city and county of denver 2015 capital projects - wastewater thomas blackman engineer supervisor

Download City and County of Denver 2015 Capital Projects - Wastewater Thomas Blackman Engineer Supervisor

If you can't read please download the document

Upload: breana-mulnix

Post on 15-Dec-2015

217 views

Category:

Documents


2 download

TRANSCRIPT

  • Slide 1

City and County of Denver 2015 Capital Projects - Wastewater Thomas Blackman Engineer Supervisor Slide 2 Wastewater Capital Projects Management Advertisement Look Ahead 33rd Street Outfall (Arkins to Mtn Cement) $ 6,000,000 Summer 2015 33rd Street Outfall (Arkins to Mtn Cement) $ 6,000,000 Summer 2015 Large diameter storm sewer project. (8 by 11 box and 10 diameter pipe) 2015 Annual Sanitary Sewer Improvements $ 3,000,000 Spring 2015 2015 Annual Sanitary Sewer Improvements $ 3,000,000 Spring 2015 Citywide sanitary sewer rehab project using Cured in Place Pipe materials. 2015 Critical Sewer Replacement $ 4,000,000 Spring 2015 2015 Critical Sewer Replacement $ 4,000,000 Spring 2015 Citywide emergency response project for addressing critical storm and sanitary sewer issues. Contract based on unit price markup. 2015 General Storm Sewer $ 3,000,000 Summer 2015 2015 General Storm Sewer $ 3,000,000 Summer 2015 Multiple location storm drainage project. 2015 Citywide Concrete Repair, Phase 4 $ 1,800,000 Spring 2015 2015 Citywide Concrete Repair, Phase 4 $ 1,800,000 Spring 2015 Citywide curb, gutter, crosspan, panel and handicap ramp project. This will be 2 SBE defined pool projects around $900k each. Kennedy Detention Pond $ 2,500,000 Fall 2015 Kennedy Detention Pond $ 2,500,000 Fall 2015 Large diameter storm sewer project to divert overflow from the existing detention pond to Cherry Creek during a 100 year storm event. 33rd Street Outfall (Mtn Cement to Lawrence St.) $ 6,000,000 Fall 2015 33rd Street Outfall (Mtn Cement to Lawrence St.) $ 6,000,000 Fall 2015 Large diameter storm sewer project. (8 by 11 box and 10 diameter pipe) Large diameter storm sewer project. (8 by 11 box and 10 diameter pipe) 2016 General Storm Sewer $2,000,000 Winter 2015 2016 General Storm Sewer $2,000,000 Winter 2015 Multiple location storm drainage project. Slide 3 33rd Street Outfall (Arkins to Mtn Cement) Slide 4 Kennedy Ball Field Detention Slide 5 33rd Street Outfall (Mtn Cement to Lawrence St.)