© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 1 of 98 White Paper Cisco UCS Scale-Up Solution for SAP HANA Design and Deploy a SAP HANA Single-Node Solution Based on Standalone Cisco UCS C460 M4 Rack Servers with SLES for SAP 12 SP1 September 2016

Upload: lynhan

Post on 15-Feb-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 1 of 98

White Paper

Cisco UCS Scale-Up Solution for SAP HANA

Design and Deploy a SAP HANA Single-Node Solution Based on Standalone

Cisco UCS C460 M4 Rack Servers with SLES for SAP 12 SP1

September 2016

Page 2: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 2 of 98

Contents

Solution Overview Introduction Audience Purpose of This Document Solution Summary

Infrastructure Overview Cisco UCS C460 M4 Rack Server Physical Components Power Cabling Network Components

Solution Design SAP HANA System Hardware Requirements for the SAP HANA Database

Configuration Guidelines

Preparing the SAP HANA Scale-Up Node Configuring the Cisco Integrated Management Controller Configuring RAID Installing the Operating System Preparing SAP HANA Data, Log, and Shared File Systems

Installing SAP HANA Important SAP Notes SAP HANA Post-Installation Checkup Tuning the SAP HANA Performance Parameters

Monitoring and Maintenance Operations Hardware Monitoring and Maintenance Upgrading the BIOS and Firmware on the Cisco UCS C460 M4 Monitoring the Operating System Maintaining the Operating System SAP HANA Operations and Maintenance

For More Information

Appendix: Solution Variables Used for This Document

Page 3: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 3 of 98

Executive Summary

Organizations in every industry are generating and using more data than ever before: from customer transactions

and supplier delivery considerations to real-time user-consumption statistics. Without reliable infrastructure that can

store, process, and analyze big data sets in real time, companies are unable to use this information to their

advantage. The Cisco® Scale-Up Solution for SAP HANA with the Cisco Unified Computing System

™ (Cisco UCS

®)

using the Cisco UCS C460 M4 Rack Server helps companies more easily harness information and make better

business decisions that let them stay ahead of the competition. Our solutions help improve access to all your data

to accelerate business decision making with policy-based, simplified management and reduce deployment risk and

total cost of ownership (TCO). Our innovations help enable you to unlock the intelligence in your data and interpret

it with a new dimension of context and insight to help you gain a sustainable, competitive business advantage.

The Cisco solution for SAP HANA with the Cisco UCS C460 M4 rack-mount server provides a robust platform for

SAP HANA workloads in a single node.

Solution Overview

This section provides an overview of the solution discussed in this document.

Introduction

The Cisco UCS C460 M4 scale-up solution provides prevalidated, ready-to-deploy infrastructure, reducing the time

and complexity involved in configuring and validating a traditional data center deployment. The reference

architecture discussed in this document highlights the resiliency and ease of deployment of a SAP HANA solution.

SAP HANA is SAP’s implementation of in-memory database technology. The SAP HANA database takes

advantage of low-cost main memory (RAM), faster access, and data-processing capabilities of multicore

processors to provide better performance for analytical and transactional applications. SAP HANA offers a multiple-

engine, query-processing environment that supports relational data (with both row- and column-oriented physical

representations in a hybrid engine) as well as graph and text processing for semistructured and unstructured data

management within the same system.

As an appliance, SAP HANA combines software components from SAP optimized for certified hardware. However,

this solution has a preconfigured hardware setup and preinstalled software package that is dedicated to SAP

HANA.

In 2013, SAP introduced the SAP HANA Tailored Datacenter Integration (TDI) option. TDI offers a more open and

flexible way to integrate SAP HANA into the data center by reusing existing enterprise storage hardware, thereby

reducing hardware costs. With the introduction of SAP HANA TDI for shared infrastructure, the Cisco UCS

Integrated Infrastructure solution provides the advantages of an integrated computing, storage, and network stack

and the programmability of Cisco UCS. The TDI option enables organizations to run multiple SAP HANA

production systems on a shared infrastructure. It also enables customers to run SAP application servers and SAP

HANA databases hosted on the same infrastructure.

For more information about SAP HANA, see the SAP help portal: http://help.sap.com/hana/.

Audience

The intended audience for this document includes sales engineers, field consultants, professional services staff, IT

managers, partner engineers, and customers deploying the Cisco solution for SAP HANA. External references are

provided wherever applicable, but readers are expected to be familiar with the technology, infrastructure, and

database security policies of the customer installation.

Page 4: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 4 of 98

Purpose of This Document

This document describes the steps required to deploy and configure a Cisco data center solution for SAP HANA.

This document presents one of the variants of Cisco’s solution for SAP HANA. Readers of this document are

expected to have sufficient knowledge to install and configure the products used; however, configuration details

that are important to the deployment of this solution are provided in this document.

Solution Summary

The Cisco Scale-Up Solution for SAP HANA is based on the Cisco UCS C460 M4 Rack Server. Tables 1, 2, and 3

summarize the server specifications and show proposed disk configurations for the SAP HANA use case.

Table 1. Overview of Cisco UCS C460 M4 Server Configuration

CPU Specification 2.20-GHz Intel® Xeon

® processor E7-8890 v4 CPU (Quantity: 2 or 4)

Analytics SAP Business Suite on SAP HANA (SoH)

Possible Memory Configurations ● 32-GB DDR4: Quantity 4 (128 GB)

● 32-GB DDR4: Quantity 8 (256 GB)

● 32-GB DDR4: Quantity 16 (512 GB)

● 32-GB DDR4: Quantity 24 (768 GB)

● 32-GB DDR4: Quantity 32 (1 TB)

● 32-GB DDR4: Quantity 48 (1.5 TB)

● 32-GB DDR4: Quantity 64 (2 TB)

● 32-GB DDR4: Quantity 4 (128 GB)

● 32-GB DDR4: Quantity 8 (256 GB)

● 32-GB DDR4: Quantity 16 (512 GB)

● 32-GB DDR4: Quantity 24 (768 GB)

● 32-GB DDR4: Quantity 32 (1 TB)

● 32-GB DDR4: Quantity 48 (1.5 TB)

● 32-GB DDR4: Quantity 64 (2 TB)

● 32-GB DDR4: Quantity 96 (3 TB)

● 64-GB DDR4: Quantity 64 (4 TB)

Hard-Disk Drive (HDD) Type and Quantity 1.6-TB solid-state disk (SSD) drive: Quantity 12

BIOS C460M4.2.0.11.22.02062016063 or later

Cisco Integrated Management Controller (IMC) Firmware

Version 2.0(11.203) or later

LSI MegaRAID Controller Cisco 12-GB SAS modular RAID controller

Network Card Cisco UCS Virtual Interface Card (VIC) 1225: Quantity 2

For 10-Gbps connectivity:

● Onboard Intel 1 Gigabit Ethernet controller: Quantity 2

● Onboard Intel 10BASE-T Ethernet controller: Quantity 2

Power Supply Redundant power supplies: Quantity 4

Table 2. Cisco UCS C460 M4 Proposed Disk Layout

Disk Disk Type Drive Group RAID Level Virtual Drive

Slot (1 through 12) SSD DG0 5 VD0

Table 3. Cisco UCS C460 M4 Proposed Disk Configuration

Drives Used RAID Type Used for File System

12 x 1.6-TB SSD drives RAID 5 Operating system ext3

Data file system XFS

Log file system XFS

SAP Hana shared file system XFS

Page 5: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 5 of 98

Infrastructure Overview

This section provides an overview of the solution infrastructure discussed in this document.

Cisco UCS C460 M4 Rack Server

The Cisco UCS C460 M4 Rack Server (Figure 1) offers industry-leading performance and advanced reliability well

suited for the most demanding enterprise and mission-critical workloads, large-scale virtualization, and database

applications.

Either as a standalone system or in Cisco UCS managed operations, the Cisco UCS C460 M4 offers customers

the benefits of its high-capacity memory when very large memory footprints are required:

● SAP workloads

● Database applications and data warehousing

● Large virtualized environments

● Real-time financial applications

● Java-based workloads

● Server consolidation

The enterprise-class Cisco UCS C460 M4 server extends the capabilities of the Cisco UCS portfolio in a 4-rack-

unit (4RU) form factor. It provides the following:

● Either two or four Intel Xeon processor E7-4800 v2, E7-8800 v2, E7 8890v3 or E78890 v4 family CPUs

● Up to 6 terabytes (TB)* of double-data-rate 3 (DDR3) memory in 96 dual in-line memory (DIMM) slots

● Up to 12 small form-factor (SFF) hot-pluggable SAS, SATA, and SSD disk drives

● 10 PCI Express (PCIe) Generation 3 (Gen 3) slots supporting Cisco UCS VICs and third-party adapters and

graphical processing units (GPUs)

● Two Gigabit Ethernet LAN-on-motherboard (LOM) ports

● Two 10 Gigabit Ethernet ports

● One dedicated out-of-band (OOB) management port

* With 64-GB DIMMs

Page 6: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 6 of 98

The Cisco UCS C460 M4 server also offers outstanding reliability, availability, and serviceability (RAS) features,

including:

● Tool-free CPU insertion

● Easy-to-use latching lid

● Hot-swappable and hot-pluggable components

● Redundant Cisco Flexible Flash Secure Digital (SD) cards

In Cisco UCS managed operations, the Cisco UCS C460 M4 takes advantage of our standards-based unified

computing innovations to significantly reduce customers’ TCO and increase business agility.

Figure 1. Cisco UCS C460 M4 Rack Server

Physical Components

Figures 2, 3, and 4 show the Cisco UCS C460 M4 server components.

Figure 2. Cisco UCS C460 M4 Front View

1 Cooling fans (hot swappable and accessible from the front panel)

8 Power supply status LED

2 Operations panel 9 Network link activity LED

3 Power button and LED 10 SAS and SATA drive bays 1 to 12 (hot swappable)

4 Identification button and LED 11 Keyboard, video, and mouse (KVM) console connector (used with a KVM cable

Page 7: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 7 of 98

that provides 2 USB connectors, 1 VGA connector, and 1 serial connector)

5 System status LED 12 Pull-out asset tag

6 Fan status LED —

7 Temperature status LED —

Figure 3. Cisco UCS C460 M4 Rear View

1 PCIe riser 1 (slots 1 to 5)

See PCIe slots information for slot specifications.

