Check list – Industrial Projects For submission of Environmental Clearance applications [Appraisal cases] Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR/EC application. Sr. No. Particular Tick mark as applicable Page no. of application 1 EIA report as per the TOR granted by SEIAA and as per the generic structure given in Appendix III of EIA Notification 2006. Yes () / No -- 2 Form-2 Application for Prior Environmental Clearance as prescribed by MoEF&CC as per OM dated 20/04/2018. Yes () / No -- 3 Documents related to Land ownership included in EIA report Yes () / No A-13 4 For 5 (f) category Project site is located within GIDC Yes () / No A-13 If No, Compliance of following conditions Water consumption < 25 KLD Fuel Consumption <25 MTPD Non-MAH Unit Yes / No -- 5 Contact details Mobile no. and e-Mail ID included in Application Yes () / No Page no. 1 of Form-2 6 Format prescribed by SEAC [Salient features of the project] included in application. Yes () / No -- 7 General Condition applicability (1) Protected areas notified under the Wildlife (Protection) Act, 1972; (2) CEPI areas (3) Eco-sensitive areas and (4) Inter-state boundaries and international boundaries; are not located within 5 km or 10 km (as the case may be) area from the boundary of the proposed site. Yes / No () -- 8 Compliance status of existing project (In case of expansion) included in EIA report i.e. Compliance report from MoEF&CC or GPCB or CPCB as per the MOEFCC’s Yes / No () --

Upload: ngotram

Post on 03-Jul-2019

245 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

Check list – Industrial Projects

For submission of Environmental Clearance applications

[Appraisal cases]

� Provide authenticated (with stamp & Signature) hard copy of this check-list during

submission of hard copy of ToR/EC application.

Sr. No.

Particular Tick mark as

applicable Page no. of application

1 EIA report as per the TOR granted by

SEIAA and as per the generic structure

given in Appendix III of EIA Notification

2006.

Yes (√) / No --

2 Form-2 Application for Prior Environmental

Clearance as prescribed by MoEF&CC as

per OM dated 20/04/2018.

Yes (√) / No --

3 Documents related to Land ownership

included in EIA report

Yes (√) / No A-13

4 For 5 (f) category

Project site is located within GIDC Yes (√) / No A-13

If No, Compliance of following conditions

• Water consumption < 25 KLD

• Fuel Consumption <25 MTPD

• Non-MAH Unit

Yes / No --

5 Contact details Mobile no. and e-Mail ID

included in Application

Yes (√) / No Page no. 1 of Form-2

6 Format prescribed by SEAC

[Salient features of the project] included in

application.

Yes (√) / No --

7 General Condition applicability

(1) Protected areas notified under the

Wildlife (Protection) Act, 1972;

(2) CEPI areas

(3) Eco-sensitive areas and

(4) Inter-state boundaries and international

boundaries; are not located within 5 km

or 10 km (as the case may be) area from

the boundary of the proposed site.

Yes / No (√) --

8 Compliance status of existing project (In

case of expansion) included in EIA report

i.e.

• Compliance report from MoEF&CC or

GPCB or CPCB as per the MOEFCC’s

Yes / No (√) --

Page 2: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

Sr. No.

Particular Tick mark as

applicable Page no. of application

Circular dated 07/09/2017.

9 Violation of EIA Notification 2006 (Yes or

No) Yes / No (√) --

10 Product profile with CAS no. / CI no. Yes (√) / No 2-8

11 Raw Material details and manufacturing

process of all products with CAS no. / CI

no.

Yes (√) / No 2-21

12 Spent Acids (H2SO4, HCl etc.) generation. Yes / No (√) --

13 If yes, it is considered as Haz. Waste? Yes/ No --

14 Source of water, Water balance included in

EIA report.

Yes (√) / No 2-25, 2-26

• Permission letter to obtain fresh water A-15

• Waste water management, Membership

certificate of common facility (CETP,

CMEE, CSD etc.

A-96

• Permission letter for discharge of waste

water etc.

A-96

15 Flue gas & process gas emission details

Included in Form-1

Yes (√) / No 2-30

16 Hazardous waste generation and its

management as per the HW Rules 2016

included in Form-1

Yes (√) / No 2-32

17 Spent solvent generation Yes (√) / No 2-32

18 If, yes Management of spent solvent

included in application?

Yes (√) / No 2-23

19 Details of Public hearing and time bound

compliance with details of budgetary

provision included in EIA report.

(In case of public hearing is applicable)

Yes / No (√) --

20 Documents regarding Accreditation of EIA

Consultant are included in EIA report.

Yes (√) / No 12-1

21 Undertaking of project proponent and EIA

Consultant regarding EIA report are

included in EIA report.

Yes (√) / No Immediate after cover page.

22 Environmental Management Plan (EMP)

report and details of financial outlay & year

wise break up is included in EIA report.

Yes (√) / No 10-2

23 Green belt details with budgetary outlay

included in EIA report.

Yes (√) / No 2-34

Page 3: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

Sr. No.

Particular

24 Declaration by experts (Name, qualification,

area of work, designati

to the EIA Report is included.

25 Compliance of MoEFCC’s OM dated

01/05/2018 regarding “Corporate

Environment Responsibility” (CER).

Above details are true to the best of mSEIAA/SEAC if above information stands wrong in the future and also agree to initiated the legal proceedings against my project.

Name & designation of the Applicant:

Stamp & Signature of Applicant

Tick mark as applicable

eclaration by experts (Name, qualification,

area of work, designation etc.) contributing

to the EIA Report is included.

Yes (√) / No

Compliance of MoEFCC’s OM dated

01/05/2018 regarding “Corporate

Environment Responsibility” (CER).

Yes (√) / No

Above details are true to the best of my knowledge and I am abided to respect the decision of the SEIAA/SEAC if above information stands wrong in the future and also agree to initiated the legal

Name & designation of the Applicant: Mansukh Radadia (Partner)

Signature of Applicant

Page no. of application

Immediate after cover page.

8-1

y knowledge and I am abided to respect the decision of the SEIAA/SEAC if above information stands wrong in the future and also agree to initiated the legal

Mansukh Radadia (Partner)

Date: 02.12.2018

Page 4: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

SEAC, Gujarat Page 1 of 17

Page 1 of 17 EC-EXP [Updated October 2018]

Project details

• Synthetic Organic Chemicals 5(f)

• For appraisal - Environmental Clearance [EC]

• Expansion of Project

1. Basic Information of the Project:

i Name & Address of the Project site

(Complete details with plot no./Survey

no., Landmark etc. )

M/s. Goklesh Lifesciences

Plot no. 9112/ 1, 2 & 3, G.I.D.C

Estate Ankleshwar-393002, Dist:

Bharuch, Gujarat

ii Name of the Applicant

Mansukh Radadia

iii Address for correspondence

M/s. Zeni Biotech

Plot No. A2/7801, G.I.D.C Estate

Ankleshwar-393002, Dist: Bharuch,

Gujarat

iv Contact no. and e-mail ID of the Applicant Mo. no. : 9824486234

e-mail:

[email protected]

v Aerial distance of nearest Habitat (KM)

Ankleshwar town is around 4 km in

East direction

vi Longitude & Latitude of the Project Site:

(4 corners of the site)

vii Category as per the Schedule to the EIA

Notification 2006 i.e. 1(d), 2(b), 5(f) etc.

Sub Category: i.e. Dyes, Dyes

Intermediates, Specialty chemicals, Bulk

Drugs etc.

5 (f) Synthetic Organic Chemicals

Sub-Category: Bulk Drugs

viii Applicability of General Conditions of

EIA Notification 2006: i.e.

Ensure that

(1) Protected areas notified under the

Wildlife (Protection) Act, 1972;

(2) CEPI areas

(3) Eco-sensitive areas and

(4) Inter-state boundaries and

international boundaries; are not

located within 5 km or 10 km (as

the case may be) area from the

boundary of the proposed site.

Not Applicable

Page 5: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

SEAC, Gujarat Page 2 of 17

Page 2 of 17 EC-EXP [Updated October 2018]

2. Online application& PH reg.:

a) Date of SEAC meeting for

recommendation to grant TOR:

16/05/18

b) Online application proposal no. :

SIA/GJ/IND2/22295/2018

c) Date online acceptance of EC application

bySEAC:

--

d) TOR issued by SEIAA: Letter no & date.

SEIAA/GUJ/TOR/5(f)/870/2018

vide dated 28/08/2018

e) Date of Public Hearing

(If applicable):

Not applicable

f) Date of presentation for Appraisal:

--

3. Product profile:

S. No.

Name of Products CAS No.

