Page 1: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

CIVIC CENTER PUBLIC REALM PLAN OVERVIEWWAR MEMORIAL TRUST | JULY 13, 2017

Photo Credit: Blake Marvin.

Page 2: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

1. Introduction

2. Planning History

3. Design Challenges

4. Plan Components & Schedule

5. Discussion/Questions

PRESENTATION

OVERVIEW

Page 3: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

Design Focus Area

SF Jazz

GROVE STREET

MCALLISTER STREET

FELL STREET

FULTON STREET

VAN

NESS AV

ENU

E

HAYES STREET

GOLDEN GATE AVENUE

FRA

NK

LIN STR

EET

GO

UG

H STR

EET

POLK

STREET

LAR

KIN

STREET

HY

DE STR

EET

MARKET STREET

REDWOOD STREET

DR. TOM WADDELL PLACE

MISSION STREET

11TH STREET

10TH STREET

9TH STREET

8TH STREET

7TH STREET

OAK STREET

PAGE STREET

HAIGHT STREET

TURK STREET

SFBallet War Memorial

Opera House

Asian Art Museum

Public Library

Bill Graham CivicAuditorium

City Hall

CaliforniaPublic UtilitiesCommission

San FranciscoPublic UtilitiesCommission

Superior Courtof California

Veterans BuildingHerbst Theatre

SF Dept of Public Health

Supreme Court of California

OrpheumTheater

DaviesSymphony Hall

San Francisco Unified School

District

50 UN Plaza Federal Building

UCHastings

Civic Center Plaza

(Brooks Hall)

(Civic Center Parking Garage)

Performing Arts Parking Garage

United NationsPlaza

Pictometry, mosaicked by City and County Department of Technology, San Francisco Enterprise GIS Program

CIVIC CENTER PUBLIC REALM PLAN

PROPOSED PLAN AREA

PLAN AREA BOUNDARY

DESIGN FOCUS AREA

LANDMARK DISTRICT BOUNDARY

Page 4: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

1912

PLANNING HISTORY

1912 Bird’s Eye View of John Galen Howard Proposal for Civic Center

Page 5: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

PLANNING HISTORYPost-World War II plans for Civic Center focused on expansion and modernization.

“Civic Center Development Plan” prepared for the City by the offices of Wurster, Bernardi and Emmons, SOM, and DeLeuw, Cather & Company.

“An Introductory Plan for the civic Center” by the San Francisco Department of City Planning.

1953 1958

Page 6: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

Excavation of Civic Center Plaza for the construction of Brooks Hall c. 1956.

PLAZA EXCAVATION

PLANNING HISTORY

1964 bird’s eye view showing the newly rebuilt plaza, completed in 1961.

Image Source: University of California Berkeley, WBE Collection, College of Environmental Design Library

These plans resulted in the excavation and reconstruction of Civic Center Plaza to build Brooks Hall and the Civic Center Parking Garage.

REBUILT PLAZA

Page 7: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

Planning Department’s “Civic Center Study.”

Planning Department’s “Fulton Street Mall Design Guidelines.”

Public Works-led “Civic Center Historic District Improvement Project” by SMWM and Olin Partnership.

1994 1996

1998

The most recent plan for the Civic Center’s public realm is nearly 20 years old.

In the 1980s and 1990s, new plans were made, but most proposals for public realm were not implemented.

Mayor Feinstein’s “Civic Center Proposal.”

1987

PLANNING HISTORY

Page 8: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

THE HUB

Public r ea lm / p l a n r efi n ements

Since the 1990s, the Civic Center area has grown as both an arts and culture district and as a residential neighborhood.

Planning is studying the potential for additional growth near the Market/Van Ness intersection.

Photo Credit: flickr Ed & Eddie Photo Credit: SPUR

ACT’s Strand Theater is one of a number of new arts venues in Civic Center.

The conversion of 100 Van Ness from office to residential is one example of the area’s growing population.

