

     » Scotts Valley High School LibraryAddition, Scotts Valley UnifiedSchool District

     » Sierra College Library Conversion,Rocklin

     » Sierra Elementary School Library

    Additions, Placerville Union SchoolDistrict

     » Solano County Library, Fairfield

     » Solano County Library, Suisun City

     » Sonoma Valley High SchoolLibrary and Media Center, SonomaValley Unified School District

     » St Francis High School LibraryModernization, Diocese of San Jose

    » Susanville Public Library

     » Tracy High School Library, TracyUnified School District

     » White Rock Elementary School

    Library Modifications, FolsomCordova Unified School District

     » Wilson Middle School Library,Santa Clara Unified School District

     » Winters Library Savings By Design

     » Yuba Gardens Elementary SchoolLibrary, Marysville Joint UnifiedSchool District

  • 8/17/2019 Civic + Government Brochure

    8/18

    s a c r a m e n t o |   l o s a n g e l e s |   b a y a r e a |   r e n o e n g i n e e r i n g e x c e l l e n c e & e x c e p t i o n a l s e r v i c e » s i n c e 1 9 47  

    Project ProfileCivic + Government 

    County 

    OWNER

    Placer County

    LOCATION

    Auburn, CA

    ARCHITECT

    Williams + PaddonArchitects + Planners, Inc.

    PROJECT VALUE

    $16,900,000

    PROJECT AREA

    97,400 SF

    COMPLETION DATE

    2005

    SERVICES

    Mechanical Engineering

    Plumbing Engineering

    LEED Documentation

    Savings By Design Program

     Title 24 Energy Analysis

    AWARDS

    2007 Best Civic/InstitutionalProject, McGraw-Hill CaliforniaConstruction Magazine

    2006 Design Award of Merit,AIA Central Valley Chapter

    CERTIFICATION

    LEED for New ConstructionSilver Certification

    PLACER COUNTY COMMUNITY DEVELOPMENT RESOURCE CENTER

     The mechanical design incorporates both direct and indirect evaporative cooling, hot watercoils served by ultra-high efficiency pulse-fire modulating boilers, and advanced controlsystems integrated into the design of both the air handling units and the energy managementsystem to further increase performance of the air conditioning equipment. The majority ofthe building’s office spaces are served via an under floor supply air plenum, which distributesair into the space through high-induction floor diffusers.

    A portion of the floor diffusers are dampered units that modulate airflow based on spacetemperature sensors to allow for greater control and improved occupant comfort. Perimeterzoning is accomplished with underfloor fan-powered terminal boxes that incorporate hotwater reheat coils. The arrangement of the underfloor distribution system promotes thedevelopment of stratification in the occupied space, both increasing ventilation effectivenessfor higher indoor air quality and reducing the effective cooling load on the space, hencedecreasing the required supply airflow.

     The mechanical design exceeded Title 24 efficiency standards in excessive of 44% energysavings, earning the prestigious Savings By Design highest performance building award.

  • 8/17/2019 Civic + Government Brochure

    9/18

    s a c r a m e n t o |   l o s a n g e l e s |   b a y a r e a |   r e n o e n g i n e e r i n g e x c e l l e n c e & e x c e p t i o n a l s e r v i c e » s i n c e 1 9 47  

    Project ProfileCivic + Government 

    County 

    OWNER

    Sacramento RegionalCounty Sanitation District

    LOCATION

    Sacramento, CA

    ARCHITECT

    Williams + PaddonArchitects + Planners, Inc.

    PROJECT VALUE

    $51,000,000

    PROJECT AREA

    179,900 SF (Building)

    522,700 SF (Corporation Yard)

    COMPLETION DATE

    2009

    SERVICES

    Mechanical Engineering

    Plumbing Engineering

    LEED Documentation

    AWARDS

    2011 Design Merit Award,American Institute of Architects

    CERTIFICATION

    LEED for New ConstructionGold Certification

    SACRAMENTO COUNTY OFFICE BUILDING AND CORPORATION YARD

     The new Sacramento Regional County Sanitation Distr ict Administration Center andCorporation Yard is a 2-story, 136,000 SF office building, a 40,000 SF warehouse and shop,a 3,900 SF central utility plant, and a 12-acre corporation yard housing operations andmaintenance personnel, set on approximately 23-acres.