Production Capacity (MT/Month) End Use

Existing Proposed Total

1. Sodium Silico Fluoride 16893-85-9 300 -25 275

Glass Manufacturing, As a preservative in

Gum/Adhesives, Rubber tyre

manufacturing

2. Alpha Keto Isoleucine Calcium Salt

51828-96-7 - 3.0 3.0

Nutritional supplement for kidney disease

3. Alpha Keto Leucine Calcium Salt

51828-95-6 - 3.0 3.0

4. Alpha Keto Phenylalanine Calcium Salt

51828-93-4 - 3.0 3.0

5. Alpha Keto Valine Calcium Salt.

51828-94-5 - 3.0 3.0

6. Alpha Hydroxy Methionine Calcium Salt

4857-44-7 - 3.0 3.0

7. Iron Sucrose 8047-67-4 - 2.0 2.0 Hematinic

8. Phenyl Acetic Acid 103-82-2 - 40.0 40.0 Pencillin-G, Perfumery

9. Diacerein 13739-02-1 - 3.0 3.0 Anti-Inflammatory

Agents

10. Tolfenamic Acid 13710-19-5 - 2.0 2.0 Non-steroidal anti-inflammatory drug

(NSAID)

11. Diosmin 520-27-4 - 3.0 3.0 Antimicrobials

12.1,2,4 Triazolo [4,3-A] Pyridine-3-One (T.P.O.)

6969-71-7 - 10.0 10.0 Drug Intermediate

13. Ferric carboxy Maltose 9007-72-1 - 1.0 1.0 Antianemic agent,

Page 6: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

SEAC, Gujarat Page 3 of 17

Page 3 of 17 EC-EXP [Updated October 2018]

S. No.

Name of Products CAS No.

Production Capacity (MT/Month) End Use

Existing Proposed Total

Treatment of iron deficiency

14.Sucroferric Oxyhydroxide

12134-57-5 - 5.0 5.0 Hyperphosphatemia

Total 300 56 356

The project falls under Category B of project activity 5(f) as per the schedule of EIA Notification 2006.

4. Product wise Raw material consumption:

Sr. No.

Name of Product

Name of Raw Material

CAS no. of raw

materials

Quantity (MT/Month)

Existing Proposed Total

1 Sodium Silicofluoride

HFS Acid [19.3%] 16961-83-4 1299 -108.25 1190.75 Sodium Carbonate 497-19-8 24 -2 22 Sodium Chloride 7647-14-5 177 -14.75 162.25

2 Alpha Keto Isoleucine Calcium Salt

Hydantoin 461-72-3 - 2.40 2.40 Methyl ethyl ketone 78-93-3 - 0.72 0.72 Ethanolamine 141-43-5 - 0.72 0.72 Sodium Hydroxide 1310-73-2 - 0.63 0.63 Calcium Chloride 10043-52-4 - 4.97 4.97 Hydrochloric acid 7647-01-0 - 2.71 2.71 Methanol 67-56-1 - 1.70 1.70

3

Alpha Keto Leucine Calcium Salt

Hydantoin 461-72-3 - 2.61 2.61 Glycine 56-40-6 - 0.78 0.78 Isobutyraldehyde 78-84-2 - 0.96 0.96 Sodium Hydroxide 1310-73-2 - 0.25 0.25 Calcium Chloride 10043-52-4 - 0.79 0.79 Hydrochloric acid 7647-01-0 - 1.33 1.33 Methanol 67-56-1 - 0.62 0.62

4 Alpha Keto phenylalanine Calcium Salt

Glycine 56-40-6 - 1.89 1.89 Acetic Anhydride 108-24-7 - 4.77 4.77 Benzaldehyde 100-52-7 - 0.54 0.54 Sodium Acetate 127-09-3 - 0.57 0.57 N,N Dimethyl Formamide

68-12-2 - 4.80 4.80

Hydrochloric acid 7647-01-0 - 4.56 4.56 Methanol 67-56-1 - 1.89 1.89 Triethylamine 121-44-8 - 1.08 1.08 Calcium chloride 10043-52-4 - 0.78 0.78

5 Alpha Keto Valine Calcium Salt

Hydantoin 461-72-3 - 2.49 2.49 Glycine 56-40-6 - 0.99 0.99 Sodium Hydroxide 1310-73-2 - 1.2 1.2 Acetone 67-64-1 - 5.34 5.34 Hydrochloric Acid 7647-01-0 - 5.67 5.67 Calcium Chloride 10043-52-4 - 1.04 1.04 Methanol 67-56-1 - 0.44 0.44

6 Alpha Hydroxy Methionine Acid 583-91-5 - 3.78 3.78

Page 7: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

SEAC, Gujarat Page 4 of 17

Page 4 of 17 EC-EXP [Updated October 2018]

Sr. No.

Name of Product

Name of Raw Material

CAS no. of raw

materials

Quantity (MT/Month)

Existing Proposed Total

Methionine Calcium Salt

Methanol 67-56-1 - 1.8 1.8 Sodium Hydroxide 1310-73-2 - 0.8 0.8 Activated Charcoal 7440-44-0 - 0.09 0.09 Hyflow 68855-54-9 - 0.12 0.12 Calcium Chloride 10043-52-4 - 1.14 1.14

7 Iron Sucrose Ferric chloride 7705-08-0 - 0.50 0.50 Sucrose 57-50-1 - 0.84 0.84 Sodium Hydroxide 1310-73-2 - 0.39 0.39 Methanol 67-56-1 - 6.66 6.66 Hyflow 68855-54-9 - 0.12 0.12 Activated Carbon 10043-52-4 - 0.12 0.12

8 Phenyl acetic acid (Mfg option 1)

Phenyl acetic acid solution

103-82-2 - 91.2 91.2

Hydrochloric acid Sulfuric acid

7647-01-0 7664-93-9

- 20.8 20.8

Phenyl acetic acid (Mfg option 2)

Benzyl chloride 100-44-7 - 38.4 38.4 Sodium Cyanide 143-33-9 - 15.2 15.2 sulfuric acid 7664-93-9 - 15.2 15.2

9 Diacerien. Aloe emodin 481-72-1 - 1.33 1.33 Anhydrous Sodium acetate

127-09-3 - 6.00 6.00

Chromium trioxide 1333-82-0 - 0.56 0.56 Dimethyl acetamide (DMA)

68-12-2 - 3.33 3.33

Sulphuric Acid 7664-93-9 - 0.03 0.03 10 Tolfenamic

Acid

N,N Dimethylformamide

68-12-2 - 14.413 14.413

Orthochlorobenzene

95-50-1 - 0.8 0.8

Potassium Carbonate

584-08-7 - 1.253 1.253

3-Chloro methyl aniline

- 1.253 1.253

Cat-TNA 7440-50-8 - 0.027 0.027 Hydrochloric acid 7647-01-0 - 0.533 0.533 Activated Carbon 7440-44-0 - 0.053 0.053 Hyflow Supercel

68855-54-9 - 0.173 0.173

11 Diosmine Hesperidin 520-26-3 - 2.76 2.76 Iodine 7553-56-2 - 0.54 0.54 Sodium Hydroxide 1310-73-2 - 1.38 1.38 Sodium Thiosulphate

10102-17-7 - 0.42 0.42

Hyflow 68855-54-9 - 0.48 0.48 Sulphuric Acid 7664-93-9 - 1.44 1.44 Pyridine 110-86-1 - 2.73 2.73 Methanol 67-56-1

1.35 1.35

12 1,2,4 Triazolo [4,3-A] Pyridine-3-

Urea 57-13-6 - 9.5 9.5 Hydrazine Hydrate 10217-52-4 - 10 10 Methanol 67-56-1 - 47.6 47.60

Page 8: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

SEAC, Gujarat Page 5 of 17

Page 5 of 17 EC-EXP [Updated October 2018]

Sr. No.

Name of Product

Name of Raw Material

CAS no. of raw

materials

Quantity (MT/Month)

Existing Proposed Total

One (T.P.O.)

