choosing the right trail surface...choosing the right trail surface presented by: steve saitta...
TRANSCRIPT
![Page 1: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/1.jpg)
CHOOSING THE RIGHT TRAIL SURFACE
Presented by:Steve Saitta
Superintendent of Planning and DevelopmentMike Snyder
Senior Parks Planner
![Page 2: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/2.jpg)
Hinkson Creek Trail
Stephens Lake Park
MKT Trail Cosmo Park
![Page 3: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/3.jpg)
The Citizens of Columbia value trails. Trails and trail relatedactivities always lead in our scientific surveys of residents.
![Page 4: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/4.jpg)
![Page 5: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/5.jpg)
Trail options for City Trail Master Plan
• Gravel• Asphalt• Concrete
![Page 6: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/6.jpg)
Gravel trails
Rock Quarry Park
Bear Creek Trail
MKT Trail
![Page 7: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/7.jpg)
Gravel Trails Pros and Cons PROS• Considered by some to be more natural looking.• Good for flat areas out of flood plains.• Softer on joints (running).• Cheaper initial installation cost.
CONS• High ongoing maintenance costs.• Difficult to maintain consistent surface quality.• Environmental damage caused by gravel erosion.• More difficult to use in winter due to soft, wet and dirty conditions.• Gravel migrates on steep trail slopes.• Difficult to ride bikes on steep slopes and in loose gravel.• Difficult to remove silt deposits after heavy rains.• A dirty surface during and many days after rains.• Very difficult to meet ADA surface standards.• Less stability for running and walking in loose gravel.
![Page 8: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/8.jpg)
Bear Creek TrailCreasy Springs
Our trails flood regularly.
![Page 9: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/9.jpg)
Bear Creek Trail during flood.
![Page 10: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/10.jpg)
Removing mud deposits after floods along the Bear Creek Trail.
Ongoing Maintenance
![Page 11: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/11.jpg)
Gravel wash out at Bear Creek Trail bridge.
![Page 12: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/12.jpg)
Replacing rock after flooding along the MKT Trail.
![Page 13: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/13.jpg)
Blowing leaf litter off the edge of the Bear Creek Trail.
![Page 14: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/14.jpg)
Gravel build-up in natural areas after flooding.
![Page 15: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/15.jpg)
Trail damage after flooding.
![Page 16: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/16.jpg)
• We replace about 179 tons of gravel that washes into the adjacent creeks after every major storm event.
• On average over 1000 tons of gravel each year.
Gravel build-up in natural areas after flooding.
![Page 17: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/17.jpg)
Compacted gravel with fines is not very pervious.
![Page 18: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/18.jpg)
Dirty surface after rain events is hard on clothes and bikes.
![Page 19: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/19.jpg)
Cosmo Park 12’ asphalt trail
Cosmo Park 12’ asphalt trail
Asphalt trails
Cosmo Park 12’ asphalt trail
![Page 20: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/20.jpg)
Asphalt Pros and ConsPROS• Best initial surface (smooth, no cracks)• Slightly cheaper than concrete in initial cost.
CONS• Edges crack with vegetation. If you want a 10’ wide trail, you have
to install a 12’ wide asphalt trail.• Constant maintenance of crack filling and sealing with our clay soils.• Must be completely overlayed approximately every 8-10 years.• Little structural strength to span over soil problems below.• Requires greater initial excavation (harming trees) to provide the
required rock base depth.• Impervious surface.
![Page 21: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/21.jpg)
Asphalt MaintenanceCracks appearing in first year even though the Cosmo Trail was built with 11” of gravel base.
![Page 22: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/22.jpg)
Cosmo Trail required crack filling and sealing after only 2 years.
![Page 23: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/23.jpg)
Asphalt settling where base failed on Lions-Stephens Trail.
![Page 24: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/24.jpg)
Concrete work done at the same time as asphalt.Lions-Stephens Park 6’ wide asphalt trail.
![Page 25: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/25.jpg)
Cracks and differential settling
The Cosmo Trail was well built with 11” of gravel base rock and has been well maintained, yet in 7 years it has major problems.
![Page 26: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/26.jpg)
Stephens Lake Park 10’ concrete trail
Concrete Trails
![Page 27: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/27.jpg)
Concrete Pros and ConsPROS• Best ADA surface long term• Best longevity. Should last 20+ years.• Best consistency of surface. Does not wash or break apart.• Does not wash in flood areas or on steep slopes.• Steel in concrete keeps it from deflecting preventing tripping hazards or barriers for
wheel chairs.• Cleaner surface during and after rains. Keeps commuters clean as well as less wear
and tear on bikes.• Does not require gravel base rock so impact on trees is less than asphalt.• We don’t have to put tons of gravel in our creeks and natural areas every time it
rains.
CONS• More expensive (initial installation).• Harder on joints (running).• Less natural looking than gravel.• Impervious surface.
![Page 28: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/28.jpg)
Concrete trail in a natural setting.
Oakland Park 8’ concrete trail
![Page 29: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/29.jpg)
Stephens Lake Park 10’ concrete trail
Concrete provides a high quality surface for wheeled activities.
![Page 30: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/30.jpg)
Concrete provides a high quality ADA surface.
Oakland Park 8’ concrete trail
![Page 31: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/31.jpg)
Concrete requires no base rock so it requires less grading around existing trees.
![Page 32: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/32.jpg)
15 year old concrete in perfect shape at Oakland Park 8’ trail.
![Page 33: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/33.jpg)
Concrete does not require gravel base like asphalt.
![Page 34: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/34.jpg)
Steel re-bar used in trails to prevent deflection and tripping hazards.
![Page 35: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/35.jpg)
Concrete allows for rolled curb to prevent a wheel chair from rolling down steep slopes.
![Page 36: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/36.jpg)
Flat Branch Park during flood.
![Page 37: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/37.jpg)
Debris deposited during flood can be easily swept off concrete.
![Page 38: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/38.jpg)
This concrete has been under water multiple times.
![Page 39: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/39.jpg)
Concrete currently utilized under bridges.
![Page 40: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/40.jpg)
Most of our proposed trails are in the flood plain.
![Page 41: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/41.jpg)
Annual cost to maintain a ¼ mile of trail.
Annual CostTrail Type
$4,226Gravel (in washout/flood areas)
$1,320Gravel (in non washout/flood areas)
$2,168Asphalt
$745Concrete
![Page 42: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/42.jpg)
Why is staff concerned?
Currently Parks and Recreation maintains:
11.27Nature18.22Gravel
37.43Total Trail Miles Maintained
# of MilesTrail Type
2.40Mountain Bike5.54Hard Surface
![Page 43: CHOOSING THE RIGHT TRAIL SURFACE...CHOOSING THE RIGHT TRAIL SURFACE Presented by: Steve Saitta Superintendent of Planning and Development Mike Snyder Senior Parks Planner Hinkson Creek](https://reader036.vdocuments.mx/reader036/viewer/2022063005/5fb4bba191fe89109462d9cd/html5/thumbnails/43.jpg)
Parks and Recreation Department has only one FTE employee for trail maintenance