chilled water coil replacement project in charlotte, north carolina
TRANSCRIPT
Project NameChilled Water CoilReplacement Project
Project LocationCharlotte, North Carolina
Project Team
Specializations
Markets
Owner: Utility Holding Company
Contractor: McKenney’s, Inc.
Mission CriticalCommercial OfficeCentral Plants
Design/Build
Pipe Shop Prefab
McKenney’s replaced nine chilled water coils in 34-year-old air handling units (AHUs) located in an operation center for a large, public service company.
The ChallengeThe facility required zero downtime during occupied hours, which gave the team only 30 hours on weekends to complete the project. The AHUs overhaul took place in small, 200-square-foot mechanical rooms and the team knew it had to act quickly and decisively as it worked alongside other trades. In addition, an awkward pipingconfiguration restricted prefabrication work and the condition of the area under the coils was unknown.
The SolutionWith design plans and detailed schedules in place, the McKenney’s team accelerated AHU replacements. New custom-built stainless steel drain pans were also fabricated to fit inside the existing pan to support the weight of the replacement coils.
The content of this document is not intended as an endorsement.
The ResultsThe project was completed on time and on budget. The AHUs are now running more efficiently, saving energy and operational costs.