Check list – Industrial Projects
For submission of Environmental Clearance applications
[Appraisal cases]
� Provide authenticated (with stamp & Signature) hard copy of this check-list during
submission of hard copy of ToR/EC application.
Sr. No.
Particular Tick mark as
applicable Page no. of application
1 EIA report as per the TOR granted by
SEIAA and as per the generic structure
given in Appendix III of EIA Notification
2006.
Yes (√) / No --
2 Form-2 Application for Prior Environmental
Clearance as prescribed by MoEF&CC as
per OM dated 20/04/2018.
Yes (√) / No --
3 Documents related to Land ownership
included in EIA report
Yes (√) / No A-13
4 For 5 (f) category
Project site is located within GIDC Yes (√) / No A-13
If No, Compliance of following conditions
• Water consumption < 25 KLD
• Fuel Consumption <25 MTPD
• Non-MAH Unit
Yes / No --
5 Contact details Mobile no. and e-Mail ID
included in Application
Yes (√) / No Page no. 1 of Form-2
6 Format prescribed by SEAC
[Salient features of the project] included in
application.
Yes (√) / No --
7 General Condition applicability
(1) Protected areas notified under the
Wildlife (Protection) Act, 1972;
(2) CEPI areas
(3) Eco-sensitive areas and
(4) Inter-state boundaries and international
boundaries; are not located within 5 km
or 10 km (as the case may be) area from
the boundary of the proposed site.
Yes / No (√) --
8 Compliance status of existing project (In
case of expansion) included in EIA report
i.e.
• Compliance report from MoEF&CC or
GPCB or CPCB as per the MOEFCC’s
Yes / No (√) --
Sr. No.
Particular Tick mark as
applicable Page no. of application
Circular dated 07/09/2017.
9 Violation of EIA Notification 2006 (Yes or
No) Yes / No (√) --
10 Product profile with CAS no. / CI no. Yes (√) / No 2-8
11 Raw Material details and manufacturing
process of all products with CAS no. / CI
no.
Yes (√) / No 2-21
12 Spent Acids (H2SO4, HCl etc.) generation. Yes / No (√) --
13 If yes, it is considered as Haz. Waste? Yes/ No --
14 Source of water, Water balance included in
EIA report.
Yes (√) / No 2-25, 2-26
• Permission letter to obtain fresh water A-15
• Waste water management, Membership
certificate of common facility (CETP,
CMEE, CSD etc.
A-96
• Permission letter for discharge of waste
water etc.
A-96
15 Flue gas & process gas emission details
Included in Form-1
Yes (√) / No 2-30
16 Hazardous waste generation and its
management as per the HW Rules 2016
included in Form-1
Yes (√) / No 2-32
17 Spent solvent generation Yes (√) / No 2-32
18 If, yes Management of spent solvent
included in application?
Yes (√) / No 2-23
19 Details of Public hearing and time bound
compliance with details of budgetary
provision included in EIA report.
(In case of public hearing is applicable)
Yes / No (√) --
20 Documents regarding Accreditation of EIA
Consultant are included in EIA report.
Yes (√) / No 12-1
21 Undertaking of project proponent and EIA
Consultant regarding EIA report are
included in EIA report.
Yes (√) / No Immediate after cover page.
22 Environmental Management Plan (EMP)
report and details of financial outlay & year
wise break up is included in EIA report.
Yes (√) / No 10-2
23 Green belt details with budgetary outlay
included in EIA report.
Yes (√) / No 2-34
Sr. No.
Particular
24 Declaration by experts (Name, qualification,
area of work, designati
to the EIA Report is included.
25 Compliance of MoEFCC’s OM dated
01/05/2018 regarding “Corporate
Environment Responsibility” (CER).
Above details are true to the best of mSEIAA/SEAC if above information stands wrong in the future and also agree to initiated the legal proceedings against my project.
Name & designation of the Applicant:
Stamp & Signature of Applicant
Tick mark as applicable
eclaration by experts (Name, qualification,
area of work, designation etc.) contributing
to the EIA Report is included.
Yes (√) / No
Compliance of MoEFCC’s OM dated
01/05/2018 regarding “Corporate
Environment Responsibility” (CER).
Yes (√) / No
Above details are true to the best of my knowledge and I am abided to respect the decision of the SEIAA/SEAC if above information stands wrong in the future and also agree to initiated the legal
Name & designation of the Applicant: Mansukh Radadia (Partner)
Signature of Applicant
Page no. of application
Immediate after cover page.
8-1
y knowledge and I am abided to respect the decision of the SEIAA/SEAC if above information stands wrong in the future and also agree to initiated the legal
Mansukh Radadia (Partner)
Date: 02.12.2018
SEAC, Gujarat Page 1 of 17
Page 1 of 17 EC-EXP [Updated October 2018]
Project details
• Synthetic Organic Chemicals 5(f)
• For appraisal - Environmental Clearance [EC]
• Expansion of Project
1. Basic Information of the Project:
i Name & Address of the Project site
(Complete details with plot no./Survey
no., Landmark etc. )
M/s. Goklesh Lifesciences
Plot no. 9112/ 1, 2 & 3, G.I.D.C
Estate Ankleshwar-393002, Dist:
Bharuch, Gujarat
ii Name of the Applicant
Mansukh Radadia
iii Address for correspondence
M/s. Zeni Biotech
Plot No. A2/7801, G.I.D.C Estate
Ankleshwar-393002, Dist: Bharuch,
Gujarat
iv Contact no. and e-mail ID of the Applicant Mo. no. : 9824486234
e-mail:
v Aerial distance of nearest Habitat (KM)
Ankleshwar town is around 4 km in
East direction
vi Longitude & Latitude of the Project Site:
(4 corners of the site)
vii Category as per the Schedule to the EIA
Notification 2006 i.e. 1(d), 2(b), 5(f) etc.
Sub Category: i.e. Dyes, Dyes
Intermediates, Specialty chemicals, Bulk
Drugs etc.
5 (f) Synthetic Organic Chemicals
Sub-Category: Bulk Drugs
viii Applicability of General Conditions of
EIA Notification 2006: i.e.
Ensure that
(1) Protected areas notified under the
Wildlife (Protection) Act, 1972;
(2) CEPI areas
(3) Eco-sensitive areas and
(4) Inter-state boundaries and
international boundaries; are not
located within 5 km or 10 km (as
the case may be) area from the
boundary of the proposed site.
Not Applicable
SEAC, Gujarat Page 2 of 17
Page 2 of 17 EC-EXP [Updated October 2018]
2. Online application& PH reg.:
a) Date of SEAC meeting for
recommendation to grant TOR:
16/05/18
b) Online application proposal no. :
SIA/GJ/IND2/22295/2018
c) Date online acceptance of EC application
bySEAC:
--
d) TOR issued by SEIAA: Letter no & date.
SEIAA/GUJ/TOR/5(f)/870/2018
vide dated 28/08/2018
e) Date of Public Hearing
(If applicable):
Not applicable
f) Date of presentation for Appraisal:
--
3. Product profile:
S. No.
Name of Products CAS No.
Production Capacity (MT/Month) End Use
Existing Proposed Total
1. Sodium Silico Fluoride 16893-85-9 300 -25 275
Glass Manufacturing, As a preservative in
Gum/Adhesives, Rubber tyre
manufacturing
2. Alpha Keto Isoleucine Calcium Salt
51828-96-7 - 3.0 3.0
Nutritional supplement for kidney disease
3. Alpha Keto Leucine Calcium Salt
51828-95-6 - 3.0 3.0
4. Alpha Keto Phenylalanine Calcium Salt
51828-93-4 - 3.0 3.0
5. Alpha Keto Valine Calcium Salt.
51828-94-5 - 3.0 3.0
6. Alpha Hydroxy Methionine Calcium Salt
4857-44-7 - 3.0 3.0
7. Iron Sucrose 8047-67-4 - 2.0 2.0 Hematinic
8. Phenyl Acetic Acid 103-82-2 - 40.0 40.0 Pencillin-G, Perfumery
9. Diacerein 13739-02-1 - 3.0 3.0 Anti-Inflammatory
Agents
10. Tolfenamic Acid 13710-19-5 - 2.0 2.0 Non-steroidal anti-inflammatory drug
(NSAID)
11. Diosmin 520-27-4 - 3.0 3.0 Antimicrobials
12.1,2,4 Triazolo [4,3-A] Pyridine-3-One (T.P.O.)
6969-71-7 - 10.0 10.0 Drug Intermediate
13. Ferric carboxy Maltose 9007-72-1 - 1.0 1.0 Antianemic agent,
SEAC, Gujarat Page 3 of 17
Page 3 of 17 EC-EXP [Updated October 2018]
S. No.
Name of Products CAS No.
Production Capacity (MT/Month) End Use
Existing Proposed Total
Treatment of iron deficiency
14.Sucroferric Oxyhydroxide
12134-57-5 - 5.0 5.0 Hyperphosphatemia
Total 300 56 356
The project falls under Category B of project activity 5(f) as per the schedule of EIA Notification 2006.
4. Product wise Raw material consumption:
Sr. No.
Name of Product
Name of Raw Material
CAS no. of raw
materials
Quantity (MT/Month)
Existing Proposed Total
1 Sodium Silicofluoride
HFS Acid [19.3%] 16961-83-4 1299 -108.25 1190.75 Sodium Carbonate 497-19-8 24 -2 22 Sodium Chloride 7647-14-5 177 -14.75 162.25
2 Alpha Keto Isoleucine Calcium Salt
Hydantoin 461-72-3 - 2.40 2.40 Methyl ethyl ketone 78-93-3 - 0.72 0.72 Ethanolamine 141-43-5 - 0.72 0.72 Sodium Hydroxide 1310-73-2 - 0.63 0.63 Calcium Chloride 10043-52-4 - 4.97 4.97 Hydrochloric acid 7647-01-0 - 2.71 2.71 Methanol 67-56-1 - 1.70 1.70
3
Alpha Keto Leucine Calcium Salt
Hydantoin 461-72-3 - 2.61 2.61 Glycine 56-40-6 - 0.78 0.78 Isobutyraldehyde 78-84-2 - 0.96 0.96 Sodium Hydroxide 1310-73-2 - 0.25 0.25 Calcium Chloride 10043-52-4 - 0.79 0.79 Hydrochloric acid 7647-01-0 - 1.33 1.33 Methanol 67-56-1 - 0.62 0.62
4 Alpha Keto phenylalanine Calcium Salt
Glycine 56-40-6 - 1.89 1.89 Acetic Anhydride 108-24-7 - 4.77 4.77 Benzaldehyde 100-52-7 - 0.54 0.54 Sodium Acetate 127-09-3 - 0.57 0.57 N,N Dimethyl Formamide
68-12-2 - 4.80 4.80
Hydrochloric acid 7647-01-0 - 4.56 4.56 Methanol 67-56-1 - 1.89 1.89 Triethylamine 121-44-8 - 1.08 1.08 Calcium chloride 10043-52-4 - 0.78 0.78
5 Alpha Keto Valine Calcium Salt
Hydantoin 461-72-3 - 2.49 2.49 Glycine 56-40-6 - 0.99 0.99 Sodium Hydroxide 1310-73-2 - 1.2 1.2 Acetone 67-64-1 - 5.34 5.34 Hydrochloric Acid 7647-01-0 - 5.67 5.67 Calcium Chloride 10043-52-4 - 1.04 1.04 Methanol 67-56-1 - 0.44 0.44
6 Alpha Hydroxy Methionine Acid 583-91-5 - 3.78 3.78
SEAC, Gujarat Page 4 of 17
Page 4 of 17 EC-EXP [Updated October 2018]
Sr. No.
Name of Product
Name of Raw Material
CAS no. of raw
materials
Quantity (MT/Month)
Existing Proposed Total
Methionine Calcium Salt
Methanol 67-56-1 - 1.8 1.8 Sodium Hydroxide 1310-73-2 - 0.8 0.8 Activated Charcoal 7440-44-0 - 0.09 0.09 Hyflow 68855-54-9 - 0.12 0.12 Calcium Chloride 10043-52-4 - 1.14 1.14
7 Iron Sucrose Ferric chloride 7705-08-0 - 0.50 0.50 Sucrose 57-50-1 - 0.84 0.84 Sodium Hydroxide 1310-73-2 - 0.39 0.39 Methanol 67-56-1 - 6.66 6.66 Hyflow 68855-54-9 - 0.12 0.12 Activated Carbon 10043-52-4 - 0.12 0.12
8 Phenyl acetic acid (Mfg option 1)
Phenyl acetic acid solution
103-82-2 - 91.2 91.2
Hydrochloric acid Sulfuric acid
7647-01-0 7664-93-9
- 20.8 20.8
Phenyl acetic acid (Mfg option 2)
Benzyl chloride 100-44-7 - 38.4 38.4 Sodium Cyanide 143-33-9 - 15.2 15.2 sulfuric acid 7664-93-9 - 15.2 15.2
9 Diacerien. Aloe emodin 481-72-1 - 1.33 1.33 Anhydrous Sodium acetate
127-09-3 - 6.00 6.00
Chromium trioxide 1333-82-0 - 0.56 0.56 Dimethyl acetamide (DMA)
68-12-2 - 3.33 3.33
Sulphuric Acid 7664-93-9 - 0.03 0.03 10 Tolfenamic
Acid
N,N Dimethylformamide
68-12-2 - 14.413 14.413
Orthochlorobenzene
95-50-1 - 0.8 0.8
Potassium Carbonate
584-08-7 - 1.253 1.253
3-Chloro methyl aniline
- 1.253 1.253
Cat-TNA 7440-50-8 - 0.027 0.027 Hydrochloric acid 7647-01-0 - 0.533 0.533 Activated Carbon 7440-44-0 - 0.053 0.053 Hyflow Supercel
68855-54-9 - 0.173 0.173
11 Diosmine Hesperidin 520-26-3 - 2.76 2.76 Iodine 7553-56-2 - 0.54 0.54 Sodium Hydroxide 1310-73-2 - 1.38 1.38 Sodium Thiosulphate
10102-17-7 - 0.42 0.42
Hyflow 68855-54-9 - 0.48 0.48 Sulphuric Acid 7664-93-9 - 1.44 1.44 Pyridine 110-86-1 - 2.73 2.73 Methanol 67-56-1
1.35 1.35
12 1,2,4 Triazolo [4,3-A] Pyridine-3-
Urea 57-13-6 - 9.5 9.5 Hydrazine Hydrate 10217-52-4 - 10 10 Methanol 67-56-1 - 47.6 47.60
SEAC, Gujarat Page 5 of 17
Page 5 of 17 EC-EXP [Updated October 2018]
Sr. No.