Page 9: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

NEW PLANS & STUDIES FOR CIVIC CENTER AREA

Civic Center Playground Renovation

Concept design finalized in 2015, construction began in Winter 2017.

Civic Center Sustainable Utilities District Plan

SFPUC plan for Civic Center utilities district released in 2015.

Central Market/Tenderloin Strategy

Near-term improvement strategy for area, released in 2015.

San Francisco Civic Center Historic District Cultural Landscape Inventory

Inventory of Civic Center’s landscape features completed in 2015.

Better Market Street

Environmental review began in 2015.

Van Ness Transit Improvement Project

Design finalized in 2015, construction set to began in 2016.

2015 CENTENNIAL

Page 10: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

A new City initiative led by the Office of Economic

and Workforce Development, focused on near-term

improvements, activation, stewardship, and management

of the public spaces linking Market Street to City Hall.civiccentercommons.org

Page 11: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

The Civic Center Public Realm Plan will build off recent plans and studies and create one coordinated, interdepartmental

plan for long-term improvements to the area’s streets, plazas, and other public spaces.

INTERDEPARTMENTAL PROJECT TEAM:

Page 12: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

OUTREACH

The project team will coordinate and build partnerships with Civic Center stakeholders, including:

-Residents

-Neighborhood groups

-Community Benefit Districts

-Business owners

-Property owners

-Cultural/arts organizations and patrons

-Social service providers

-Public safety officials

-Government agencies

-Civic Center event organizers

-Visitors

-Workers

Portraits of people in Civic Center from SF Planning’s “Civic Center Stories” Project

Page 13: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

Streets

WHAT CONSTITUTES THE CIVIC CENTER’S PUBLIC REALM?

Plazas & Parks

War Memorial CourtyardPolk & Grove Intersection

Other Public Spaces

Brooks Hall

Page 14: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

SAN FRANCISCO’S CIVIC HEART

...HOW HEALTHY IS IT TODAY?

Page 15: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

CHALLENGES: STREET DESIGN

Example: Wide roadways like Grove Street are barriers to pedestrian movement and lack a unified lighting or landscape design.

Page 16: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

CHALLENGES: PARKING & LOADING MANAGEMENT

Example: Parking and loading often dominates Fulton Street at Pioneer Monument.

Page 17: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

CHALLENGES: INACTIVE GROUND FLOORS

Example: The ground floor of Davies Symphony Hall at Van Ness Avenue and Grove Street.

Page 18: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

CHALLENGES: FRAGMENTED PUBLIC SPACES

Example: Civic Center Plaza, Fulton Street, and United Nations Plaza lack a holistic, long-term plan that balances competing uses and desires for the spaces.

Page 19: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

CHALLENGES: UNWELCOMING PUBLIC SPACES

Example: Removal of public seating throughout the area has resulted in spaces that are unwelcoming to all users.

Page 20: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

CHALLENGES: STREETSCAPE/MATERIALS

Example: Lack of streetscape design standards has resulted in a patchwork of paving, landscaping, and lighting that detracts from sense of place.

Page 21: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

CHALLENGES: UNDER-USED PUBLIC ASSETS

Example: Brooks Hall, the former conference facility beneath Civic Center plaza is currently used for storage.

Page 22: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

HEART OF THE CITY FARMERS MARKET

CHALLENGE: THREE SCALES OF ACTIVATION

MARRIAGE EQUALITY CELEBRATION

Day to Day Special EventsWeekly Events

CIVIC CENTER PLAZA LAWNS

Page 23: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

DESIGNING FOR DAY & NIGHT

CHALLENGE: EVENING ENVIRONMENT

Page 24: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

PLAN COMPONENTS

Public Life Study Analyses of how people use the public realm throughout the

day. Findings will inform design decisions and serve as the basis for testing ideas for improvements through temporary, physical

installations.

Conducted in partnership with the San Francisco office of , a Danish firm that pioneered methodologies for studying public

space around the world.

