City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection Improvement Plans January 17, 2012. What ’ s the Problem?. N-S lanes are offset by 22 feet through the Alabama St./ Redlands Blvd. intersection. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection

City of RedlandsCity of Redlands

Redlands Boulevard/Alabama Street/Redlands Boulevard/Alabama Street/Colton AvenueColton Avenue

Revision to IntersectionRevision to IntersectionImprovement PlansImprovement Plans

January 17, 2012January 17, 2012

Page 2: City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection

WhatWhat’’s the Problem?s the Problem?

• N-S lanes are offset by 22 feet through the Alabama St./ Redlands Blvd. intersection.

• Traffic demands exceed the capacity of the intersection during peak hours.

• Unorthodox merge/intersection of Colton Ave. / Redlands Blvd.

Page 3: City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection

Traffic Pattern TerminologyTraffic Pattern Terminology“LOS” – Level of Service (Capacity vs. Demand)

Ranges from A to F

LOS “A” – Free Flowing Traffic

LOS “C” – Occasional Traffic Restrictions

LOS “F” – Jammed Traffic Condition

Page 4: City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection

SolutionsSolutions• Improve the intersection geometry of Redlands

Boulevard/Alabama Street (removes 22-foot offset).

• Improves vehicle traffic flow through intersections from a LOS “F” to LOS “C”.

• Create a signalized T-intersection for Colton Avenue/Redlands Boulevard.

Page 5: City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection

Solutions (cont.)Solutions (cont.)• Incorporate value engineering to reduce

property acquisition and construction costs.

• Proposed improvements be constructed as single phase, instead of multiple phases.

Page 6: City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection

ComparisonComparison

Present day

Page 7: City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection

ComparisonComparison

Value Engineered Design

Page 8: City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection

Value Engineered Design

(LOS “C” thru 2025)

ComparisonComparison

Present Day (LOS “F”)

Page 9: City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection

Comparison - overhead viewComparison - overhead view

Present day

Page 10: City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection

Comparison - overhead viewComparison - overhead view

Value Engineered Design

Page 11: City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection

• By reducing a single South-bound lane a significant portion new ROW from the northeast corner will no longer be necessary.

• LOS will remain at “C” for peak hours until year 2025 rather than 2027.

Value EngineeringValue Engineering

Page 12: City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection

Property Acquisition Reduction Property Acquisition Reduction Implementing Value EngineeringImplementing Value Engineering

Page 13: City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection

Colton Ave./ Redlands Blvd.And

Alabama St./ Redlands Blvd.

Intersections

Ultimate Design*

Value Engineering

Design**

Cost Savings

Total $ 9,911,233 $ 8,659,447 $1,251,786

Estimated Cost and Time Estimated Cost and Time SavingsSavings

3 years reduction in time until construction

*5 lanes for all approaches at Alabama/ Redlands Blvd.**4 lanes for south-bound approach at Alabama/ Redlands Blvd.

Page 14: City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection

• Authorize staff to proceed forward with the Value Engineered Design for the Redlands / Alabama / Colton intersection improvement project (LOS “C” - 2025).

• Authorize engineering service amendment with Parsons Brinckerhoff to prepare revised plans and specifications to implement the Proposed Value Engineered Design.

RecommendationRecommendation