Name of Product
Name of Raw Material
CAS no. of raw
materials
Quantity (MT/Month)
Existing Proposed Total
One (T.P.O.)
Hydrochloric acid 7647-01-0 - 20.5 20.50 2-chloro pyridine 109-09-1 - 4.9 4.90 Sulphuric Acid 7664-93-9 - 0.24 0.24 2-Ethoxy ethanol 110-80-5 - 40.3 40.3
13 Ferric Carboxy Maltose
Ferric Chloride 7705-08-0 - 0.21 0.21 Sodium Carbonate 497-19-8 - 0.21 0.21 Sodium Hydroxide 1310-73-2 - 0.06 0.06 Maltodextrin 9050-36-6 - 0.29 0.29 Sodium Hypochlorite
7681-52-9 - 0.34 0.34
Sodium Bromide 7647-15-6 - 0.01 0.01 Hydrochloric Acid 7647-01-0 - 0.04 0.04 Methanol 67-56-1 - 10.34 10.34
14 Sucroferric Oxy hydroxide
Ferric chloride 7705-08-0 - 0.3 0.3 Sodium carbonate 497-19-8 - 0.58 0.58 Sucrose 57-50-1 - 0.18 0.18 Starch 9005-25-8 - 0.18 0.18 Acetone 67-64-1 - 1.39 1.39
5. Compliance status of the existing project:
Sr.
no. Particulars Brief Information/Details Remarks
1 • Earlier EC details
• In case of EC not
obtained, Copy of
CTE &CCA obtained
before 14.09.2006.
This unit was purchased by M/s.
Goklesh Lifesciences. Earlier
CCA was obtained in name of
M/s. Vidsa Inorganics Pvt. Ltd.
(CCA no. WH-78226 dated 06-
05-2016). Same CCA was
transferred on name of M/s.
Goklesh Lifesciences on 07-07-
2017.
--
2 Compliance of EC conditions Not Applicable --
3 Status of inspection by RO-
MoEF&CC, Bhopal.
i.e. CCR-Certified
Compliance Report
Not Applicable --
4 Status of submission of half
yearly returns to concern
authorities.
Not Applicable --
5 Copy of CC&A and
Compliance of existing
CC&A Conditions.
Unit has obtained CCA wide order no. WH-78266 in name of M/s. Vidsa Inorganics Pvt. Ltd. Same CCA was transferred on name of M/s.Goklesh Lifesciences on 07-07-2017
--
SEAC, Gujarat Page 6 of 17
Page 6 of 17 EC-EXP [Updated October 2018]
which is valid upto 14/01/2021. However, the unit was not in operation during acquisition and it is in closed condition till date. Production will be started after obtaining EC and we will comply all the CCA conditions.
6 Legal actions/Closure
directions/SCN etc. Issued
by GPCB and its current
status. For last 3 years
Yes, 1 SCN is issued by GPCB. --
7 Any Public Complaints
None --
8 Is there any litigation
pending before any court of
Law against the Project?
None --
6. Salient features of the project including Water, Air and Hazardous waste
management:
Sr
.
n
o.
Particulars Details
A Total cost of Proposed Project
(Rs. in Crores):
Existing: 0.95
Proposed: 4.96
Total: 5.91
B Total Plot area
( sq. meter)
Existing: 4,700 Sq. m. Proposed: 0 Sq. m. Total: 4,700 Sq. m.
Green belt area
( sq. meter)
Existing: 800 Sq. m. Proposed: 756 Sq. m. Total: 1,556 Sq. m.
C Employment generation Existing: 20 Proposed: 15 Total: 35
D Water
i
Source of Water Supply
(GIDC Bore well, Surface water, Tanker supply etc...)
Ankleshwar, G.I.D.C
Status of permission from the concern authority.
Unit has water permission
letter for existing unit and
NOC from
GIDC,Ankleshwar for
SEAC, Gujarat Page 7 of 17
Page 7 of 17 EC-EXP [Updated October 2018]
additional water
requirement.
ii
Water consumption (KLD)
Existing
KLD*
Revised Existing
KLD**
Proposed (Additional)
KLD
Total after Expansion
KLD Remarks
(1) (2) (3) (2+3)
(A) Domestic 2 2 1 3 - (B) Gardening 0 0 6 6 -
Process 34 31 7 38 -
Boiler 0 0 4 4 - Cooling 0 0 4 4 -
Washing 2 2 1 3 - Others 3 3 -3 0 -
Others (Scrubbing) 0 0 1 1 - (C) Industrial Total 39 36 14 50 -
Grand Total (A+B+C)
41 38 21 59
Fresh 56.5 +
Recycled 2.5
Note: * For 300 MT/M inorganic production ** For 275 MT/M inorganic production (Revised scenario after expansion)
1) Total water requirement for the project: 59 KLD
2) Quantity to be recycled: 2.5 KLD
3) Total fresh water requirement: 56.5 KLD
iii
Waste water generation (KLD)
Category Existing
KLD*
Revised Existing
KLD**
Proposed (Additional)
KLD
Total after Expansion
KLD Remarks
(1) (2) (3) (2+3)
(A) Domestic 1 1 0.8 1.8 To septic tank/
soak pit system
(B) Industrial
Process 74 68 7.5 75.5 1 KLD high
COD and 74.5 KLD low COD
Boiler 0 0 0.2 0.2 Treated in ETP and then sent to FETP
and then discharged
into deep sea through NCTL
pipeline.
Cooling 0 0 0.3 0.3 Washing 2 2 1.0 3.0
Scrubbing 0 0 1.0 1.0
Others 3 3 -3 0
Total Industrial waste water
79 73 7 80 No additional effluent will be
SEAC, Gujarat Page 8 of 17
Page 8 of 17 EC-EXP [Updated October 2018]
sent to FETP other than the booked load
(79 KLD treated low
COD stream)
iv Treatment facility within premises with capacity [For existing and Proposed]
[In-house ETP (Primary, Secondary, Tertiary), MEE, Stripper, Spray Dryer, STP etc..
ETP: 80 KL/d with primary, secondary and tertiary treatment.
v Mode of Disposal & Final meeting point
Domestic:
To septic tank/ soak pit system
Industrial:
Low COD effluent will be treated in ETP and after achieveing desired norms, treated effluent will be sent to FETP and further discharged into deep sea through NCTL pipeline. High COD will be sent to Common MEE.
vi In case of Common facility (CF) like CETP, Common Spray dryer, Common MEE,
CHWIF etc.
Name of Common facility
� CETP: Final Effluent Treatment Plant (FETP) operated by Narmada Clean Tech Ltd (NCTL)
� Common MEE: Bharuch Enviro Infrastructure Limited (BEIL) Membership of Common facility (CF)
(For waste water treatment)
� Membership of CETP is obtained wide letter no. NCT/BQC/Transfer/2018/ February-70
� NOC from BEIL is obtained vide letter no. BEIL/ANK/2018 for high COD stream vii Simplified water balance diagram with reuse / recycle of waste water
vii Reuse/Recycle details (KLD)
[Source of reuse & application area]
SEAC, Gujarat Page 9 of 17
Page 9 of 17 EC-EXP [Updated October 2018]
Total reuse…….KLD
Source of waste water
for reuse with quantity
in KLD
Application area with
quantity in KLD
Remarks regarding
feasibility to reuse i.e.
w/w characteristics (COD,
BOD, TDS etc.)
2.5 KLD Distilled water
from manufacturing
activity
2.5 KLD distilled water will
be reused in washing.
COD, BOD, TDS is nil.
Hence, it is completely
feasible to use distilled
water for washing.
-
E Air
i Flue gas emission details
No. of Boilers/TFH/Furnaces/DG sets etc. with capacities viz. TPH, Kcal/hr, MT/hr,
KVA etc.
Existing & Proposed
-
SR. no.
Source of emission
With Capacity
Stack Height (meter)
Type of
Fuel
Quantity of Fuel MT/Day
Type of emissions
i.e. Air Pollutants
Air Pollution Control
Measures (APCM)
Existing None Proposed
1
Steam Boiler (1000 Kg/Hr)
11 Natural
Gas 800
m3/Day PM SO2 NO2
Adequate stack height will be provided
Steam Boiler (1000 Kg/Hr)
2 DG Set
(250 KW + 93 KW)
09 HSD 20 Lit/hr
-
ii Process gas i.e. Type of pollutant gases (SO2, HCl, NH3, Cl2, NOx etc.)
Existing & Proposed
-
Sr. no.
Source of emission
Type of emission
Stack/Vent Height (meter)
Air Pollution Control Measures (APCM)
Existing
None Proposed
1 Reactor Ammonia 12 Water scrubber followed
by Acidic scrubber
-
iii Fugitive emission details with its mitigation measures.
The fugitive emissions of organic chemicals and VOCs mainly occur due to tank
SEAC, Gujarat Page 10 of 17
Page 10 of 17 EC-EXP [Updated October 2018]
breathing losses, Leaking pipe fitting and valves, during maintenance operations. Though these are not expected to be significant, the following measures are being followed to ensure compliance and further reductions wherever possible, the same will be continued after expansion.
• The fugitive emissions in terms of handling losses are reduced by proper storage and handling.
• Hazardous chemicals are stored as per standard criteria.
• Proper ventilation in storage & production area is provided and all materials are being stored in suitable packing to prevent contamination of air due to particulates & volatile emissions from storage container & area.
• Enclosed system & efficient procedures for materials charging is provided.
• Good housekeeping is maintained in the plant.
• Work area monitoring is carried out twice in a year as per GFR.
• Water shall be sprinkled during the construction
• Mechanical seals for pumps etc. should be used and maintained.
• Closed unloading, conveying and packing system
• All the reactors shall be closed.
• Raw material storage in closed storage area
• Regular monitoring of solvents’ concentration in work zone.
• Greenbelt development around the plant F Hazardous waste
(as per the Hazardous and Other Wastes (Management and Transboundary
Movement) Rules 2016.
Existing & Proposed
i
Sr. no.
Type/Name of Hazardous waste
Specific Source of generation (Name of the Activity, Product etc.)
Category and Schedule as per HW Rules.
Quantity (MT/Annum)
Management of HW
Existing
Proposed
Total
1
Discarded Containers
/ Barrels/lin
er
Raw material storage area
Schedule-I-33.1
0.12 5 5.12
Collection, storage and
send to authorized recycler.
2 Process Waste
From manufacturing
process of product no. 11,
12 and 13 Schedule-I-28.1
0 63.6 63.6
Collection, storage and transport to TSDF site.
From manufacturing
process of product no. 4
0 3.6 3.6
Sent for Co-processing or sent to
CHWIF for Incineration.
3 Used oil D.G.Set &
Machineries Schedule-I-5.1
-- 200
Lit/Year
200 Lit/Yea
r
Collection, storage and
reuse as lubricants in
the machineries
within the premises
only or send to
SEAC, Gujarat Page 11 of 17
Page 11 of 17 EC-EXP [Updated October 2018]
authorized re-
processors
4 ETP
Sludge ETP
Schedule-I-35.3
18.0 54.0 72.0
Collection, storage and transport to TSDF site.
5 Spent
Solvent
From manufacturing
process of product no.
2,3,5,7,9,10,12,14
Schedule-I-28.6
-- 1435 1435
In-house Distillation
and recovered
solvents will be reused
6 Distillation Residue
Solvent distillation
Schedule-I-36.1
-- 26.6 26.6
Sent for Co-processing or sent to
CHWIF for Incineration.
7 Spent
Carbon
From manufacturing
process of product no. 6, 7
& 8
Schedule-I-28.3
-- 3.36 3.36
Sent for Co-processing or sent to
CHWIF for Incineration
8 Spent Hyflo
From manufacturing
process of product no. 6, 7
& 10
- -- 5.04 5.04
Sent for Co-processing or sent to
CHWIF for Incineration.
9 Acetic Acid
From manufacturing
process of product no. 4
and 9
- - 103.2 103.2 Sell to end
users as per rule-9
10 Methyl Iodide
From manufacturing
process of product no. 11
- - 7.2 7.2 Sell to end
users as per rule-9
-
ii Membership details of TSDF, CHWIF etc.
(For HW management)
NOC of BEIL, Ankleshwar is obtained
for landfill waste and incinerable
waste as well as for co-processing
dated 25/10/2018.
iii Details of Non-Hazardous waste & its
disposal(MSW and others)
--
G Solvent management, VOC emissions etc.
i Types of solvents, Details of Solvent recovery, % recovery. reuse of recovered
Solvents
S. No.
Input Solvent to Recovery
System
Quantity
(MT/M)
Recovered Solvent
Quantity
(MT/M)
% Recove
ry
Distillation
residue
End use of
recovered
solvent
1 Spent Methyl Ethyl Ketone
0.72 Methyl Ethyl
Ketone 0.71 98.0% 0.01
Re-Use in
Process
SEAC, Gujarat Page 12 of 17
Page 12 of 17 EC-EXP [Updated October 2018]
2 Spent
Methanol 57.12 Methanol 56.12 98.3% 1.00
Re-Use in
Process
3 Spent N,N
Dimethylacetamide
3.35 N,N
Dimethylacetamide
3.28 98.0% 0.07 Re-Use
in Process
4 Spent N,N
Dimethylformamide
14.40 N,N
Dimethylformamide
14.1 98.0% 0.29 Re-Use
in Process
5 Spent 2-ethoxy
ethanol 39.94
Spent 2-ethoxy ethanol
39.18 98.1% 1.90 Re-Use
in Process
6 Spent Acetone 4.17 Acetone 4.09 98.0% 2.00 Re-Use
in Process
- ii VOC emission sources and its mitigation measures
� The fugitive emissions in terms of handling losses are reduced by proper storage and handling.
