  • 7/25/2019 Checklist Room Integrit Test

    1/1

    Civil Mechanical Electrical

    Result

    (OK/RJ/NA)

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    Name

    Signature

    Date

    PROJECT QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 11- PACKAGE S2, S3 & S7

    CLIENT

    Main Contractor GTC/488C/2012

    Consultant

    Proj. Ref:

    Sub Contractor

    Quality Control Form FM200-008

    Commissioning Form

    NAFFCO

    Quality Form Ref

    Substation Name

    ITR Ref Number

    Description of Test Pre-Intergrity Testing Check List

    Reference Drawings:

    Descipline: ( Tick which Ever Applicable)

    Major air circulating fans (e.g. A/C, UPS) shut down on actual

    discharge?Walls between rooms within the zone stop at the suspended

    ceiling (i.e. common ceiling space throughout) ?

    Sl

    NoTest Description Remarks

    Room Perimeter walls go from floor slab to ceiling slab or

    roof?

    Dampers installed on all ducts and their operation has been

    checked.

    N/AYes No

    Rejected with remarks ( RJ) Not Applicable( NA)

    All apparent leaks have been sealed and hardware itemsinstaled?

    Infiltrometer system will fit the chosen doorway?

    Doorway to be used in weather-stripped?

    Unrestricted return flow path from door fan to all leaks during

    the test?

    HVAC shutdown has been arranged? With who?

    Agent discharge shuts down the building air handlers in the

    vicinity?

    NAFFCO

    All suspended celing tiles are in place?

    A/C and electronic equipment in room can be shit down

    during test?

    Legend: Accepted (OK)

    SIEMENS

    Signatures

    Register:

    EPE / KAHRAMAA

    PH11-8C-10-76-P004 REV. A Page 24