Hydrochloric acid 7647-01-0 - 20.5 20.50 2-chloro pyridine 109-09-1 - 4.9 4.90 Sulphuric Acid 7664-93-9 - 0.24 0.24 2-Ethoxy ethanol 110-80-5 - 40.3 40.3

13 Ferric Carboxy Maltose

Ferric Chloride 7705-08-0 - 0.21 0.21 Sodium Carbonate 497-19-8 - 0.21 0.21 Sodium Hydroxide 1310-73-2 - 0.06 0.06 Maltodextrin 9050-36-6 - 0.29 0.29 Sodium Hypochlorite

7681-52-9 - 0.34 0.34

Sodium Bromide 7647-15-6 - 0.01 0.01 Hydrochloric Acid 7647-01-0 - 0.04 0.04 Methanol 67-56-1 - 10.34 10.34

14 Sucroferric Oxy hydroxide

Ferric chloride 7705-08-0 - 0.3 0.3 Sodium carbonate 497-19-8 - 0.58 0.58 Sucrose 57-50-1 - 0.18 0.18 Starch 9005-25-8 - 0.18 0.18 Acetone 67-64-1 - 1.39 1.39

5. Compliance status of the existing project:

Sr.

no. Particulars Brief Information/Details Remarks

1 • Earlier EC details

• In case of EC not

obtained, Copy of

CTE &CCA obtained

before 14.09.2006.

This unit was purchased by M/s.

Goklesh Lifesciences. Earlier

CCA was obtained in name of

M/s. Vidsa Inorganics Pvt. Ltd.

(CCA no. WH-78226 dated 06-

05-2016). Same CCA was

transferred on name of M/s.

Goklesh Lifesciences on 07-07-

2017.

--

2 Compliance of EC conditions Not Applicable --

3 Status of inspection by RO-

MoEF&CC, Bhopal.

i.e. CCR-Certified

Compliance Report

Not Applicable --

4 Status of submission of half

yearly returns to concern

authorities.

Not Applicable --

5 Copy of CC&A and

Compliance of existing

CC&A Conditions.

Unit has obtained CCA wide order no. WH-78266 in name of M/s. Vidsa Inorganics Pvt. Ltd. Same CCA was transferred on name of M/s.Goklesh Lifesciences on 07-07-2017

--

Page 9: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

SEAC, Gujarat Page 6 of 17

Page 6 of 17 EC-EXP [Updated October 2018]

which is valid upto 14/01/2021. However, the unit was not in operation during acquisition and it is in closed condition till date. Production will be started after obtaining EC and we will comply all the CCA conditions.

6 Legal actions/Closure

directions/SCN etc. Issued

by GPCB and its current

status. For last 3 years

Yes, 1 SCN is issued by GPCB. --

7 Any Public Complaints

None --

8 Is there any litigation

pending before any court of

Law against the Project?

None --

6. Salient features of the project including Water, Air and Hazardous waste

management:

Sr

.

n

o.

Particulars Details

A Total cost of Proposed Project

(Rs. in Crores):

Existing: 0.95

Proposed: 4.96

Total: 5.91

B Total Plot area

( sq. meter)

Existing: 4,700 Sq. m. Proposed: 0 Sq. m. Total: 4,700 Sq. m.

Green belt area

( sq. meter)

Existing: 800 Sq. m. Proposed: 756 Sq. m. Total: 1,556 Sq. m.

C Employment generation Existing: 20 Proposed: 15 Total: 35

D Water

i

Source of Water Supply

(GIDC Bore well, Surface water, Tanker supply etc...)

Ankleshwar, G.I.D.C

Status of permission from the concern authority.

Unit has water permission

letter for existing unit and

NOC from

GIDC,Ankleshwar for

Page 10: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

SEAC, Gujarat Page 7 of 17

Page 7 of 17 EC-EXP [Updated October 2018]

additional water

requirement.

ii

Water consumption (KLD)

Existing

KLD*

Revised Existing

KLD**

Proposed (Additional)

KLD

Total after Expansion

KLD Remarks

(1) (2) (3) (2+3)

(A) Domestic 2 2 1 3 - (B) Gardening 0 0 6 6 -

Process 34 31 7 38 -

Boiler 0 0 4 4 - Cooling 0 0 4 4 -

Washing 2 2 1 3 - Others 3 3 -3 0 -

Others (Scrubbing) 0 0 1 1 - (C) Industrial Total 39 36 14 50 -

Grand Total (A+B+C)

41 38 21 59

Fresh 56.5 +

Recycled 2.5

Note: * For 300 MT/M inorganic production ** For 275 MT/M inorganic production (Revised scenario after expansion)

1) Total water requirement for the project: 59 KLD

2) Quantity to be recycled: 2.5 KLD

3) Total fresh water requirement: 56.5 KLD

iii

Waste water generation (KLD)

Category Existing

KLD*

Revised Existing

KLD**

Proposed (Additional)

KLD

Total after Expansion

KLD Remarks

(1) (2) (3) (2+3)

(A) Domestic 1 1 0.8 1.8 To septic tank/

soak pit system

(B) Industrial

Process 74 68 7.5 75.5 1 KLD high

COD and 74.5 KLD low COD

Boiler 0 0 0.2 0.2 Treated in ETP and then sent to FETP

and then discharged

into deep sea through NCTL

pipeline.

Cooling 0 0 0.3 0.3 Washing 2 2 1.0 3.0

Scrubbing 0 0 1.0 1.0

Others 3 3 -3 0

Total Industrial waste water

79 73 7 80 No additional effluent will be

Page 11: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

SEAC, Gujarat Page 8 of 17

Page 8 of 17 EC-EXP [Updated October 2018]

sent to FETP other than the booked load

(79 KLD treated low

COD stream)

iv Treatment facility within premises with capacity [For existing and Proposed]

[In-house ETP (Primary, Secondary, Tertiary), MEE, Stripper, Spray Dryer, STP etc..

ETP: 80 KL/d with primary, secondary and tertiary treatment.

v Mode of Disposal & Final meeting point

Domestic:

To septic tank/ soak pit system

Industrial:

Low COD effluent will be treated in ETP and after achieveing desired norms, treated effluent will be sent to FETP and further discharged into deep sea through NCTL pipeline. High COD will be sent to Common MEE.

vi In case of Common facility (CF) like CETP, Common Spray dryer, Common MEE,

CHWIF etc.

Name of Common facility

� CETP: Final Effluent Treatment Plant (FETP) operated by Narmada Clean Tech Ltd (NCTL)

� Common MEE: Bharuch Enviro Infrastructure Limited (BEIL) Membership of Common facility (CF)

(For waste water treatment)

� Membership of CETP is obtained wide letter no. NCT/BQC/Transfer/2018/ February-70

� NOC from BEIL is obtained vide letter no. BEIL/ANK/2018 for high COD stream vii Simplified water balance diagram with reuse / recycle of waste water

vii Reuse/Recycle details (KLD)

[Source of reuse & application area]

Page 12: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

SEAC, Gujarat Page 9 of 17

Page 9 of 17 EC-EXP [Updated October 2018]

Total reuse…….KLD

Source of waste water

for reuse with quantity

in KLD

Application area with

quantity in KLD

Remarks regarding

feasibility to reuse i.e.

w/w characteristics (COD,

BOD, TDS etc.)

2.5 KLD Distilled water

from manufacturing

activity

2.5 KLD distilled water will

be reused in washing.

COD, BOD, TDS is nil.

Hence, it is completely

feasible to use distilled

water for washing.

-

E Air

i Flue gas emission details

No. of Boilers/TFH/Furnaces/DG sets etc. with capacities viz. TPH, Kcal/hr, MT/hr,

KVA etc.

Existing & Proposed

-

SR. no.

Source of emission

With Capacity

Stack Height (meter)

Type of

Fuel

Quantity of Fuel MT/Day

Type of emissions

i.e. Air Pollutants

Air Pollution Control

Measures (APCM)

Existing None Proposed

1

Steam Boiler (1000 Kg/Hr)

11 Natural

Gas 800

m3/Day PM SO2 NO2

Adequate stack height will be provided

Steam Boiler (1000 Kg/Hr)

2 DG Set

(250 KW + 93 KW)

09 HSD 20 Lit/hr

-

ii Process gas i.e. Type of pollutant gases (SO2, HCl, NH3, Cl2, NOx etc.)

Existing & Proposed

-

Sr. no.

Source of emission

Type of emission

Stack/Vent Height (meter)

Air Pollution Control Measures (APCM)

Existing

None Proposed

1 Reactor Ammonia 12 Water scrubber followed

by Acidic scrubber

-

iii Fugitive emission details with its mitigation measures.

The fugitive emissions of organic chemicals and VOCs mainly occur due to tank

Page 13: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

SEAC, Gujarat Page 10 of 17

Page 10 of 17 EC-EXP [Updated October 2018]

breathing losses, Leaking pipe fitting and valves, during maintenance operations. Though these are not expected to be significant, the following measures are being followed to ensure compliance and further reductions wherever possible, the same will be continued after expansion.

• The fugitive emissions in terms of handling losses are reduced by proper storage and handling.

• Hazardous chemicals are stored as per standard criteria.

