city projects buenos aires city. ict industry law 2.972 - promotion of the ict companies of the city...
TRANSCRIPT
City projects
Buenos Aires City
ICT IndustryLaw 2.972 - PROMOTION OF THE ICT COMPANIES OF THE CITY
OF BUENOS AIRES (December 2008)• Industry definition • Geographic location• Tax exemptions • Infrastructure• Education
21 settled companies 2.763 HR 50.930 M2
• Optical Fibre Promotion Law• Land Use Law.• Infrastructure and Security Master Plan• CMT – Metropolitan Technology Centre• Subway
CURRENTLY WORKING ON
Recyclable buildings: 63.250 m2
Lots: 101.274 m2
Storehouses: 178.694 m2
Audiovisual Industry Cinema TV Advertising Entertainment Videogames
LAW - PROMOTION OF AUDIOVISUAL ACTIVITIES IN THE CITY OF BUENOS AIRES
AUDIOVISUAL ACTIVITY =STRATEGIC INDUSTRY
The Government as facilitator. Industry internationalization. Tax benefits for SMBs Banco Ciudad credit lines
Tax benefits Development of a cluster Boost educational training
•District area: 642 Ha. •Cementery: 90 Ha. •Lots ex AU3: 8 Ha.•GCBA Offices: 2.5 Ha.•Conectivity: Subway, railways, buses.
CHARACTERISTICSAUDIOVISUAL DISTRICT
AUDIOVISUAL ACTIVITY =STRATEGIC INDUSTRY
Design Industry STAGES OF THE PROJECT• 1st Stage – Positioning of the CMD (2010 - 2011)• 2nd Stage – CMD Surroundings (2010 – 2012)• 3rd Stage – Priority Subzone (2011 – 2013)• 4th Stage – Design District (from 2013 onwards)
CMD - METROPOLITAN DESIGN CENTER
The CMD is a public institution created to provide assistance to companies, designers and entrepreneurs in order to improve their
competitiveness through design and innovation.
Total Surface 13.600 m2
Lots in Catalinas
Surface: 5.857m21
1,6
73
150
H MIN.
H MAX.
LO LB LB LO
2 ULTIMOS NIVELES : 50% SUP. NIVEL ANTERIOR
MAX. 3 NIVELES DE SUBSUELO
H MAX.
52.0
00 m
2
9.000 m2
Surface: 3.628m2
2 ULTIMOS NIVELES : 50% SUP. NIVEL ANTERIOR
MAX. 3 NIVELES DE SUBSUELO
73
110
H MIN.
H MAX.
11,6
LO LB LB LO
H MAX.
38.0
00 m
2
6.500 m2
Surface: 4.932m2
2 ULTIMOS NIVELES : 50% SUP. NIVEL ANTERIOR
MAX. 3 NIVELES DE SUBSUELO
LO LB LB LO
73
11
,6
11
0
H MIN.
H MAX.
H MAX.
35.5
00 m
2
6.000 m2
Av. Madero
Av. L N Alem Av. San Martín
Av. C
órdo
ba
2 1 3
312
•Offices •Malls
•Hotels (any category)•Commercial area
•Residential
POSSIBLE USES
Hospital unification
34 hospitals under the jurisdiction of the City Government
• 1st Stage: F. Muñiz (infections), B. Udaondo (gastroenterology), M. Ferrer (pulmonary rehab). Unification will take place in the area of the Muñiz Hospital.
• 2nd Stage: J. A. Penna and Dr. T.Alvarez.
The unification will allow hospitals to share main services.
Estimated area 150.000 m2
• Extension: 37,7 ha. Today this area is occupied by the Borda and Moyano Hospitals and the Rawson home for children.
• Total necessary surface: 300.000 m2
Recycling of existing buildings + Construction of new ones
Civic Park Project
•Edificio del Plata•Beruti 3345•Esmeralda 638•Viamonte 860•Bolívar 191•Balcarce 360
•Carlos Pellegrini 313•Uruguay 454•Uruguay 428•Tacuarí 138•Paseo Colón 255•Córdoba 2222
List of main City buildings
Relocation of the City administration
Waste management The collection of urban solid waste is regulated by CEAMSE – a tripartite entity formed by the national government, the government of the Province of Buenos Aires and the Government of the City of Buenos Aires.
• Buenos Aires’ City: 5000 tons of waste daily.Disposal of waste mainly in landfills in the outskirts of the City nearing the limit of their capacity.
• Law 1.854 – Progressive removal of landfills. “Cero Waste” program.
PROGRESSIVE REDUCTION OBJECTIVES(basis: 2004 = 1.497.656 tons of waste sent to landfills)
• 2010: 30% • 2012: 50%• 2017: 75%• 2020: Prohibition of the final disposal of
recyclable and usable materials.
SOME TECHNOLOGIES FOR WASTE TREATMENT (based in 3500 ton of USW)
Waste to energy• Requires 8 has • Amendments in the regulations in force
Anaerobic Bio-Digestion• Requires 22 has
Combination of Waste to energy + Recovery Instalment of materials + Anaerobic Bio-Digestion
• Requires 18 has