    Energy conservation measures include extensive use of louvered skylights providing 75% ofall occupied spaces with natural daylighting, exterior sunshades, underfloor air distribution,

    high efficiency lighting integrated with daylighting, Cool Roof rated “white roof”, 100 kWphotovoltaics located on the warehouse roof, and energy performance savings greater than28% above California Title 24 baseline.

    Sustainable design concepts include the use of ultra-low flush and flow fixtures, recycledcontent and regional materials, vegetated swales and filtration system for filtering andinfiltrating stormwater runoff onsite, water efficient landscape design, centrally locatedfacility encouraging alternative means of transportation, and preferred parking for low-emission and fuel-efficient vehicles.

  • 8/17/2019 Civic + Government Brochure

    10/18

    s a c r a m e n t o |   l o s a n g e l e s |   b a y a r e a |   r e n o e n g i n e e r i n g e x c e l l e n c e & e x c e p t i o n a l s e r v i c e » s i n c e 1 9 47  

    Project ProfileCivic + Government 

    Federal 

    OWNER

    General Services Administration

    LOCATION

    Sacramento, CA

    ARCHITECTS

    Nacht & Lewis Architects

    HLM Architects

    PROJECT VALUE

    $150,900,000

    PROJECT AREA

    740,521 SF

    COMPLETION DATE

    1999

    SERVICES

    Mechanical Engineering

    Plumbing Engineering

    Fire Suppression Engineering

     Title 24 Energy Analysis

    AWARDS

    SMUD Rebate

    AIA Citation Award

    GSA Design Award

    ROBERT T. MATSUI FEDERAL COURTHOUSE

    Robert T. Matsui Federal Courthouse is a 345 foot tall high rise, with 16 above grade floors,indoor firing range, secure entry into the plaza, courtrooms and supporting spaces, lawlibrary, and detention cells, fitness rooms including an indoor firing range, conference roomsand underground parking for 300 cars.

     The building mechanical system includes 43 floor level air-handling units, 1,700 tons of chi llercapacity, and 20,000 MBH of boiler capacity. Efficiency measures including a 10,000 cfm heat

    recovery system and a plate heat exchanger for cooling tower free cooling were incorporated. The building envelope, lighting, and mechanical systems design were optimized and receivedthe Sacramento Municipal Utility District Board’s approval for $1.2 million dollars in rebatesand financial incentives for energy efficiency design.

  • 8/17/2019 Civic + Government Brochure

    11/18

    s a c r a m e n t o |   l o s a n g e l e s |   b a y a r e a |   r e n o e n g i n e e r i n g e x c e l l e n c e & e x c e p t i o n a l s e r v i c e » s i n c e 1 9 47  

    Project ProfileCivic + Government 

    Indian

    OWNER

    Jackson Rancheria Bandof Miwuk Indians

    LOCATION

    Jackson, CA

    ARCHITECT

    Williams + PaddonArchitects + Planners, Inc.

    PROJECT VALUE

    $7,900,000

    PROJECT AREA

    33,500 SF

    COMPLETION DATE

    2009

    SERVICES

    Mechanical Engineering

    Plumbing Engineering

     Title 24 Energy Analysis

    Fire Suppression Engineering

    LEED Documentation

    Whole Building Commissioning

    CERTIFICATION

    LEED for New ConstructionSilver Certification

    JACKSON RANCHERIA PUBLIC SAFETY BUILDING

     The new Public Safety Building at Jackson Rancheria, is a 33,500 SF, two-s tory buildinghousing the Tribal Police Department, Tribal Fire Department and a Network OperationsCenter. The exterior façade has extensive use of natural stone, stucco, architectural steel,and rough sawn wood elements. Additional features include a two bay fire station, physicalfitness space, administrative offices, and communications center.

     The HVAC design incorporated raised computer access flooring throughout with a pass ive

    underfloor air distribution (UFAD) system and a water cooled split air handler and coolingtower mechanical HVAC system. Cooling is provided by two semi-custom AAON packagedwater-cooled air conditioning units specifically designed for UFAD and displacement systemswith return air bypass section that allows warm return to mix with air off the cooling coilincluding a hot refrigerant gas reheat coil to reheat air should the mixture of return airand cold air be less than the desired supply air temperature. Designed as a mission criticalbuilding, the systems, and infrastructure were designed to ensure uninterrupted service 24hours per day, 365 days a year.