• Proper ventilation in storage & production area is provided and all materials are being stored in suitable packing to prevent contamination of air due to particulates & volatile emissions from storage container & area.

• Enclosed system & efficient procedures for materials charging is provided.

• Good housekeeping is maintained in the plant.

• Work area monitoring is carried out twice in a year as per GFR.

• Water shall be sprinkled during the construction

• Mechanical seals for pumps etc. should be used and maintained.

• Closed unloading, conveying and packing system

• All the reactors shall be closed.

• Raw material storage in closed storage area

• Regular monitoring of solvents’ concentration in work zone.

• Greenbelt development around the plant F Hazardous waste

(as per the Hazardous and Other Wastes (Management and Transboundary

Movement) Rules 2016.

Existing & Proposed

i

Sr. no.

Type/Name of Hazardous waste

Specific Source of generation (Name of the Activity, Product etc.)

Category and Schedule as per HW Rules.

Quantity (MT/Annum)

Management of HW

Existing

Proposed

Total

1

Discarded Containers

/ Barrels/lin

er

Raw material storage area

Schedule-I-33.1

0.12 5 5.12

Collection, storage and

send to authorized recycler.

2 Process Waste

From manufacturing

process of product no. 11,

12 and 13 Schedule-I-28.1

0 63.6 63.6

Collection, storage and transport to TSDF site.

From manufacturing

process of product no. 4

0 3.6 3.6

Sent for Co-processing or sent to

CHWIF for Incineration.

3 Used oil D.G.Set &

Machineries Schedule-I-5.1

-- 200

Lit/Year

200 Lit/Yea

r

Collection, storage and

reuse as lubricants in

the machineries

within the premises

only or send to

Page 14: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

SEAC, Gujarat Page 11 of 17

Page 11 of 17 EC-EXP [Updated October 2018]

authorized re-

processors

4 ETP

Sludge ETP

Schedule-I-35.3

18.0 54.0 72.0

Collection, storage and transport to TSDF site.

5 Spent

Solvent

From manufacturing

process of product no.

2,3,5,7,9,10,12,14

Schedule-I-28.6

-- 1435 1435

In-house Distillation

and recovered

solvents will be reused

6 Distillation Residue

Solvent distillation

Schedule-I-36.1

-- 26.6 26.6

Sent for Co-processing or sent to

CHWIF for Incineration.

7 Spent

Carbon

From manufacturing

process of product no. 6, 7

& 8

Schedule-I-28.3

-- 3.36 3.36

Sent for Co-processing or sent to

CHWIF for Incineration

8 Spent Hyflo

From manufacturing

process of product no. 6, 7

& 10

- -- 5.04 5.04

Sent for Co-processing or sent to

CHWIF for Incineration.

9 Acetic Acid

From manufacturing

process of product no. 4

and 9

- - 103.2 103.2 Sell to end

users as per rule-9

10 Methyl Iodide

From manufacturing

process of product no. 11

- - 7.2 7.2 Sell to end

users as per rule-9

-

ii Membership details of TSDF, CHWIF etc.

(For HW management)

NOC of BEIL, Ankleshwar is obtained

for landfill waste and incinerable

waste as well as for co-processing

dated 25/10/2018.

iii Details of Non-Hazardous waste & its

disposal(MSW and others)

--

G Solvent management, VOC emissions etc.

i Types of solvents, Details of Solvent recovery, % recovery. reuse of recovered

Solvents

S. No.

Input Solvent to Recovery

System

Quantity

(MT/M)

Recovered Solvent

Quantity

(MT/M)

% Recove

ry

Distillation

residue

End use of

recovered

solvent

1 Spent Methyl Ethyl Ketone

0.72 Methyl Ethyl

Ketone 0.71 98.0% 0.01

Re-Use in

Process

Page 15: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

SEAC, Gujarat Page 12 of 17

Page 12 of 17 EC-EXP [Updated October 2018]

2 Spent

Methanol 57.12 Methanol 56.12 98.3% 1.00

Re-Use in

Process

3 Spent N,N

Dimethylacetamide

3.35 N,N

Dimethylacetamide

3.28 98.0% 0.07 Re-Use

in Process

4 Spent N,N

Dimethylformamide

14.40 N,N

Dimethylformamide

14.1 98.0% 0.29 Re-Use

in Process

5 Spent 2-ethoxy

ethanol 39.94

Spent 2-ethoxy ethanol

39.18 98.1% 1.90 Re-Use

in Process

6 Spent Acetone 4.17 Acetone 4.09 98.0% 2.00 Re-Use

in Process

- ii VOC emission sources and its mitigation measures

� The fugitive emissions in terms of handling losses are reduced by proper storage and handling.

� Hazardous chemicals are stored as per standard criteria. � Proper ventilation in storage & production area is provided and all materials are

being stored in suitable packing to prevent contamination of air due to particulates & volatile emissions from storage container & area.

� Enclosed system & efficient procedures for materials charging is provided. � SOP’s for start-up, shut down, operation & maintenance are established &

maintained in all relevant area of works. � The coverage of greenbelt around the plant consisting of noise and air pollution

capturing species also acts as natural barrier to stop carrying of dust along with the wind current.

� Regular workplace monitoring will be done to check the level of VOCs within working area.

� Good housekeeping will be maintained in the plant.

7. Details regarding EIA report:

Sr. no.

Particulars Details (Give brief note / Conclusion of the particular subject)

Page no., Section no. & chapter no. of EIA report

a Ensure that there is no change in EIA report w. r. t. ToR i.e. Form-1 & PFR

There is no change in EIA report w.r.t. ToR i.e.Form-1 & PFR

--

b Baseline environmental monitoring period

The baseline data were collected during 16th March to 15th June, 2017 is utilized for this project, these data were collected for Ankleshwar-Panoli cluster. One month additional study is conducted for ambient air quality monitoring at project site in May-2018.

--

c Baseline study area (Km)

10 --

Page 16: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

SEAC, Gujarat Page 13 of 17

Page 13 of 17 EC-EXP [Updated October 2018]

d No. of AAQM stations including project site

8 --

Conclusion of the Monitoring (Baseline study) Air, Water & Land

e

Parameters considered for AAQM including project specific parameters.

PM10, PM2.5, SO2, NO2, CO VOC and NH3

Page no. 3-5, Table no. 3-3, Chapter 3.

- Sr. no.

Parameters Range of Concentrations

(µg/m3) Remarks

1. PM10 69.25 - 82.81 -- 2. PM2.5 25.52 - 35.05 -- 3. SO2 9.31 - 13.12 -- 4. NO2 15.05 - 20.56 -- 5. CO BDL --

6. VOC BDL --

7. NH3 BDL --

- f Whether the results of AAQM is

within the norms prescribed in NAAQS ? If no, give reasons as per EIA report

All AAQM results are within the norms prescribed in NAAQS

Page no. 3-5, Section 3.3.2, Chapter 3

g Comments for AAQM results w. r. t.

NAAQS

All AAQM results are within the norms prescribed in NAAQS

Page no. 3-5, Section 3.3.2, Chapter 3

h Software used for the mathematical

Modelling for anticipated incremental GLCs (Ground Level Concentrations)

ISC-AERMOD View is used for mathematical modelling for anticipated incremental GLCs. The ground level concentration are as under

Page no. 4-10, Chapter 4

i The resultant concentrations w. r. t.

NAAQS and its conclusion.

As below Page no. 4-11, Chapter 4

Pollutant

Average 24 hourly Maximum

Ground Level Concentration

(µg/m3)

Distance & Direction

PM10 1.665 3.2 km in ENE

SO2 1.920 3.2 km in ENE

NOX 0.688 3.2 km in ENE

NH3 0.897 Project site

- j Suggested mitigation measures w. r.

t. Air

As below --

For fugitive emission:

• Raw materials will be stored in isolated storage area and containers will be kept tightly closed.

• Manufacturing activity will be carried out in closed reactors / vessels and regular

Page 17: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

SEAC, Gujarat Page 14 of 17

Page 14 of 17 EC-EXP [Updated October 2018]

checking and maintenance of the same will be carried out to avoid any leakages.

• Precautionary measures will be taken while handling various hazardous.

• Transporters will be instructed to cover the trucks by tarpaulin sheets.

• Care will be taken during charging and handling of fuel to reduce fugitive emission.

For process emission:

• The fuel to be used in boiler is natural gas, hence adequate stack height will be provided.

• Greenbelt development consisting of air pollutant tolerant species is started will help to reduce pollution load.

k Conclusion of the Monitoring during

baseline study of water

As below Section 3.4.3 Page no. 3-13, Chapter 3

• It can be concluded from the baseline monitoring, that as per Drinking water standard of IS: 10500, ground water and surface water can be used for domestic purpose.

