cii 19th national award for excellence in energy ......kempegowda international airport will excel...

40
BANGALORE INTERNATIONAL AIRPORT LIMITED CII 19 th National Award for Excellence in Energy Management 2018

Upload: others

Post on 26-Apr-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

BANGALORE INTERNATIONAL AIRPORT LIMITED

CII 19th National Award for Excellence in Energy Management 2018

Page 2: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Company Profile : BIAL

Public limited company under Indian Companies Act

Private Public Partnership

BOOT project transferred after 60 years (30 + 30)

Operated by BIAL according to international standards.

Started operation: May 23rd 2008

No. Of Employees at BIAL: 899

Vision

Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New India

Shares in %

FairFax52%

Siemens 22%

GoI13%

GoK13%

Shares in %

Page 3: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Energy Objectives

• To reduce the energy consumption

• To increase the of use renewable energy

• To reduce energy losses & wastages

This is achieved by

• Use of latest technologies

• Use of high energy efficient equipment

• Conversion of conventional lights with energy efficient lights (LED)

• To improve energy efficiency performance of equipment

• Employee involvement through trainings & capacity building

Energy Efficient

Equipments

Bench Marking

Energy Audits

Monitoringand review

systems

Energy Management

planning

TotalEmployee

Involvement

EnergyExcellence

EnergyManagement

Structure

Page 4: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Specific Energy Consumption (SEC) - last 3 years

2.08

1.72

1.38

0.00

0.50

1.00

1.50

2.00

2.50

2015-16 2016-17 2017-18

SEC of Terminal Building (KWh/Pax)

39496164 39411376 37140856

1897129022881410

26910431

0

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

45000000

2015-16 2016-17 2017-18

Passenger commutation Vs KWh

KWH consumption Terminal buiding Pax

0.900

0.920

0.940

0.960

0.980

1.000

Apr-

14

Jul-

14

Oct-

14

Jan-1

5

Apr-

15

Jul-

15

Oct-

15

Jan-1

6

Apr-

16

Jul-

16

Oct-

16

Jan-1

7

Apr-

17

Jul-

17

Oct-

17

Jan-1

8

Power Factor

20.15 20.10

18.94

18.00

18.50

19.00

19.50

20.00

20.50

2015-16 2016-17 2017-18

SEC of Terminal Building (KWH/Sq. M)

Page 5: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Road map to achieve Energy benchmark/national/global best

• An ISO 50001 certified company

• Follows Energy accounting & Energy Balancing

• Uses Energy Efficient equipment

• Optimum utilization of HVAC system

• Use of day light to maximum

• Use of energy efficient lights

• Use of renewable Energy to offset carbon emissions

• Use of advance digital technologies

Page 6: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

National & International Benchmarking : SEC (KWH/PAX)

Source: CII Website, Sustainability report of different airports

5.92

5.1

4

2.792.46

2.08

5.68

4.74.38

2.67

1.87 1.72

5.09

4.5

2.31

1.54 1.38

0

1

2

3

4

5

6

7

Malasia AirportsHoldings, Berhad

YancouverInternational

Airport,Canada

HongkongInternational Airport,

Hong kong

Malta InternationalAirport, Malta

GMR HyderabadInternational Airport

Limited

BengaloreInternational Airport

Ltd., Bengaluru

NATIONAL/INTERNATIONAL BENCHMARKING (SEC/PAX.)

2015-16 2016-17 2017-18

Page 7: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Energy Policy: salient features

• Commitment to supply reliable energy on 24 x7 basis

• Use of Renewal Energy

• Conserve energy

• Minimizing the energy losses

• Comply with legal & regulatory requirement

• Commitment to maintain Energy parameters

• Support to purchase energy efficient products & services

• Involvement of all employees

Page 8: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Energy Conservation Initiatives

• Use of Day lighting

• Implementation of Green Data Centre.

• Lighting control through lux, occupancy, motion sensors & lighting automation

• Replacement of conventional lighting with LEDs.

• Use of variable frequency drives (VFDs) for pumps, motors & chillers.