6 10 Gigabit Ethernet ports (2)

2 PCIe riser 2 (slots 6 to 10) 7 USB 2.0 ports (3)

3 Serial port (DB-9 connector) 8 1 Gigabit Ethernet ports (2)

4 VGA video port (DB-15 connector) 9 Rear identification LED and button

5 1 Gigabit Ethernet dedicated management port M1

10 Power supplies 1 to 4 (hot swappable and redundant as 2+2)

Page 8: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 8 of 98

Figure 4. Cisco UCS C460 M4 Top View (Open)

1 PCIe riser 1 (slots 1 to 5)

See PCIe slots information for slot specifications.

6 10 Gigabit Ethernet ports (2)

2 PCIe riser 2 (slots 6 to 10) 7 USB 2.0 ports (3)

3 Serial port (DB-9 connector) 8 1 Gigabit Ethernet ports (2)

4 VGA video port (DB-15 connector) 9 Rear identification LED and button

5 1 Gigabit Ethernet dedicated management port M1

10 Power supplies 1 to 4 (hot swappable and redundant as 2+2)

Power Cabling

The standard power supply setup is 1+1. Therefore, both power supplies must be connected to one grid, and the

server tolerates the failure of one power supply. However, a grid failure is not protected.

To protect against a grid failure, each power supply must be connected to a completely separate grid. This setup is

the preferred installation and is recommended to the customer.

Network Components

The Cisco UCS C460 server is equipped with a management board for remote management over the network. This

board includes virtual KVM access at the hardware level.

The M1 interface must be connected to the console network at the customer’s location.

Page 9: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 9 of 98

The server is also equipped with four onboard network interfaces. For this appliance, the following interfaces

were used:

● Two 1 Gigabit Ethernet interfaces (number 8 in Figure 3) are available for management access.

● Two Cisco VICs are available in this rack-mounted server for application access.

The VIC that comes with the Cisco UCS C460 M4 can be configured to provide multiple virtual network interface

cards (vNICs) as needed by the implemented use case.

Cisco UCS VIC 1225

The Cisco UCS VIC 1225 option was used in the validation system and is also used as an example in this

document. However, other VICs, such as the Cisco UCS VIC 1285 or 1385, are also supported, and the

configuration principles are the same.

A Cisco innovation, the Cisco UCS VIC 1225 (Figure 5) is a dual-port Enhanced Small Form-Factor Pluggable

(SFP+) 10 Gigabit Ethernet and Fibre Channel over Ethernet (FCoE)–capable PCIe card designed exclusively for

Cisco UCS C-Series Rack Servers. The VIC 1225 lets you create multiple vNICs (up to 128) on the converged

network adapter (CNA). This feature allows complete I/O configurations to be provisioned in both virtualized and

nonvirtualized environments using just-in-time provisioning, providing tremendous system flexibility and allowing

consolidation of multiple physical adapters. System security and manageability is improved by providing network

policy and security visibility and portability all the way to the virtual machines.

Figure 5. Cisco UCS VIC 1225

The VICs can be configured to create vNICs, and by default two vNICs are available for each VIC. These have a

bandwidth of 10 Gbps, and depending on the customer network and IP address range they can be connected and

configured in the operating system (Figure 6).

For both VICs in a pair, a bond device can be created on the OS level based on customer-specific requirements,

if any.

Page 10: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 10 of 98

Figure 6. Configuring the VICs

Solution Design

This section describes the SAP HANA system requirements defined by SAP and the architecture of the Cisco UCS

solution for SAP HANA.

SAP HANA System

An SAP HANA scale-up system on a single server is the simplest of the installation types. It is possible to run an

SAP HANA system entirely on one host and then scale the system up as needed. All data and processes are

located on the same server and can be accessed locally. The network requirements for this option are at least one

1 Gigabit Ethernet access network and one 10 Gigabit Ethernet storage network.

Hardware Requirements for the SAP HANA Database

SAP defines hardware and software requirements for running SAP HANA systems. For the latest information about

the CPUs and memory configurations supported for SAP HANA, see

https://global.sap.com/community/ebook/2014-09-02-hana-hardware/enEN/index.html

Note: This document does not cover the updated information published by SAP. Additional information is

available at http://saphana.com.

File System Layout

Figure 7 shows the file system layout and the required storage sizes for installing and operating SAP HANA. When

installing SAP HANA on a host, specify the mount point for the installation binary files (/hana/shared/<sid>), data

Page 11: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 11 of 98

files (/hana/data/<sid>), and log files (/hana/log/<sid>), where <sid> is the instance identifier of the SAP HANA

installation.

Figure 7. Proposed Disk Layout with Partition Mapping

The storage size for the file system is based on the amount of memory on the SAP HANA host.

The following list shows sample file system sizes for a single-node system with 3 TB of memory:

● /hana/shared: 1 x memory (3 TB)

● /hana/data: 3 x memory (9 TB)

● /hana/log: 1 x memory (512 GB)*

* For solutions based on the Intel Xeon processor E7-88x0 v4 CPU, the size of the log volume must be

as follows:

◦ Half of the server memory for systems ≤ 256 GB of memory

◦ Minimum of 512 GB for systems with ≥ 512 GB of memory

Operating System

SAP HANA supports the following operating systems:

● SUSE Linux Enterprise Server (SLES) for SAP applications

● Red Hat Enterprise Linux (RHEL) for SAP HANA

Note: This document provides Installation steps for SLES 12 for SAP SP1.

Page 12: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 12 of 98

Configuration Guidelines

This document is intended to enable you to fully configure the customer environment. In this process, various steps

require you to insert customer-specific naming conventions, IP addresses, and VLAN schemes, as well as to

record appropriate MAC addresses. Table 4 lists the configuration variables that are used throughout this

document. This table can be completed based on the specific site variables and used in implementing the

configuration steps presented in this document.

Table 4. Configuration Variables

Variable Description Customer Implementation Value

<<var_cimc_ip_address>> Cisco UCS C460 M4 server’s IMC IP address

<<var_cimc_ip_netmask>> Cisco UCS C460 M4 server’s IMC network netmask

<<var_cimc_gateway_ip>> Cisco UCS C460 M4 server’s IMC network gateway IP address

<<var_raid5_vd_name>> Name for virtual drive VD0 during RAID configuration

<<var_hostname.domain>> SAP HANA node’s fully qualified domain name (FQDN)

<<var_sys_root-pw>> SAP HANA node’s root password

<<var_lvm_vg_name>> SAP HANA node’s OS logical volume management (LVM) volume group name

<<var_mgmt_ip_address>> SAP HANA node’s management and administration IP address

<<var_mgmt_nw_netmask>> SAP HANA node’s management network netmask

<<var_mgmt_gateway_ip>> Cisco UCS C460 M4 server’s management and administrative network gateway IP address

<<var_mgmt_netmask_prefix>> Netmask prefix in Classless Inter-Domain Routing (CIDR) notation

Preparing the SAP HANA Scale-Up Node

This section presents procedures for you to follow to prepare the SAP HANA node for configuration.

Configuring the Cisco Integrated Management Controller

To configure the on-board Cisco IMC, you should connect a KVM switch to the server.

1. After everything is connected, turn on the power to the server (Figures 8 and 9).

Page 13: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 13 of 98

Figure 8. BIOS POST Screen

Page 14: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 14 of 98

Figure 9. BIOS POST Screen (Continued)

Page 15: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 15 of 98

2. Press F8 to display the IMC configuration (Figure 10).

Figure 10. Cisco UCS C460 IMC Configuration View (Local Display)

3. Use the console network IP address <<var_cimc_ip_address>>, netmask <<var_cimc_ip_netmask>>, and

gateway <<var_cimc_gateway_ip>> for the IPv4 settings of the IMC. Select None for NIC redundancy.

4. Press F10 to save the configuration and exit the utility.

5. Open a web browser on a computer on the same network with Java and Adobe Flash installed.

6. Enter the IMC IP address of the Cisco UCS C460 M4 server: http://<<var_cimc_ip_address>>.

7. Enter the login credentials as updated in the IMC configuration. The default username and password are

admin and password.

Page 16: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 16 of 98

Figure 11 shows the results.

Figure 11. Cisco UCS C460 IMC Home Screen

Page 17: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 17 of 98

8. BIOS Properties: Sample output from the validation system is provided here for reference.

Figure 12. BIOS properties

Configuring RAID

The following procedure shows the RAID configuration on the Cisco UCS C460 server used for SAP HANA.

Page 18: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 18 of 98

1. From the IMC page, click Launch KVM Server.

2. Click KVM Console.

3. When the KVM console is launched, click Boot Server (Figure 13).

Figure 13. Cisco UCS KVM Console

4. When prompted, press Ctrl+R to run the MegaRAID Configuration Utility (Figure 14).

Page 19: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 19 of 98

Figure 14. Run the MegaRAID Configuration Utility

5. On the VD Mgmt tab, press F2 to select Operations (Figure 15).

Figure 15. MegaRAID Configuration Utility: Virtual Drive Management

6. Select Create Virtual Drive (Figure 16).

Page 20: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 20 of 98

Figure 16. MegaRAID Configuration Utility: Create Virtual Drive

7. Choose the following options to create a RAID 5 virtual drive with six disks (Figure 17):

a. For RAID Level, choose RAID-5.

b. Choose all 12 disks.

c. Name the virtual drive <<var_raid5_vd_name>>.

Figure 17. MegaRAID Configuration Utility: Create RAID 5

8. Click the Advanced option (Figure 18).

a. For Strip Size, choose 256KB.

b. For Read Policy, choose Ahead.

c. For Write Policy, choose Always Write Back.

d. For I/O Policy, choose Cached.

Page 21: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 21 of 98

e. For Disk cache Policy and Emulation, keep the default settings.

f. Choose Initialize.

g. Click OK.

Figure 18. MegaRAID Configuration Utility: Create RAID 5 Advanced Options

9. Click OK to create a new virtual drive page (Figure 19).

Figure 19. MegaRAID Configuration Utility with Virtual Drives

Page 22: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 22 of 98

10. Wait for the initialization process for VD0 to complete, which may take several minutes.

11. Press Esc and select OK to exit the RAID Configuration Utility.

12. Press Ctrl+Alt+Del to reboot the server.

Installing the Operating System

The following procedure shows the SLES 12 SP1 installation on local drives. Keep the SLES DVD handy.

1. On the IMC page, click Launch KVM Server.

2. Click KVM Console.

3. After the KVM console is launched, click Boot Server.

4. Choose Virtual Media > Activate Virtual Devices.

a. For Unencrypted Virtual Media Session, select Accept this Session and then click Apply.

b. Click Virtual Media and choose Map CD/DVD.

c. Click Browse to navigate to the ISO media location.

d. Click Map Device.