• The water can be used for drinking purpose after proper treatment of hardness, TDS, TSS, Salinity and bacteria removal such as filtration, RO and UV.

l Suggested mitigation measures w. r. t. Water

As below Section 4.3.2 Page no. 4-6, Chapter 4

• Low COD stream will be treated in ETP having primary, secondary and tertiary treatment. After achieving desired norms, treated effluent will be discharged in to G.I.D.C. underground drainage system and conveyed to FETP which ultimately leads to deep sea for final disposal through NCTL pipeline.

• High COD stream (1.0 KLD) will be sent to Common MEE for further treatment and disposal.

• Pucca flooring will be done in ETP area to avoid any type of leakage that can be percolated into contaminated ground water. Thus, no adverse impact will be occurred on water environment.

• Hazardous chemicals will be stored in designated area with dyke wall and spillage collection system.

• Unit will install rain water harvesting system within premises to collect and reuse rainwater, thus reducing fresh water requirement.

• Care will be taken to avoid of leakage or spillage of chemicals, hazardous waste, effluent while handling, storage and disposal. Also impervious base and guard around the structure will be provided to avoid penetration of same.

• Hazardous waste generated from processes and ETP will be properly stored in designated storage area having roof and leachate collection system.

m Conclusion of the Monitoring during baseline study of Land

As below Section 3.6.1 Page no. 3-19, Chapter 3

The porosity of soils varied from 25% to 58% and can be considered as moderate to good for air and water movement in the soil. Organic carbon varied from 0.36% to 1.41%. The Water Holding Capacity varied from 32.3% to 39%. Bulk Density varied from 0.6 to 1.8 g/cm3. pH varied from 7.1 to 8.3.

n Suggested mitigation measures w .r. t. Land

As below Section 4.3.1 Page no. 4-6, Chapter 4

Page 18: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

SEAC, Gujarat Page 15 of 17

Page 15 of 17 EC-EXP [Updated October 2018]

• Hazardous chemicals will be stored in designated area with dyke wall and spillage collection system.

• Care will be taken to avoid of leakage or spillage of chemicals, hazardous waste, effluent while handling, storage and disposal. Also impervious base and guard around the structure will be provided to avoid penetration of same.

• Pucca flooring will be done in ETP area to avoid any type of leakage that can be percolated into soil.

• Hazardous waste generated from processes and ETP will be properly stored in designated storage area having roof and leachate collection system.

• As the project site is located in GIDC, no major infrastructural development is expected. Thus, no change will be occurred in land use pattern of the area.

• Care will be taken to have proper infrastructural development at site. o Conclusion of the Monitoring during

baseline study of Noise

As below Section 3.5.2 Page no. 3-15, Chapter 3

Out of all the 8 locations measured for noise levels, the sound levels recorded at Ankleshwar town, project site Atul and Uchhali village are higher in day time as well as night time. At all other locations recorded Noise levels are found to be within the standard limits.

p Suggested mitigation measures w. r. t. Noise

As below Section 4.3.3 Page no. 4-7, Chapter 4

• As far as the noise that will be generated due to the transportation is concerned, the same will be minimized transportation only in day time and by maintaining transportation vehicles properly.

• Main source of noise in proposed plant will be boiler, D.G. Set. However, the same will be stand by and operated only in case of main power failure. Latest technology based low noise D.G. set with acoustic enclosures will be installed.

• Proper and timely lubrication, oiling and maintenance will be carried out for all plant and machineries.

• The noise generation will be mitigated by installing noise barriers/absorbers around stationery noise sources.

• Adequate noise control measures such as antivibration pad for equipment with high vibration will be provided. All the vibrating parts will be checked periodically and serviced to reduce the noise generation.

• The equipment, which generates excessive noise, will be provided with enclosures etc. Thus, there will not be any major source of higher noise generation which can be propagated in vicinity.

• Regular noise monitoring will be carried out at the prominent place in the premises.

• Greenbelt consisting of noise capturing plant species will reduce noise levels. q Main issues in Public hearing (If

applicable)

Not Applicable

r Brief description of Public hearing (If applicable): Not Applicable Main Issues raised by stake holders

Commitments by Project proponent and action plan.

- - -

s

Major hazardous chemicals and worst case scenario considered in

As below: Section 7.3.5.1 Page no. 7-14,

Page 19: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

SEAC, Gujarat Page 16 of 17

Page 16 of 17 EC-EXP [Updated October 2018]

Risk Analysis report. Chapter 7

• Major hazardous chemicals are Acetone, Methanol, Pyridin, Acetic Anhydride, HCl, Sulfuric acid, Triethylamine

• Leakage of Acetone from 1 inch dia. Hole, Catastrophic failure of Acetone storage tank, Leakage of Methanol from 1 inch dia. Hole, Catastrophic failure of Methanol storage tank, Catastrophic failure of Pyridine Drum, Catastrophic failure of Triethylamine Drum, Leakage of Acetic Anhydride from 1 inch dia. Hole, Catastrophic failure of Acetic Anhydride storage tank, Catastrophic failure of Pyridine Drum, Catastrophic failure of Triethylamine Drum

Comments/Suggestions/mitigation measures in brief

As below: Section 7.3.5.5 Page no. 7-21, Chapter 7

• Sulphuric Acid, Caustic Solution etc are toxic materials. Whenever there is spillage on the ground, the pool will be immediately covered with sand and neutralizers like LIME shall be spread on the spillage. 90% of the potential harm will be reduced.

• Acetone, Methanol is highly flammable chemical with low flash point and boiling point. These chemicals are a potential source of major fires.

• The storage area shall be well protected from any ignitable substances. All the electrical fittings shall be flameproof. Only qualified /trained persons shall be used to operate in the tank farm. The tank farm shall be monitored all the 365 days including nights. Major accident scenarios have to be planned and MOCK DRILLS conducted.

• The design of the tank-farm area is to be done with good safety practices. All the tanks shall have dumping arrangements planned for reducing the severity during emergencies. Dumping arrangement is a spare tank facility kept empty and ready to receive the chemical from the tank with an emergency. The empty tank will be in the same tank farm and will be maintained empty.

• Toxic Chemicals tank farm shall be separated from flammable chemical tank farm. They have to be separated by considerable distance.

• The cooling arrangements for the reactors shall be with standby system. This will control the rise in exothermic reaction temperatures. There shall be also two Temperature indicators for monitoring temperature rise.

• In case of pressure reactors where the pressures of operations are greater than atmospheric pressure, the overrun of exothermic reactions control is very important. In addition to the safety devices, there must be arrangement to dislodge the reaction mass through the bottom discharge valve. There shall be a provision of remote controlled discharge valves for the purpose.

• Ventilation should be provided for any enclosed are where hydrocarbon or toxic vapors may accumulate. Several such areas were noticed- these may be surveyed and tackled accordingly.

• Flame arrestor should be provided.

• Adequate number of caution boards highlighting the hazards of chemicals should be provided at critical locations.

• Prepare & display the safe operating procedure for hazardous chemicals storage, handling & transporting or using.

• Local Exhaust ventilation and scrubber should be installed where it is required to reduce fumes, vapors, temperature and heat stress.

t An undertaking by the Project Proponent (PP) on the ownership of the EIA report as per the OM of MoEF&CC dated 05/10/2011 and an undertaking by the Consultant

Both declarations are given after cover page of EIA report

--

Page 20: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

EC-EXP [Updated October 2018]

regarding the prescribed TORs have been complied with and the data submitted is factually correct as per the OM of MoEF&CC dated 04/08/2009.

u Any other details: --

8. Details of Environmental Consultant:

Sr.

no.

Particulars

i Name of the Consultant

ii Contact no. and e-mail ID of the

Consultant

iii Accreditation for the categories and

Validity

iv Any other details

Name & designation of the Applican

Stamp &Signature of Applicant:

General Instructions

• Format shall be in WORD Format

• Do not change Format.

• Provide authenticated (with stamp & Signature) hard copy during presentation.

• Kindly send e-mail to :

• Above data shall be as per application

• Incorporate relevant details in respective column in the Format. Do not attach

Annexure except copy of Certificates etc.

SEAC, Gujar

2018]

regarding the prescribed TORs have been complied with and the data submitted is factually correct as per the OM of MoEF&CC dated

Details of Environmental Consultant:

Details

Name of the Consultant En-Tech Laboratories

mail ID of the Mo. no. : 9909975203

e-Mail: [email protected]

[email protected]

Accreditation for the categories and Stay Order against NABET/QCI

--

of the Applicant: Mansukh Radadia (Partner)

Stamp &Signature of Applicant:

Date: 28/11/2018

Format shall be in WORD Format (Font type- Arial, Font size- 11)

Do not change Format. Fill up your details / information in prescribed tables.