• Use of Building Management System (BMS)

• Energy performance Indicators (KWH/Pax, KW/TR ) for performance monitoring

• Implementation of Automatic Tube cleaning system in Chiller Plant

• Implementation of zone monitoring system to improve air-conditioning efficiency

• Use of Electrical vehicles for Airport staff

• Use of Airport shuttle vehicles for Airport community

• GPS monitoring of vehicles to optimize fuel consumption

• Focus towards complete electrical vehicles in Apron area

Page 9: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Summary Energy saving vs. investment made

S.N Description Energy Savings in Million KWH

Investmentmade in Million

Rs.

% investment for energy

conservation projects on

turnover

1 Implemented in 2015-16 1.45 5.19 0.2%

2 Implemented in 2016-17 4.05 10.93 0.12%

3 Implemented in 2017-18 1.21 4.38 0.14%

Page 10: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

EnCon Projects Implemented in FY 2017-18

Energy saving project implemented Energy saving (KWh)Conversion of CFL to LED lightings 16162Conversion of LED lightings 3154Conversion of HPSV to LED lightings 114392Conversion of FTL to LED lightings 15768Conversion of LED lightings ARFF Area 30835Conversion of LED lightings at V&E workshop 87863Conversion of sign boards with LED signboards at airside 15447Energy conservation through Automatic condenser Tube Cleaning System 147588LED conversion at T1 & T1 areas 243307LED conversion at High mast lights at parking area 110592LED conversion at ISHA corridor area 57283LED conversion at PBB area 281667LED conversion at Secondary access road, Haj parking 55728LED conversion at Staff rest rooms & AHU rooms 77993

Conversion of sign boards with LED signboards at airside 15447LED conversion at BHS area 25750

LED conversion at Staff rest rooms 8009

Total 1406985

Page 11: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

EnCon Projects Implemented in FY 2016-17

Energy saving project implemented Energy saving

(KWh)Conversion of light fixtures to energy efficient light fixtures at Main Access road. 153792

LED lighting conversion at Vehicle and equipment workshop and Ancillary Buildings 75028

Replacement FTL light fixtures to LED at Terminal Basement 122860

Replacement of Halogen light fixtures to LED lights at Arrival/Departure Bus gates 29013

T1A Roof energy efficient lighting conversion 11232

Conversion of CFL to LED lightings 16162

Conversion of LED lightings at V&E workshop 92353

LED conversion at BHS area 214147

LED conversion at check in Hall roof 29160

Replacement of Older UPS system to energy efficient 2260000

Occupancy Sensor Fixed in all PBB FLB Passage to Control Light fixtures. 16162

Lux Sensor Fixing at Access Road Feeder Pillars to gain Optimum Energy Savings. 120000

Conversion of Car parking area High mast lighting 870080

Total 4009989

Page 12: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Energy saving project implemented Energy saving (KWh)

Energy conservation at BHS arrival/Departure area by avoiding idle running 95272

Energy conservation by assessing lux levels and removal of unwanted lightings 23886

Energy conservation by Managing apron lighting system through GSM technology 138000

Implementation of Keycard switch to AHU rooms 240363

Installation of Air curtains to PTB exit points at BHA 20482

LED conversion at Apron 508518

LED conversion of Terminal Parking area 60584

LED light implementation at Domestic transfer and Bus lounges area 11528

LED light implementation at Street light and Flyover 225351

Optimization of UPS system 190128

Replacement of CFL with energy efficient LED lightings at Elevators 3060

Replacement of UPS with energy efficient 186661

Retrofit of Guidance signage board to Led 55220

Timer installed for Split AC units 85547

Total 1844600

EnCon Projects Implemented in FY 2015-16

Page 13: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Centralized online monitoring system to reduce the down-time & to enhance the customer experience

• All Electrical Substations and Electrical Rooms are running unmanned

• Number of substations are more and Distribution areas are vast

• Critical UPS systems are installed at various locations

• Any power trip in substation/UPS will be notified only when an information passed from the field

• More turnaround time, thus resolution time also

• Critical system power outage more than stipulated time may affect Airport operations

• Proper record or report can be fetched of all occurrence

A monitoring system of Breaker in Substations and other critical System

status at a designated control room might compact the response time.