Page 25: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

PLAN COMPONENTS Public Life Study Survey Dates

Surveys and data collection took place all day from 8:00 am to 8:00 p.m. on 5/25, 5/27, 6/7 and 6/10

Page 26: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

The War Memorial was one of the study’s focus areas.

Volunteers counted the number of people walking and biking through the area and recorded information on their demographics and what activities they

engaged in while in the space.

Page 27: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

PLAN COMPONENTS

Locations and design palettes for streetscape amenities (lighting, paving, sidewalk furnishings) compatible with historic district guidelines.

Streetscape Design Standards

Page 28: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

PLAN COMPONENTS

Plan for changes to the transportation infrastructure throughout the plan area including parking/loading, roadway lane configuration, transit

improvements, and pedestrian and bicycle facilities.

Transportation Infrastructure Plan

Page 29: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

PLAN COMPONENTS

Focus Area Conceptual DesignsConceptual designs for key public spaces and streets within the area.

Page 30: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

DESIGN FOCUS AREAS: STREETS

POLK STREET LARKIN STREET GROVE STREET

FULTON/FRANKLINALLEYWAYS

Page 31: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

The City team would like to work with the War Memorial and its users to study ways to make the Fulton/Franklin intersection and the western entrance to the War Memorial Courtyard a more welcoming gateway to Civic Center.

Fulton/Franklin Gateway

Page 32: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PLAZA PIONEER MONUMENT U.N. PLAZA

DESIGN FOCUS AREAS: PUBLIC SPACES

BROOKS HALL BILL GRAHAM CIVIC

Page 33: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

DESIGN FOCUS AREAS: PUBLIC SPACES

LOWER SPROUL PLAZA

MOSCONE CENTER EXPANSION

MINT PLAZA

ST. JAMES PARKTREASURE ISLAND

Prime Consultant:

San Francisco, CA Berkeley, CA

San Francisco, CA San Francisco, CA San Jose, CA

Page 34: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

Sub-Consultant Team:

Tactical Projects & Urban Design:

Economic Modeling & Management:

Architecture: Historic Resources: Outreach & Public Participation:

Civil Engineering & Green Infrastructure:

Structural Engineering

Mechanical, electrical, & plumbing

Lighting Design: Cost Estimation:

DESIGN FOCUS AREAS: PUBLIC SPACES

Page 35: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

PLAN COMPONENTS

Plan for reusing and activating under-used public spaces, focused on both programming and long-term changes that will

increase public use and enjoyment of Civic Center.

Reuse & Activation Plan

Page 36: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

PLAN COMPONENTS

Public space management, operations, and implementation/funding strategies for Civic Center’s public spaces will be developed as part

of the plan.

Implementation & Management Strategy

Page 37: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

Environmental ReviewThe project scope includes environmental review and the

Planning Department anticipates preparing a full environmental impact report for the Plan.

PLAN COMPONENTS

Page 38: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

CIVIC CENTER PUBLIC REALM PLAN

PLAN TIMELINE

Existing Conditions Analysis & Public Life Study NOW – SEPT. 2017

Plan Development & Community Engagement AUG. 2017 – AUG. 2018 Environmental Analysis APR. 2018 – APR. 2020

Plan Adoption Hearings APR. 2020– JULY 2020

Community outreach will be on-going throughout the Plan’s development, with major outreach events anticipated to

begin Fall 2017.

Subject to change

Page 39: CIVIC CENTER PUBLIC REALM PLAN OVERVIEW...2017/07/13  · Transportation Infrastructure Plan CIVIC CENTER PUBLIC REALM PLAN PLAN COMPONENTS Focus Area Conceptual Designs Conceptual

DISCUSSION & QUESTIONS

Contact Information:

Nicholas Perry, Plan Manager

San Francisco Planning Department

[email protected] | (415) 575-9066

Website: www.civiccentersf.org THANK YOU!