� Hazardous chemicals are stored as per standard criteria. � Proper ventilation in storage & production area is provided and all materials are
being stored in suitable packing to prevent contamination of air due to particulates & volatile emissions from storage container & area.
� Enclosed system & efficient procedures for materials charging is provided. � SOP’s for start-up, shut down, operation & maintenance are established &
maintained in all relevant area of works. � The coverage of greenbelt around the plant consisting of noise and air pollution
capturing species also acts as natural barrier to stop carrying of dust along with the wind current.
� Regular workplace monitoring will be done to check the level of VOCs within working area.
� Good housekeeping will be maintained in the plant.
7. Details regarding EIA report:
Sr. no.
Particulars Details (Give brief note / Conclusion of the particular subject)
Page no., Section no. & chapter no. of EIA report
a Ensure that there is no change in EIA report w. r. t. ToR i.e. Form-1 & PFR
There is no change in EIA report w.r.t. ToR i.e.Form-1 & PFR
--
b Baseline environmental monitoring period
The baseline data were collected during 16th March to 15th June, 2017 is utilized for this project, these data were collected for Ankleshwar-Panoli cluster. One month additional study is conducted for ambient air quality monitoring at project site in May-2018.
--
c Baseline study area (Km)
10 --
SEAC, Gujarat Page 13 of 17
Page 13 of 17 EC-EXP [Updated October 2018]
d No. of AAQM stations including project site
8 --
Conclusion of the Monitoring (Baseline study) Air, Water & Land
e
Parameters considered for AAQM including project specific parameters.
PM10, PM2.5, SO2, NO2, CO VOC and NH3
Page no. 3-5, Table no. 3-3, Chapter 3.
- Sr. no.
Parameters Range of Concentrations
(µg/m3) Remarks
1. PM10 69.25 - 82.81 -- 2. PM2.5 25.52 - 35.05 -- 3. SO2 9.31 - 13.12 -- 4. NO2 15.05 - 20.56 -- 5. CO BDL --
6. VOC BDL --
7. NH3 BDL --
- f Whether the results of AAQM is
within the norms prescribed in NAAQS ? If no, give reasons as per EIA report
All AAQM results are within the norms prescribed in NAAQS
Page no. 3-5, Section 3.3.2, Chapter 3
g Comments for AAQM results w. r. t.
NAAQS
All AAQM results are within the norms prescribed in NAAQS
Page no. 3-5, Section 3.3.2, Chapter 3
h Software used for the mathematical
Modelling for anticipated incremental GLCs (Ground Level Concentrations)
ISC-AERMOD View is used for mathematical modelling for anticipated incremental GLCs. The ground level concentration are as under
Page no. 4-10, Chapter 4
i The resultant concentrations w. r. t.
NAAQS and its conclusion.
As below Page no. 4-11, Chapter 4
Pollutant
Average 24 hourly Maximum
Ground Level Concentration
(µg/m3)
Distance & Direction
PM10 1.665 3.2 km in ENE
SO2 1.920 3.2 km in ENE
NOX 0.688 3.2 km in ENE
NH3 0.897 Project site
- j Suggested mitigation measures w. r.
t. Air
As below --
For fugitive emission:
• Raw materials will be stored in isolated storage area and containers will be kept tightly closed.
• Manufacturing activity will be carried out in closed reactors / vessels and regular
SEAC, Gujarat Page 14 of 17
Page 14 of 17 EC-EXP [Updated October 2018]
checking and maintenance of the same will be carried out to avoid any leakages.
• Precautionary measures will be taken while handling various hazardous.
• Transporters will be instructed to cover the trucks by tarpaulin sheets.
• Care will be taken during charging and handling of fuel to reduce fugitive emission.
For process emission:
• The fuel to be used in boiler is natural gas, hence adequate stack height will be provided.
• Greenbelt development consisting of air pollutant tolerant species is started will help to reduce pollution load.
k Conclusion of the Monitoring during
baseline study of water
As below Section 3.4.3 Page no. 3-13, Chapter 3
• It can be concluded from the baseline monitoring, that as per Drinking water standard of IS: 10500, ground water and surface water can be used for domestic purpose.
• The water can be used for drinking purpose after proper treatment of hardness, TDS, TSS, Salinity and bacteria removal such as filtration, RO and UV.
l Suggested mitigation measures w. r. t. Water
As below Section 4.3.2 Page no. 4-6, Chapter 4
• Low COD stream will be treated in ETP having primary, secondary and tertiary treatment. After achieving desired norms, treated effluent will be discharged in to G.I.D.C. underground drainage system and conveyed to FETP which ultimately leads to deep sea for final disposal through NCTL pipeline.
• High COD stream (1.0 KLD) will be sent to Common MEE for further treatment and disposal.
• Pucca flooring will be done in ETP area to avoid any type of leakage that can be percolated into contaminated ground water. Thus, no adverse impact will be occurred on water environment.
• Hazardous chemicals will be stored in designated area with dyke wall and spillage collection system.
• Unit will install rain water harvesting system within premises to collect and reuse rainwater, thus reducing fresh water requirement.
• Care will be taken to avoid of leakage or spillage of chemicals, hazardous waste, effluent while handling, storage and disposal. Also impervious base and guard around the structure will be provided to avoid penetration of same.
• Hazardous waste generated from processes and ETP will be properly stored in designated storage area having roof and leachate collection system.
m Conclusion of the Monitoring during baseline study of Land
As below Section 3.6.1 Page no. 3-19, Chapter 3
The porosity of soils varied from 25% to 58% and can be considered as moderate to good for air and water movement in the soil. Organic carbon varied from 0.36% to 1.41%. The Water Holding Capacity varied from 32.3% to 39%. Bulk Density varied from 0.6 to 1.8 g/cm3. pH varied from 7.1 to 8.3.
n Suggested mitigation measures w .r. t. Land
As below Section 4.3.1 Page no. 4-6, Chapter 4
SEAC, Gujarat Page 15 of 17
Page 15 of 17 EC-EXP [Updated October 2018]
• Hazardous chemicals will be stored in designated area with dyke wall and spillage collection system.
• Care will be taken to avoid of leakage or spillage of chemicals, hazardous waste, effluent while handling, storage and disposal. Also impervious base and guard around the structure will be provided to avoid penetration of same.
• Pucca flooring will be done in ETP area to avoid any type of leakage that can be percolated into soil.
• Hazardous waste generated from processes and ETP will be properly stored in designated storage area having roof and leachate collection system.
• As the project site is located in GIDC, no major infrastructural development is expected. Thus, no change will be occurred in land use pattern of the area.
• Care will be taken to have proper infrastructural development at site. o Conclusion of the Monitoring during
baseline study of Noise
As below Section 3.5.2 Page no. 3-15, Chapter 3
Out of all the 8 locations measured for noise levels, the sound levels recorded at Ankleshwar town, project site Atul and Uchhali village are higher in day time as well as night time. At all other locations recorded Noise levels are found to be within the standard limits.
p Suggested mitigation measures w. r. t. Noise
As below Section 4.3.3 Page no. 4-7, Chapter 4
• As far as the noise that will be generated due to the transportation is concerned, the same will be minimized transportation only in day time and by maintaining transportation vehicles properly.
• Main source of noise in proposed plant will be boiler, D.G. Set. However, the same will be stand by and operated only in case of main power failure. Latest technology based low noise D.G. set with acoustic enclosures will be installed.
• Proper and timely lubrication, oiling and maintenance will be carried out for all plant and machineries.
• The noise generation will be mitigated by installing noise barriers/absorbers around stationery noise sources.
• Adequate noise control measures such as antivibration pad for equipment with high vibration will be provided. All the vibrating parts will be checked periodically and serviced to reduce the noise generation.
• The equipment, which generates excessive noise, will be provided with enclosures etc. Thus, there will not be any major source of higher noise generation which can be propagated in vicinity.
• Regular noise monitoring will be carried out at the prominent place in the premises.
• Greenbelt consisting of noise capturing plant species will reduce noise levels. q Main issues in Public hearing (If
applicable)
Not Applicable
r Brief description of Public hearing (If applicable): Not Applicable Main Issues raised by stake holders
Commitments by Project proponent and action plan.
- - -
s
Major hazardous chemicals and worst case scenario considered in
As below: Section 7.3.5.1 Page no. 7-14,
SEAC, Gujarat Page 16 of 17
Page 16 of 17 EC-EXP [Updated October 2018]
Risk Analysis report. Chapter 7
• Major hazardous chemicals are Acetone, Methanol, Pyridin, Acetic Anhydride, HCl, Sulfuric acid, Triethylamine
• Leakage of Acetone from 1 inch dia. Hole, Catastrophic failure of Acetone storage tank, Leakage of Methanol from 1 inch dia. Hole, Catastrophic failure of Methanol storage tank, Catastrophic failure of Pyridine Drum, Catastrophic failure of Triethylamine Drum, Leakage of Acetic Anhydride from 1 inch dia. Hole, Catastrophic failure of Acetic Anhydride storage tank, Catastrophic failure of Pyridine Drum, Catastrophic failure of Triethylamine Drum
Comments/Suggestions/mitigation measures in brief
As below: Section 7.3.5.5 Page no. 7-21, Chapter 7
• Sulphuric Acid, Caustic Solution etc are toxic materials. Whenever there is spillage on the ground, the pool will be immediately covered with sand and neutralizers like LIME shall be spread on the spillage. 90% of the potential harm will be reduced.
• Acetone, Methanol is highly flammable chemical with low flash point and boiling point. These chemicals are a potential source of major fires.
• The storage area shall be well protected from any ignitable substances. All the electrical fittings shall be flameproof. Only qualified /trained persons shall be used to operate in the tank farm. The tank farm shall be monitored all the 365 days including nights. Major accident scenarios have to be planned and MOCK DRILLS conducted.
• The design of the tank-farm area is to be done with good safety practices. All the tanks shall have dumping arrangements planned for reducing the severity during emergencies. Dumping arrangement is a spare tank facility kept empty and ready to receive the chemical from the tank with an emergency. The empty tank will be in the same tank farm and will be maintained empty.
• Toxic Chemicals tank farm shall be separated from flammable chemical tank farm. They have to be separated by considerable distance.
• The cooling arrangements for the reactors shall be with standby system. This will control the rise in exothermic reaction temperatures. There shall be also two Temperature indicators for monitoring temperature rise.
• In case of pressure reactors where the pressures of operations are greater than atmospheric pressure, the overrun of exothermic reactions control is very important. In addition to the safety devices, there must be arrangement to dislodge the reaction mass through the bottom discharge valve. There shall be a provision of remote controlled discharge valves for the purpose.
• Ventilation should be provided for any enclosed are where hydrocarbon or toxic vapors may accumulate. Several such areas were noticed- these may be surveyed and tackled accordingly.
• Flame arrestor should be provided.
• Adequate number of caution boards highlighting the hazards of chemicals should be provided at critical locations.
• Prepare & display the safe operating procedure for hazardous chemicals storage, handling & transporting or using.
• Local Exhaust ventilation and scrubber should be installed where it is required to reduce fumes, vapors, temperature and heat stress.
t An undertaking by the Project Proponent (PP) on the ownership of the EIA report as per the OM of MoEF&CC dated 05/10/2011 and an undertaking by the Consultant
Both declarations are given after cover page of EIA report
--
EC-EXP [Updated October 2018]
regarding the prescribed TORs have been complied with and the data submitted is factually correct as per the OM of MoEF&CC dated 04/08/2009.
u Any other details: --
8. Details of Environmental Consultant:
Sr.
no.
Particulars
i Name of the Consultant
ii Contact no. and e-mail ID of the
Consultant
iii Accreditation for the categories and
Validity
iv Any other details
Name & designation of the Applican
Stamp &Signature of Applicant:
General Instructions
• Format shall be in WORD Format
• Do not change Format.
• Provide authenticated (with stamp & Signature) hard copy during presentation.
• Kindly send e-mail to :
• Above data shall be as per application
• Incorporate relevant details in respective column in the Format. Do not attach
Annexure except copy of Certificates etc.
SEAC, Gujar
2018]
regarding the prescribed TORs have been complied with and the data submitted is factually correct as per the OM of MoEF&CC dated
Details of Environmental Consultant:
Details
Name of the Consultant En-Tech Laboratories
mail ID of the Mo. no. : 9909975203
e-Mail: [email protected]
Accreditation for the categories and Stay Order against NABET/QCI
--
of the Applicant: Mansukh Radadia (Partner)
Stamp &Signature of Applicant:
Date: 28/11/2018
Format shall be in WORD Format (Font type- Arial, Font size- 11)
Do not change Format. Fill up your details / information in prescribed tables.
Provide authenticated (with stamp & Signature) hard copy during presentation.
mail to : [email protected]
Above data shall be as per application Form-1 & PFR.
Incorporate relevant details in respective column in the Format. Do not attach
Annexure except copy of Certificates etc.
SEAC, Gujarat Page 17 of 17
Page 17 of 17 2018]
Stay Order against NABET/QCI
11)
your details / information in prescribed tables.
Provide authenticated (with stamp & Signature) hard copy during presentation.
Incorporate relevant details in respective column in the Format. Do not attach
FORM-2
FOR OBTAINING ENVIRONMENT CLEARANCE
For Proposed Active Pharmaceutical Ingredient (API) & Bulk Drug
Intermediates Manufacturing in Existing Inorganic Unit
of
M/s. Goklesh Lifesciences
Located at
Plot No. 9112/ 1, 2 & 3, G.I.D.C Estate Ankleshwar-393002,
Dist: Bharuch, Gujarat
Prepared by:
En-Tech Laboratories
202, Trade Square, Opp. Torrent Power House,
Sabarmati, Ahmedabad - 380005
November 2018
FORM-2 OF GOKLESH LIFESCIENCES
Page 1 of 37
1. Details of Project
Sr.