Innovation Project - 1

Page 14: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

14

Centralized online monitoring of critical system to reduce the resolution & rectification time

• Main LV Panel – Switchgears

• Sub LV Panel – Switchgears

• Critical Distribution Boards like – UPS and Lighting

• UPS systems Status monitoring

• DC Power Supply units status

• Inline X Ray systems Status

• Smoke Vents status

• Charging Points/Stations – Power Status

List of Systems / Equipment's Integrated in Monitoring Tool

Page 15: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Importance of centralized online monitoring system

To Ensure 99.99%

availability

Page 16: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Importance of centralized online monitoring system

Turnaround/response Time – 15-20mints

Turnaround/response Time 4-5mints

After implementing this system observed huge changes in response time which directly improved the efficiency of the terminal

Page 17: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Schematic diagram of centralized online monitoring system

Wireless communication

SIO’SSIO’S

Gate way

Ethernet switch

SMS annunciation Centralized monitoring station

LV panels

MCBDB’S Substations

UPS & Battery banks

Charging points

TS-1 & TS-2

Roof lights

X-rays

ISP & data center

Page 18: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

System Dashboard & its Benefits

• Immediate annunciation of any power outages/faults thru mails/SMS

• All events(trips/faults occurrence & rectification) are recorded

• Vendor Performance can be analyzed thru above data

• Data analysis can be done with monthly data to reduce on the events

• Better customer satisfaction and experience

Page 19: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

19

ATCS has been installed on all 4 Carrier Make Chillers at T1A

Chiller Plant to prevent the increase in “condenser

approach” thereby ensuring the chillers will operate at

optimum efficiency.

Installation of ATCS will help us conserve energy and reduce

the downtime of the equipment.

This work amounting to INR. 22,42,000/-was carried out

under CAPEX

Innovation Project - 2

AUTOMATIC TUBE CLEANING SYSTEM (ATCS) IN CENTRIFUGAL CHILLERS

0

2

4

6

8

Condense

r A

ppro

ach

C

Chiller Condenser Approach Trend Deg. C (May'15 to Oct'16)

Note: Condenser tube cleaning had been carried out 5 timesFrom May 2015 till July 2016.

Page 20: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Cost benefit analysis

Description of parameter UnitChiller operation

1.0 °C approach

Chiller operation

4.0 °C approach

Chiller Plant Capacity TR 500 500

Annual avg No. of Chillers in operation Nos 2 2

Power Consumption of Chillers Kw/TR 0.624 0.643

% Loading of Chillers % 90% 90%

Annual Operating HRS Hrs 8760 8760

Annual energy consumption Kwh 4919616.00 5067204.48

Average Electricity Tariff Rate INR 8.15

Total amount spent towards input Energy INR 40,094,870.40 41,297,716.51

Total energy saving KWH 1,47,588.00

Annual energy saving INR 1,202,846.11

SITC of ATCS for Centrifugal Chillers INR 22,42,000.00

Payback period Years 1 Year and 10 months

ROI % 53.8%

Note: It is observed that 3 °C rise in condenser approach results in 3% increase in power consumption.

Page 21: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Innovation Project - 3

Implementation of EC fans in AHU rooms

As a pilot project existing AC motor driven centrifugal AHUs

with pulley and belt drive has been retrofitted with EC fans.

Description of parameter Unit Value

Average Consumption before EC fan installation Kwh 2.58

Average Consumption after EC fan installation Kwh 1.48

Average difference energy consumption Kwh 1.11

Percentage savings attained through EC fan % 42.81%

Average daily energy conservation per AHU Kwh 27

No of AHUs for EC fan implementation Nos 4

Annual energy conservation attained Kwh 38767

Page 22: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

BIAL Sustainable Measures

Energy optimisation and adoption of Renewable Energy

Use of GPU as much as possible when aircraft on

ground

Water conservation, preservation, reuse

Recycling of waste materials.

Setting up of in house Solid waste management

Ground water recharging, Rain water harvesting and community water studies

Noise & Habitat Management

Continuous ambient air quality monitoring

7

Future Terminal Design considering sustainable model

BIAL Sustainable Goals

To Become Energy neutral for the current consumption by 2020

To become water positive by 2020

Zero waste discharge to landfill by 2019

Page 23: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Our Renewable Energy Foot Print

0.5 MW roof top Solar Power - May 2016

2.5 MW on ground Solar in the North side of Runway - May 2017

0.44 MW Car Port Solar Power – March 2017

3.35 MW roof top Solar Power- under commissioning - August 2018

40 MU/annum through Open access Solar Power- July 2018

With all the above Projects, Our Renewable Energy foot print is 50 Million

units and meets close to 70% of KIAB needs

Utilization of renewable energy sources

440KWp Car Port Solar 503KWp Roof Top Solar 2.5MWp Ground Mounted Solar

Page 24: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Retail & Restaurants 34.97%