5. The system will automatically boot from the ISO image. Select the installation option (Figure 20).

Page 23: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 23 of 98

Figure 20. Booting to ISO image

6. On the first Language, Keyboard and License Agreement page, select the language you want to use and the

keyboard layout, select Agree to license terms, and click Next.

7. On the Network Settings page, click Next. You will specify the network configuration as part of the post-

installation tasks.

8. On the Registration pages, select Skip Registration. You will register your system later as part of the post-

installation tasks.

9. On the Product Installation Mode page, select the Proceed with standard SLES for SAP Applications

installation option (Figure 21).

Page 24: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 24 of 98

Figure 21. Product Installation Mode

10. On the Add On Product page, click Next. You don’t have any additional products to install.

11. On the Suggested Partitioning page, click Expert Partitioner (Figure 22).

Page 25: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 25 of 98

Figure 22. Suggested Partitioning Initial Proposal

12. In the left pane, choose System View > Linux > Hard Disks > sda.

13. You need to clear the suggested partitions. The example in Figure 23 shows two suggested partitions, sda1

and sda2, so you need to delete sda1 and sda2.

14. Delete partition sda2 (Figures 24 and 25).

Page 26: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 26 of 98

Figure 23. Expert Partitioner: Delete Partition sda2

Page 27: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 27 of 98

Figure 24. Expert Partitioner: Confirm Deletion of sda2 Partition

15. Delete partition sda1 (Figures 25 and 26).

Page 28: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 28 of 98

Figure 25. Expert Partitioner: Delete Partition sda1

Figure 26. Expert Partitioner: Confirm Deletion of sda1 Partition

16. From the unpartitioned device sda, do the following:

17. Create a 200-MB /boot partition, /dev/sda1, from the disk device available: /dev/sda.

Page 29: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 29 of 98

18. Create another partition, /dev/sda2, assigning the rest of the available space in the device: dev/sda. Assign

this partition to the Linux LVM, thus making it a physical volume.

19. Create a volume group, hanavg, and assign the available physical volume, /dev/sda2, to it.

20. Create a logical volume for the / file system with a size of 100 GB and formatted in ext3.

21. Create a swap volume with a size of 2 GB.

22. On the Expert Partitioner page, choose the device /dev/sda and click Add (Figure 27).

Figure 27. Add New Partition

23. For /boot, create a partition with a size of 200 MB (Figure 28).

Page 30: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 30 of 98

Figure 28. Add Partition: Specify a New Partition Size

24. Click Next. Select the Operating System role (Figure 29).

Figure 29. Add Partition: Specify Role

25. Click Next. Choose the ext3 file system and choose /boot for the mount point (Figure 30).

Page 31: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 31 of 98

Figure 30. Add Partition: Formatting and Mounting Options

26. Click Finish.

27. Click Add to add another partition (Figure 31).

Figure 31. Expert Partitioner: Add Another Partition

28. Allocate the rest of the available space for the partition (Figure 32).

Page 32: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 32 of 98

Figure 32. Add Partition: Specify the Partition size

29. Click Next. Select the Data and ISV Applications role (Figure 33).

Figure 33. Add Partition: Specify Role

30. Click Next. Assign the partition with file system ID 0x8E Linux LVM (Figure 34).

Page 33: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 33 of 98

Figure 34. Add Partition – specify formatting and mounting options

31. Click Finish (Figure 35).

Figure 35. Expert Partitioner: Hard Disk /dev/sda Partitions Overview

32. In the System View pane on the left, select Volume Management. Click Add and choose Volume Group

(Figure 36).

Page 34: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 34 of 98

Figure 36. Expert Partitioner: Volume Management to Add Volume Group

33. Provide a name for the volume group. In the Available Physical Volumes pane, select /dev/sda2 and click Add

(Figure 37).

Page 35: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 35 of 98

Figure 37. Add Volume Group: Select Available Physical Volumes

34. The volume group is added in the right pane. Click Finish (Figure 38).

Figure 38. Add Volume Group

35. Click Finish.

36. Under Volume Management, click Add and select Logical Volume (Figure 39).

Page 36: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 36 of 98

Figure 39. Expert Partitioner: Add Logical Volume

37. Add a logical volume for / with the name rootlv and the Normal Volume type (Figure 40).

Figure 40. Add Logical Volume: Specify the Name and Type

38. Click Next. Specify a custom size of 100 GB and singlestripe (Figure 41).

Page 37: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 37 of 98

Figure 41. Add Logical Volume: Specify the Size and Number of Stripes

39. Click Next. Select Operating System role (Figure 42).

Figure 42. Add Logical Volume: Specify Role

40. Click Next. Format the 100-GB logical volume rootlv with the ext3 file system and assign / as the mount point

(Figure 43).

Page 38: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 38 of 98

Figure 43. Add Logical Volume: Specify Formatting and Mounting Options

41. Click Finish.

42. Create a swap volume with a size of 2 GB. Under Volume Management, click Add and choose Logical

Volume (Figure 44).

Figure 44. Expert Partitioner: Volume Management to Add Another Logical Volume

43. Add a logical volume for the swap volume with the name swapvol and a type of Normal Volume. Click Next

(Figure 45).

Page 39: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 39 of 98

Figure 45. Add Logical Volume: Specify the Name and Type

44. Assign 2 GB of space. Click Next (Figure 46).

Figure 46. Add Logical Volume: Specify Size and Stripe Information

45. Select the Swap role and click Next (Figure 47).

Page 40: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 40 of 98

Figure 47. Add Logical Volume: Specify Role

46. Specify Swap as the formatting option and swap as the mounting option (Figure 48).

Figure 48. Add Logical Volume: Specify Formatting and Mounting Options

47. Click Finish (Figure 49).

Page 41: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 41 of 98

Figure 49. Expert Partitioner: Volume Management Summary

48. Review the updated partion information (Figure 50) and then click Next.

Figure 50. Suggested Partitioning: Configuration Created

49. Review the updated Partion information and click Next

50. Clock and Time Zone settings, choose the appropriate time zone and select Hardware clock set to UTC.

Page 42: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 42 of 98

51. For the Password for the System Administrator “root” setting, enter an appropriate password <<var_sys_root-

pw>>.

52. Installation Settings page (Figure 51).

Figure 51. Installation Settings: Default Proposal

53. You will customize the Software settings. Click Software headline to make the changes (Figure 52):

a. Deselect Gnome Desktop Environment.

b. Select C/C++ Compiler and Tools.

c. Select SAP HANA Server Base.

Page 43: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 43 of 98

Figure 52. Software Selection and System Tasks: Customized

54. Click OK.

55. Click Firewall and SSH’ headline: and click disable to disable the firewall. This selection will automatically

enable Secure Shell (SSH) service (Figure 53).

Figure 53. Firewall and SSH: Customized

56. Click Kdump’ headline: Select Disable Kdump (Figure 54).

Page 44: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 44 of 98

Figure 54. Disabling Kdump

57. Click OK.

58. Click Default systemd target’ headline: select Text mode (Figure 55).

Figure 55. Setting Default Systemd Target to Text Mode

59. Click OK.

60. Click Clone System Configuration headline (Figure 56).

Page 45: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 45 of 98

Figure 56. Select Clone System Configuration

61. Click do not write it (Figure 57).

Figure 57. Customize Clone System Configuration

62. Leave the Booting and System default selections unchanged (Figure 58).

Figure 58. Installation Settings: Final Selections

63. Click Install and also select Install at subsequent Confirm Installation prompts. The installation starts, and you

can monitor the status (Figure 59).

Page 46: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 46 of 98

Figure 59. Performing Installation

Figure 60. Performing Installation: Reboot Alert After Installation

The system will reboot. The default selection ‘Boot from Hard Disk’ on launch screen will take you to the login

prompt (Figures 61, 62, 63, and 64).

Page 47: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 47 of 98

Figure 61. Booting from Hard Disk

Figure 62. Menu Options

Figure 63. Default Booting Menu Option

Page 48: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 48 of 98

Figure 64. Login Prompt

64. Use the KVM console to log in to the installed system as the user root with the password <<var_sys_root-

pw>> (Figure 65).

Figure 65. Login as root

Page 49: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 49 of 98

65. Configure the host name and disable IPv6 by entering the YaST command (Figure 66):

#yast2

Figure 66. YaST Control Center: Network Settings

66. Choose System > Network Settings and press Alt+S to select the Hostname/DNS tab (Figure 67).

Figure 67. YaST Control Center: Hostname/DNS

67. Enter the name <<var_hostname.domain>>. Also enter the Domain Name System (DNS) server address of

your network for resolution, if any and press Alt+O.

68. Press Alt+G to open the Global Options tab if you want to disable IPv6. Disable IPv6 by unselecting the

Enable IPv6 option as shown in Figure 68. Note that changing the IPv6 setting requires a reboot to apply the

change.

Page 50: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 50 of 98

Figure 68. YaST: IPv6 Setting

69. Press Alt+O to save the network configuration. Press Alt+Q to quit the YaST control center.

70. Reboot the system to apply the IPv6 selection and the host name settings:

#reboot

71. Identify the Ethernet interface port that is connected to the top-of-the-rack (ToR) switch. For now, you can use

that port for management connectivity to the host. You can also check the port by using the ifconfig

command, as shown in the sample in Figure 69.

Figure 69. Network Interface Configuration

72. Assign <<var_mgmt_ip_address>> as the IP address and enter <<var_mgmt_nw_netmask>> as the

subnet mask for the available interface (for example, eth5 as in the sample in Figure 68). You can use this

configuration temporarily until you port it to a high-availability bond device and create another configuration

with the Cisco VIC’s 10-Gbps ports.

Page 51: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 51 of 98

73. Go to the network configuration directory and create a configuration for eth5.

#cd /etc/sysconfig/network

#vi ifcfg-eth5

BOOTROTO=’static’

IPADDR=’<<var_mgmt_ip_address>>’

NETMASK=’<<var_mgmt_nw_netmask>>’

NETWORK=’’

MTU=’’

REMOTE_IPADDR=’’

STARTMODE=’auto’

USERCONTROL=’no’

74. Add the default gateway.

#cd /etc/sysconfig/network

# vi routes

default <<var_mgmt_gateway_ip>> - -

Note: Be sure that the system has access to the Internet or a SUSE update server to install the patches.