No. Particular Details
a. Name of the Project(S) : Proposed Active Pharmaceutical Ingredient (API) & Bulk
Drug Intermediates Manufacturing in Existing Inorganic Unit
b. Name of the Company/Organisation : M/s. Goklesh Lifesciences
c. Registered Address : Plot No. 9112/ 1, 2 & 3, G.I.D.C Estate Ankleshwar-393002,
Dist: Bharuch, Gujarat
d. Legal Status of the Company : Partnership firm.
e. Joint Venture (Yes/No) : Yes
If Yes
(i) No. of JV Partners (multiple
Entries Allowed)
: 4
Name of the JV
Partner
Share of
the JV
partner
Address of the JV
Partner Email ID of JV Partner
Mobile No.
of JV
Partner
Mansukh Naran
Radadia
25% 10-Vrundavan co-
operative housing
society, Nr.Jaldhara
Chockdi, GIDC,
Ankleshwar-
393002.
[email protected] 9824486234
Gopal Naran
Radadia
25% Vil.-Mandlikpur,
T.-Jetpur,
D-Rajkot.
9824815055
Shital Mansukh
Radadia
25% 10-Vrundavan co-
operative housing
society, Nr.Jaldhara
Chockdi, GIDC,
Ankleshwar-
393002.
9824486234
Rekha Gopal
Radadia
25% Vil.-Mandlikpur,
T.-Jetpur,
D-Rajkot.
9824815055
2. Address for the Correspondence
Sr.
No. Particular Details
a. Name of applicant : Mr. Mansukh Radadia
b. Designation(owner/Partner/CEO) : Partner
c. Address : Plot No. 9112/ 1, 2 & 3, G.I.D.C Estate
Ankleshwar-393002, Dist: Bharuch, Gujarat
d. Pin code : 393002
e. e-mail : [email protected]
f. Telephone No. : +919824486234
g. Fax No. : -
3. Category of the Project/Activity as per Schedule of EIA Notification,2006
Sr.
No. Particular Details
a. Project /Activity : 5 (f)
FORM-2 OF GOKLESH LIFESCIENCES
Page 2 of 37
Sr.
No. Particular Details
[1(a)(i)/1(a)(ii)/1(b)/1(c)/1(d)/1(e)/2(a)/2(b)/3(a)/3(b)/4(a)/4(b)(i)/4(b)(ii)/4(c)/
4(d)/4(e)/4(f) /5(a)/5(b)(b)/5(c)/5(d)/5(e)/5(f)/5(g)/5(h)
/5(i)/5(j)/6(a)/6(b)/(a)/7(b)/7(c)/7(d)/7(e)/7(f)/7(g)/7(h)/7( i) /8(a)/8(b)]
b. Category (A/B1/B2) : B
If B1 or B2 B1
Reason for application at Central Level / State level (in case of B2 Projects) : --
If others --
c. Please Specify : --
d. EAC concerned (for category a Project only)
(coal Mining/Non-coal Mining/ Thermal/River Valley & Hydro/Industry-I/
Industry-II /Infrastructure -I/Infrastructure-II/Nuclear & Defence/CRZ
: Industry-II
e. New / Expansion / Modernization / One Time Capacity expansion (only for
Coal Mining) / Expansion under Para 7(ii) / Modernization under Para 7(ii) /
Change of Product Mix under Para 7 (ii))
: Expansion
4. Location of the Project
Sr.
No. Particular Details
a. Plot / Survey / Khasra No. : 9112/ 1, 2 & 3
b. Village : GIDC Estate Ankleshwar
c. Tehsil : Ankleshwar
d. District : Bharuch
e. State : Gujarat
f. Pin Code : 393002
g. Bounded Latitudes(North) :
From : 21°37'51.87"N, 73° 2'54.96"E
To : 21°37'52.03"N, 73° 2'53.24"E
h. Bounded Longitudes (East) :
From : 21°37'55.08"N, 73° 2'53.45"E
To : 21°37'55.00"N, 73° 2'55.15"E
i. Survey of India Topo Sheet No. : F43M14
j. Upload Topo Sheet File (Upload PDF only) : --
k. Maximum Elevation Above Means Sea Level
(AMSL)
: 25 m
l. Upload (kml) File (Upload kml only) : --
m. Distance of Nearest HFL from the Project bound
within the study area
: None within study area
n. Seismic Zone (Zone: 1 / 2 / 3 / 4 / 5) : 3
5. Whether Project is executed in multiple States (Yes / No)?: Not Applicable
If yes
Sr.
No. Particular Details
a. Number of States in which Project will be
Executed (e.g. 1,2,3,4,5,6) :
--
b. Main State of the Project : --
c. Other State (Multiple Entries Allowed)
(If the project to be executed, does not belong to any state, then state category could be selected as
'Other')
FORM-2 OF GOKLESH LIFESCIENCES
Page 3 of 37
State District Tehsil Village
-- -- -- --
6. Details of Terms of Reference (TOR)
Sr.
No. Particular Details
a. Whether TOR is mandatory for submitting
application (Yes / No)? :
Yes
If Yes : --
b. Date of issue of ToR / Standard TOR : 28/08/2018
c. MoEF&CC / SEIAA File No. : SEIAA/GUJ/TOR/5(f)/870/2018
d. Upload ToR letter (PDF only) : --
7. Details of Public Consultation
Sr.
No. Particular Details
a. Whether the Project Exempted from Public
Hearing (Yes/No)? :
Yes
If Yes, : --
Reason :
Project is located within notified industrial
area of Ankleshwar GIDC
b. Supporting Document (upload PDF only) : --
c. Whether details of Public Hearing available
(Yes/No)? :
No
If No, : --
d. Reason thereof :
Public hearing is not applicable to proposed
expansion Project.
Supporting Document (upload PDF only) : --
If Yes, :
e. Date of Advertisement of Public Hearing : --
f. Copy of advertisement in English (Upload PDF
only) :
--
g. Whether Public hearing was presided over by an
officer of the rank of Additional District
Magistrate or above (Yes/No)?
:
--
If Yes : --
h. Designation of Presiding Officer (District
Magistrate / District Collector / Deputy
Commissioner / others - please specify)
:
--
i. Copy of duly signed Proceedings of Public
Hearing in English (Upload PDF only) :
--
j. Date of Public Hearing : --
k. Venue of Public Hearing: : --
Village : --
Tehsil : --
District : --
State : --
l. Distance of Public Hearing Venue from the
Proposed Project (km) :
--
m. No. of people attended : --
n. If the multiple public hearings conducted : --
PI give the details of each PH as per (e) to (o) : --
FORM-2 OF GOKLESH LIFESCIENCES
Page 4 of 37
Sr.
No. Particular Details
above
8. Details of Project Configuration / Product (Multiple Entries Allowed)
Sr.
No
.
Particular Details
a. Whether the project is New (Yes/No?) : Yes
If Yes, : --
b. Project Configuration
Plant / Equipment / Facility Configuration Remarks if any
SS Reactor with Condenser & Receiver 3 KL (08) --
SS Reactor with Condenser & Receiver 5 KL (02) --
SS Reactor with Condenser & Receiver 2 KL (02) --
Distillation Column 5 KL (02) --
Glass Lined Reactor with Glass Assembly 5 KL (01) --
Glass Lined Reactor with Glass Assembly 3 KL (01) --
SS Centrifuge 36’’ (02) --
SS Centrifuge 48” (06) --
RL Centrifuge 36’’(01) --
SS Tray Dryer with PP Tray 96 Tray (01) --
SS Tray Dryer with PP Tray 48 Tray (02) --
Sparkler Filter 11 Plate (03) --
Multi Mill 250 Kg/hrs (03) --
SS storage Tank 12 KL (06) --
HDPE storage Tank 12 KL (02) --
RCVD 1 KL(01) --
c. Product
S.
No. Name of Products
CAS
No.
Production Capacity
(MT/Month) End Use
Existing Proposed Total
1. Sodium Silico Fluoride 16893-85-9 300 -25 275
Glass Manufacturing,
As a preservative in
Gum/Adhesives,
Rubber tyre
manufacturing
2. Alpha Keto Isoleucine Calcium Salt 51828-96-7 - 3.0 3.0
Nutritional
supplement for
kidney disease
3. Alpha Keto Leucine Calcium Salt. 51828-95-6 - 3.0 3.0
4. Alpha Keto Phenylalanine Calcium Salt. 51828-93-4 - 3.0 3.0
5. Alpha Keto Valine Calcium Salt. 51828-94-5 - 3.0 3.0
6. Alpha Hydroxy Methionine Calcium Salt. 4857-44-7 - 3.0 3.0
7. Iron Sucrose 8047-67-4 - 2.0 2.0 Hematinic
8. Phenyl Acetic Acid 103-82-2 - 40.0 40.0 Pencillin-G,
Perfumery
9. Diacerein 13739-02-1 - 3.0 3.0 Anti-Inflammatory
Agents
10. Tolfenamic Acid 13710-19-5 - 2.0 2.0
Non-steroidal anti-
inflammatory drug
(NSAID)
11. Diosmin 520-27-4 - 3.0 3.0 Antimicrobials
12. 1,2,4 Triazolo [4,3-A] Pyridine-3-One
(T.P.O.) 6969-71-7 - 10.0 10.0 Drug Intermediate
13. Ferric carboxy Maltose 9007-72-1 - 1.0 1.0 Antianemic agent,
FORM-2 OF GOKLESH LIFESCIENCES
Page 5 of 37
Sr.
No
.
Particular Details
Treatment of iron
deficiency
14. Sucroferric Oxyhydroxide 12134-57-5 - 5.0 5.0 Hyperphosphatemia
Total 300 56 356
• Unit: - (Tons per Annum(TPA), Mega Watt(MW), Hectares(ha), Kilo litre per Day(KLD)Tons
Crushed per Day(TCD), Cubic Meter per Day, Kilometres(Km), Day(MLD), Others)
• Mode of Transport/Transmission of Product (Road, Rail, conveyor, Belt, pipe, Arial Ropeway,
combination of two or three modes, Others)
9. If Expansion / Modernisation / One Time Capacity expansion (only for Coal Mining) /
Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product
Mix under Clause 7 (ii)
Sr.
No. Particular Details
a. Details of environmental clearance granted earlier
(i) Date of issue of environmental clearance : Existing unit is inorganic unit which doest
not require EC.
(ii) MoEFCC / SEIAA File Number : -
(iii) Upload EC Letter : -
b. Details of certified report on compliance of earlier environmental clearance conditions
(i) Details of Regional Office of MoEFCC /
Zonal Office of CPCB / SPCB / UTPCC
from which certified report on compliance
of earlier environmental clearance
conditions obtained
: Not applicable.
(ii) Letter No : --
(iii) Status of Compliance : --
(iv) Certified report on compliance of earlier
environmental clearance conditions
(Including Monitoring Report) (Upload
PDF only)
: --
(v) Date of site visit : --
c. Details of Consent to Operate
(i) Whether Consent to operate obtained
(Yes/No)?
:
Yes
[Earlier CCA was obtained in name of M/s.
Vidsa Inorganics Pvt. Ltd. (CCA no. WH-
78226 dated 06-05-2016). Same CCA was
transferred on name of M/s. Goklesh
Lifesciences on 07-07-2017. However, the
unit was not in operation during acquisition
and it is in closed condition till date]
If yes, :
(ii) Upload Copies of all Consent to operate
obtained since inception (Upload PDF
only)
:
--
(iii) Date of issue : 06/05/2016
FORM-2 OF GOKLESH LIFESCIENCES
Page 6 of 37
Sr.
No. Particular Details
(iv) Valid up to : 14/01/2021
(v) File No. : 356396
(vi) Application No. : 101646
(vii) Upload Copy of Consent to operate valid
as on date (Upload PDF only) :
--
d. Details of Capacity Expansion (Multiple Entries Allowed)
Product / Activity
(Capacity/Area)
Quantity
From
Quantity
To Unit
Mode of Transport
/ Transmission of
Product
Sodium Silico Fluoride 3600 3300 TPA Road
Alpha Keto Isoleucine Calcium Salt 0.0 36 TPA
Alpha Keto Leucine Calcium Salt. 0.0 36 TPA
Alpha Keto Phenylalanine Calcium Salt. 0.0 36 TPA
Alpha Keto Valine Calcium Salt. 0.0 36 TPA
Alpha Hydroxy Methionine Calcium Salt. 0.0 36 TPA
Iron Sucrose 0.0 24 TPA
Phenyl Acetic Acid 0.0 480 TPA
Diacerein 0.0 36 TPA
Tolfenamic Acid 0.0 24 TPA
Diosmin 0.0 36 TPA
1,2,4 Triazolo [4,3-A] Pyridine-3-One
(T.P.O.) 0.0 120 TPA
Ferric carboxy Maltose 0.0 12 TPA
Sucroferric Oxyhydroxide 0.0 60 TPA
Total 3600 4272 TPA
• Unit:(Tons per Annum(TPA), Mega Watt(MW), Hectares(ha), Kilo Litre per Day(KLD), Tons
Crushed per Day(TCD), Cubic Meter per Day, Kilometers (Km), Million Liters per Day(MLD),
Others)
• Mode of Transport/Transmission of Product (Road, Rail, Conveyor Belt, Pipe Conveyor, Arial
Ropeway, combination of two or three modes, Others
10. Project Cost
Sr.
No. Particular Details
a. Total Cost of the Project at current price level (in
Lakhs)
: 496
b. Funds Allocated for Environment Management
(Capital) (in Lakhs)
: 80
c. Funds Allocated Towards ESC (Entrepreneur
Social Responsibility) (in Lakhs)
: 4.96
d. Funds Allocated for Environment Management
Plan (EMP) (Recurring per Annum)(in Lakhs)
: 20
FORM-2 OF GOKLESH LIFESCIENCES
Page 7 of 37
11. Whether project attracts the General Condition specified in the Schedule of EIA
Notification (Yes/No)? [provide name of WL/CPA/ESA/Inter-state boundary
/International boundary and distance from the project]: Not Applicable
If Yes
Sr.
No. Particular Details
a. Protected Area Notified Under the Wild
Life(Protection) Act, 1972
: --
b. Critically Polluted Areas as identified by the
Central Pollution Control Board from Time to
Time
: --
c. Notified Eco-Sensitive Areas : --
d. Inter-State Boundaries and International
Boundaries
: --
12. Whether projects attract the Specific Condition specified in the Schedule of EIA
Notification (Yes/No)?: No.
If Yes
Sr.