Terminal2.98%

Administration3.88%

Cargo4.73%Caterers

11.53%

Public Areas14.45%

Aircraft Waste/ Ground Handler21.43%

Airside Maintenance6.03%

WASTE CATEGORISATION

Utilization of waste material as fuel

Page 25: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Utilization of waste material as fuel

0%

5%

10%

15%

20%

25%

30%

35%

40%

TissuePaper

Tetra Cup CartonBox

PETBottle

Tin bottle FoodWaste

NewsPaper

Silver foilpaper

Steel

1 2 3 4 5 6 7 8 9

Percentage 5% 15% 7% 12% 10% 40% 6% 4% 1%

5%

15%

7%

12%

10%

40%

6%

4%

1%

PE

RC

EN

TA

GE

TYPES OF WASTE

Page 26: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Waste Material Processing

The Pet bottle, plastic, polythene, newspaper & waste

papers are sending to ITC Ltd for recycling.

Tetra packs are sent to an SAHAS (NGO) an authorized

institution for collecting the tetra packs.

Glass bottles are separated for colored Glass & others,

it is send for Pulverizing Industries for recycling.

• After extracting the Biogas the expelled material is

converted to Compost

• BIAL is now setting up 25TPD in house Solid Waste Management

plant wherein solid waste will be processed and energy will be

produced, expected to be operationalized by March 2019.

Use of color coded bin concept ensures segregation at

source.

Page 27: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Rain Water Harvesting

Rain water is harvested through the roof of

terminal building

• 100 % utilization of treated water from STP for

Landscape, HVAC & Firefighting.

Construction of 315 Rain Water recharge

pits & Open type recharge pond to enhance

the ground water table.

Page 28: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Environmental Activities & Initiatives

Ambient Air Quality monitoring system

• We have installed continuous real time ambient air quality monitoring station to evaluate the pollutant level in the ambient air due to airport activities. This gives eight parameters i.e. NOx, So2, CO, THC Ozone analyzers, PM 10 & 2.5 & oxygen analyzer and also having watch dog weather monitoring station.

Noise Monitoring Station

• BIAL has two permanent Noise Monitoring Station on flight path as per guidelines to monitor the noise level of arrival & departure flight movements. Also BIAL uses mobile noise monitoring equip for measuring the noise level within the airport & surrounding communities.

Emission Measurement

• Installed for measuring and monitoring Airside vehicle and equipment emissions as a proactive measure.

Page 29: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

GHG InventorisationCarbon Emission in tones of CO2 Equivalent

Year Passengers Scope-1 Scope-2Total Emission

(tCO2)

Total Emission/Pax

tCO2/Pax

% Reduction in Carbon

Emission/Pax(MT of CO2)

2014-15 15402931 754.39 38162.26 38916.65 0.002526574 0.00%

2015-16 18971290 751.32 37398.32 38149.64 0.002010914 20.40%

2016-17 22187906 770.90 36808.62 37579.52 0.001694000 32.95%

2017-18 25047274 908.9 36311.91 37220.85 0.001486024 41.18%

0.00000

0.00050

0.00100

0.00150

0.00200

0.00250

0.00300

0.00350

0.00400

2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

0.00379

0.00266

0.00221 0.00206 0.002000.002349 0.002526

0.0020110.001694

0.001486

Carbon Emission/Pax (MT of CO2) Reference point

Page 30: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Carbon foot print reduction trend

0.00%

20.40%32.95% 41.18%

30%

40%

50%

60%

70%

80%

90%

100%

2014-15 2015-16 2016-17 2017-18

Year

% OF CARBON REDUCTION PER PAX FROM BASE YEAR 2014-15

Carbon Emission/Pax(MT of CO2)

Reduction in Carbon Emission/Pax(MT of CO2)

Page 31: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

GHG Inventorisation – Scope 3

S.N. Sources of Emissions

1 LTO Arrival2 LTO Departure3 Engine Testing Run up4 APU Usage5 GSE Operations6 Passenger Access7 Staff Access Commute8 Staff Business Travel9 Concessionaries/Tenant energy consumptions10 Disposal of Solid Waste

11 Emission because of CISF Vehicles

12 LPG use at BIAL canteen- common canteen

Year Scope-3 (Tonns of

CO2)

2015-16 234254

2016-17 248816

2017-18 287414

Page 32: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

• Centralized Remote Breaker Status monitoring system implemented to Monitor LV Panel Breaker status, Critical IT & Lighting UPS Status and Critical MCB DB status.