75. Verify /etc/hosts as shown in the sample in Figure 70.

Figure 70. Verifying /etc/hosts

Page 52: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 52 of 98

76. Set up a proxy service so that the appliance can reach the Internet (Figure 71).

#yast2

Figure 71. YaST Proxy Configuration

77. Enter the proxy server and port information as shown in the sample configuration in Figure 72. Select OK and

then quit YaST to save the configuration.

Page 53: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 53 of 98

Figure 72. YaST Proxy Configuration Continued

78. Register the system with SUSE to get the latest patches. For more information, refer to the SUSE knowledge-

base article at https://www.suse.com/de-de/support/kb/doc?id=7016626.

The system must have access to the Internet to proceed with this step.

#SUSEConnect -r <<registration_code>> -e <<email_address>>

79. Update the system with the following command. Again, the system must have access to the Internet to

proceed with this step.

#zypper update

80. Follow the on-screen instructions to complete the update process. Reboot the server and log in to the system

again.

Post-Installation OS Configuration

To optimize the use of the SAP HANA database with SLES 12 or SLES for SAP 12 SP1, apply the settings

presented here.

1. Disable transparent hugepages, configure C-states for lower latency, and disable the autoNUMA feature

(Figure 73).

a. Run the YaST2 boot loader:

# yast bootloader

b. Press Alt+K to go to the Kernel Parameters tab and edit the Optional Kernel Command Line Parameter

section by appending the following:

transparent_hugepage=never intel_idle.max_cstate=0 processor.max_cstate=1

numa_balancing=disabled

Page 54: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 54 of 98

Figure 73. YaST Optional Kernel Command Line Parameters Configuration

2. Configure energy performance bias (EPB) by appending cpupower set -b 0 to the /etc/init.d/after.local file at

boot time (Figure 74).

Figure 74. Configuring after.local with EPB settings

3. Reboot the server.

#reboot

Page 55: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 55 of 98

Configuring Bonding for High Availability

To configure a bond for high availability, first view the Ethernet interfaces available in the system.

By examining the hardware and MAC addresses of the interfaces using the ifconfig command and the properties

using ethtool, you can clearly differentiate the interfaces for the two dual-port Cisco UCS VIC 1225 adapters

installed in the server as well as the onboard 1-Gbps interface.

A bond configured with two 1-Gbps ports can be used for the administration, management, and access networks,

and a bond configured with two ports, using one port from each dual-port VIC, can be used for a backup network.

Additional interfaces can be configured on the VICs based on needs.

In the example in Figure 75, the ethtool output for the interfaces showing Fibre Channel support and 10-Gbps

throughput indicates that eth0 through eth4 are VIC ports. In addition, a close observation of their MAC addresses

reveals that eth0 and eth1 and that eth2 and eth3 are ports on the same VICs (in both cases, the last octet of the

MAC address differs).

So for high availability, eth0 and eth2 constitute one possible slave pair for creating a 10-Gbps bond device.

Likewise, 1-Gbps interfaces eth4 and eth5 are potential slave interfaces for a 1-Gbps bond device.

In this section, you will manually create at least these two bond interfaces.

Note: In SLES, use of YaST is recommended. It provides an easier wizardlike approach for creating bond

devices. For ease of implementation, this section provides steps for manually configuring it.

Page 56: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 56 of 98

Figure 75. The ifconfig Output Provides an Overview of the Interfaces

1. Create 1-Gbps bond device ifcfg-bond0 with eth4 and eth5 as slaves.

a. Create a bond0 configuration file.

# vi /etc/sysconfig/network/ifcfg-bond0

BONDING_MASTER='yes'

BONDING_MODULE_OPTS='mode=active-backup miimon=100'

BOOTPROTO='static'

BROADCAST=''

ETHTOOL_OPTIONS=''

Page 57: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 57 of 98

IPADDR=’<<var_mgmt_ip_address>>/<<var_mgmt_netmask_prefix>>’

MTU=''

NAME=''

NETWORK=''

REMOTE_IPADDR=''

STARTMODE='auto'

USERCONTROL='no'

BONDING_SLAVE0='eth4'

BONDING_SLAVE1='eth5'

b. Modify the eth4 and eth5 configuration files.

# vi /etc/sysconfig/network/ifcfg-eth4

BOOTPROTO='none'

BROADCAST=''

ETHTOOL_OPTIONS=''

IPADDR=''

MTU=''

NAME='VIC Ethernet NIC'

NETMASK=''

NETWORK=''

REMOTE_IPADDR=''

STARTMODE='hotplug'

USERCONTROL='no'

# vi /etc/sysconfig/network/ifcfg-eth5

BOOTPROTO='none'

BROADCAST=''

ETHTOOL_OPTIONS=''

IPADDR=''

MTU=''

NAME='VIC Ethernet NIC'

NETMASK=''

NETWORK=''

REMOTE_IPADDR=''

STARTMODE='hotplug'

USERCONTROL='no'

c. Test the configuration.

Restart the network service to bring up the bond0 interface. Then enter the following command:

# rcnetwork restart

To query the current status of the Linux kernel bounding driver, enter the following command:

# cat /proc/net/bonding/bond0

Page 58: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 58 of 98

Figure 76 shows sample output.

Figure 76. Sample bond0 Configuration Test Output

2. Create 10-Gbps bond device ifcfg-bond1 with eth0 and eth2 as slaves.

a. Create a bond1 configuration file.

# vi /etc/sysconfig/network/ifcfg-bond1

BONDING_MASTER='yes'

BONDING_MODULE_OPTS='mode=active-backup miimon=100'

BOOTPROTO='static'

BROADCAST=''

ETHTOOL_OPTIONS=''

IPADDR='<<ip_address_customer_usecase>>/<<netmask_prefix>>'

MTU=''

NAME=''

NETWORK=''

REMOTE_IPADDR=''

STARTMODE='auto'

USERCONTROL='no'

BONDING_SLAVE0='eth0'

BONDING_SLAVE1='eth2'

b. Modify the eth0 and eth2 configuration files.

# vi /etc/sysconfig/network/ifcfg-eth0

Page 59: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 59 of 98

BOOTPROTO='none'

BROADCAST=''

ETHTOOL_OPTIONS=''

IPADDR=''

MTU=''

NAME='VIC Ethernet NIC'

NETMASK=''

NETWORK=''

REMOTE_IPADDR=''

STARTMODE='hotplug'

USERCONTROL='no'

# vi /etc/sysconfig/network/ifcfg-eth2

BOOTPROTO='none'

BROADCAST=''

ETHTOOL_OPTIONS=''

IPADDR=''

MTU=''

NAME='VIC Ethernet NIC'

NETMASK=''

NETWORK=''

REMOTE_IPADDR=''

STARTMODE='hotplug'

USERCONTROL='no'

c. Test the configuration.

Restart the networking service to bring up the bond0 interface. Enter the following command:

# rcnetwork restart

To query the current status of Linux kernel bounding driver, enter the following command:

# cat /proc/net/bonding/bond1

Figure 77 shows sample output.

Page 60: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 60 of 98

Figure 77. Sample bond1 Configuration Test Output

Preparing SAP HANA Data, Log, and Shared File Systems

To prepare the file systems, you start by carving out logical volumes for the data, log, and HANA shared files. Then

you create the file systems. Then you update /etc/fstab and mount the volumes.

1. Use the following command to check for the available physical volume (PV), as shown in Figure 78.

#pvdisplay

Figure 78. Checking for the Physical Volume

2. Use the following command to check for the available volume group (VG) hanavg (Figure 79).

#vgdisplay

Page 61: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 61 of 98

Figure 79. Checking for the Volume Group

3. Create logical volumes (LVs) for the data, log, and HANA shared file systems (Figure 80).

#lvcreate –name <<lvname>> -I<<stripesize>> -L<<volume-size>> <<parent-vg-

name>>

# lvcreate --name datalv -I256 -L9T hanavg

# lvcreate --name loglv -I256 -L512G hanavg

# lvcreate --name sharedlv -I256 -L3T hanavg

Figure 80. Creating Logical Volumes

4. Verify the created logical volumes (Figure 81).

# lvdisplay

Page 62: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 62 of 98

Figure 81. Verifying the Logical Volumes

Page 63: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 63 of 98

5. Create file systems in the data, log and HANA shared volumes (Figure 82).

#mkfs.xfs -f /dev/hanavg/datalv

#mkfs.xfs -f /dev/hanavg/loglv

#mkfs.xfs -f /dev/hanavg/sharedlv

Figure 82. Creating File Systems

6. Create mount directories for the data, log, and HANA shared file systems.

#mkdir -p /hana/data

#mkdir -p /hana/log

#mkdir -p /hana/shared

7. Mount options vary from the default Linux settings for XFS for SAP HANA data and log volumes. The following

is a sample /etc/fstab entry. Make sure that you use the same mount options for the data and log file systems

as shown in example.

/dev/mapper/hanavg-rootlv / ext3 defaults 1 1

UUID=fc2e52c4-e6f6-4e9a-9ad1-86aeb3369942 /boot ext3 defaults 1 2

/dev/mapper/hanavg-swapvol swap defaults 0 0

/dev/hanavg/datalv /hana/data xfs

nobarrier,noatime,nodiratime,logbufs=8,logbsize=256k,async,swalloc,allocsize=131072k 1 2

/dev/hanavg/loglv /hana/log xfs

nobarrier,noatime,nodiratime,logbufs=8,logbsize=256k,async,swalloc,allocsize=131072k 1 2

/dev/hanavg/sharedlv /hana/shared xfs defaults 1 2

8. Use the following command to mount the file systems.

#mount -a

9. Use the df –h command to check the status of all mounted volumes (Figure 83).

Page 64: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 64 of 98

Figure 83. Checking the Status of Mounted Volumes

10. Change the directory permissions before you install SAP HANA. Use the chown command on each SAP

HANA node after the file systems are mounted.

#chmod -R 777 /hana/data

#chmod -R 777 /hana/log

#chmod –R 777 /hana/shared

Installing SAP HANA

Use the official SAP documentation, which describes the installation process with and without the SAP unified

installer.

For the SAP HANA installation documentation, see SAP HANA Server Installation Guide.

All other SAP installation and administration documentation is available at http://service.sap.com/instguides.

Important SAP Notes

Read the following SAP Notes before you start the installation. These SAP Notes contain the latest information

about the installation, as well as corrections to the installation documentation.

The latest SAP Notes can be found at: https://service.sap.com/notes.