No. Particular Details
a. If any Industrial Estate / Complex / Export
processing Zones / Special Economic Zones /
Biotech Parks / Leather Complex with
homogeneous type of industries such as Items
4(d), 4(f), 5(e), 5(f), or those Industrial estates
with pre-defined set of activities (not necessarily
homogeneous, obtains prior environmental
clearance, individual industries including
proposed industrial housing within such estates /
complexes will not be required to take prior
environmental clearance, so long as the Terms
and Conditions for the industrial estate/complex
are complied with (Such estates/complexes must
have a clearly identified management with the
legal responsibility of ensuring adherence to the
Terms and Conditions of prior environmental
clearance, who may be held responsible for
violation of the same throughout the life of
thecomplex/estate
: --
13. Raw Material / Fuel Requirement (Multiple Entries Allowed)
Sr.
No. Particular Details
a. Details of Raw Material / Fuel Requirement
Raw
Material /
Fuel
Quantity
per Annum
Unit Source
(incase of
Import
, please
specify
country
and
Mode of
Transport
Distance of
Source
from
Project Site
(in Kilo
meters)
(In case of
Type of
Linkage
(Linkage /
Fuel
Supply
Agreement
FORM-2 OF GOKLESH LIFESCIENCES
Page 8 of 37
Sr.
No. Particular Details
Name of
the port
from
which
Raw
Material /
Fuel is
received)
import,
distance
from the
port from
which the
raw
material /
fuel is
received
/ e-auction
/
MoU /
LOA
Captive /
Open
market
/ Others)
Hyflow Supercel 2.1 MTPA Local
Vendor
By truck Local
Vendor
--
2-chloro pyridine 58.8 MTPA
2-Ethoxy ethanol 483.6 MTPA
3-Chloro methyl aniline 15.0 MTPA
Acetic Anhydride 57.2 MTPA
Acetone 80.8 MTPA
Activated Carbon 3.2 MTPA
Aloe emodin 16.0 MTPA
Anhydrous Sodium
acetate 72.0 MTPA
Benzaldehyde 6.5 MTPA
Benzyl chloride 460.8 MTPA
Calcium Chloride 104.6 MTPA
Cat-TNA 0.3 MTPA
Chromium trioxide 6.7 MTPA
Dimethyl acetamide
(DMA) 40.0 MTPA
Ethanolamine 8.6 MTPA
Ferric chloride 12.1 MTPA
Glycine 43.9 MTPA
Hesperidin 33.1 MTPA
HFS Acid [19.3%] 14289.0 MTPA
Hydantoin 90.0 MTPA
Hydrazine Hydrate 120.0 MTPA
Hydrochloric acid 673.7 MTPA
Hyflow 8.6 MTPA
Iodine 6.5 MTPA
Isobutyraldehyde 11.5 MTPA
Maltodextrin 3.5 MTPA
Methanol 868.8 MTPA
Methionine Acid 45.4 MTPA
Methyl ethyl ketone 8.6 MTPA
N,N Dimethyl
Formamide 57.6 MTPA
N,N Dimethylformamide 173.0 MTPA
Orthochlorobenzene 9.6 MTPA
Phenyl acetic acid
solution 1094.4 MTPA
Potassium Carbonate 15.0 MTPA
Pyridine 32.8 MTPA
Sodium Acetate 6.8 MTPA
FORM-2 OF GOKLESH LIFESCIENCES
Page 9 of 37
Sr.
No. Particular Details
Sodium Bromide 0.1 MTPA
Sodium Carbonate 273.5 MTPA
Sodium Chloride 1947.0 MTPA
Sodium Cyanide 182.4 MTPA
Sodium Hydroxide 56.5 MTPA
Sodium Hypochlorite 4.1 MTPA
Sodium Thiosulphate 5.0 MTPA
Starch 2.2 MTPA
Sucrose 12.2 MTPA
sulfuric acid 202.9 MTPA
Triethylamine 13.0 MTPA
Urea 114.0 MTPA
Fuel
Natural gas 800 m3/hr Local
Vendor -- -- --
HSD 20 Lit/hr
In case of expansion proposals, total requirement of raw material / fuel shall be given
• Unit: - (Tons per Annum(TPA), Mega Watt(MW), Hectares(ha), Kilo Litre per Day(KLD), Tons
Crushed per Day(TCD), Cubic Meter per Day, Kilometers(Km), Million Liters per Day(MLD),
Others)
• Mode of Transport/Transmission of Product (Road, Rail, conveyor Belt, Pipe Conveyor, Arial
Ropeway, combination of two or three modes, Others
b. Upload copy of Linkage / Fuel Supply Agreement / e-
auction / Memorandum of Understanding / Letter of
Allocation / Captive source / others.
:
NA
14. Baseline Data (Air / Water / Noise / Soil / Ground water table/ Others)
Sr.
No. Particular Details
a. Period of Base Line Data Collection Baseline details of Ankleshwar cluster
collected in 16th March to 15
thJune, 2017 is
utilized for this project. One month additional
study is conducted for ambient air quality
monitoring at project site and other two
locations in May 2018.
From (DD/MM/YYYY) : 16/03/2017
To (DD/MM/YYYY) : 15/06/2017
b. Season (Summer / Pre-monsoon / Post-monsoon /
Winter)
: Summer
c. No. of Ambient Air Quality (AAQ) Monitoring
Locations
: 9
d. Details of AAQ Monitoring (Multiple Entries Allowed)
Criteria
Pollutants Unit
Maximum
Value
Minimum
Value
98 Percentile
Value
Prescribed
Standard
PM10 µg/m3 82.81 69.25 79.4 100
PM2.5 µg/m3 35.05 25.52 33.2 60
SO2 µg/m3 13.12 9.31 10.2 80
FORM-2 OF GOKLESH LIFESCIENCES
Page 10 of 37
Sr.
No. Particular Details
NO2 µg/m3 20.56 15.05 18.6 80
CO mg/m3 BDL 2
NH3 µg/m3 BDL 400
VOC ppm BDL -
• Criteria Pollutants: - (PM10, PM2.5, SO2, NOx, Others parameters specific to sector)
• Unit: - (Micro Gram per Meter Cube, Nano Gram per Meter Cube, Mili Gram per Meter Cube,
NA)
e. No. of Ground Water Monitoring Locations : 7
f. Details of Ground Water Monitoring (Multiple Entries Allowed)
Criteria
Pollutants Unit
Maximum
Value Minimum Value
98 Percentile
Value
Prescribed
Standard
pH - 8.1 7.3 - No Relaxation
Temperature °C 31.0 30.0 31.0 --
Colour Hazen BDL - -
Odor -- Unobjectionable - -
Turbidity NTU 1.5 0.7 1.5
Total Solid (TS) mg/L 2545.0 905.0 2483.0 --
Total Suspended
Solids (TSS) mg/L 100.0 40.0 97.6 --
Total Dissolved
Solids (TDS) mg/L 2505.0 825.0 2442.0 2000
Electrical
Conductivity
(EC)
µS/cm 3758.0 1238.0 3663.4 --
Biological
Oxygen Demand
(BOD)
mg/L BDL -- --
Chemical
Oxygen Demand
(COD)
mg/L 7.0 5.2 6.9 --
Total Coliform
(TC) MPN / 100 ml 28.0 20.0 27.8 Absent
Faecal Coliform
(FC) MPN / 100 ml 16.8 12.0 16.7 Absent
E. Coli MPN / 100 ml 8.4 6.0 8.3 Absent
Total Hardness
(as CaCO3) mg/L 290.0 203.0 285.8 600
Calcium
Hardness mg/L 160.0 96.0 157.7 --
Magnesium
Hardness mg/L 130.0 91.0 129.3 --
Total Alkalinity (
as CaCO3) mg/L 493.0 340.0 486.5 600
Carbonate mg/L BDL 0.0 --
Bi-Carbonate mg/L 493.0 340.0 486.5 --
Sodium (as Na) mg/L 69.0 40.0 68.6 --
Potassium (as K) mg/L 3.1 1.9 3.1 --
Magnesium (as
Mg) mg/L 52.0 36.4 51.7 100
Calcium (as Ca) mg/L 64.0 38.4 63.1 200
FORM-2 OF GOKLESH LIFESCIENCES
Page 11 of 37
Sr.
No. Particular Details
Chloride (as Cl) mg/L >10 - 1000
Sulphates (as
SO4) mg/L >40 - 400
Nitrate (as NO3) mg/L 6.3 0.5 6.2 No Relaxation
Nitrite (as NO2) mg/L 2.5 1.2 2.5 --
Fluoride (as F) mg/L 1.0 0.5 1.0 1.5
Boron (as B) mg/L BDL - 1
Iron (as Fe) mg/L BDL - No Relaxation
Manganese (as
Mn) mg/L BDL - 0.3
Lead (as Pb) mg/L BDL - No Relaxation
Copper (as Cu) mg/L BDL - 1.5
Zinc (as Zn) mg/L BDL - 15
Total Arsenic (as
As) mg/L BDL - 0.05
Cynide (as CN) mg/L BDL - No Relaxation
• Criteria Pollutants: - (pH, TSS, TDS, Total Hardness, Chlorides, Fluoride, Heavy Metals, other
parameters specific to the sector)
• Unit : -(mg/l, NA)
g. No. of Surface Water Monitoring Locations : 3
h. Details of Surface Water Monitoring (Multiple Entries Allowed)
Criteria
Pollutants Unit
Maximum
Value Minimum Value
98 Percentile
Value
Prescribed
Standard
pH - 8.2 7.5 8.2 No Relaxation
Temperature °C 35.0 30.5 34.9 --
Colour Hazen BDL - 15
Odor -- Unobjectionable - Agreeable
Turbidity NTU 2.0 1.0 2.0 5
Total Solid (TS) mg/L 660.0 260.0 652.2 --
Total Suspended
Solids (TSS) mg/L 100.0 10.0 98.6 --
Total Dissolved
Solids (TDS) mg/L 560.0 250.0 553.6 2000
Electrical
Conductivity
(EC)
µS/cm 840.0 375.0 830.4 --
Dissolved
Oxygen (DO) mg/L 5.9 3.7 5.8 --
Biological
Oxygen Demand
(BOD)
mg/L 5.3 5.3 5.3 --
Chemical
Oxygen Demand
(COD)
mg/L 15.0 10.0 14.9 --
Total Coliform
(TC) MPN / 100 ml 400.0 42.0 394.0 Absent
Faecal Coliform
(FC) MPN / 100 ml 240.0 25.2 236.4 Absent
E. Coli MPN / 100 ml 120.0 12.6 118.2 Absent
Total Hardness
(as CaCO3) mg/L 267.0 112.0 262.3 600
FORM-2 OF GOKLESH LIFESCIENCES
Page 12 of 37
Sr.
No. Particular Details
Calcium
Hardness mg/L 134.0 54.0 131.4 --
Magnesium
Hardness mg/L 133.0 58.0 131.0 --
Total Alkalinity
( as CaCO3) mg/L 459.0 190.0 453.3 600
Carbonate mg/L 0.0 0.0 --
Bi-Carbonate mg/L 459.0 190.0 453.3 --
Sodium (as Na) mg/L 63.0 10.0 62.5 --
Potassium (as K) mg/L 3.7 2.0 3.7 --
Magnesium (as
Mg) mg/L 53.2 23.2 52.4 100
Calcium (as Ca) mg/L 53.6 21.6 52.5 200
Chloride (as Cl) mg/L >10 -- 1000
Sulphates (as
SO4) mg/L
19 BDL 24.9 400
Nitrate (as NO3) mg/L 6.7 BDL 6.7 No Relaxation
Nitrite (as NO2) mg/L 3.0 1.4 3.0 --
Fluoride (as F) mg/L 1.2 0.8 1.2 1.5
Boron (as B) mg/L BDL - 1
Iron (as Fe) mg/L BDL - No Relaxation
Manganese
(as Mn) mg/L BDL - 0.3
Lead (as Pb) mg/L BDL - No Relaxation
Copper (as Cu) mg/L BDL - 1.5
Zinc (as Zn) mg/L 1.6 BDL 1.60 15
Total Arsenic
(as As) mg/L BDL - 0.05
Cynide (as CN) mg/L BDL - No Relaxation
Residual
Chlorine mg/L BDL - 1
• Parameter: - pH, DO, BOD, COD, Others parameters specific to the sector
• Unit: - (mg/1, NA)
i. No. of Ambient Noise Monitoring Locations : 8
j. Details of Noise Monitoring (Multiple Entries Allowed)
Parameter Unit Maximum
Value Minimum Value
98 Percentile
Value
Prescribed
Standard
Industrial
Day Time Leq dB(A) 82.2 -- 75
Night Time Leq dB(A) 73.4 -- 70
Residential
Day Time Leq dB(A) 60.2 39.3 59.9 55
Night Time Leq dB(A) 48.5 33.6 48.4 45
• Parameter: - (Leq (Day), Leq (Night))
• Unit: - A-weighted decibels(dB(A))
k. No. of Soil Monitoring Locations (Multiple Entries
Allowed)
: 8
Criteria Pollutants Unit Maximum Value Minimum Value 98 Percentile
FORM-2 OF GOKLESH LIFESCIENCES
Page 13 of 37
Sr.
No. Particular Details
Value
Texture Qualitative Clay/ Sandy clay/ Silty clay loam
Bulk Density g/cc 1.8 0.6 1.8
Porosity % 58.0 25.0 57.6
Water holding
capacity % 39.0 32.3 38.7
Organic carbon
(OC) % 1.4 0.4 1.4
Potassium as K mg/kg 587.0 510.0 582.2
Calcium as Ca mg/kg >1000 -
Magnesium as Mg mg/kg 429.0 90.0 425.2
Sodium as Na mg/kg 649.0 365.0 647.7
Cation Exchange
Capacity meq/100g 33.3 12.6 33.2
Exchangable
Sodium Percentage % 8.9 5.4 8.8
pH - 8.3 7.1 8.3
Electrical
Conductivity µS/cm 341.0 237.0 339.6
Available Nitrogen mg/kg 191.0 42.0 186.0
Available Potassium mg/kg 5.9 5.1 5.8
Available
Phosphorus mg/kg 12.5 0.8 11.6
• Parameter: - (pH, N(Nitrogen), P(Phosphorus), K (Potassium), Electric Conductivity)
• Unit: - (Millisiemens per Centimeter, Milligram per Litre, Percent, Centimeter per Second,
Milliequivalents per 100 Gram, Milligram per Kilogram, Kilogram per hectare, Others
l Ground Water Table
i Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)):
From : 2
To : 5
ii Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)):
From : 2
To : 5
iii Whether Ground Water Intersection will be there
(Yes / No)?