  • 8/17/2019 Civic + Government Brochure

    12/18

    s a c r a m e n t o |   l o s a n g e l e s |   b a y a r e a |   r e n o e n g i n e e r i n g e x c e l l e n c e & e x c e p t i o n a l s e r v i c e » s i n c e 1 9 47  

    Project ProfileCivic + Government 

    State

    OWNER

    State of California

    LOCATION

    Sacramento, CA

    ARCHITECT

    Carey & Co. Inc.

    PROJECT VALUE

    $6,000,000

    PROJECT AREA

    375,000 SF

    COMPLETION DATE

    2014 (Anticipated)

    SERVICES

    Mechanical Engineering

    Plumbing Engineering

    STATE CAPITOL EAST ANNEX FAN ROOM REPLACEMENTS

    With the current infrastructure in need of replacement, Capital was contracted by Carey & Co.,Inc. to provide site investigation engineering, design and focused, in-depth energy efficientstrategies for the State Capitol Building.

    Replacing the fan room equipment sets the stage for future renovation work in the officesoccupied by the senate assembly members as well as the Department Of Finance and theGovernor. Fan room #4 was the prototype fan room setting the stage for future work. The

    project was given a green light with a very short performance window. Design assist was thedelivery method chosen to complete the design, procure the equipment, and complete theinstallation.

     The work was completed with no interruption to the daily operation of the building, thanksto careful planning, working nights and weekends, and the use of temporary heating andcooling systems.

  • 8/17/2019 Civic + Government Brochure

    13/18

    s a c r a m e n t o |   l o s a n g e l e s |   b a y a r e a |   r e n o e n g i n e e r i n g e x c e l l e n c e & e x c e p t i o n a l s e r v i c e » s i n c e 1 9 47  

    Project ProfileCivic + Government 

    State

    OWNER

    State of California

    LOCATION

    Sacramento, CA

    ARCHITECT

    Lionakis

    PROJECT VALUE

    $120,000,000

    PROJECT AREA

    552,991 SF

    COMPLETION DATE

    2012

    SERVICES

    Mechanical Engineering

    Plumbing Engineering

    Central Plant Design

    BIM Integration andModeling (CUP)

    Fire Sprinkler Criteria

    Energy Conservation Retrofit

    Analysis and DesignMaster Development Planning

    LEED Documentation

    Savings By Design Program

    AWARDS

    Central Valley American Instituteof Architects Citation Award

    CERTIFICATIONS

    LEED for New ConstructionSilver Certification

    DEPARTMENT OF MOTOR VEHICLES HEADQUARTERS AND CENTRAL PLANT

     The ambitious, multiphase renovation of DMV’s 552,991 SF Sacramento headquarters ,originally built in 1962, features a new dual-skin building façade, new energy-efficientmechanical systems, LED lighting, the new steam and chilled water stand-alone central plant,and a 475 kW photovoltaic system situated on the building’s roof. Construction on the 25-acrecampus, which serves 3,300 employees, was performed at full building occupancy withoutcompromising work environment functionality.

     The building is s erved by modular factory-packaged air handling units, and VAV air handlerswith single-duct VAV boxes equipped with re-heat coils. Each floor of the building is servedby a dedicated chiller for air conditioning and air quality.

  • 8/17/2019 Civic + Government Brochure

    14/18

    s a c r a m e n t o |   l o s a n g e l e s |   b a y a r e a |   r e n o e n g i n e e r i n g e x c e l l e n c e & e x c e p t i o n a l s e r v i c e » s i n c e 1 9 47  

    Project ProfileCivic + Government 

    State

    OWNER

    State of California

    LOCATION

    Sacramento, CA

    ARCHITECT

    Johnson Fain Partners

    PROJECT VALUE

    $392,000,000

    PROJECT AREA

    1,5000,000 SF

    COMPLETION DATE

    2003

    SERVICES

    Mechanical Engineering

    Plumbing Engineering

    Fire Suppression Engineering

    Preliminary Design

    Bridging Documents

    AWARDS

    2002 Award for BestConstruction and DemolitionDebris Diversion Program,California ResourceRecovery Association

    2002 Best Mixed Use Project,McGraw-Hill CaliforniaConstruction Magazine

    CERTIFICATION

    LEED for New ConstructionGold Certification

    CAPITOL EAST END COMPLEX

     This five building complex, total ing 1.5 million SF, is the State of California’s first green buildingcomplex. Scope included a rigorous process of applying sustainable design principalsin a consensus approach involving many State agencies and stakeholders, evaluation ofa third party central utility plant, and extensive modeling and cost benefit analyses. Theinvolvement continued through the completion of construction in a design review capacityand as a resource for the State. The project als o includes 2,260 parking spaces and a separate