SAP HANA In-Memory Database (IMDB) Notes

SAP Note 1514967: SAP HANA: Central note

SAP Note 2004651: SAP HANA platform SPS 08 release note

SAP Note 2075266: SAP HANA platform SPS 09 release note

SAP Note 1523337: SAP HANA database: Central note

SAP Note 2000003: FAQ: SAP HANA

SAP Note 1730999: Configuration changes in SAP HANA appliance

SAP Note 1514966: SAP HANA 1.0: Sizing SAP in-memory database

SAP Note 1780950: Connection problems due to host name resolution

Page 65: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 65 of 98

SAP Note 1780950: SAP HANA SPS 06: Network setup for external communication

SAP Note 1743225: SAP HANA: Potential failure of connections with scale-out nodes

SAP Note 1755396: Released disaster tolerant (DT) solutions for SAP HANA with disk replication

SAP Note 1890444: HANA system slow due to CPU power save mode

SAP Note 1681092: Support for multiple SAP HANA databases on a single SAP HANA appliance

SAP Note 1514966: SAP HANA: Sizing the SAP HANA database

SAP Note 1637145: SAP Business Warehouse (BW) on HANA: Sizing the SAP HANA database

SAP Note 1793345: Sizing for SAP Business Suite on SAP HANA

Linux Notes

SAP Note 2205917: SAP HANA database: Recommended OS settings for SLES 12 and SLES for SAP

Applications 12

SAP Note 2235581: SAP HANA: Supported operating systems

SAP Note 1944799: SAP HANA guidelines for the SLES operating system

SAP Note 1731000: Nonrecommended configuration changes

SAP Note 1557506: Linux paging improvements

SAP Note 1726839: SAP HANA database: Potential crash when using XFS file system

SAP Note 1740136: SAP HANA: Wrong mount option may lead to corrupt persistency

SAP Note 1829651: Time-zone settings in SAP HANA scale-out landscapes

SAP Application Notes

SAP Note 1658845: SAP HANA database hardware check

SAP Note 1637145: SAP BW on SAP HANA: Sizing SAP in-memory database

SAP Note 1661202: Support for multiple applications on SAP HANA

SAP Note 1681092: Support for multiple SAP HANA databases on one SAP HANA appliance (also known as multi-

system ID [multi-SID])

SAP Note 1577128: Supported clients for SAP HANA 1.0

SAP Note 1808450: Homogenous system landscape for on SAP BW on SAP HANA

SAP Note 1976729: Application component hierarchy for SAP HANA

SAP Note 1927949: Standard behavior for SAP logon tickets

SAP Note 1577128: Supported clients for SAP HANA

Third-Party Software Notes

SAP Note 1730928: Using external software in an SAP HANA appliance

Page 66: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 66 of 98

SAP Note 1730929: Using external tools in an SAP HANA appliance

SAP Note 1730930: Using antivirus software in an SAP HANA appliance

SAP Note 1730932: Using backup tools with Backint for SAP HANA

SAP HANA Virtualization Notes

SAP Note 1788665: SAP HANA running on VMware vSphere virtual machines

SAP HANA Post-Installation Checkup

For a SAP HANA system installed with <SID> set to BWL and the system number <nr> set to 00, log in as

<sid>adm ir bwladm and run the commands presented here.

To Check the SAP HANA Services

bwladm@cishana01:/usr/sap/BWL/HDB00> /usr/sap/hostctrl/exe//sapcontrol -nr

00 -function GetProcessList

19.05.2016 11:29:27

GetProcessList

OK

name, description, dispstatus, textstatus, starttime, elapsedtime, pid

hdbdaemon, HDB Daemon, GREEN, Running, 2016 04 13 08:51:49, 866:37:38, 41691

hdbcompileserver, HDB Compileserver, GREEN, Running, 2016 04 13 08:51:56,

866:37:31, 41837

hdbindexserver, HDB Indexserver, GREEN, Running, 2016 04 13 08:52:00,

866:37:27, 41863

hdbnameserver, HDB Nameserver, GREEN, Running, 2016 04 13 08:51:50,

866:37:37, 41711

hdbpreprocessor, HDB Preprocessor, GREEN, Running, 2016 04 13 08:51:56,

866:37:31, 41839

hdbwebdispatcher, HDB Web Dispatcher, GREEN, Running, 2016 04 13 08:53:11,

866:36:16, 42431

hdbxsengine, HDB XSEngine, GREEN, Running, 2016 04 13 08:52:00, 866:37:27,

41865

bwladm@cishana01-bwl:/usr/sap/BWL/HDB00>

Page 67: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 67 of 98

To Check the HANA Database (HDB) Information

bwladm@cishana01:/usr/sap/BWL/HDB00> HDB info

USER PID PPID %CPU VSZ RSS COMMAND

bwladm 59578 59577 0.0 108472 1944 -sh

bwladm 59663 59578 0.0 114080 2020 \_ /bin/sh /usr/sap/BWL/HDB00/HDB

info

bwladm 59692 59663 0.0 118048 1596 \_ ps fx -U bwladm -o

user,pid,ppid,pcpu,vsz,rss,args

bwladm 41683 1 0.0 22188 1640 sapstart

pf=/hana/shared/BWL/profile/BWL_HDB00_cishana01-bwl

bwladm 41691 41683 0.0 582888 290988 \_ /usr/sap/BWL/HDB00/cishana01-

bwl/trace/hdb.sapBWL_HDB00 -d -nw -f /usr/sap/BWL/HDB00/cishana01-

bwl/daemon.ini

bwladm 41711 41691 0.3 54292416 2058900 \_ hdbnameserver

bwladm 41837 41691 0.1 4278472 1243356 \_ hdbcompileserver

bwladm 41839 41691 0.2 11773976 8262724 \_ hdbpreprocessor

bwladm 41863 41691 6.2 22143172 18184604 \_ hdbindexserver

bwladm 41865 41691 0.5 8802064 2446612 \_ hdbxsengine

bwladm 42431 41691 0.1 4352988 823220 \_ hdbwebdispatcher

bwladm 41607 1 0.0 497576 23232 /usr/sap/BWL/HDB00/exe/sapstartsrv

pf=/hana/shared/BWL/profile/BWL_HDB00_cishana01-bwl -D -u bwladm

bwladm@cishana01-bwl:/usr/sap/BWL/HDB00>

Tuning the SAP HANA Performance Parameters

After SAP HANA is installed, tune the parameters shown here to get the best performance.

Log in as the SAP HANA system administrator <sid>adm to run the commands.

Page 68: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 68 of 98

To Tune the Data File System

bwladm@cishana01:/usr/sap/HWL/HDB00> hdbparam --paramset

fileio"[/hana/data/HWL/hdb00001/]".max_parallel_io_requests=256

bwladm@cishana01:/usr/sap/HWL/HDB00> hdbparam --paramset

fileio"[/hana/data/HWL/hdb00001/]".async_read_submit=on

bwladm@cishana01:/usr/sap/HWL/HDB00> hdbparam --paramset

fileio"[/hana/data/HWL/hdb00001/]".async_write_submit_blocks=all

bwladm@cishana01:/usr/sap/HWL/HDB00> hdbparam --paramset

fileio"[/hana/data/HWL/hdb00001/]".async_write_submit_active=on

To Tune the Log File System

bwladm@cishana01:/usr/sap/HWL/HDB00> hdbparam --paramset

fileio"[/hana/log/HWL/hdb00001/]".async_read_submit=on

bwladm@cishana01:/usr/sap/HWL/HDB00> hdbparam --paramset

fileio"[/hana/log/HWL/hdb00001/]".async_write_submit_blocks=all

bwladm@cishana01:/usr/sap/HWL/HDB00> hdbparam --paramset

fileio"[/hana/log/HWL/hdb00001/]".async_write_submit_active=on

Monitoring and Maintenance Operations

Hardware Monitoring and Maintenance

This section discusses hardware monitoring and maintenance tasks.

Checking Faults and Logs

To check faults and logs, follow these steps.

1. Open your web browser and navigate to the console. Log in with your credentials (Figure 84).

Page 69: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 69 of 98

Figure 84. Cisco IMC Login Page

2. Choose Server > Faults and Logs (Figure 85).

Figure 85. Faults and Logs Summary Page

Page 70: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 70 of 98

3. Expand the columns to meet your needs and look for faults with a severity level of Critical. Note the

descriptions. You may find faulty hardware. The Summary section provides an option to launch a KVM session

in the event that you have lost the network connection. From the KVM console, you can work as in a normal

SSH session.

4. View the health of the hard drives from the IMC as shown in Figure 86.

Figure 86. Viewing the Health of the Hard Drives

5. View the RAID levels that are configured and the disks associated with the various RAID levels from IMC as

well. This screen also shows the status of individual disks in the RAID level to help you address any problems

(Figure 87).

Page 71: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 71 of 98

Figure 87. Viewing the RAID Levels

Using the MegaCLI Utility

You can use MegaCLI Utility to obtain information from the LSI RAID controller. You can also use it as a

troubleshooting tool. It is a command-line interface (CLI) binary file that is used to communicate with the full LSI

family of RAID controllers. The program is a text-based CLI and consists of a single static binary file.

You need to install the MegaCLI64 program to be able to communicate with the LSI controller. To install this

program, follow these steps:

1. Go to the LSI Downloads page: http://www.avagotech.com/support/download-search.

2. Search on the keyword megacli.

3. Click Management Software and Tools.

4. Download the MegaCLI <<x.xXx> zip file (use the file that is valid for all DOS, Microsoft Windows, Linux,

and FreeBSD operating systems).

5. Unzip the file.

6. The Linux directory contains a Red Hat Package Manager (RPM) file. Copy it to the SAP HANA node

using SFTP.

7. Install the RPM file using the command rpm -ivh <<MegaCli-x.xx.xx-x.noarch.rpm>>.

Page 72: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 72 of 98

[root@cishana01 ~]# rpm -ivh MegaCli-8.07.14-1.noarch.rpm

Preparing...

########################################### [100%]

1:MegaCli

########################################### [100%]

[root@cishana01 ~]# cd /opt/MegaRAID/MegaCli

[root@cishana01 MegaCli]# ll

total 3228

-rw-r--r--. 1 root 0 Jul 4 22:28 install.log

lrwxrwxrwx. 1 root 48 Jul 4 22:28 libstorelibir-2.so ->

/opt/MegaRAID/MegaCli/libstorelibir-2.so.14.07-0

-rwx------. 1 root 540512 Dec 16 2013 libstorelibir-2.so.14.07-0

-rwxr-xr-x. 1 root 2720320 Dec 16 2013 MegaCli64

-rw-r--r--. 1 root 32369 Jul 4 22:35 MegaSAS.log

Replacing a Failed Hard Drive

The monitoring tasks may reveal a hard-drive failure. In addition, the color of the LED in the faulty hard drive will

change from green to amber. To replace or install a hot-pluggable hard drive, follow the steps presented here

(Figure 88).