This Project has the below benefits

• This Monitoring system will improve resolution time and reduce the impact of airport

operation during any power trip and reduce energy consumption.

• Remote monitoring system Incorporated in a Dashboard concept

• All Panel Single Line Diagram (SLD) and UPS Schematic displays in Able to mitigate

problems and reduce energy consumption

Team work, Employee Involvement & Monitoring

Page 33: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Energy conservation/Cost Saving through team work

• Automation of E&M office Air conditioner Units through timer from evening to Morning as part of Energy Conservation

• Fixing of Key card switch in T1A AHU rooms in view of Energy Conservation

• LED Conversion from 36W FTL to 18 LED Tube in basement tunnels, staircases & AHU/FAN rooms carried out.

• Replaced 1200 LED tube lights and saved 50% of energy

Page 34: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Knowledge Share sessions

• Knowledge sharing session conducted on Function and operation of

Sensors and relays

• Knowledge sharing session conducted on Importance of Proper Usage of Tools and

Measuring Meters

Page 35: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

R&R /QC Awards for appreciating the employeesS.N Name/ Team Project Award

1 Sanjay Energy conservation in HVAC rooms using Keyguard switches R&R2 Abdul Raheem Energy conservation in HVAC rooms using Keyguard switches R&R3 Vinod Kumar K S Providing Uninterrupted power supply with redundancy for Inline X-ray m/c’s R&R4 Narayana Rao Providing Uninterrupted power supply with redundancy for Inline X-ray m/c’s R&R5 Samuel S REDUNDANCY work executed for critical SG1 & 2 AEG UPS Systems R&R6 Ravichandran R REDUNDANCY work executed for critical SG1 & 2 AEG UPS Systems R&R7 Ananda Automation of E&M Office AC Units Star of Quarter8 Raghavendra Renovation of STP pump panel control/protection circuits Star of Quarter9 Pramod PN Renovation of Parking area lighting Team of Quarter

10 Vinod Renovation of Parking area lighting Team of Quarter11 Mahesha Renovation of Parking area lighting Team of Quarter12 Gokul Reduce power outage of water spout Star of Quarter13 Narayanan Energy savings at chiller plant Star of Quarter

Page 36: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Awards & Accolades2015 -SKYTRAX award for Best Regional Connectivity in Central Asia,

2016: All 13 QC teams are awarded under the “Gold” category in Chapter Convention on Quality Circles – CCQC 2017” at Bengaluru

2015 - Passenger satisfaction survey which is the most prestigious amongst all the surveys measuring airport services.

2017 - Out of 14 QC projects, won 13 “Gold” & 1 “Silver” category – CCQC 2017” at Bengaluru on 20th August 2017.

2017 – HR team Won Golden Peacock Award for Significant achievement in the field of excellence in Training by Institute of Directors

2018 - Out of 10 QC/Kaizen projects, won 10 “Gold” category – CCQC 2018” at Bengaluru on 19th August 2018.

Page 37: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Awards & Accolades

BIAL participated in CII SR KAIZEN competition held in Chennai in Jul 18 and

won the 1st prize under Large service sector

Page 38: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

Certifications Details

ISO 9001:2015 Quality Management System

ISO 14001:2015 Environmental Management System

ISO 27001 : 2012 Information Security & Data Management System

OHSAS 18001 : 2007 Occupational Healthy & Safety System

ISO 22301 : 2012 Business Continuity Management System

LEED – PTB LEED certification of terminal building expansion is certified in Gold category

GREENCO First company to be certified under GreenCo PLATINUM rated.

ISO 20000 IT Service Management

ISO 50001:2011 Energy Management System

Airport Carbon Accreditation

Airport Carbon Accreditation for Level 3+ (Neutralization level)

Certifications

Page 39: CII 19th National Award for Excellence in Energy ......Kempegowda International Airport will excel in consistent efficient & friendly delivery of airport services as gate way to New

KIA Bengaluru is certified “GreenCo Platinum” Company by CII Green Building council