    parking structure.Capital’s role of design criteria and construction support, aligned with the Master Architect’srole of developing a strong design approach and clear materials and methods requirementsfor quality assurance, resulting in the best value for the State of California.

  • 8/17/2019 Civic + Government Brochure

    15/18

    s a c r a m e n t o |   l o s a n g e l e s |   b a y a r e a |   r e n o e n g i n e e r i n g e x c e l l e n c e & e x c e p t i o n a l s e r v i c e » s i n c e 1 9 47  

    Project ProfileCivic + Government 

    State

    OWNER

    State of California

    LOCATION

    Sacramento, CA

    ARCHITECTS

    HOK 

    Lionakis

    PROJECT VALUE

    $200,000,000

    PROJECT AREA

    2,000,000 SF

    COMPLETION DATE

    2011

    SERVICES

    Mechanical Engineering

    Plumbing Engineering

     Title 24 Energy Analysis

    Whole Building Commissioning

    LEED Documentation

    CERTIFICATION

    LEED for New ConstructionGold Certification

    FRANCHISE TAX BOARD

    Capital led the design and commissioning of the central heating and cooling plant and energymanagement system for the State of California Franchise Tax Board. The new district heatingand cooling plant provides 4,400 tons of cooling and 30,000,000 Btu/h heating capacity forthe 2,000,000 SF complex. Additionally, the plant capacity was designed for anticipatedfuture growth up to another 500,000 SF office space.

     The central plant was constructed prior to the start of the new office building construction,

    as well as two new chillers and two relocated chillers, all associated pumps, cooling towers,boilers, switch gear, and emergency generator. Capital provided mechanical engineeringdesign that surpasses Title 24 goals by over 20% by incorporating a thermal storage system, aswell as high efficiency, free-standing district heating and cooling plant with several thousandfeet of direct burial hydronic piping distribution.

  • 8/17/2019 Civic + Government Brochure

    16/18

    s a c r a m e n t o |   l o s a n g e l e s |   b a y a r e a |   r e n o e n g i n e e r i n g e x c e l l e n c e & e x c e p t i o n a l s e r v i c e » s i n c e 1 9 47  

    Project ProfileCivic + Government 

    State

    OWNER

    State of California

    LOCATION

    Sacramento, CA

    ARCHITECT

    HGA

    PROJECT VALUE

    $95,000,000

    PROJECT AREA

    632,000 SF

    COMPLETION DATE

    2010

    SERVICES

    Mechanical Engineering

    Plumbing Engineering

    Fire Suppression Engineering

     Title 24 Energy Analysis

    LEED Documentation

    CERTIFICATION

    LEED for New ConstructionGold Certification

    STATE OFFICE BUILDINGS 8 & 9

    Renovations of these two 18 floor towers, including 632,000 SF of office space for theState of California included the implementation of new mechanical, electrical, andtelecommunications systems, structural upgrades addressing seismic consideration, overallbuilding upgrades meeting current code requirements, and minor repairs to the exterior shell.A new 12,000 SF addition provided a central secured lobby and checkpoint to serve bothbuildings, second level walkway connection OB8 and OB9. Goals for this project included

    meeting or exceeding all appropriate California Tier 1, Tier 2, and Title 24 design criteria andachieving a LEED Silver Certification through USGBC.

    As part of the renovation scope, Capital replaced the existing primary and secondary dual-duct air distribution system with a new pressure independent dual-duct VAV air distributionsystem with chilled water and steam served via the State’s central utility plant. The chilledwater is supplied through various A/C coils via base-mounted lead-lag pumps with VFDs.Energy efficient measures includes premium efficiency motors on all new 1 HP and largermotors with VFD motor speed controllers for all new motors over 10 HP, variable volumedistribution, both air and water, demand controlled ventilation via carbon dioxide sensorsin the return air duct and full DDC energy management and control system with optimizedsystem start and shut-off and reset of supply air and water temperatures.