1. Remove the drive that you are replacing or remove a blank panel from an empty bay.

a. Press the release button on the face of the hard drive.

b. Grasp the ejector lever and pull the hard drive tray out of the slot.

c. If you are replacing an existing drive, remove the four drive tray screws that secure the drive to the tray and

then lift the drive out of the tray.

2. Install a new drive.

a. Place a new hard drive in the empty drive tray and replace the four drive-tray screws.

b. Insert the drive tray into the empty drive bay.

c. Push the tray into the slot until the drive connectors are fully seated in the backplane.

d. Press the ejector lever flat to lock the drive and tray in place.

Page 73: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 73 of 98

Figure 88. Replacing a Hard Drive

1 Drive bays 1 to 12

(All bays support SAS and SATA drives.)

2 Drive bays 3, 4, 6, 7, 8, 10, 11, and 12

(At this time, the supported RAID controller can support only 8 drives, which must be in these bays for RAID control.)

Page 74: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 74 of 98

Configuring RAID After Replacing a Faulty Disk Drive

After you replace a disk drive, you need to configure RAID.

1. Enter the following command to display the statistics for the MegaRAID controller and the disks.

cishana01:/opt/MegaRAID/MegaCli # ./MegaCli64 -EncInfo -aALL

Number of enclosures on adapter 0 -- 1

Enclosure 0:

Device ID : 25

Number of Slots : 12

Number of Power Supplies : 0

Number of Fans : 0

Number of Temperature Sensors : 1

Number of Alarms : 0

Number of SIM Modules : 0

Number of Physical Drives : 12

Status : Normal

Position : 1

Connector Name : Port 0 - 3

Enclosure type : SES

FRU Part Number : N/A

Enclosure Serial Number : N/A

ESM Serial Number : N/A

Enclosure Zoning Mode : N/A

Partner Device Id : 65535

Inquiry data :

Vendor Identification : Cisco

Product Identification : UCS-C460-M4

Product Revision Level : 0225

Vendor Specific : x48-65.2.37.0

Page 75: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 75 of 98

2. Enter the following command to see a list of the available virtual drives (RAID arrays) configured with

the controller.

cishana01:/opt/MegaRAID/MegaCli # ./MegaCli64 -LDInfo -Lall -Aall

Adapter 0 -- Virtual Drive Information:

Virtual Drive: 0 (Target Id: 0)

Name :ucs_hana

RAID Level : Primary-5, Secondary-0, RAID Level Qualifier-3

Size : 15.997 TB

Sector Size : 512

Is VD emulated : No

Parity Size : 1.454 TB

State : Optimal

Strip Size : 256 KB

Number Of Drives : 12

Span Depth : 1

Default Cache Policy: WriteBack, ReadAdaptive, Cached, Write Cache OK if Bad BBU

Current Cache Policy: WriteBack, ReadAdaptive, Cached, Write Cache OK if Bad BBU

Default Access Policy: Read/Write

Current Access Policy: Read/Write

Disk Cache Policy : Disk's Default

Encryption Type : None

PI type: No PI

Is VD Cached: No

Page 76: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 76 of 98

3. Enter the following command to view the failed disk in the RAID array. Also, the LED on the failed hard

drive will be amber and blinking. Note the enclosure device ID and the slot number.

cishana01:/opt/MegaRAID/MegaCli # ./MegaCli64 -PDList -aAll | egrep "Enclosure

Device ID:|Slot Number:|Inquiry Data:|Error Count:|state"

Enclosure Device ID: 25

Slot Number: 1

Media Error Count: 0

Other Error Count: 0

Firmware state: Online, Spun Up

Inquiry Data: SanDisk LT1600MO C401423398600000ags/T43L

Enclosure Device ID: 25

Slot Number: 2

Media Error Count: 0

Other Error Count: 0

Firmware state: Online, Spun Up

Inquiry Data: SanDisk LT1600MO C401423813520000ags/T43L

Enclosure Device ID: 25

Slot Number: 3

Media Error Count: 0

Other Error Count: 0

Firmware state: Online, Spun Up

Inquiry Data: SanDisk LT1600MO C401424343720000ags/T43L

Enclosure Device ID: 25

Slot Number: 4

Media Error Count: 0

Other Error Count: 0

Firmware state: Offline

Inquiry Data: SanDisk LT1600MO C401424357000000ags/T43L

4. Manually inspect the output for the drive for which the firmware state is not “Online.” Drives that have been

removed will not appear in this list.

5. Prepare to remove the failed disk from the RAID array. In the following example, [25:4] represents the

enclosure device ID, and the disk slot number -a0 points to adapter 0.

a. Set the drive offline, if it is not already offline due to an error.

cishana01:/opt/MegaRAID/MegaCli # ./MegaCli64 -PDOffline -PhysDrv [25:4]

–a0

Page 77: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 77 of 98

b. Mark the drive as missing and note the array and row information, which you will need later when you

replace the drive.

cishana01:/opt/MegaRAID/MegaCli # ./MegaCli64 -PDMarkMissing -PhysDrv [25:4] –

a0

EnclId-25 SlotId-4 is marked Missing.

Exit Code: 0x00

cishana01:/opt/MegaRAID/MegaCli # ./MegaCli64 -PDGetMissing -aALL

Adapter 0 - Missing Physical drives

No. Array Row Size Expected

0 0 1 837353 MB

Exit Code: 0x00

c. Prepare the drive for removal.

cishana01:/opt/MegaRAID/MegaCli # ./MegaCli64 -PDPrpRmv -PhysDrv [25:4] –

a0

6. Physically remove the failed disk and insert the new replacement disk. After the new disk is inserted, it will be

considered a foreign disk and is shown with the status “Unconfigured (bad).”

cishana01:/opt/MegaRAID/MegaCli # ./MegaCli64 -PDList -aAll | egrep "Enclosure

Device ID:|Slot Number:|Inquiry Data:|Error Count:|state"

Enclosure Device ID: 25

Slot Number: 3

Media Error Count: 0

Other Error Count: 0

Firmware state: Online, Spun Up

Inquiry Data: SanDisk LT1600MO C401424343720000ags/T43L

Enclosure Device ID: 25

Slot Number: 4

Media Error Count: 0

Other Error Count: 0

Firmware state: Unconfigured (bad)

Inquiry Data: SanDisk LT1600MO C401424357000000ags/T43L

Page 78: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 78 of 98

7. Enter the following commands to make the newly inserted disk usable in a RAID array.

cishana01:/opt/MegaRAID/MegaCli # ./MegaCli64 -CfgForeign -Scan -a0

There are 1 foreign configuration(s) on controller 0.

Exit Code: 0x00

cishana01:/opt/MegaRAID/MegaCli # ./MegaCli64 -CfgForeign -Clear -a0

Foreign configuration 0 is cleared on controller 0.

Exit Code: 0x00

cishana01:/opt/MegaRAID/MegaCli # ./MegaCli64 -PDMakeGood -PhysDrv [252:4] -a0

cishana01:/opt/MegaRAID/MegaCli # ./MegaCli64 -PDList -aAll | egrep "Enclosure

Device ID:|Slot Number:|Inquiry Data:|Error Count:|state"

Enclosure Device ID: 25

Slot Number: 3

Media Error Count: 0

Other Error Count: 0

Firmware state: Online, Spun Up

Inquiry Data: SanDisk LT1600MO C401424343720000ags/T43L

Enclosure Device ID: 25

Slot Number: 4

Media Error Count: 0

Other Error Count: 0

Firmware state: Unconfigured (good)

Inquiry Data: SanDisk LT1600MO C401424357000000ags/T43L

8. Add the new drive to your RAID virtual drive and start the rebuilding process.

cishana01:/opt/MegaRAID/MegaCli # ./MegaCli64 -PDReplaceMissing -PhysDrv [25:4] –

Array0 –row1 –a0

cishana01:/opt/MegaRAID/MegaCli # ./MegaCli64 -PDRbld -Start -PhysDrv [25:4] –a0

Page 79: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 79 of 98

9. Verify the progress of the rebuilding operation.

cishana01:/opt/MegaRAID/MegaCli # ./MegaCli64 -PDList -aAll | egrep "Enclosure

Device ID:|Slot Number:|Inquiry Data:|Error Count:|state"

Enclosure Device ID: 25

Slot Number: 3

Media Error Count: 0

Other Error Count: 0

Firmware state: Online, Spun Up

Inquiry Data: SanDisk LT1600MO C401424343720000ags/T43L

Enclosure Device ID: 25

Slot Number: 4

Media Error Count: 0

Other Error Count: 0

Firmware state: Rebuild

Inquiry Data: SanDisk LT1600MO C401424357000000ags/T43L

The drive status should be displayed as “Firmware state: Rebuild.”

a. Enter the following command to see the rebuild status.

cishana01:/opt/MegaRAID/MegaCli # ./MegaCli64 -PDrbld -showprog -

physdrv[9:2] –a0

b. Display the rebuild status with a continuous text GUI message.

cishana01:/opt/MegaRAID/MegaCli #./MegaCli64 -PDrbld -progdsply -physdrv[9:2] –a0

10. After the rebuilding process is complete, the disk will be online and participating in the RAID configuration.

Check the status of the disk with the commands in step 9.

Page 80: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 80 of 98

Identifying a Faulty DIMM

The memory riser has LEDs that can assist you in isolating a faulty DIMM. Faulty DIMMs are indicated by amber

lights on the DIMM fault LEDs (Figure 89).

Figure 89. Memory Riser LEDs (Top View)

1 Attention button (used for hot swapping)

2 Attention LED (indicates whether hot swapping is safe)

3 Power LED (indicates whether the riser has power)

4 Mirror activity LED (indicates whether memory mirroring is enabled)

5 DIMM fault LEDs 1 through 8 (indicate which DIMM has failed)

Replacing a Failed DIMM

To replace a failed DIMM pair, follow these steps (Figure 90):

1. Remove the DIMMs that you are replacing.

a. Slide the server out the front of the rack far enough so that you can remove the top cover.

b. Remove the top cover.

c. Press the attention button (ATTN) on the top of the memory riser that contains the faulty DIMM.

d. Wait until the attention LED (ATTN) and the power LED turn off.

e. Simultaneously press both green release buttons on the top of the memory riser to release the riser

retaining latches. The latches open at a 45-degree angle when they are released.

f. Lift the memory riser straight up and out of the motherboard connector.

g. Locate the faulty DIMM and remove it from the connector on the memory riser.

