checkmate inline check valve - wef home · checkmate inline check valve closed opening system...
TRANSCRIPT
-
1
Red Valve Company
CheckMate Inline Check Valve
Red Valve Company
CheckMate Check Valve
-
2
Red Valve Company
CheckMate Inline Check Valve
Closed
Opening
System Challenges
• CSO communities are looking for a long term approach to prevent overflows Municipalities face system and financial challenges in reaching their goal(s).
• System challenges in the collection system:– Inflow and infiltration reduces capacity– Connections residential/commercial growth– Undersized Pipes frequent CSO events
Red Valve Company
-
3
CheckMate = Cost Savings
Red Valve Company
Removed from Project
$110K/site saved in design, excavation and
labor x 3 sites. Total savings $300,000.00+
Red Valve Company
Influent and Effluent Pipe Installations in Manhole
-
4
Red Valve Company
CheckMate Sizes
Red Valve Company
CheckMate Inline Check Valve
Bucket
-
5
Red Valve Company
CheckMate Manufacturing
Red Valve Company
CheckMate In-House Flow Testing
-
6
Red Valve Company
CheckMate In-House Flow Testing
Red Valve Company
6”, 12”, 24” CheckMate Independent Flow Testing at Utah State University
-
7
Red Valve Company
In-House Backpressure Testing
Red Valve Company
CheckMate Installation Options
-
8
Upstream Clamp - 18” Kings County Park Seattle
Red Valve Company
Downstream Clamp - Clear Creek Mall, TX
Red Valve Company
-
9
Red Valve Company
Downstream Clamp
Red Valve Company
(10) 42” CheckMates (Pumped Application)Hidalgo & Cameron County Irrigation Dist. #9, TX
-
10
Red Valve Company
(2) 60” CheckMate Valves - Australia
Red Valve Company
72” CheckMate-Float, Sink, PullFlorida DOT
-
11
Installation Procedure – Lubricate O.D.
Red Valve Company
Installation Procedure - Lower
Red Valve Company
-
12
Installation Procedure - Insert
Red Valve Company
Installation Procedure – Clamp & Pin
Red Valve Company
-
13
Installation Procedure – Clamp & Pin
Red Valve Company
Louisville, KY
Red Valve Company
-
14
Installation Procedure
Red Valve Company
Don’t Do
Do
Opening of a Large Checkmate
Red Valve Company
-
15
Red Valve Company
Rubber Adhesive Strip to Field Fit for Snug Fit
Red Valve Company
Tandem CheckMate
-
16
Red Valve Company
Arch Pipe CheckMate Check Valve
Red Valve Company
Elliptical CheckMate Check Valve
-
17
Flanged Upstream
Red Valve Company
Red Valve Company
CheckMate Installation Options
-
18
Red Valve Company
CheckMate Thimble Insert
Thimble Insert-World Trade Center
Red Valve Company
-
19
World Trade Center
Red Valve Company
World Trade Center
Red Valve Company
-
20
World Trade Center
Red Valve Company
Red Valve Company
Red Valve Company
600 North Bell Ave.Carnegie, PA 15106P: (412) 279-0044F: (412) 279-7878
www.redvalve.comwww.tideflex.com