cim test development process john simmins weekly status and planning meeting 4/5/2011
TRANSCRIPT
CIM Test Development Process
John Simmins
Weekly Status and Planning Meeting4/5/2011
2© 2011 Electric Power Research Institute, Inc. All rights reserved.
Agenda
1. Progress since last meeting
2. Issues, opportunities and risks arising during the previous week
3. Verify progress against stakeholder expectations
4. General issues discussion
5. Action items for individuals
6. Expected work output during next week
3© 2011 Electric Power Research Institute, Inc. All rights reserved.
Progress Since Last Call
• Mark Ortiz furnished VPN client for Consumers server
– Windows 64 bit version available EPRI FTP site
– Windows 32 bit version also needed
• Sample messages created
4© 2011 Electric Power Research Institute, Inc. All rights reserved.
Paris CIM Interop Test Last Week
5© 2011 Electric Power Research Institute, Inc. All rights reserved.
Meter Outage System Test ECITP 2.05 / 2.06
Systems Under Test
AMI Network
MR-MDM / MDMS
(Optional)
Validate Outage Reporting
Meter
Item(s) Tested
Item used in test
NO-FLTOMS
CREATED (EndDeviceEvents)2000 Meter outages, 1000 comm failures
CREATED (EndDeviceEvents)
6© 2011 Electric Power Research Institute, Inc. All rights reserved.
Outage Management Part 9 Message Mapping
Test Procedures Systems Under Test
Service Operations
Messages Payload XSD
XSD created
• 1.05 Meter Outage Nominal Conformance
• 1.06 Meter Outage Message and XML Errors
• 2.05 Meter Outage Nominal Interoperability
• 2.06 Meter Outage System Errors
MDMS, OMS
CreatedCreateReplyCreateReply CreateReply
EndDeviceEventsMeterServiceRequestMeterServiceRequestEndDeviceControlsEndDeviceControlsMeterReadingsMeterReadings
EndDeviceEventsMeterServiceRequest(Message)EndDeviceControls(Message)MeterReadingsMeterReadings
EndDeviceEventsMessageMeterServiceRequestsMessageMeterServiceRequestsMessageEndDeviceControlsMessageEndDeviceControlsMessageMeterReadingsMessageMeterReadingsMessage
7© 2011 Electric Power Research Institute, Inc. All rights reserved.
CIM Common Message Structure
8© 2011 Electric Power Research Institute, Inc. All rights reserved.
UML for EndDeviceControls Messages
9© 2011 Electric Power Research Institute, Inc. All rights reserved.
Sample CreateEndDeviceEvents Message
<?xml version="1.0" encoding="UTF-8"?><CIMCommonMsg:CreateEndDeviceEvents xmlns:Payload="http://iec.ch/TC57/2010/EndDeviceEvents#" xmlns:CIMCommonMsg="http://www.iec.ch/TC57/2010/EndDeviceEventsMessage" xmlns:MessageHeader="http://www.iec.ch/TC57/2010/schema/message" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.iec.ch/TC57/2010/EndDeviceEventsMessage file:///c:/EnerNex/EndDeviceEventsMessage.xsd" version="1.0.0" > <CIMCommonMsg:Header> <MessageHeader:Verb>Create</MessageHeader:Verb> <MessageHeader:Noun>EndDeviceEvent</MessageHeader:Noun> <MessageHeader:Timestamp>2011-05-10T12:00:00-05:00</MessageHeader:Timestamp> <MessageHeader:Source> source_identifier of requesting machine </MessageHeader:Source> </CIMCommonMsg:Header></CIMCommonMsg:CreateEndDeviceEvents>
• Need Sample “Initiate Service” message
10© 2011 Electric Power Research Institute, Inc. All rights reserved.
Sample “Last Gasp” Meter Power Outage EndDeviceEvent Message
<?xml version="1.0"?><CIMCommonMsg:EndDeviceEventsResponseMessage xmlns:Payload="http://iec.ch/TC57/2010/EndDeviceEvents#" xmlns:CIMCommonMsg="http://www.iec.ch/TC57/2010/EndDeviceEventsMessage" xmlns:MessageHeader="http://www.iec.ch/TC57/2010/schema/message" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.iec.ch/TC57/2010/EndDeviceEventsMessage file:///c:/EnerNex/EndDeviceEventsMessage.xsd" version="1.0.0" ><CIMCommonMsg:Header> <MessageHeader:Verb>Created</MessageHeader:Verb> <MessageHeader:Noun>EndDeviceEvent</MessageHeader:Noun> <MessageHeader:Timestamp>2011-05-10T12:00:00-05:00</MessageHeader:Timestamp></CIMCommonMsg:Header>
<Payload:EndDeviceEvent> <Payload:createdDateTime>2011-11-04T18:52:50.001-05:00</Payload:createdDateTime> <Payload:EndDeviceEventType>3.26.17.85</Payload:EndDeviceEventType>
<Payload:description>Meter Last Gasp loss of power </Payload:description> <Payload:Assets> <Payload:mRID>3dc53ee5-777e-50b4-8699-a1c224f45f3d</Payload:mRID> <Payload:Names> <Payload:name>Meter23253</Payload:name> </Payload:Names> </Payload:Assets> </Payload:EndDeviceEvent></CIMCommonMsg:EndDeviceEventsResponseMessage>
11© 2011 Electric Power Research Institute, Inc. All rights reserved.
Open Action Items
Assignee Action StatusJohn Simmins Work with internal resources to separate lab network
completely from the EPRI operational network.In process
Mark Ortiz Provide written procedures on access to Consumer’s DMZ network and server
In process
Kay Stefferud Contract Mark Ortiz to request written procedures to access the Consumers server.
In process
Margaret Goodrich Review sample abstract test case. In process
Mark Ortiz Send Kay excel spreadsheet with test set-up information.
In process
12© 2011 Electric Power Research Institute, Inc. All rights reserved.
Expected Work Output During the Next Week
•Meeting with Consumers (Mark) and EnerNex (Kay)
–Consumer server login process
•Continue Sample Messages
–Sample message from IOP would be helpful
•Process to connect multiple test sites needs to be dry run
13© 2011 Electric Power Research Institute, Inc. All rights reserved.
Together…Shaping the Future of Electricity