Provide authenticated (with stamp & Signature) hard copy during presentation.

mail to : [email protected]

Above data shall be as per application Form-1 & PFR.

Incorporate relevant details in respective column in the Format. Do not attach

Annexure except copy of Certificates etc.

SEAC, Gujarat Page 17 of 17

Page 17 of 17 2018]

[email protected]

Stay Order against NABET/QCI

11)

your details / information in prescribed tables.

Provide authenticated (with stamp & Signature) hard copy during presentation.

Incorporate relevant details in respective column in the Format. Do not attach

Page 21: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2

FOR OBTAINING ENVIRONMENT CLEARANCE

For Proposed Active Pharmaceutical Ingredient (API) & Bulk Drug

Intermediates Manufacturing in Existing Inorganic Unit

of

M/s. Goklesh Lifesciences

Located at

Plot No. 9112/ 1, 2 & 3, G.I.D.C Estate Ankleshwar-393002,

Dist: Bharuch, Gujarat

Prepared by:

En-Tech Laboratories

202, Trade Square, Opp. Torrent Power House,

Sabarmati, Ahmedabad - 380005

November 2018

Page 22: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 1 of 37

1. Details of Project

Sr.

No. Particular Details

a. Name of the Project(S) : Proposed Active Pharmaceutical Ingredient (API) & Bulk

Drug Intermediates Manufacturing in Existing Inorganic Unit

b. Name of the Company/Organisation : M/s. Goklesh Lifesciences

c. Registered Address : Plot No. 9112/ 1, 2 & 3, G.I.D.C Estate Ankleshwar-393002,

Dist: Bharuch, Gujarat

d. Legal Status of the Company : Partnership firm.

e. Joint Venture (Yes/No) : Yes

If Yes

(i) No. of JV Partners (multiple

Entries Allowed)

: 4

Name of the JV

Partner

Share of

the JV

partner

Address of the JV

Partner Email ID of JV Partner

Mobile No.

of JV

Partner

Mansukh Naran

Radadia

25% 10-Vrundavan co-

operative housing

society, Nr.Jaldhara

Chockdi, GIDC,

Ankleshwar-

393002.

[email protected] 9824486234

Gopal Naran

Radadia

25% Vil.-Mandlikpur,

T.-Jetpur,

D-Rajkot.

[email protected]

9824815055

Shital Mansukh

Radadia

25% 10-Vrundavan co-

operative housing

society, Nr.Jaldhara

Chockdi, GIDC,

Ankleshwar-

393002.

[email protected]

9824486234

Rekha Gopal

Radadia

25% Vil.-Mandlikpur,

T.-Jetpur,

D-Rajkot.

[email protected]

9824815055

2. Address for the Correspondence

Sr.

No. Particular Details

a. Name of applicant : Mr. Mansukh Radadia

b. Designation(owner/Partner/CEO) : Partner

c. Address : Plot No. 9112/ 1, 2 & 3, G.I.D.C Estate

Ankleshwar-393002, Dist: Bharuch, Gujarat

d. Pin code : 393002

e. e-mail : [email protected]

f. Telephone No. : +919824486234

g. Fax No. : -

3. Category of the Project/Activity as per Schedule of EIA Notification,2006

Sr.

No. Particular Details

a. Project /Activity : 5 (f)

Page 23: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 2 of 37

Sr.

No. Particular Details

[1(a)(i)/1(a)(ii)/1(b)/1(c)/1(d)/1(e)/2(a)/2(b)/3(a)/3(b)/4(a)/4(b)(i)/4(b)(ii)/4(c)/

4(d)/4(e)/4(f) /5(a)/5(b)(b)/5(c)/5(d)/5(e)/5(f)/5(g)/5(h)

/5(i)/5(j)/6(a)/6(b)/(a)/7(b)/7(c)/7(d)/7(e)/7(f)/7(g)/7(h)/7( i) /8(a)/8(b)]

b. Category (A/B1/B2) : B

If B1 or B2 B1

Reason for application at Central Level / State level (in case of B2 Projects) : --

If others --

c. Please Specify : --

d. EAC concerned (for category a Project only)

(coal Mining/Non-coal Mining/ Thermal/River Valley & Hydro/Industry-I/

Industry-II /Infrastructure -I/Infrastructure-II/Nuclear & Defence/CRZ

: Industry-II

e. New / Expansion / Modernization / One Time Capacity expansion (only for

Coal Mining) / Expansion under Para 7(ii) / Modernization under Para 7(ii) /

Change of Product Mix under Para 7 (ii))

: Expansion

4. Location of the Project

Sr.

No. Particular Details

a. Plot / Survey / Khasra No. : 9112/ 1, 2 & 3

b. Village : GIDC Estate Ankleshwar

c. Tehsil : Ankleshwar

d. District : Bharuch

e. State : Gujarat

f. Pin Code : 393002

g. Bounded Latitudes(North) :

From : 21°37'51.87"N, 73° 2'54.96"E

To : 21°37'52.03"N, 73° 2'53.24"E

h. Bounded Longitudes (East) :

From : 21°37'55.08"N, 73° 2'53.45"E

To : 21°37'55.00"N, 73° 2'55.15"E

i. Survey of India Topo Sheet No. : F43M14

j. Upload Topo Sheet File (Upload PDF only) : --

k. Maximum Elevation Above Means Sea Level

(AMSL)

: 25 m

l. Upload (kml) File (Upload kml only) : --

m. Distance of Nearest HFL from the Project bound

within the study area

: None within study area

n. Seismic Zone (Zone: 1 / 2 / 3 / 4 / 5) : 3

5. Whether Project is executed in multiple States (Yes / No)?: Not Applicable

If yes

Sr.

No. Particular Details

a. Number of States in which Project will be

Executed (e.g. 1,2,3,4,5,6) :

--

b. Main State of the Project : --

c. Other State (Multiple Entries Allowed)

(If the project to be executed, does not belong to any state, then state category could be selected as

'Other')

Page 24: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 3 of 37

State District Tehsil Village

-- -- -- --

6. Details of Terms of Reference (TOR)

Sr.

No. Particular Details

a. Whether TOR is mandatory for submitting

application (Yes / No)? :

Yes

If Yes : --

b. Date of issue of ToR / Standard TOR : 28/08/2018

c. MoEF&CC / SEIAA File No. : SEIAA/GUJ/TOR/5(f)/870/2018

d. Upload ToR letter (PDF only) : --

7. Details of Public Consultation

Sr.

No. Particular Details

a. Whether the Project Exempted from Public

Hearing (Yes/No)? :

Yes

If Yes, : --

Reason :

Project is located within notified industrial

area of Ankleshwar GIDC

b. Supporting Document (upload PDF only) : --

c. Whether details of Public Hearing available

(Yes/No)? :

No

If No, : --

d. Reason thereof :

Public hearing is not applicable to proposed

expansion Project.

Supporting Document (upload PDF only) : --

If Yes, :

e. Date of Advertisement of Public Hearing : --

f. Copy of advertisement in English (Upload PDF

only) :

--

g. Whether Public hearing was presided over by an

officer of the rank of Additional District

Magistrate or above (Yes/No)?

:

--

If Yes : --

h. Designation of Presiding Officer (District

Magistrate / District Collector / Deputy

Commissioner / others - please specify)

:

--

i. Copy of duly signed Proceedings of Public

Hearing in English (Upload PDF only) :

--

j. Date of Public Hearing : --

k. Venue of Public Hearing: : --

Village : --

Tehsil : --

District : --

State : --

l. Distance of Public Hearing Venue from the

Proposed Project (km) :

--

m. No. of people attended : --

n. If the multiple public hearings conducted : --

PI give the details of each PH as per (e) to (o) : --

Page 25: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 4 of 37

Sr.

No. Particular Details

above

8. Details of Project Configuration / Product (Multiple Entries Allowed)

Sr.

No

.