: No.
If Yes, --
(i) Upload Copy of Central Ground Water
Authority Letter (Upload PDF only)
: --
(ii) Letter No. : --
(iii) Date of issue : --
15. Details of Water Requirement (During Operation) (Multiple Entries Allowed)
Sr.
No. Particular Details
a. Details
Source Quantity in Method of water Distance from Mode of Transport
FORM-2 OF GOKLESH LIFESCIENCES
Page 14 of 37
KLD withdrawal Source
GIDC 59 GIDC supply -- GIDC Pipeline
• Source: Surface / Ground Water / Sea / Others
• Mode of Transportation: Pipeline / Canal / Others
• Method of water withdrawal: Barrage / Weir / Intake well / Jackwell / Tube well / Open well /
Others
b. Upload Copy of Permission from Competent
Authority (Upload PDF only)
: --
c. Letter No. : NA/DEE(W/S)/1574
d. Date of issue : 19/09/2018
e. Permitted quantity : 59 KL/day
f. Whether Desalination is proposed (Yes/ No) : No
If Yes, --
(i) Desalination capacity (KLD) : --
(ii) Quality of Brine (KLD) : --
(iii) Mode of Disposal of brine : --
16. Waste Water Management (During Operation)
Sr.
No. Particular Details
Type / Source
Quantity of
Waste Water
Generated
(Kilo Litre per
Day)
Treatment
Capacity (Kilo
Litre per
Day)
Treatment
Method
Mode of
Disposal
Quantity of
Treated
Water Used in
Recycling /
Reuse (Kilo
Litre per
Quantity of
Discharged
Water
(Kilo Litre per
Day)
Domestic 1.8 - To soak pit via
septic tank - -
Washing 3.5 80 KLD Primary,
Secondary and
Tertiary
treatment
Treated effluent
will be
discharged in to
G.I.D.C.
underground
drainage system
and conveyed to
FETP which
ultimately leads
to deep sea for
final disposal
through NCTL
pipeline.
-
79 KLD
(CETP, NCT)
+
1 KLD
(Common
MEE)
Boiler blow
down
0.2
Cooling tower
blow down
0.3
Scrubber 1.0
Process 75.0
a. Total Waste Water Generation : 80 KLD
b. Total Discharged Water : 80 KLD (79 CETP, NCT + 1 Common MEE)
c. Total Reused Water : --
17. Solid Waste Generation Management (Multiple Entries Allowed)
Item Quantity
per Annum Unit
Distance
from Site
Mode of
Transport
Mode of
Disposal
FORM-2 OF GOKLESH LIFESCIENCES
Page 15 of 37
Item Quantity
per Annum Unit
Distance
from Site
Mode of
Transport
Mode of
Disposal
Discarded
Containers/
Barrels/liner
5.12 MTPA -- Road Collection, storage and send to
authorized recycler.
Process Waste
63.6 MTPA
1.5
Road Collection, storage and
transport to TSDF site.
3.6 MTPA Road Sent for Co-processing or sent
to CHWIF for Incineration.
Used oil 200
Lit/Year MTPA 1.5 Road
Collection, storage and reuse as
lubricants in the machineries
within the premises only or
send to authorized re-
processors
ETP Sludge 72.0 MTPA 1.5 Road Collection, storage and
transport to TSDF site.
Spent Solvent 1435 MTPA -- Road
In-house Distillation and
recovered solvents will be
reused
Distillation Residue 26.6 MTPA 1.5 Road Sent for Co-processing or sent
to CHWIF for Incineration.
Spent Carbon 3.36 MTPA 1.5 Road Sent for Co-processing or sent
to CHWIF for Incineration
Spent Hyflo 5.04 MTPA 1.5 Road Sent for Co-processing or sent
to CHWIF for Incineration.
Acetic Acid 103.2 MTPA -- Road Sell to end users as per rule-9
Methyl Iodide 7.2 MTPA -- Road Sell to end users as per rule-9
Item: - (Industrial waste, Municipal Solid waste, Fly ash, Bottom Ash, Hazardous Waste (as per Hazardous
and Other Waste Management Rules 2016), E Waste, Bio-Medical waste, Construction & Demolition waste,
Plastic Waste, Others)
Unit: - (Tons, Kiloliter)
Mode of Disposal: - (Treatment, Storage and Disposal Facility(TSDF), Authorized cyclers, Landfills,
Sanitary Landfills, Others)
18. Air Quality Impact Prediction (Multiple Entries Allowed)
Criteria
Pollutants Unit
Baseline
Concentration
Minimum
Value
Incremental
Concentration
Total
GLC
Prescribe
Standard
PM10 µg/m3 87.12 72.65 1.665 88.785 100
SO2 µg/m3 14.89 11.07 1.920 16.81 80
NOX µg/m3 23.84 17.27 0.688 24.528 80
NH3 µg/m3 BDL BDL 0.897 0.897 150
• Parameter: - (PM10, PM2.5, SO2, NOx, Others parameters specific to the sector)
• Unit :- Microgram per Meter Cube, NA
19. Power Requirement
Sr.
No. Particular Details
FORM-2 OF GOKLESH LIFESCIENCES
Page 16 of 37
Sr.
No. Particular Details
a. Quantity (Kilo Volt Amps (KVA)) : 350 KW
b. Source : Dakshin Gujarat Vij Company
c. Upload Copy of Agreement (Upload PDF only) : --
d. Standby Arrangement (Details of DG Sets) : (250 KW x 1 No) + (93 KW x 1 No)
e. Stack Height (in m) : 9 m
20. Land Ownership Pattern (Prior to the project proposal) in Ha
Sr.
No. Particular Details
a. Forest land : -
b. Private Land : 0.47
c. Government Land : -
d. Revenue Land : -
e. Other Land : -
Total land 0.47
21. Present Land Use breakup in Ha
Sr.
No. Particular Details
a. Agriculture Area : 20596
b. Waste/Barren Area : 3297
c. Grazing / Community Area :
d. Surface Water bodies : 2166
e. Settlements : 2731
f. Industrial : 2386
g. Forest : --
h. Mangroves : --
i. Marine area : --
j. Others (Specify) : 515 (scrub)
Total : 31400
22. Land requirement for various activities (Multiple entries allowed) in Ha
Description of Activity / Facility / Plant /
Others Land requirement Remarks
Builtup 0.25 52.3
Open & Road 0.16 33.0
Green belt 0.07 14.6
Total 0.47 100%
• Activity / Facility / Plant / Others include: Main Plant, Township, Greenbelt, Ash pond, Quarry area, OB
dump Area, Safety zone, Tailing pond, Landfill, Water reservoir, Desalination plant, Area for solid waste
management, Built-u area, others
FORM-2 OF GOKLESH LIFESCIENCES
Page 17 of 37
23. Ecological and Environmental Sensitivity (Within 10 Km): - WLS-Wild Life Species;
NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs- Eco Sensitive Zones
Sr.
No. Particular Details
a. Details of Ecological Sensitivity
Details of Ecological Sensitivity Name Distance from the
Project (Km) Remarks
None Not Applicable -- Project site is located
in GIDC area
• Details of Ecological Sensitivity: - (Critically Polluted Area, WLS, NPA, ESAs, ESZs, Corridors,
Wildlife Corridors)
b. Whether NBWL recommendation is required
(Yes/No)? :
No
If yes : --
Upload NBWL recommendation in PDF : --
c. Details of Environmental Sensitivity
Details of
Environmental Sensitivity
Name Distance from the Pro
project (Km)
Remarks
None Not Applicable -- Project site is located
in GIDC area
• Details of Environmental Sensitivity: - (Forest, Archaeological Sites, Defence, Installations, Others)
d. Whether NOC / Permission from the competent
authority is required (Yes/No)? :
No
If yes : Not Applicable
Upload NOC / Permission from the competent
authority in PDF :
Not Applicable
24. Forest Land
Sr.
No. Particular Details
1 Whether any Forest Land involved (Yes/No)? No.
If Yes --
a. Forests Clearance Status (In-Principle(Stage-I)
Approval Obtained / Final (Stage-Il) Approval
Obtained / Forest Clearance Under Process(Stage-I)
/ Forest Clearance Under Process(Stage-II) /
Application for Forest Clearance yet to be
Submitted)
: --
If In-Principle (Stage-I) Approval Obtained, : --
(i) MoEFCC file number --
(ii) Date of In Principle (Stage-I) approval : --
(iii) Area diverted : --
(iv) Upload FC Letter (Upload PDF only and attach
it as Annexure-FC letter)
: --
If Final (Stage-Il) Approval Obtained, : --
FORM-2 OF GOKLESH LIFESCIENCES
Page 18 of 37
Sr.
No. Particular Details
(i) MoEFCC file number --
(ii) Date of Final Approval : --
(iii) Date of In-Principle Approval : --
(iv) Area diverted : --
(v) Upload FC Letter (UploadPDFonly and attach it
as Annexure-FC letter)
: --
If Forest Clearance under process (Stage-I), --
(i) MoEFCC file number : --
(ii) Area applied : --
If Forest Clearance under process (Stage-Il), --
(i) MoEFCC file number : --
(ii) Area applied : --
b. Legal Status of Forest Land (Reserved, Protected,
Private, Village, Others)
--
If Others, --
Please Specify Others : --
25. Tree Cutting, if any
Sr.
No. Particular Details
a. No. of Trees Cut for the Project (if Forestland not
involved)
: No trees will be cut for the project.
b. Details of Tree Cutting and Planting of Trees
(UploadPDFOnly)
: --
26. Land Acquisition Status
Sr.
No. Particular Details
a. Acquired Land : Land already acquired.
b. Land yet to be acquired : --
c. Status of Land acquisition if not acquired : --
27. Rehabilitation and Resettlement (R&R): Not applicable
Sr.
No. Particular Details
a. No. of Villages : --
b. No. of Households : --
c. No. of PDFs (Project Displaced Families) : --
d. No. of PAFs (Project Affected Families) : --
e. Funds Allocated for R&R : --
f. Status of R&R (Completed / In-progress / Yet to
start)
: --
FORM-2 OF GOKLESH LIFESCIENCES
Page 19 of 37
28. Whether there is Presence of Schedule-I Species (Yes/No)? If yes,
Sr.
No. Particular Details
a. Details of Schedule-I Species : Among the study area there is 3 Species
observed under Sch-1 as below:
1. Pavocristatus-Indian pea fowl
2. Varanusbengalensis -Bengal Monitor Lizard
b. Whether conservation plan for Schedule-I Species
has been prepared (Yes/ No)?
: yes
If Yes,
(i) Upload conservation plan (Upload only PDF) : --
(ii) Fund Provision made : --
(iii) Period of Implementation : --
c. Whether conservation plan for Schedule-I Species
has been approved by competent authority (Yes/
No)?
: No
(i) Upload copy of approval (Upload PDF Only) : --
(ii) Letter No. : --
(iii) Date of issue : --
(iv) Recommendations if any : --
29. Whether there is Presence of Water Bodies in Core Area (Yes/No)? If yes,
Sr.
No. Particular Details
a. Details of Water Bodies in Core Area : Talav in villages within study area of 10 km
radius, Amala khadi
b. Whether there is Diversion required (Yes/No)? : No.
If yes, : --
c. Details of diversion required : --
d. Details of study conducted : --
e. Whether permission has been obtained from
competent authority (Yes/No)?
: --
(i) Upload copy of permission (Upload PDF Only) : --
(ii) Letter No. : --
(iii) Date of issue : --
(iv) Recommendations if any : --
30. Whether there is Presence of Water Bodies in Buffer Area (Yes/No)?If Yes
Not Applicable
Sr.
No. Particular Details
a. Details of Water Bodies in Buffer Area : --
b. Direction of Water Bodies in Buffer Area (North /
south / East / West / NorthEast / North West / :
--
FORM-2 OF GOKLESH LIFESCIENCES
Page 20 of 37
Sr.
No. Particular Details
South East / South West
c. Distance of Water Bodies in Buffer Area (kilo
meters) :
--
31. Manpower Requirement
Sr.
No. Particular Details
a. Permanent employment during construction : -
b. Permanent employment during operation : 35
c. Temporary employment during construction : 10
d. Temporary employment during operation : 05
e. No. of working days : 345
f. Total manpower : 35
32. Green Belt in Ha
Sr.
No. Particular Details
a. In case of new projects : --
i. Total Area of Green Belt : --
ii. Percentage of Total Project Area : --
iii. No. of Plants to be Planted : --
iv. Funds Allocated for Plantation : --
v. Upload Green Belt Plan (Upload PDF only)
b. In case of expansion / modernization / change in product mix etc.
i Description Existing Proposed Total
Total Area of Green Belt 0.80 0.76 1.56
Percentage of Total Project Area 17% 16% 33%
No. of Plants 195 185 380
Funds Allocated 1,20,000 1,10,000 2,30,000
ii Upload Green Belt Plan (Upload PDF Only) : --
33. Project Benefit (Multiple entry allowed)
Type of Project Benefits Details of Project Benefit
Employment Potential Direct and indirect employment generation.
Employment shall be around 35 personnel.
Benefits of Industry Increase in commercial and economical status of
the locality.
Social Benefits A total amount of Rs. 4.96 Lacs would be utilized
for Entrepreneur Social Commitment for three
years which is 2% of proposed project.
(Project benefits shall include environmental, social and others)
FORM-2 OF GOKLESH LIFESCIENCES
Page 21 of 37
34. Whether the Project / Activity attracts the provisions of CRZ (Yes/No)? If yes,
NOT APPLICABLE
Sr.
