1 Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee Actions and Activities Benefiting the Basin 7:00 a.m., July 11, 2013 Lewis County EDC

Upload: fayola

Post on 23-Feb-2016

41 views

Category:

Documents


0 download

DESCRIPTION

Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee. Actions and Activities Benefiting the Basin 7 :00 a .m., July 11, 2013 Lewis County EDC. Today’s Presentation. Raise awareness Encourage discussion Key messages we’d like to leave you with . . . - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

1

Chehalis River Basin Flood AuthorityCommunity Outreach and Education Subcommittee

Actions and Activities Benefiting the Basin

7:00 a.m., July 11, 2013Lewis County EDC

Page 2: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

2

Today’s Presentation Raise awareness

Encourage discussion

Key messages we’d like to leave you with . . .1. Broad agreement -- For the first time in a century there is broad agreement

across the Basin on next steps to reduce flood damage and enhance salmon runs in the Basin.

2. Basin-wide strategy -- A Basin-wide strategy is needed to protect communities along the river and enhance salmon runs.

3. Flood Authority -- Positioned to continue be a galvanizing force in the Basin to collaboratively implement tools and projects.

Discussion

July 2013

Page 3: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

3

Chehalis River Basin Flood Authority

July 2013

Grays Harbor County Lewis County Thurston County City of Aberdeen

City of Napavine City of Oakville Town of Pe Ell Town of Bucoda

Formed in 2008

Formal body focused on: (1) flood hazard mitigation throughout the Basin; and (2) decision-making that is . . . informed by science. protective of Basin residents/communities. environmentally appropriate.

Basin jurisdictions represented City of Centralia City of Chehalis City of Cosmopolis City of Montesano

Page 4: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

4July 2013

2007 Flood -- $938M Basin-wide damage, $300M lost economic activity (WA)

City of Centralia STEVE RINGMAN / SEATTLE TIMES

Exit 77 (I-5) in Chehalis STEVE RINGMAN / SEATTLE TIMES

Background

Photos Source: LEWIS COUNTY,DIVISION OF EMERGENCY MANAGEMENT

Page 5: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

5

Ranked high flow events (1932 - 2012) . . . I-5 closed 1990, 1996, 2007, 2009. Five largest events since 1986 -- Frequent floods are getting worse and

damage is increasing . . . Chart -- Chehalis River Flow Rates near Grand Mound (cubic ft./sec.)

July 2013

1932

1934

1936

1938

1940

1942

1944

1946

1948

1950

1952

1954

1956

1958

1960

1962

1964

1966

1968

1970

1972

1974

1976

1978

1980

1982

1984

1986

1988

1990

1991

1993

1995

1996

1998

2000

2002

2004

2006

2008

2010

2012

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

913

7

13 11

6

1610

4

3

8

2

12 15

1

5

Background

Page 6: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

6July 2013

Background

Response and recovery is expensive, takes time, and may not be fully achieved (at least on a near-term time scale) . . .

Page 7: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

7

Chehalis is the second largest river basin in the state, rich in natural resources . . .

July 2013

Background

Upper Chehalis (5/31/2010) JAMES E. WILCOX / WILD GAME FISH CONSERVATION INTERNATIONAL

www.chehalisbasinpartnership.org

Page 8: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

8

Need -- Strategy, Action, Tools . . .

July 2013

Strategy = Basin-wide SolutionA. Significant reduction in flood

damage.B. Solving one’s problems doesn’t

increase another’s.C. Maintain focus in five areas:

1. major capital projects.2. localized projects.3. land use management.4. fish and habitat

enhancements.5. flood warning, emergency

response.

William D. Ruckelshaus Center

Page 9: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

9July 2013

Action – Capital Projects (2012, 2013)(Go to “Projects” Tab)

2012 Capital Budget:1. $5.0M – Local projects.(Lewis County = $1,983,974)

2013 Capital Budget:2. $10.7M -- Local projects.

3. $9.2M -- Design evaluations by 2014 for Upper Basin dam (~$5.6M) and I-5 protection (~$3.4M).

4. $4.3M -- Fish and habitat enhancements.

5. $1.8M -- Local programs (buyouts, flood proofing, home elevations).

6. $2.2M – Implementation capacity, technical experts.

Page 10: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

10

Action – Spotlighting Other Key Projects

July 2013

I-5 - Mellen Street to Blakeslee Junction Dedicated collector/distributor lanes to improve local

mobility, enhance safety and improve access to hospital, airport, etc.