Particular Details

a. Whether the project is New (Yes/No?) : Yes

If Yes, : --

b. Project Configuration

Plant / Equipment / Facility Configuration Remarks if any

SS Reactor with Condenser & Receiver 3 KL (08) --

SS Reactor with Condenser & Receiver 5 KL (02) --

SS Reactor with Condenser & Receiver 2 KL (02) --

Distillation Column 5 KL (02) --

Glass Lined Reactor with Glass Assembly 5 KL (01) --

Glass Lined Reactor with Glass Assembly 3 KL (01) --

SS Centrifuge 36’’ (02) --

SS Centrifuge 48” (06) --

RL Centrifuge 36’’(01) --

SS Tray Dryer with PP Tray 96 Tray (01) --

SS Tray Dryer with PP Tray 48 Tray (02) --

Sparkler Filter 11 Plate (03) --

Multi Mill 250 Kg/hrs (03) --

SS storage Tank 12 KL (06) --

HDPE storage Tank 12 KL (02) --

RCVD 1 KL(01) --

c. Product

S.

No. Name of Products

CAS

No.

Production Capacity

(MT/Month) End Use

Existing Proposed Total

1. Sodium Silico Fluoride 16893-85-9 300 -25 275

Glass Manufacturing,

As a preservative in

Gum/Adhesives,

Rubber tyre

manufacturing

2. Alpha Keto Isoleucine Calcium Salt 51828-96-7 - 3.0 3.0

Nutritional

supplement for

kidney disease

3. Alpha Keto Leucine Calcium Salt. 51828-95-6 - 3.0 3.0

4. Alpha Keto Phenylalanine Calcium Salt. 51828-93-4 - 3.0 3.0

5. Alpha Keto Valine Calcium Salt. 51828-94-5 - 3.0 3.0

6. Alpha Hydroxy Methionine Calcium Salt. 4857-44-7 - 3.0 3.0

7. Iron Sucrose 8047-67-4 - 2.0 2.0 Hematinic

8. Phenyl Acetic Acid 103-82-2 - 40.0 40.0 Pencillin-G,

Perfumery

9. Diacerein 13739-02-1 - 3.0 3.0 Anti-Inflammatory

Agents

10. Tolfenamic Acid 13710-19-5 - 2.0 2.0

Non-steroidal anti-

inflammatory drug

(NSAID)

11. Diosmin 520-27-4 - 3.0 3.0 Antimicrobials

12. 1,2,4 Triazolo [4,3-A] Pyridine-3-One

(T.P.O.) 6969-71-7 - 10.0 10.0 Drug Intermediate

13. Ferric carboxy Maltose 9007-72-1 - 1.0 1.0 Antianemic agent,

Page 26: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 5 of 37

Sr.

No

.

Particular Details

Treatment of iron

deficiency

14. Sucroferric Oxyhydroxide 12134-57-5 - 5.0 5.0 Hyperphosphatemia

Total 300 56 356

• Unit: - (Tons per Annum(TPA), Mega Watt(MW), Hectares(ha), Kilo litre per Day(KLD)Tons

Crushed per Day(TCD), Cubic Meter per Day, Kilometres(Km), Day(MLD), Others)

• Mode of Transport/Transmission of Product (Road, Rail, conveyor, Belt, pipe, Arial Ropeway,

combination of two or three modes, Others)

9. If Expansion / Modernisation / One Time Capacity expansion (only for Coal Mining) /

Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product

Mix under Clause 7 (ii)

Sr.

No. Particular Details

a. Details of environmental clearance granted earlier

(i) Date of issue of environmental clearance : Existing unit is inorganic unit which doest

not require EC.

(ii) MoEFCC / SEIAA File Number : -

(iii) Upload EC Letter : -

b. Details of certified report on compliance of earlier environmental clearance conditions

(i) Details of Regional Office of MoEFCC /

Zonal Office of CPCB / SPCB / UTPCC

from which certified report on compliance

of earlier environmental clearance

conditions obtained

: Not applicable.

(ii) Letter No : --

(iii) Status of Compliance : --

(iv) Certified report on compliance of earlier

environmental clearance conditions

(Including Monitoring Report) (Upload

PDF only)

: --

(v) Date of site visit : --

c. Details of Consent to Operate

(i) Whether Consent to operate obtained

(Yes/No)?

:

Yes

[Earlier CCA was obtained in name of M/s.

Vidsa Inorganics Pvt. Ltd. (CCA no. WH-

78226 dated 06-05-2016). Same CCA was

transferred on name of M/s. Goklesh

Lifesciences on 07-07-2017. However, the

unit was not in operation during acquisition

and it is in closed condition till date]

If yes, :

(ii) Upload Copies of all Consent to operate

obtained since inception (Upload PDF

only)

:

--

(iii) Date of issue : 06/05/2016

Page 27: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 6 of 37

Sr.

No. Particular Details

(iv) Valid up to : 14/01/2021

(v) File No. : 356396

(vi) Application No. : 101646

(vii) Upload Copy of Consent to operate valid

as on date (Upload PDF only) :

--

d. Details of Capacity Expansion (Multiple Entries Allowed)

Product / Activity

(Capacity/Area)

Quantity

From

Quantity

To Unit

Mode of Transport

/ Transmission of

Product

Sodium Silico Fluoride 3600 3300 TPA Road

Alpha Keto Isoleucine Calcium Salt 0.0 36 TPA

Alpha Keto Leucine Calcium Salt. 0.0 36 TPA

Alpha Keto Phenylalanine Calcium Salt. 0.0 36 TPA

Alpha Keto Valine Calcium Salt. 0.0 36 TPA

Alpha Hydroxy Methionine Calcium Salt. 0.0 36 TPA

Iron Sucrose 0.0 24 TPA

Phenyl Acetic Acid 0.0 480 TPA

Diacerein 0.0 36 TPA

Tolfenamic Acid 0.0 24 TPA

Diosmin 0.0 36 TPA

1,2,4 Triazolo [4,3-A] Pyridine-3-One

(T.P.O.) 0.0 120 TPA

Ferric carboxy Maltose 0.0 12 TPA

Sucroferric Oxyhydroxide 0.0 60 TPA

Total 3600 4272 TPA

• Unit:(Tons per Annum(TPA), Mega Watt(MW), Hectares(ha), Kilo Litre per Day(KLD), Tons

Crushed per Day(TCD), Cubic Meter per Day, Kilometers (Km), Million Liters per Day(MLD),

Others)

• Mode of Transport/Transmission of Product (Road, Rail, Conveyor Belt, Pipe Conveyor, Arial

Ropeway, combination of two or three modes, Others

10. Project Cost

Sr.

No. Particular Details

a. Total Cost of the Project at current price level (in

Lakhs)

: 496

b. Funds Allocated for Environment Management

(Capital) (in Lakhs)

: 80

c. Funds Allocated Towards ESC (Entrepreneur

Social Responsibility) (in Lakhs)

: 4.96

d. Funds Allocated for Environment Management

Plan (EMP) (Recurring per Annum)(in Lakhs)

: 20

Page 28: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 7 of 37

11. Whether project attracts the General Condition specified in the Schedule of EIA

Notification (Yes/No)? [provide name of WL/CPA/ESA/Inter-state boundary

/International boundary and distance from the project]: Not Applicable

If Yes

Sr.

No. Particular Details

a. Protected Area Notified Under the Wild

Life(Protection) Act, 1972

: --

b. Critically Polluted Areas as identified by the

Central Pollution Control Board from Time to

Time

: --

c. Notified Eco-Sensitive Areas : --

d. Inter-State Boundaries and International

Boundaries

: --

12. Whether projects attract the Specific Condition specified in the Schedule of EIA

Notification (Yes/No)?: No.

If Yes

Sr.

No. Particular Details

a. If any Industrial Estate / Complex / Export

processing Zones / Special Economic Zones /

Biotech Parks / Leather Complex with

homogeneous type of industries such as Items

4(d), 4(f), 5(e), 5(f), or those Industrial estates

with pre-defined set of activities (not necessarily

homogeneous, obtains prior environmental

clearance, individual industries including

proposed industrial housing within such estates /

complexes will not be required to take prior

environmental clearance, so long as the Terms

and Conditions for the industrial estate/complex

are complied with (Such estates/complexes must

have a clearly identified management with the

legal responsibility of ensuring adherence to the

Terms and Conditions of prior environmental

clearance, who may be held responsible for

violation of the same throughout the life of

thecomplex/estate

: --

13. Raw Material / Fuel Requirement (Multiple Entries Allowed)

Sr.

No. Particular Details

a. Details of Raw Material / Fuel Requirement

Raw

Material /

Fuel

Quantity

per Annum

Unit Source

(incase of

Import

, please

specify

country

and

Mode of

Transport

Distance of

Source

from

Project Site

(in Kilo

meters)

(In case of

Type of

Linkage

(Linkage /

Fuel

Supply

Agreement

Page 29: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 8 of 37

Sr.

