PROJECT QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 11- PACKAGE S2, S3 & S7
CLIENT
Main Contractor GTC/488C/2012
Consultant
Proj. Ref:
Sub Contractor
Quality Control Form FM200-008
Commissioning Form
NAFFCO
Quality Form Ref
Substation Name
ITR Ref Number
Description of Test Pre-Intergrity Testing Check List
Reference Drawings:
Descipline: ( Tick which Ever Applicable)
Major air circulating fans (e.g. A/C, UPS) shut down on actual
discharge?Walls between rooms within the zone stop at the suspended
ceiling (i.e. common ceiling space throughout) ?
Sl
NoTest Description Remarks
Room Perimeter walls go from floor slab to ceiling slab or
roof?
Dampers installed on all ducts and their operation has been
checked.
N/AYes No
Rejected with remarks ( RJ) Not Applicable( NA)
All apparent leaks have been sealed and hardware itemsinstaled?
Infiltrometer system will fit the chosen doorway?
Doorway to be used in weather-stripped?
Unrestricted return flow path from door fan to all leaks during
the test?
HVAC shutdown has been arranged? With who?
Agent discharge shuts down the building air handlers in the
vicinity?
NAFFCO
All suspended celing tiles are in place?
A/C and electronic equipment in room can be shit down
during test?
Legend: Accepted (OK)
SIEMENS
Signatures
Register:
EPE / KAHRAMAA
PH11-8C-10-76-P004 REV. A Page 24