  • 8/17/2019 Civic + Government Brochure

    17/18

    s a c r a m e n t o |   l o s a n g e l e s |   b a y a r e a |   r e n o e n g i n e e r i n g e x c e l l e n c e & e x c e p t i o n a l s e r v i c e » s i n c e 1 9 47  

    Project ProfileCivic + Government 

    Community Center 

    OWNER

    City of Fairfield

    LOCATION

    Fairfield, CA

    ARCHITECT

    Stafford King Wiese Architects

    PROJECT VALUE

    $14,000,000

    PROJECT AREA

    3 acres

    COMPLETION DATE

    2010

    SERVICES

    Mechanical Engineering

    Plumbing Engineering

     Title 24 Energy Analysis

    AQUATICS COMPLEX AT ALLAN WITT PARK

     This year-round complex features an “OpenAire” natatorium with a retractable roof, a zerodepth entry play area, a lazy river current for fun, therapy, and exercise, a six-lane act ivity poolwith water slide and diving board, an outside shallow play area for kids with slides, climbingstructures, water dumping, and water spray toys adjacent to a grassy area, an adjacentbuilding for restrooms, lockers, concessions, and offices, and a modified site building tohouse the pool supplies and pumps.

     The natatorium is provided with two energy recovery dehumidification systems designed tomaintain ideal room humidity. This dehumidification process results in large quantities ofrejected heat that is in turn used to heat the complex, providing a substantial energy savings.In order to prevent condensation and water damage on the interior surfaces, twelve-footdiameter fans are used to circulate air over the glass and polycarbonate roof.

     To improve eye comfort and breathing air quality for the swimmers, off-gassed chloramineson the surface of the water are swept away by a lightly thrown air supply across the poolsurface. This facility is a resounding success, allowing the city of Fairfield to provide a fun,revenue-generating aquatic center to the community year-round.

  • 8/17/2019 Civic + Government Brochure

    18/18

    s a c r a m e n t o |   l o s a n g e l e s |   b a y a r e a |   r e n o e n g i n e e r i n g e x c e l l e n c e & e x c e p t i o n a l s e r v i c e » s i n c e 1 9 47  

    Project ExperienceCivic + Government

     Animal Care

    INTRODUCTION

    Capital has provided our clients with engineering and consulting serv ices since 1947, developing into one of the foremost mechanicalengineering firms in the western United States. We maintain a client base of over 600 architects, contractors, construction managers,and other industry professionals, with many client relationships stretching back 50 years. The firm has grown geographically with officesserving Northern Nevada, Southern California, and the San Francisco Bay Area in addition to our headquarters in Sacramento. Capital’sreputation is built on its exceptional staff, clients, and the relationships fostered though our commitment to quality, innovation, andservice.

    UNIVERSITY OF C ALIFORNIA, DAVIS

    Mechanical engineering design following the AmericanAssociation for the Accreditation of Laboratory Animal Care(AAALAC) and the Animal Welfare Act. More than 15 University ofCalifornia, Davis veterinary medicine projects include:

     » Cat House

     » Vet Med Toxicology Suite

     » Haring Hall Renovations (11 projects)

     » Vet Med Ortho

     » Vet Med II Renovations

     » Vet Med Avion Remodel

     » Horse Barn Renovations

     » Bird Cage Renovations

    » Swine Facility

    TONY LA RUSSA’S ANIMAL R ESCUE FOUNDATION, WALNUT CREEK 

    Mechanical engineering for new animal care building

    BEALE AIR FORCE BASE VETERINARY CLINIC, MARYSVILLE

    Mechanical engineering design for new $500,000 veterinary clinic

    CONTRA COSTA COUNTY ANIMAL SHELTER, MARTINEZ

    Mechanical engineering for new 35,000 SF facility

    LAKE ELSINORE ANIMAL FRIENDS, LAKE ELSINORE

    Mechanical engineering for 38,000 SF new animal shelter

    SAN DIEGO ANIMAL CONTROL BUILDING, SAN DIEGOMechanical engineering design for preparation of design/build fornew 38,430 SF animal facility

    EAST BAY SPCA, DUBLIN

    Project mechanical engineer for 22,000 SF animal facility