Cheri Collins

General Manager – External AlliancesSouthern Nuclear Company

2

Southern Company Today

3

Southern Company Today

• More than 42,000 megawatts of

generating capacity

• More than 27,000 miles of

transmission lines

• 4.4 million customers in the

Southeast

• ≈ 26,000 employees

4

Who is Southern Nuclear ?

Joseph M. Farley Nuclear Plant

Edwin I. Hatch Nuclear Plant Vogtle Electric Generating Plant

5

ALABAMA POWER LOGO

MISSISSIPPI POWER

LOGO

GULF POWER

LOGO

GEORGIA POWER

LOGO

Farley

Vogtle

Hatch

Vogtle

3&4

Southern Nuclear Fleet

6

• Streamlined licensing process

– Early public participation and resolution

of safety issues prior to construction

– Authorization of both construction and

operation in a single proceeding

Allows utilities to develop much more

certainty around budgets and schedules

at the front end of the project

Why New Nuclear?

7

Old Licensing Process

Construction Permit

Application *

Construction Operating License

Application

Operating License

Issued *Operations

8

Improved Licensing Process

Early Site Permit

(ESP)

Combined

Construction and

Operating

License (COL)

Procurement

and

Preconstruction

Construction

and

Startup

Early Site Permit (ESP)

• Addresses the suitability of the site

• Issues addressed such as:

• seismic suitability,

• water availability,

• emergency planning,

• socio-economic,

• environmental impacts of construction and operation.

• Some pre-construction activities are allowed under this permit.

Procurement and Preconstruction

• Long lead procurement of major

components and commodities.

• Subsurface preparation

• Building of some infrastructure

• Barge slip

• Roads

• Temporary Construction Facilities

• Laydown areas

Combined Construction and Operating License (COL)

• Evaluation of a certified plant design on a specific site.

• Additional site specific evaluations, design, and analyses

are performed to demonstrate that a plant using a specific

technology can be safely built and operated at that site.

Construction and Startup

• All safety related construction

activities

• Training Operations and

Maintenance personnel

9

• Nuclear Power Generation Technology

– New safety system designs like that

utilized by the AP1000

– Use of modular construction techniques

– Standardization of reactor designs

Allows for better cost and schedule

certainty and allows for more

standardization operations once installed

Why New Nuclear?

10

Fewer Commodities and Components

50% Fewer

Safety Valves

35% Fewer

Pumps

80% Less

Safety Pipe

(still achieving

higher levels

of safety)

45% Less

Seismic

Building

Volume

70% Less

Cable

11

Modular Construction

13

Projected New Reactor Locations

14

What is going on at

Vogtle 3 & 4?

15

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 20172005

PSC Certification √

Vogtle 3&4 Schedule

Issued March 17, 2009

CWIP / Senate Bill 31 Legislation

Monthly Status Reports

Semi-annual Monitor Report

Construction Monitor

16

• Georgia State Regulatory

– Certification Statute

– GPSC certification on March 17, 2009 at $6.4

billion

– CWIP legislation passed by the Georgia

legislature, and approved by the Georgia

Public Service Commission

• Reduction to $4.5 billion

• DOE Loan Guarantee– 1 of 4 finalists under the DOE loan program

– Due Diligence underway

Project Regulatory / Financial

17

Project Basics

• Engineering Procurement

Construction Contract (EPC)

–Westinghouse and Shaw Consortium

–AP1000 Technology

–Signed April 8, 2008

–Basis of Self-build Proposal submitted

to Georgia Public Service Commission

18

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 20172005

Early Site Permit √

Vogtle 3&4 Schedule

Issued August 26, 2009 – First technology

specific ESP and LWA

Site Suitability

Environmental Impacts

Seismic Analysis

Limited Work Authorization (LWA)

19

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 20172005

Pre-COL Construction

Vogtle 3&4 Schedule

Excavation

Engineered Fill (Backfill)

Mechanical Stabilizing Earth Walls

Concrete Batch Plant

Buildings / Utilities

20

Pre-COL Construction

March 23, 2009

21

Pre-COL Construction

22

Pre-COL Construction

23

Pre-COL Construction

24

Pre-COL Construction

25

Pre-COL Construction

26

Pre-COL Construction

27

Pre-COL Construction

28

Pre-COL Construction

29

Pre-COL Construction

30

Pre-COL Construction

31

Pre-COL Construction

32

Pre-COL Construction

33

Pre-COL Construction

34

Pre-COL Construction

35

Pre-COL Construction

36

Pre-COL Construction

37

Pre-COL Construction

38

Pre-COL Construction

39

Pre-COL Construction

40

Pre-COL Construction

41

Pre-COL Construction

42

Pre-COL Construction

43

Pre-COL Construction

44

Pre-COL Construction

45

Pre-COL Construction

46

Pre-COL Construction

47

Pre-COL Construction

48

Pre-COL Construction

49

Pre-COL Construction

50

Pre-COL Construction

51

Pre-COL Construction

52

Pre-COL Construction

53

Construction

July 28, 2009

Pre-COL Construction

54

• Add recent site photos

Pre-COL Construction

55

Pre-COL Construction

56

Pre-COL Construction

57

Pre-COL Construction

58

Pre-COL Construction

December 31, 2009

Pre-COL Construction

January 14, 2010

Pre-COL Construction

November 2009

Pre-COL Construction

November 2009

Pre-COL Construction

63

Minimum Excavation

Blue Bluff Marl (Bearing Layer)

Lower Sands

Engineering FillUpper Sands

Utley Limestone45º

86’

75’

90

0

Pre-LWA Activities

- Excavation

LWA Activities

- Engineered Fill

- Mud Mats (A)

- Waterproof Liner (B)

- MSE Wall (C)

A B

C

65

Excavation Facts• Excavation began August 10, 2009

• The estimated on-site mileage of all the

dump trucks used during earthwork

would equal driving around the world 8

times.

• If you built an interstate highway with the

concrete used on-site it would stretch

2,000 miles.

• The largest projected single crane lift will

be over 1000 tons.

66

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 20172005

DCD Certification & COL License

Post-COL Construction

Vogtle 3&4 Schedule

Westinghouse - DCD

Intense NRC Interaction

NuStart

Allows for Full Construction

Major Safety Related Concrete

48 months Construction + 6 months Startup

NRC Inspection and Testing

67

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 20172005

Early Site Permit

PSC Certification √

DCD Certification & COL License

Pre-COL Construction

Post-COL Construction

Vogtle 3&4 Schedule

68

Construction Staffing

Projected Staffing During Construction

• About 3,000 people on site during

construction

~2,500 craft workers required at peak

~500 Contractor Construction and

Project Mgt

~125 Southern Company Oversight

Personnel

69

SNC Staffing Timeline – Total Plant

39

458

665

800

39

880890

244

106

67

214

207

135

90

138

0

100

200

300

400

500

600

700

800

900

1000

2009 2010 2011 2012 2013 2014 2015 2016 2017

Date

Pe

rso

nn

el

70

Source: Westinghouse

PO Placed

In Progress

Procurement

71

Procurement

Steam Generator Tube Sheet Inspection

72

Nuclear Development

Procurement

Reactor Vessel Closure Head Forging

73

• Back up slides follow

• Use if needed

75

Passive Containment Cooling System

http://www.ap1000.westinghousenuclear.com/ap1000_psrs_pcs.html

Projected Disturbed Areas

Vogtle 1&2