Airport road culverts to drain flood waters away from Chamber Way.

http://www.wsdot.wa.gov/projects/i5/mellentograndmound/phase3/

Visualization and Photo Source: WASHINGTON STATE DEPARTMENT OF TRANSPORTATION

Page 11: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

11

Tools -- Flood Warning System

www.chehalisriverflood.com

July 2013

Front-facing website.

Back-end data collection, data synchronization.

Improves forecasting and early-warning.

Page 12: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

12

Tools -- Flood Warning System

July 2013

Localized tracking, forecasting . . .www.chehalisriverflood.com

Page 13: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

13

Tools -- Flood Warning System

July 2013

Localized tracking, forecasting . . .www.chehalisriverflood.com

Page 14: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

14

Tools -- Flood Warning System

July 2013

Localized tracking, forecasting . . .www.chehalisriverflood.com

Page 15: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

15

Tools -- Hydraulic Analysis Model

Science-based model to inform decision-makers on hydraulic effects of potential flood relief options (at basin-wide and localized scales).

July 2013

Covers mouth of Chehalis River upstream to Pe Ell (108 miles).

Page 16: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

16

Tools -- Hydraulic Analysis Model

July 2013

Example: Basin-wide effects analysis (Chehalis Basin Flood Hazard Mitigation Alternatives Report 12/2012)

Table 1 (pg.70) -- “Mainstem Dam, Upper Chehalis”

Page 17: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

17

Tools -- Fish Studies Two significant fish studies conducted in Upper Basin (WRIA 23).

1. Analyze effect of dam alternatives on Spring Chinook, Steelhead and Coho.2. Prioritize potential fish habitat enhancement opportunities.

Initial and preliminary projections . . .

July 2013

Species Multi-Purpose Dam

Flood Control-Only Dam

Fish Habitat Enhancement

Measures

Spring Chinook 20% 4% likely same as Coho

Steelhead 7% 11% likely same as Coho

Coho 1% 1% 4-5%

Page 18: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

18

Resources, Additional Information

Visit Flood Authority’s Project Tracking and Documentation website!

July 2013

www.ezview.wa.gov

Page 19: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

19

Local Projects 2013 – 2015 Capital Budget

July 2013

Page 20: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

20

Local Projects -- 2012, 2013 Funding Breakdown

July 2013

Sponsor Project Funded (2012)

Proposed (2013)

1.     Aberdeen Burger King Trail/Dike $ 24,600

$ 140,000

2.     Aberdeen Dike Bank of Wishkah North of Highway $ 47,000

$ 270,000

3.     Aberdeen Market Street Dike $ -

$ 670,000

4.     Aberdeen Southside Dike/Levee Certification $ 50,000

$ -

5.     Bucoda Bucoda Levee $ 42,000

$ 305,000

6.     Chehalis Tribe Flood Gage Station $ 50,000

$ -

7.     Chehalis Tribe Sickman-Ford Overflow Bridge Project $ 2,075,000

$ -

8.     Cosmopolis Mill Creek Dam Improvements $ -

$ 2,250,000

9.     Grays Harbor County

Elma-Porter Flood Mitigation Project $ -

$ 584,000

10.   Grays Harbor County

Satsop River Floodplain Restoration $ 50,000

$ 510,000

11.   Grays Harbor County

Wishkah Road Flood Levee $ 125,000

$ 2,642,000

12.   Lewis County Adna Levee $ 244,145

$ -

13.   Lewis County Airport Levee (Phase I) $ 1,239,829

$ -

14.   Montesano Revetment for Montesano Rd., Sewage Treatment Plant, Mary’s River Lumber

$ 102,426

$ 2,000,000

15.   Pe Ell Wastewater Treatment Plant Flood Prevention Dike $ -

$ 521,000

16.   WA Cons. Comm.

Critter Pads and Evacuation Routes $ 500,000

$ 850,000

17.   Sponsor??? Restoration -- Allen Creek $ -

$ 990,000

18.   Sponsor??? Restoration -- Oxbow Reconnect at RM 78 $ -

$ 861,000

19.   Sponsor??? Restoration -- Oxbow Lake Reconnect $ -

$ 1,149,000

20.   Sponsor??? Restoration -- Basin-wide Salmon Recovery Strategy $ -

$ 1,350,000

Total = $ 4,550,000

$ 15,092,000

Page 21: Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee

21

Thank You!

July 2013

Vickie Raines, ChairChehalis River Basin Flood Authority360/590-4100 [email protected]

Karen Valenzuela, Vice-ChairChehalis River Basin Flood Authority360/[email protected]

Scott Boettcher, StaffChehalis River Basin Flood Authority360/[email protected]

Edna Fund, ChairCommunity Outreach and Education Subcommmittee (Flood Authority)360/[email protected]