2. Install a new DIMM.

a. Insert the DIMM assembly into the connector on the riser.

b. Push the DIMM into the connector until it is seated properly and the white clips on either side of the

connector lock into place.

c. Push the hot-swappable memory riser into the motherboard connector until it is seated and the open

release levers engage the chassis and the CPU cage.

d. Simultaneously press down on each release lever to put the levers in the closed position. This step helps

ensure that the riser is properly seated in the motherboard connector.

e. Press the attention button on the top of the memory riser. Then wait until the attention LED turns off.

Page 81: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 81 of 98

f. Replace the top cover.

g. Replace the server in the rack and replace any cables.

Figure 90. Removing and Replacing DIMMs

1 DIMM slots 2 Memory riser

Upgrading the BIOS and Firmware on the Cisco UCS C460 M4

The Cisco Host Upgrade Utility (HUU) is a tool that upgrades the following firmware:

● Cisco IMC

● System BIOS

● LAN on motherboard (LOM)

● RAID controllers (for any third-party RAID controllers that are installed)

● Cisco UCS VIC 1225

● Intel PCI adapters: i350 quad-port adapter

● LSI: LSI MegaRAID SAS 9361-8i controller

The upgrade utility includes the options to download ISO images for a selected platform on a Microsoft Windows

operating system. The image file for the firmware is embedded in the ISO image, and the utility displays a menu

that allows you to choose the firmware components that you want to upgrade.

Using the Cisco Host Upgrade Utility

You can use the HUU ISO image to upgrade components of the server from the host locally with a writable disk

(DVD or CD), or remotely by mounting the HUU ISO image as a virtual device.

1. Download the HUU ISO file.

a. Navigate to the following URL: http://www.cisco.com/cisco/software/navigator.html.

b. In the middle column, click Servers – Unified Computing.

c. In the right column, click Cisco UCS C-Series Rack-Mount Standalone Server Software.

d. In the right column, choose the name of your server model.

e. Click Unified Computing System (UCS) Server Firmware.

f. Choose the release number.

g. Click Download Now to download the ucs-server platform-huu-version_number.iso file.

Page 82: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 82 of 98

h. Verify the information on the next page. Then click Proceed With Download.

i. Continue through the subsequent screens to accept the license agreement and browse to the location

where you want to save the file.

2. If you want to prepare the ISO image for a local upgrade, complete this step; otherwise, go to step 3.

a. Copy the ISO image onto a writable disk (DVD, USB flash drive, or CD).

b. Connect a VGA monitor and USB keyboard to the Cisco UCS C-Series server.

c. Insert the disk into the DVD drive of the Cisco UCS C-Series server.

d. Proceed to step 4.

3. Prepare the ISO image for a remote upgrade using the KVM console.

a. Use a browser to connect to the IMC GUI software on the server that you are upgrading.

b. In the address field of the browser, enter the IMC IP address for that server; then enter your username

and password.

c. On the toolbar, click Launch KVM Console to launch the KVM console.

d. On the KVM console, click Virtual Media.

e. Click Add Image and click the ucs-server-name-huu-version_number.iso file.

f. In the Client View area, in the Mapped column, select the check box for the ISO file that you added and

then wait for the mapping process to complete.

g. After the ISO file appears as a mapped remote device, proceed to step 4.

4. Boot the server and press F6 when you are prompted to open the Boot Menu screen.

5. On the Boot Menu screen, choose the prepared ISO image:

● For a local upgrade, choose the physical CD/DVD device and then press Enter.

● For a remote upgrade, choose Cisco vKVM-Mapped vDVD1.22 and press Enter.

The server boots from the selected device.

6. After the HUU boots, the Cisco End-User License Agreement (EULA) appears. Read the EULA and select one

of the following:

● Select “I Agree” to accept the license agreement and proceed with the update.

● Select “I Disagree” to cancel the update process.

Page 83: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 83 of 98

After you accept the EULA, the HUU window appears with a list of all the components that are available for

updating.

7. If you want to update all the listed components, click Update all.

8. If you want update specific components from the list, choose the components that you want to update.

9. Click Update.

Note: You should update the BIOS each time that you update the IMC firmware. You also should update the

IMC each time you update the BIOS firmware. If you update the IMC firmware, after successfully completing the

update, reboot the server to activate the new firmware.

This step initiates the update process, and the status of the update process is displayed in the Update Status

column. You can also view a more detailed log of a series of activities and statuses involved in updating the

firmware in the Execution Logs section.

10. Reboot the server and click Verify Last Update to verify if the update was successfully completed.

This action compares the previously updated firmware version for each component that was updated using the

HUU with the current version of the firmware on the components and provides the status of the update.

11. If you want to save the update status log files for later use, click Save Logs.

Log files that contain a detailed status of the update are saved to an external USB device that is connected to

the server physically or through the KVM virtual media.

Note: If an error occurs while the firmware is being updated, you are prompted to save the error log. Click Save

Logs to save the log to an externally connected USB device. This log can be used to identify the cause of the error

and perform troubleshooting.

12. Click Exit to exit from the HUU.

Monitoring the Operating System

You can install monitoring agents, such as Tivoli, on the SAP HANA nodes to integrate the Cisco and SAP HANA

solution into a central enterprise monitoring tool.

Also, you can configure the syslog-ng daemon to send log messages to the existing central log host available on

the customer infrastructure.

Maintaining the Operating System

The customer is responsible for implementing security updates and patches, adding software components, and

changing OS settings that may be requested by SAP for future releases of SAP HANA or that may be required by

SUSE to help ensure system security and stability. See the related SAP OS notes for required OS settings.

This section describes how to update the OS and the implications of updating OS components. It is not meant to

replace the Linux administration documentation.

Prerequisites

Whenever you change the OS or parts of the OS such as drivers and kernel parameters, be sure that you have at

least a backup copy of your SAP HANA system, preferably not stored on the appliance. You also should check the

related OS notes or Cisco support channels for additional information.

Page 84: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 84 of 98

Some changes may require a reboot and should be applied when SAP HANA is shut down.

Updating the OS and Kernel

Not all updates and patches update the OS kernel. But if a kernel update is necessary, you need to take specific

precautions. During the entire update process, SAP HANA must be shut down.

These are the general steps for updating the kernel:

● Perform these tasks before updating the kernel:

◦ Stop SAP HANA and back up the existing log area (in case the device causes a problem and needs to be

recreated).

◦ Unmount /hana/log and cleaning /etc/fstab.

● Update the kernel using YaST (or a manual procedure).

● Perform these tasks after updating the kernel:

◦ Check the GRUB file and boot sector (menu.lst).

◦ Reboot and check /etc/fstab.

The following steps present the tasks in more detail.

1. Back up the SAP HANA log area.

a. Stop SAP HANA. Then move to the log area and back up the HANA log partition.

cishana01 :~ # cd /hana/log

cishana01 :/hana/log # find . –xdev | cpio –oav > /backup/hana.log.cpio

b. If the backup partition has enough room, choose it. Otherwise, choose an appropriate location for the

backup.

2. Unmount /hana/log.

cishana01 :~ #umount /hana/log

Updating SUSE and the Kernel Online

You can update the operating system and kernel either through YaST or manually.

Page 85: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 85 of 98

Option 1: Using YaST

You can update the OS online using YaST. This method will update all OS components. A kernel update may also

be included.

1. Set up a proxy service, if necessary, so that the appliance can reach the Internet. Make sure that

PROXY_ENABLED is set to “yes” and that appropriate proxy server host IP address for the port configured is

used.

cishana01:~ # cd /etc/sysconfig/

cishana01:/etc/sysconfig # vi proxy

PROXY_ENABLED="yes"

HTTP_PROXY="http://<Proxy_server_IP>:<Proxy_Service_port>"

HTTPS_PROXY="http://<Proxy_server_IP>:<Proxy_service_port>"

FTP_PROXY="http://<Proxy_server_IP>:<Proxy_service_port>"

2. Start YaST and choose Software > Online Update.

a. Select Yes to configure the update repository (Figure 91).

Figure 91. YaST Online Update

b. Log in with your account used for licensing to register the server. Click Next (Figure 92).

Page 86: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 86 of 98

Figure 92. YaST Online Update: Registration

c. An overview of the available extension and modules is displayed. Click Next (Figure 93).

Figure 93. YaST Online Update: Extension and Module Selection

Page 87: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 87 of 98

d. A list of the available patches in the online repository is displayed. Click Accept (Figure 94).

Figure 94. YaST Online Update: Patches List

The system downloads all the available patches (Figures 95 and 96).

Page 88: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 88 of 98

Figure 95. YaST Online Update: Package Update

Figure 96. YaST Online Update: List of Packages Updated

e. Some patches may require a reboot after installation. Select Continue (Figure 97).

Page 89: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 89 of 98

Figure 97. YaST Online Update: Package Update

Patches are downloaded and installed (Figure 98).

Page 90: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 90 of 98

Figure 98. YaST Online Update: Progress of Package Update Process

f. The release notes are displayed. Select Close (Figure 99).

Page 91: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 91 of 98

Figure 99. YaST Online Update: Release Notes

g. Click OK at the reboot prompt (Figure 100).

Page 92: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 92 of 98

Figure 100. YaST Online Update: Reboot Message

h. Quit YaST.

i. Reboot the system to apply the patches.

SAP HANA Operations and Maintenance

SAP HANA operations and maintenance are described in detail in many related SAP documents. For a complete

list of documentation, see http://help.sap.com/hana.

This document summarizes only a few important operation and maintenance procedures. Most of the procedures

described in this document are CLI procedures and are independent of any GUI requiring an X terminal or other

GUI front end (Microsoft Windows PC, Linux desktop, etc.). CLI procedures can be started using the KVM or any

SSH tool such as PuTTY (for Windows) or Terminal (for Mac OS), or any Linux terminal window to connect to the

SAP HANA database system (the appliance).

Monitoring SAP HANA

Three easy CLI methods are available to check the running SAP HANA database.