No. Particular Details
1. Project Details
a. CRZ Classification: (CRZ 1 (A), CRZ I(B), CRZ
II, CRZ III, CRZ IV (A), CRZ IV(B)) :
--
b. Location type: (Non-Eroding Coast, Low and
Medium Eroding Coast, High Eroding Coast) :
--
c. Details of Mangroves Land Involved, if Any : --
d. Area of Mangroves Land (hectare) : --
e. EIA (Terrestrial) Studies: (Carried Out, Not Carried Out)
If Carried Out,
1) Summary Details of EIA (Terrestrial)
Studies :
--
2) Upload Recommendation made in EIAs
(Upload PDF only) :
--
3) Period of Study from (EIA Terrestrial) : --
4) Period of Study to (EIA Terrestrial) : --
If Not Carried out,
Give Reason : --
f. EIA (Marine) Studies: (Carried Out, Not Carried Out)
If carried out,
1) Summary Details of EIA (Marine)
Studies :
--
2) Upload Recommendation made in EIAs : --
3) Period of Study from (EIA Marine) : --
4) Period of Study to (EIA Marine) : --
If Not Carried out,
Give Reason : --
g. Disaster Management Plan/National Oil Spill
Disaster Contingency Plan (if Applicable) :
--
2. Description of the Project Under Consideration
a. Type of Project: (Resort/Buildings/civic amenities, Coastal Roads/Roads on Stilt, Pipelines from
Thermal Power Blow Down, Marine Disposal of Treated Effluent, Facility for Storage of
Goods/Chemicals, Offshore structures, Desalination Plant, Mining of Rare Earth/Atomic Minerals,
Sewage Treatment Plants, Lighthouse, Wind Mills, Others)
If Resort/Buildings/civic amenities,
1) Agency Name for Preparing CRZ Maps : --
2) Total Area/Built-up Area (hectare) : --
3) Height of Structure : --
4) FSI Ratio : --
5) The governing Town Planning : --
FORM-2 OF GOKLESH LIFESCIENCES
Page 22 of 37
Sr.
No. Particular Details
Rules/Regulations
6) Details of Provision of Car Parking Area : --
If Coastal Roads/Roads on stilt,
1) Agency Name for Preparing CRZ Maps : --
2) Area of Land Reclamation : --
3) Estimated Quantity of Muck/Earth for
Reclamation :
--
4) Carrying Capacity of Traffic : --
If Pipelinesfrom Thermal Power Blow Down,
1) Agency Name for Preparing CRZ Maps : --
2) Length of Pipeline : --
3) Length Traversing CRZ Area : --
4) Depth of Excavation : --
5) Width of Excavation : --
6) Length of Pipeline from Seashore to Deep
Sea :
--
7) Depth of Outfall Point from Surface of
Sea Water :
--
8) Temperature of effluent above Ambient at
Disposal Point :
--
If Marine Disposal of Treated Effluent,
1) Agency Name for Preparing CRZ Maps : --
2) Location of Intake/Outfall : --
3) Depth of Outfall Point : --
4) Length of Pipeline : --
5) Length Traversing CRZ Area : --
6) Depth of Excavation : --
7) Width of Excavation : --
8) Length of Pipeline from Seashore to Deep
Sea/Creek :
--
9) Depth of Outfall Point from Surface of
Sea Water :
--
10) Depth of Water at Disposal Point : --
11) Type of Disposal : --
If Facilityfor Storage of Goods/Chemicals,
1) Agency Name for Preparing CRZ Maps : --
2) Name and Type of Chemical : --
3) End use of the Chemical : --
4) No. of Tanks for Storage : --
5) Capacity of tanks : --
If offshore structures,
FORM-2 OF GOKLESH LIFESCIENCES
Page 23 of 37
Sr.
No. Particular Details
1) Agency Name for Preparing CRZ Maps : --
2) Exploration or Development : --
3) Depth of Sea Bed : --
4) No. of Rigs/Platform : --
5) Details of Group Gathering Stations : --
If Desalination Plant,
1) Agency Name for Preparing CRZ Maps : --
2) Capacity of Desalination : --
3) Total Brine Generation : --
4) Temperature of Effluent Above Ambient
at Disposal Point :
--
5) Ambient Salinity : --
6) Disposal Point : --
If Mining of Rare Earth/Atomic Minerals,
1) Agency Name for Preparing CRZ Maps : --
2) Capacity of Mining : --
3) Volume/Area to be mined : --
4) Type of Mineral to be Extracted : --
5) End use of the Mineral : --
If Sewage Treatment Plants,
1) Agency Name for Preparing CRZ Maps : --
2) Capacity : --
3) Total Area of Construction : --
4) Compliance of effluent parameters as laid
down by CPCB/SPCB/other authorized
agency
:
--
5) Whether discharge is in sea water/creek?
If yes, :
--
Distance of Marine Outfall Point from
Shore/from the tidal river bank :
--
Depth of Outfall Point from Sea Water
Surface :
--
Depth of Sea at Outfall Point : --
If Lighthouse,
1) Agency Name for Preparing CRZ Maps : --
2) Total Area of Construction : --
3) Height of the Structure : --
If Wind Mills,
1) Agency Name for Preparing CRZ Maps : --
2) Capacity (MW) : --
3) Transmission Lines: (Overhead, : --
FORM-2 OF GOKLESH LIFESCIENCES
Page 24 of 37
Sr.
No. Particular Details
Underground)
4) Diameter of Windmill : --
5) Length of Blade : --
6) Speed of Rotation : --
7) Height of the Structure : --
If Others,
1) Agency Name for Preparing CRZ Maps : --
2) Please Specify with salient features : --
3) Upload relevant Document
(UploadPDFonly) :
--
3. Distance of Project (In Meters) from LTL/HTL to be Stated
a. Clause of CRZ Notification Under which the
Project is a Permissible/Regulated Activity :
--
b. Whether CU Map Indicating HTL, LTL
Demarcation in 1:4000 Scales Prepared? (Yes/No) :
--
If Yes,
1) Distance of Project (in meters) from HTL
to be Stated :
--
2) Upload Maps(km/ File) : --
3) Distance of Project(in meters) from LTL
to be Stated :
--
4) Upload Maps (kml File) : --
c. Whether Project Layout Superimposed on CRZ
Map 1 :4000 Scales? (Yes/No) :
--
If Yes;
1) Upload Maps (kml File) --
d. Whether CRZ Map 1 :25000 Covering 7 km
Radius Around Project Site Prepared? (Yes/No) :
--
If Yes,
1) Upload Maps (kml File) --
e. Whether CRZ Map Indicating CRZ-I, II, III and IV
Including Other Notified ESAs Prepared?
(Yes/No)
: --
If Yes,
1) Upload Maps (kml File) --
f. NOC from State Pollution Control Boards
Obtained: (Yes/No) :
--
If Yes
1) Upload Copy of NOC (Upload PDF only) --
g. Details of Rain Water Harvesting System : --
4. Recommendation of State Coastal Zone Management Authority
a. Upload Copy of CZMA (Upload PDF Only) : --
FORM-2 OF GOKLESH LIFESCIENCES
Page 25 of 37
Sr.
No. Particular Details
b. State the Conditions Imposed : --
c. Social and Environmental Issues and Mitigations
Measures Suggested
Including but not Limited to R&R, Water, Air,
Hazardous Wastes,
Ecological aspects, etc. (Brief Details to be
Provided)
:
--
35. Sector Specific Details
I. Whether the proposal is mining of minerals (coal / non-coal) project (Yes/No)?If yes,
NOT APPLICABLE
Sr.
No. Particular Details
1 No. of Mineral to be Mined (Multiple Entries Allowed)
Minerals To be Mined Major or Minor Mineral
-- --
-- --
2 Mine Capacity in ROM (Run of Mine) :
3 Upload 500 meters Cluster Certificate from State
Mines and Geology in case of minor minerals
(Upload PDFOnly)
:
--
4 Mining Plan
a. Approval Letter No. : --
b. Date of Approval : --
c. Upload Approved Letter (Upload
PDFOnly) :
--
d. Approved by State Mines & Geology
Department / Indian Bureau ofMines /
Ministry of Coal / Ministry of Mines / State
Government / Atomic Mineral Directorate /
Others
:
--
e. If Others, : --
Please specify : --
f. Approved Mining Lease Area : --
g. Approved Capacity : --
5 Technical Details
a. Total Geological Reserves (Million Ton) : --
b. Mineable Reserves (Million Ton) : --
c. Extractable Reserves (Million Ton) : --
d. Percent of Extraction (%) : --
e. Grade of Coal /Ore /Mineral : --
f. Stripping Ratio : --
FORM-2 OF GOKLESH LIFESCIENCES
Page 26 of 37
Sr.
No. Particular Details
g. Category of Gaseousness (Only for Coal
Mining, Others may write Not applicable) :
--
h. Average Gradient(Degree) : --
i. Maximum Thickness of Seams(meters)
(Only for Coal Mining, Others may write
Notapplicable)
:
--
j. Mining Method (Opencast / Underground /
Mixed (Opencast + Under round) /Adit :
--
k. Life of Mine (Years) : --
6 Details of beneficiation (including crushing / screening/others)
a. Whether it is proposed to install crusher
within the mining lease area (Yes/No)? :
--
If yes, : --
b. No. of crushers : --
c. Details of crusher (Multiple entries allowed)
Crusher ID Capacity (in TPH) Remarks
-- -- --
-- -- --
-- -- --
d. Whether it is proposed to install
beneficiation plant / Coal washery within
the mining lease area (Yes/No)?
:
--
If yes, : --
e. Beneficiation / washing Technology : --
f. Capacity : --
7 Details of Seams if applicable
a. No. of seams : --
b. Thickness of seams to be worked on : --
c. Maximum Thickness of Seams(meters) (if
not Applicable, may Write NA) :
--
8 Details of Mining Lease
a. Details of Mining Lease : --
b. Upload Letter of Intent (Upload PDF only) : --
c. Date of Execution of Mining Lease with
Reference Number :
--
d. Validity of Mining Lease : --
e. Upload Copy of Executed Lease deed valid
as on Date (Upload PDF only) :
--
f. Earlier Renewals (Multiple Entries
Allowed) :
--
Uploaded Co of Earlier Lease Date of Renewal
-- --
-- --
FORM-2 OF GOKLESH LIFESCIENCES
Page 27 of 37
Sr.
No. Particular Details
9 OB (Over Burden) Management (Only if Mining Method: Opencast)
a. Details of External Dumps
i) No. ofOB Dumps : --
ii) Total Area (in Hectare) : --
iii) Height (in meter) : --
iv) Quantity (in Million Cubic meter) : --
v) No. of year back fill up : --
b. Details of Internal Dump
i) No. of Internal Dumps : --
ii) Total Area (in Hectare) : --
iii) Height (in meter) : --
iv) Quantity (in Million Cubic meter) : --
10 Details of Topsoil Management
a. Quantity of Topsoil excavated during the
entire life of the mine (in Million Cubic
meter)
:
--
b. Quantity of Topsoil proposed for utilization
for reclamation during the entire life of the
mine (in Million Cubic meter)
:
--
c. Quantity of Topsoil proposed for utilization
for other activities during the entire life of
the mine (in Million Cubic meter)
:
--
11 Detail of Final Mine Void (Only if Mining Method: Opencast)
a. Area (in Hectare) : --
b. Depth (in meter) : --
c. Volume (in Million Cubic meter) : --
12 Details of Quarry (Only if Mining Method: Opencast)
a. Final Void of (hectare) : --
b. At a Depth of (meter which is proposed to
be converted into a Water Body) :
--
c. Total Quarry Area (ha) : --
13 Details of Transportation
a. In Pit/Underground to Surface : --
b. Surface to Siding/Loading : --
c. Transportation / Conveyor Details : --
14 Details of Land Usage (Pre-Mining)
Land Use Within ML
Area
(Hectare)
Outside ML
Area
(Hectare)
Total
Agriculture Land -- -- --
Forest Land -- -- --
Waste Land -- -- --
FORM-2 OF GOKLESH LIFESCIENCES
Page 28 of 37
Sr.
No. Particular Details
Grazing Land -- -- --
Surface Water Bodies -- -- --
Settlements -- -- --
Others (Specify) -- -- --
15 Details of Transportation
a. In Pit/Underground to Surface : --
b. Surface to Siding/Loading : --
c. Transportation / Conveyor Details : --
16 Details of Land Usage (Pre-Mining)
Land Use Within ML Area
Hectare
Outside ML
Area Hectare Total
Agriculture Land -- -- --
Forest Land -- -- --
Waste Land -- -- --
Grazing Land -- -- --
Surface Water Bodies -- -- --
Settlements -- -- --
Others (Specify) -- -- --
17 Details of Land Usage (Post-Mining)
Land Use Plantation Water Body Public Use Others
Excavation /
quarry
-- -- -- --
To Soil Storage -- -- -- --
External OB
dumps
-- -- -- --
Internal OB
dumps
-- -- -- --
Roads -- -- -- --
Built Up Area
(Colony/Office)
-- -- -- --
Green Belt -- -- -- --
Virgin Area -- -- -- --
Other -- -- -- --
Total -- -- -- --
18 Details of Reclamation (Only if Mining Method: Opencast) Total Afforestation Plan shall be
Implemented Covering of Mining. This will include:
a. External OB Dump (in hectare) : --
b. Internal Dump (in hectare) : --
c. Quarry (in hectare) : --
d. Safety Zone (in hectare) : --
e. Final Void of (hectare) : --
FORM-2 OF GOKLESH LIFESCIENCES
Page 29 of 37
Sr.
No. Particular Details
f. At a Depth of (meter which is proposed to
be converted into a WaterBody)
: --
g. Density of Tree Plantation per ha (in no.) : --
h. Others in ha (such as Excavation Area
along ML Boundary, along Roads and
Infrastructure, Embankment Area and in
Township Located outside the Lease etc.
