checklist safety mexico

2
Date: December 12 th , 2001 Matrix safety checklist. Safety Measures: Safety release of Matrix line Exhaust operational Acid spill leakage kit Fire extinguisher Eyeshower Warning signs acid tanks / positions Calcium gluconate gel Material safety data sheets for first aid instructions Personal protective equipment: o Chemicals resistant gloves o Face shield o Apron o Acid resistant tyvek suit o Eye glasses o Respirator box Instructions to operators: General safety procedure Matrix line Handling of the acid carts / positions. Procedure acid spills. Procedure acid burnings. Procedure safety emergencies. safety checklist before start running in. General items: General announcement to local people, subcontractors, etc. Hands on training acid handling. Block room for non – authorized people Acid drain ready Yellow light at acid position under mezzanine. Sprinkler check. No leakeage at positions / supply carts. Eyeshower drain All items should be ready during safety release audit on December 12,2001. Signed:

Upload: carlos-fernando-garza

Post on 06-Nov-2015

213 views

Category:

Documents


1 download

DESCRIPTION

checklis process comisioning

TRANSCRIPT

Date: December 12th, 2001

Matrix safety checklist.

Safety Measures:

Safety release of Matrix line

Exhaust operational

Acid spill leakage kit

Fire extinguisher

Eyeshower

Warning signs acid tanks / positions

Calcium gluconate gel

Material safety data sheets for first aid instructions

Personal protective equipment:

Chemicals resistant gloves

Face shield

Apron

Acid resistant tyvek suit

Eye glasses

Respirator box

Instructions to operators:

General safety procedure Matrix line

Handling of the acid carts / positions.

Procedure acid spills.

Procedure acid burnings.

Procedure safety emergencies.

safety checklist before start running in.

General items:

General announcement to local people, subcontractors, etc.

Hands on training acid handling.

Block room for non authorized people

Acid drain ready

Yellow light at acid position under mezzanine.

Sprinkler check.

No leakeage at positions / supply carts.

Eyeshower drain

All items should be ready during safety release audit on December 12,2001.

Signed:Installation manager. Local safety officer: Installation manager FE

Mark Jonkhof

Joel Ibarra

Rick Knoops