Page 93: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 93 of 98

saphostagent

1. Start a shell and connect to the SAP HANA system as root user.

cishana01:~ # /usr/sap/hostctrl/exe/saphostctrl -function ListDatabases

Instance name: HDB00, Hostname: cishana01, Vendor: HDB, Type: hdb, Release:

1.00.60.0379371

Database name: HAN, Status: Error

cishana01:~ #

2. Get a list of installed HANA instances or databases.

cishana01:~ # /usr/sap/hostctrl/exe/saphostctrl -function ListInstances

Inst Info : HAN - 00 - cishana01 - 740, patch 17, changelist 1413428

cishana01:~ #

3. Using this information (SID and system number), you can use sapcontrol to gather more information about

the running SAP HANA database.

sapcontrol

1. In a shell, use the sapcontrol function GetProcessList to display a list of running HANA OS processes.

cishana01:~ # /usr/sap/hostctrl/exe/sapcontrol -nr 00 -function GetProcessList

19.07.2016 14:54:45

GetProcessList

OK

name, description, dispstatus, textstatus, starttime, elapsedtime, pid

hdbdaemon, HDB Daemon, GREEN, Running, 2016 07 15 11:57:45, 98:57:00, 8545

hdbnameserver, HDB Nameserver, GREEN, Running, 2016 07 15 12:05:27, 98:49:18,

11579

hdbpreprocessor, HDB Preprocessor, GREEN, Running, 2013 08 15 12:05:27,

98:49:18, 11580

hdbindexserver, HDB Indexserver, GREEN, Running, 2016 07 15 12:05:27,

98:49:18, 11581

hdbstatisticsserver, HDB Statisticsserver, GREEN, Running, 2016 07 15

12:05:27, 98:49:18, 11582

hdbxsengine, HDB XSEngine, GREEN, Running, 2016 07 15 12:05:27, 98:49:18,

11583

sapwebdisp_hdb, SAP WebDispatcher, GREEN, Running, 2016 07 15 12:05:27,

98:49:18, 11584

hdbcompileserver, HDB Compileserver, GREEN, Running, 2016 07 15 12:05:27,

98:49:18, 11585

You see processes such as hdbdaemon, hdbnameserver, and hdbindexserver that belong to a running

SAP HANA database.

2. You can also get a system instance list, which is more useful for a scale-out appliance.

Page 94: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 94 of 98

cishana01:~ # /usr/sap/hostctrl/exe/sapcontrol -nr 00 -function

GetSystemInstanceList

19.07.2016 15:03:12

GetSystemInstanceList

OK

hostname, instanceNr, httpPort, httpsPort, startPriority, features, dispstatus

cishana01, 0, 50013, 0, 0.3, HDB, GREEN

HDB info

Another important tool is the HDB info command, which needs to be issued by the <SID>adm user: the OS user

who owns the SAP HANA database.

As the root user on the SAP HANA appliance, enter the following command.

cishana01:~ # su – hanadm

cishana01:/usr/sap/HAN/HDB00> HDB info

USER PID PPID %CPU VSZ RSS COMMAND

hanadm 61208 61207 1.6 13840 2696 -sh

hanadm 61293 61208 0.0 11484 1632 \_ /bin/sh /usr/sap/HAN/HDB00/HDB info

hanadm 61316 61293 0.0 4904 872 \_ ps fx -U hanadm -o

user,pid,ppid,pcpu,vsz,rss,args

hanadm 8532 1 0.0 20048 1468 sapstart

pf=/hana/shared/HAN/profile/HAN_HDB00_cishana01

hanadm 8545 8532 1.5 811036 290140 \_

/usr/sap/HAN/HDB00/cishana01/trace/hdb.sapHAN_HDB00 -d -nw -f

/usr/sap/HAN/HDB00/cis

hanadm 11579 8545 6.6 16616748 1789920 \_ hdbnameserver

hanadm 11580 8545 1.5 5675392 371984 \_ hdbpreprocessor

hanadm 11581 8545 10.9 18908436 6632128 \_ hdbindexserver

hanadm 11582 8545 8.7 17928872 3833184 \_ hdbstatisticsserver

hanadm 11583 8545 7.4 17946280 1872380 \_ hdbxsengine

hanadm 11584 8545 0.0 203396 16000 \_ sapwebdisp_hdb

pf=/usr/sap/HAN/HDB00/cishana01/wdisp/sapwebdisp.pfl -f /usr/sap/H

hanadm 11585 8545 1.5 15941688 475708 \_ hdbcompileserver

hanadm 8368 1 0.0 216268 75072 /usr/sap/HAN/HDB00/exe/sapstartsrv

pf=/hana/shared/HAN/profile/HAN_HDB00_cishana01 -D -u

This command produces output similar to that from the sapcontrol GetProcessList function, with a bit more

information about the process hierarchy.

Starting and Stopping SAP HANA

Before you stop the SAP HANA appliance, you must be able to stop and start the SAP HANA database. You can

use the commands shown here.

Page 95: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 95 of 98

sapcontrol

You can use the sapcontrol functions StartSystem and StopSystem to start and stop a HANA database.

Stop the system with the StopSystem function.

cishana01:~ # /usr/sap/hostctrl/exe/sapcontrol -nr 00 -function StopSystem HDB

19.07.2016 15:05:35

StopSystem

OK

Use the following command to check that the database has stopped.

cishana01:~ # /usr/sap/hostctrl/exe/sapcontrol -nr 00 -function

GetSystemInstanceList

19.07.2016 15:05:58

GetSystemInstanceList

OK

hostname, instanceNr, httpPort, httpsPort, startPriority, features, dispstatus

cishana01, 0, 50013, 0, 0.3, HDB, YELLOW

Wait for the status to be “GRAY.”

cishana01:~ # /usr/sap/hostctrl/exe/sapcontrol -nr 00 -function

GetSystemInstanceList

19.07.2016 15:07:52

GetSystemInstanceList

OK

hostname, instanceNr, httpPort, httpsPort, startPriority, features, dispstatus

cishana01, 0, 50013, 0, 0.3, HDB, GRAY

Page 96: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 96 of 98

Alternatively, use the HDB info command

cishana01:~ # su -l hanadm

cishana01:/usr/sap/HAN/HDB00> HDB info

USER PID PPID %CPU VSZ RSS COMMAND

hanadm 61477 61476 2.0 13840 2692 -sh

hanadm 61562 61477 0.0 11484 1632 \_ /bin/sh /usr/sap/HAN/HDB00/HDB info

hanadm 61585 61562 0.0 4904 872 \_ ps fx -U hanadm -o

user,pid,ppid,pcpu,vsz,rss,args

hanadm 8368 1 0.0 216784 75220 /usr/sap/HAN/HDB00/exe/sapstartsrv

pf=/hana/shared/HAN/profile/HAN_HDB00_cishana01 -D -u

cishana01:/usr/sap/HAN/HDB00>

You can start the database again with the sapcontrol command StartSystem function.

cishana01:~ # /usr/sap/hostctrl/exe/sapcontrol -nr 00 -function StartSystem

HDB

19.07.2016 15:08:48

StartSystem

OK

To check the system status, use the sapcontrol command GetSystemInstanceList function. Wait for status

“GREEN.”

cishana01:~ # /usr/sap/hostctrl/exe/sapcontrol -nr 00 -function

GetSystemInstanceList

19.07.2016 15:10:19

GetSystemInstanceList

OK

hostname, instanceNr, httpPort, httpsPort, startPriority, features, dispstatus

cishana01, 0, 50013, 0, 0.3, HDB, GREEN

Page 97: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 97 of 98

HDB

You can use the HDB start and stop commands to stop and start the HANA database.

Use HDB stop to stop the database.

cishana01:~ # su - hanadm

cishana01:/usr/sap/HAN/HDB00> HDB stop

hdbdaemon will wait maximal 300 seconds for NewDB services finishing.

Stopping instance using: /usr/sap/HAN/SYS/exe/hdb/sapcontrol -prot NI_HTTP -nr

00 -function StopWait 400 2

19.07.2016 19:10:37

Stop

OK

In contrast to sapcontrol, this command waits until the database is stopped or started.

cishana01:/usr/sap/HAN/HDB00> HDB start

StartService

Impromptu CCC initialization by 'rscpCInit'.

See SAP note 1266393.

OK

OK

Starting instance using: /usr/sap/HAN/SYS/exe/hdb/sapcontrol -prot NI_HTTP -nr

00 -function StartWait 2700 2

19.07.2016 19:11:20

Start

OK

Downloading Revisions

To download revisions, you need to connect to the service marketplace and select the software download area to

search for available patches.

Refer to http://help.sap.com/hana/SAP_HANA_Master_Update_Guide_en.pdf for update procedures for SAP

HANA.

Page 98: Cisco UCS Scale-Up Solution for SAP · PDF fileCisco UCS Scale-Up Solution for SAP HANA ... SAP HANA is SAP’s implementation of in-memory database technology. ... Database applications

© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 98 of 98

For More Information

For more information about SAP HANA, see https://hana.sap.com/abouthana.html

For information about certified and supported SAP HANA hardware, see

https://global.sap.com/community/ebook/2014-09-02-hana-hardware/enEN/index.html

Appendix: Solution Variables Used for This Document

Before starting the configuration process, you need to collect some specific configuration information. Table 5

provides information to help you assemble the required network and host address, numbering, and naming

information. This worksheet can also be used as a “leave behind” document for future reference.

Table 5. Solution Variables Used in This Document

Variable Description Value Used in the Lab for This Document

<<var_cimc_ip_address>> Cisco UCS C460 M4 server’s IMC IP address 173.36.215.117

<<var_cimc_ip_netmask>> Cisco UCS C460 M4 server’s IMC network netmask 255.255.255.0

<<var_cimc_gateway_ip>> Cisco UCS C460 M4 server’s IMC network gateway IP address

173.36.215.1

<<var_raid5_vd_name>> Name for virtual drive VD0 during RAID configuration ucs_hana

<<var_hostname.domain>> SAP HANA node FQDN cishana01.custdom.local

<<var_sys_root-pw>> SAP HANA node’s root password Saphana1!

<<var_lvm_vg_name>> SAP HANA node’s OS LVM volume group name hanavg

<<var_mgmt_ip_address>> SAP HANA node’s management and administration IP address

173.36.215.118

<<var_mgmt_nw_netmask>> SAP HANA node’s management network netmask 255.255.255.0

<<var_mgmt_gateway_ip>> Cisco UCS C460 M4 server’s management and administration network gateway IP address

173.36.215.1

<<var_mgmt_netmask_prefix>> Netmask prefix in CIDR notation 24

Printed in USA C11-737767-00 09/16