:
--
i. Total afforestation plant (in hectare) : --
19 Status of Progressive Mining Closure Plan (For Expansion Projects only)
a. Implementation of Various Activities as per
Approved Progressive Mine Closure Plan
(in Bar Chart)(upload PDF Only)
:
--
b. Any Deviation from the Approved
Progressive Mine Closure Plan :
--
c. Total Area Excavated (in hectare) : --
d. Total Area Backfilled after Excavation (in
hectare) :
--
e. Total Area Reclaimed (in hectare) : --
20 Actual Coal/Ore Production vis-a-vis sanctioned capacity Since inception (Multiple Entries Allowed)
Financial Year
Sanctioned
Capacity as per
EC (MTPA)
Sanctioned
capacity as per
CTO
Sanctioned
capacity as per
approved
Mining Plan
Actual
Production
Excess
Production
Beyond the
EC/CTOMining
Plan Sanctioned
Capacity
(MTPA)
-- -- -- -- -- --
-- -- -- -- -- --
II. Whether proposal is for Thermal Project (including captive power plant and Waste Heat
Recovery Plant) (Yes/No)?If Yes,
NOT APPLICABLE
Sr.
No. Particular Details
1 Specifications of the Plant
a. Technology proposed (Supercritical, Sub-
Critical, CFBC, AFBC,PFBC, IGCC,
Incineration, Pyrolysis, Gasification, Bio-
methanation, Others
: --
b. Plant Load Factor (%) : --
c. Station Heat Rate (Kcal/Kwh) : --
d. Steam Rate/Flow Rate : --
e. Boiler Temperature : --
f. Boiler Pressure : --
FORM-2 OF GOKLESH LIFESCIENCES
Page 30 of 37
Sr.
No. Particular Details
g. Type of Stack (Single flue / Bi-flue / Tri-flue) : --
h. No. of Stacks : --
Stack ID Stack height
(m)
Stack Diameter
at exit (m)
Exit velocity of
stack gas (m/s)
Exit temperature of
stack gas (C)
-- -- -- -- --
-- -- -- -- --
2 Details of fuel linkage (please specify if multiple linkages are involved)
a. Type of linkage (Linkage / Fuel Supply
Agreement / e-auction / MOU / LOA /
Captive / Open market / Others)
:
--
b. Quantity of linkage granted : --
c. Date of Linkage : --
d. Duration of linkage : --
3. Details of Transportation of fuel
Details / Mode Distance (km) Quantity (TPA)
Rail -- --
Road -- --
Pipeline -- --
Conveyor -- --
Other mode (Please specify) -- --
4. Details of Fuel Characteristics
a. Gross Calorific Value (Kcal/Kg) : --
b. Ash content (%) : --
c. Sulphur Content (%) : --
d. Moisture (%) : --
e. Mercury (mg/kg) : --
f. Fixed Carbon (%) : --
g. Volatile Matter (%) : --
5. Details of Cooling system
a. Type of cooling system: Air cooled/Water
cooled :
--
b. Type of draft: Natural draft/Forced draft : --
c. Type of air circulation: Parallel flow/ Counter
flow :
--
d. Cycles of Cooling (COC): : --
e. Water requirement for cooling (m3/day): : --
f. Boiler blow down temperature: : --
III. Whether proposal is for River Valley & Hydroelectric Project (Yes/No)?If Yes,
NOT APPLICABLE
FORM-2 OF GOKLESH LIFESCIENCES
Page 31 of 37
Sr.
No. Particular Details
1. Sub Sector: (Multipurpose Project / Hydroelectric
Project / Irrigation project)
--
2. Name of the River : --
3. Whether Cumulative Impact Assessment and
Carrying Capacity Study of River Basin Carried
Out? (Yes/No)
: --
If Yes : --
a. Status of Cumulative Impact Assessment and
Carrying Capacity Study of River Basin:
(Recommended / Not Recommended,)
--
If Recommended --
b. Details of Cumulative Impact Assessment and
Carrying Capacity Study of River Basin
--
c. Upload Relevant Document
(UploadPDFonly)
--
4. Type of Project: (Construction of Dam Barrage /
Run of the River / Lift Irrigation Scheme)
: --
5. Dam Height (meter) if applicable : --
6. Dam Length (meter) if applicable --
7. Total Submergence Area (hectare) : --
8. Details of Gross Command Area (GCA) (hectare) : --
9. Details of Irrigable Command Area (ICA) (hectare) : --
10. Details of Culturable Command Area (CCA)
(hectare)
: --
11. Total Command Area (hectare) : --
12. Powerhouse Installed Capacity
a. Type of Powerhouse: (Underground /
Surface) :
--
b. Capacity (megawatts) : --
c. No. of Tunnels : --
d. No. ofUnits : --
e. Bank of River: (Left /Right / Both) : --
13. Generation of Electricity Annually
a. Quantity of Generation of Electricity
Annually (in Giga Watt Hours (GWh)) :
--
b. Water availability at various percentages : --
Percentage Water availability
(Cusecs) Dependable year Remarks
At 50% -- -- --
At 75% -- -- --
At 90% -- -- --
c. Machine Availability (%) : --
d. Cost of Electricity Generation (in INR) : --
FORM-2 OF GOKLESH LIFESCIENCES
Page 32 of 37
Sr.
No. Particular Details
e. Internal Rate of Return (%) : --
f. Year of achievement of Internal Rate of
Return :
--
14. Catchment Area Treatment Plan (Upload PDF) : --
15. Muck Management Plan
a. Upload Muck Management Plan in PDF : --
b. Total Excavation Muck (Cubic Meter) : --
c. Utilized for Construction (Cubic Meter) : --
d. No. of Muck Disposal sites : --
e. Total Muck Disposal Area (Ha) : --
16. Fishery Development and Management Plan
a. Upload Fishery Development and
Management Plan in PDF
: --
b. No. of Fingerlings : --
c. No. of Fish Species : --
d. Name of the umbrella Fish Species (Scientific
Name)
: --
17. Status of Environmental Flow
Season Average Inflow (in Million Cubic
Meter)
Percent of Flow
Lean -- --
Non-Lean -- --
Monsoon -- --
Non-Monsoon -- --
18. Free Flow Stretch (km) : --
19. Approval of Central Water Commission
a. Approval Reference No. : --
b. Date of Approval : --
c. Upload Copy of Approval (UploadPDFonly) : --
20. Approval of Central Electricity Authority
a. Approval Reference No. : --
b. Date of Approval : --
c. Upload Copy of Approval (UploadPDFonly) : --
21. Details of Coffer Dam (upstream) if applicable
a. Quantity of the material (m3) : --
b. Length of the dam (m) : --
c. Quantity of muck to be used (m3) : --
d. Quantity of borrow material to be used (m3) : --
e. Decommissioning plan (upload in PDF) : --
22 Details of Coffer Dam (downstream) if applicable
a. Quantity of the material (m3) : --
FORM-2 OF GOKLESH LIFESCIENCES
Page 33 of 37
Sr.
No. Particular Details
b. Length of the dam (m) : --
c. Quantity of muck to be used (m3) : --
d. Quantity of borrow material to be used (m3) : --
e. Decommissioning plan (upload in PDF) : --
IV. Whether the proposal is Infrastructure projects (Yes/No) If yes?
NOT APPLICABLE
Sr.
No. Particular Details
1 Details of Building Construction
a. Maximum Height of the Building (Meters) : --
b. Total No. of Flats to be Build : --
c. No. of Buildings : --
d. Total plot area (sqm) : --
e. Total built up area (sqm) : --
2 Foreshore Facilities And/or Marine Disposal
a. Whether Project Involves Foreshore
Activities and/or marine Disposal (Yes/No)? :
--
If Yes, : --
b. Upload Shoreline Study (Upload PDF only) : --
c. Type of Cargo : --
d. Quantity of Cargo : --
e. Control Measures of Cargo : --
f. Dust Control Measures : --
g. Quantum : --
h. Quantity of Dredging (Cubic meter per day) : --
i. Type of Dredging (Capital, Maintenance) : --
j. Disposal of Dredge Material : --
k. Details of Outfall Diffusers : --
m. No. of Dilution Expected : --
n. Distance at which the outlet will Reach
Ambient Parameters :
--
o. Details of Monitoring at outfall : --
p. Copy of NoC from PCB in case of Marine
Disposal (Upload PDF only) :
--
3 Rain Water Harvesting
a. No. of Storage : --
b. Capacity : --
c. No. of Recharge Pits : --
d. Capacity : --
4 Parking
FORM-2 OF GOKLESH LIFESCIENCES
Page 34 of 37
Sr.
No. Particular Details
a. Details of 4-Wheeler/ 2-Wheeler Parking : --
5. Energy Saving Measures
a. Source/Mode : --
b. Percentage : --
c. Quantity : --
6. Other Details
a. Details of impact on Water Bodies and
Drainage patters of catchment area, if any :
--
b. Details of Traffic Density ImpactAssessment
and Modelling Study (Upload PDF only) :
--
c. In case of Underground Tunnel projects
below the Forest Land — Subsidence 1mpact
Study report (Upload PDF only)
:
--
7. Type of Industries to be established with Industrial Estate as per their category A/B
Sl. No Type of Industry No. of Units Category A/B
-- -- -- --
-- -- -- --
8. Length of the alignment in case of
highwayprojects :
9. Details Bridges/ROB/Interchanges, Flyovers, Vehicle Underpass and Pedestrian Underpass (in case of
Highway Projects)
a. Total No. of Bridges : --
b. Total No. of ROB : --
c. Total No. of Interchanges : --
d. Total No. of Flyovers : --
e. Total No. of Vehicle Underpass : --
f. Total No of Pedestrian Underpass : --
g. Details of other utilities rail and road
corridors :
--
36. Details of Court Cases if any: Not Applicable
Sr.
No. Particular Details
a. Whether there is any Court Cases pending against
the project and/or land in which the project is
proposed to be setup(Yes/No)?
:
No.
If Yes, : --
b. Name of the Court (Districts Court / High Court /
NGT/ Tribunals / Supreme Court of India) :
--
Ifname ofCourt: (Districts Court, High Court,
NGT, Tribunals) :
--
c. Name of the Sub-court : --
d. Case No. : --
FORM-2 OF GOKLESH LIFESCIENCES
Page 35 of 37
Sr.
No. Particular Details
e. Orders / Directions of the court, if any and its
relevance with the proposed project :
--
f. Case Details : --
g. Upload Court Order if any (Upload PDF Only) : --
37. Detail of direction issued under Environment (Protection)Act/Air (Prevention &
Control of Pollution)Act
Sr.
No. Particular Details
a. Whether any direction issued under Environment
(protection) Act /Air (Prevention & Control of
Pollution) Act /Water (Prevention &control of
Pollution) Act(Yes/No)?
:
No.
If Yes, : --
b. Detail of direction issued under Environment
(Protection) Act /Air (Prevention & Control of
Pollution) Act /Water (Prevention & Control of
Pollution) Act
:
--
c. Upload copy of directions issued under
Environment (Protection) Act /Air (Prevention &
Control of Pollution) Act /Water (Prevention
&control of Pollution) Act
:
--
d. Compliance status of the directions : --
38. Details of EIA Consultant
Sr.
No. Particular Details
a. Have you hired Consultant for preparing
document (Yes/No)?
: Yes
If No, --
i. Reason for not engaging the Consultant : --
If Yes, --
ii Accreditation No. : --
iii Name of the EIA Consultant : En-Tech Laboratories
iv Address : 202, Trade Square, Opp. Torrent Power
House, Sabarmati, Ahmedabad - 380005
v Mobile No. : 9824012121
vi Landline No. : 079-2757 2758
vii E-mail Id : [email protected]
viii Category of Accreditation (Eligible for Category
A / Eligible for Category B)
: --
ix Sector of Accreditation : --
x Validity of Accreditation : --
FORM-2 OF GOKLESH LIFESCIENCES
Page 36 of 37
Sr.
No. Particular Details
xi Upload Certificate of Accreditation certified by
QCI/NABET (Upload PDF Only)
: Stay order against QCI/NABET
39. Documents to be attached
I. If Project Type is New / Expansion / Modernization / one-time capacity expansion for coal mining.
NOT APPLICABLE
Sr.
No. Particular Details
a. Upload Copy of EIA/EMP Report : --
b. Upload Copy of Risk Assessment Report : --
c. Upload Copy of Feasibility Report/ Detailed
Project Report(DPR) /Detailed Engineering
Report /Detailed Conceptual Plan / Approved
Mining Plan (in case of Mining proposals)
(Upload PDF Only)
:
--
d. Upload Copy of Final Layout Plan (Upload PDF
Only) :
--
e. Upload Cover Letter (Upload PDF Only and
attach it as Annexure-document of Cover letter) :
--
f. Upload a copy of documents in support of the
competence/authority of the person making this
application to make application on behalf of the
User Agency(uploadPDF only and attach it as
Annexure-authorization)
:
--
g. Upload copy of District Survey Report (for
mining of minor minerals only) :
--
h. Upload copy of Replenishment Study Report &
Baseline Survey data (for river sand mining
proposals only)
:
--
i. Upload Additional File, if any (Upload PDF only) : --
II. If Project Type is other than New /Expansion /Modernization / one-time capacity expansion or
coal mining:-
NOT APPLICABLE
Sr.
No. Particular Details
a. Upload Copy of Feasibility Report / Detailed
Project Report(DPR) /Detailed Engineering
Report /Detailed Conceptual Plan (Upload PDF
only)
:
--
b. Upload Copy of Final Layout Plan (Upload PDF
only) :
--
c. Upload Cover Letter (Upload PDF only and attach
it as Annexure-document of Cover letter) :
--
d. Upload a copy of documents in support of the : --
FORM-2 OF GOKLESH LIFESCIENCES
Page 37 of 37
Sr.
No. Particular Details
competence/authority of the person making this
application to make application on behalf of the
User Agency(Upload PDF only and attach it as
Annexure-authorization)
e. Upload Additional File, if any (Upload PDF only) : --
f. Upload Updated Form I (Upload PDF only) : --
40. Undertaking
a. I hereby give undertaking that the data and information given in the application and enclosures are true
to be best of my knowledge and belief and I am aware that if any part of the data and information
found to be false or misleading at any stage, the project will be rejected and clearance given, if any to
the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no
activity / construction / expansion has since been taken up.
b. Name : Mansukh Radadia
c. Designation : Partner
d. Company : Goklesh Lifesciences
e. Address :
Plot No. 9112/ 1, 2 & 3, G.I.D.C Estate Ankleshwar-393002,
Dist: Bharuch, Gujarat