No. Particular Details

Name of

the port

from

which

Raw

Material /

Fuel is

received)

import,

distance

from the

port from

which the

raw

material /

fuel is

received

/ e-auction

/

MoU /

LOA

Captive /

Open

market

/ Others)

Hyflow Supercel 2.1 MTPA Local

Vendor

By truck Local

Vendor

--

2-chloro pyridine 58.8 MTPA

2-Ethoxy ethanol 483.6 MTPA

3-Chloro methyl aniline 15.0 MTPA

Acetic Anhydride 57.2 MTPA

Acetone 80.8 MTPA

Activated Carbon 3.2 MTPA

Aloe emodin 16.0 MTPA

Anhydrous Sodium

acetate 72.0 MTPA

Benzaldehyde 6.5 MTPA

Benzyl chloride 460.8 MTPA

Calcium Chloride 104.6 MTPA

Cat-TNA 0.3 MTPA

Chromium trioxide 6.7 MTPA

Dimethyl acetamide

(DMA) 40.0 MTPA

Ethanolamine 8.6 MTPA

Ferric chloride 12.1 MTPA

Glycine 43.9 MTPA

Hesperidin 33.1 MTPA

HFS Acid [19.3%] 14289.0 MTPA

Hydantoin 90.0 MTPA

Hydrazine Hydrate 120.0 MTPA

Hydrochloric acid 673.7 MTPA

Hyflow 8.6 MTPA

Iodine 6.5 MTPA

Isobutyraldehyde 11.5 MTPA

Maltodextrin 3.5 MTPA

Methanol 868.8 MTPA

Methionine Acid 45.4 MTPA

Methyl ethyl ketone 8.6 MTPA

N,N Dimethyl

Formamide 57.6 MTPA

N,N Dimethylformamide 173.0 MTPA

Orthochlorobenzene 9.6 MTPA

Phenyl acetic acid

solution 1094.4 MTPA

Potassium Carbonate 15.0 MTPA

Pyridine 32.8 MTPA

Sodium Acetate 6.8 MTPA

Page 30: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 9 of 37

Sr.

No. Particular Details

Sodium Bromide 0.1 MTPA

Sodium Carbonate 273.5 MTPA

Sodium Chloride 1947.0 MTPA

Sodium Cyanide 182.4 MTPA

Sodium Hydroxide 56.5 MTPA

Sodium Hypochlorite 4.1 MTPA

Sodium Thiosulphate 5.0 MTPA

Starch 2.2 MTPA

Sucrose 12.2 MTPA

sulfuric acid 202.9 MTPA

Triethylamine 13.0 MTPA

Urea 114.0 MTPA

Fuel

Natural gas 800 m3/hr Local

Vendor -- -- --

HSD 20 Lit/hr

In case of expansion proposals, total requirement of raw material / fuel shall be given

• Unit: - (Tons per Annum(TPA), Mega Watt(MW), Hectares(ha), Kilo Litre per Day(KLD), Tons

Crushed per Day(TCD), Cubic Meter per Day, Kilometers(Km), Million Liters per Day(MLD),

Others)

• Mode of Transport/Transmission of Product (Road, Rail, conveyor Belt, Pipe Conveyor, Arial

Ropeway, combination of two or three modes, Others

b. Upload copy of Linkage / Fuel Supply Agreement / e-

auction / Memorandum of Understanding / Letter of

Allocation / Captive source / others.

:

NA

14. Baseline Data (Air / Water / Noise / Soil / Ground water table/ Others)

Sr.

No. Particular Details

a. Period of Base Line Data Collection Baseline details of Ankleshwar cluster

collected in 16th March to 15

thJune, 2017 is

utilized for this project. One month additional

study is conducted for ambient air quality

monitoring at project site and other two

locations in May 2018.

From (DD/MM/YYYY) : 16/03/2017

To (DD/MM/YYYY) : 15/06/2017

b. Season (Summer / Pre-monsoon / Post-monsoon /

Winter)

: Summer

c. No. of Ambient Air Quality (AAQ) Monitoring

Locations

: 9

d. Details of AAQ Monitoring (Multiple Entries Allowed)

Criteria

Pollutants Unit

Maximum

Value

Minimum

Value

98 Percentile

Value

Prescribed

Standard

PM10 µg/m3 82.81 69.25 79.4 100

PM2.5 µg/m3 35.05 25.52 33.2 60

SO2 µg/m3 13.12 9.31 10.2 80

Page 31: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 10 of 37

Sr.

No. Particular Details

NO2 µg/m3 20.56 15.05 18.6 80

CO mg/m3 BDL 2

NH3 µg/m3 BDL 400

VOC ppm BDL -

• Criteria Pollutants: - (PM10, PM2.5, SO2, NOx, Others parameters specific to sector)

• Unit: - (Micro Gram per Meter Cube, Nano Gram per Meter Cube, Mili Gram per Meter Cube,

NA)

e. No. of Ground Water Monitoring Locations : 7

f. Details of Ground Water Monitoring (Multiple Entries Allowed)

Criteria

Pollutants Unit

Maximum

Value Minimum Value

98 Percentile

Value

Prescribed

Standard

pH - 8.1 7.3 - No Relaxation

Temperature °C 31.0 30.0 31.0 --

Colour Hazen BDL - -

Odor -- Unobjectionable - -

Turbidity NTU 1.5 0.7 1.5

Total Solid (TS) mg/L 2545.0 905.0 2483.0 --

Total Suspended

Solids (TSS) mg/L 100.0 40.0 97.6 --

Total Dissolved

Solids (TDS) mg/L 2505.0 825.0 2442.0 2000

Electrical

Conductivity

(EC)

µS/cm 3758.0 1238.0 3663.4 --

Biological

Oxygen Demand

(BOD)

mg/L BDL -- --

Chemical

Oxygen Demand

(COD)

mg/L 7.0 5.2 6.9 --

Total Coliform

(TC) MPN / 100 ml 28.0 20.0 27.8 Absent

Faecal Coliform

(FC) MPN / 100 ml 16.8 12.0 16.7 Absent

E. Coli MPN / 100 ml 8.4 6.0 8.3 Absent

Total Hardness

(as CaCO3) mg/L 290.0 203.0 285.8 600

Calcium

Hardness mg/L 160.0 96.0 157.7 --

Magnesium

Hardness mg/L 130.0 91.0 129.3 --

Total Alkalinity (

as CaCO3) mg/L 493.0 340.0 486.5 600

Carbonate mg/L BDL 0.0 --

Bi-Carbonate mg/L 493.0 340.0 486.5 --

Sodium (as Na) mg/L 69.0 40.0 68.6 --

Potassium (as K) mg/L 3.1 1.9 3.1 --

Magnesium (as

Mg) mg/L 52.0 36.4 51.7 100

Calcium (as Ca) mg/L 64.0 38.4 63.1 200

Page 32: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 11 of 37

Sr.

No. Particular Details

Chloride (as Cl) mg/L >10 - 1000

Sulphates (as

SO4) mg/L >40 - 400

Nitrate (as NO3) mg/L 6.3 0.5 6.2 No Relaxation

Nitrite (as NO2) mg/L 2.5 1.2 2.5 --

Fluoride (as F) mg/L 1.0 0.5 1.0 1.5

Boron (as B) mg/L BDL - 1

Iron (as Fe) mg/L BDL - No Relaxation

Manganese (as

Mn) mg/L BDL - 0.3

Lead (as Pb) mg/L BDL - No Relaxation

Copper (as Cu) mg/L BDL - 1.5

Zinc (as Zn) mg/L BDL - 15

Total Arsenic (as

As) mg/L BDL - 0.05

Cynide (as CN) mg/L BDL - No Relaxation

• Criteria Pollutants: - (pH, TSS, TDS, Total Hardness, Chlorides, Fluoride, Heavy Metals, other

parameters specific to the sector)

• Unit : -(mg/l, NA)

g. No. of Surface Water Monitoring Locations : 3

h. Details of Surface Water Monitoring (Multiple Entries Allowed)

Criteria

Pollutants Unit

Maximum

Value Minimum Value

98 Percentile

Value

Prescribed

Standard

pH - 8.2 7.5 8.2 No Relaxation

Temperature °C 35.0 30.5 34.9 --

Colour Hazen BDL - 15

Odor -- Unobjectionable - Agreeable

Turbidity NTU 2.0 1.0 2.0 5

Total Solid (TS) mg/L 660.0 260.0 652.2 --

Total Suspended

Solids (TSS) mg/L 100.0 10.0 98.6 --

Total Dissolved

Solids (TDS) mg/L 560.0 250.0 553.6 2000

Electrical

Conductivity

(EC)

µS/cm 840.0 375.0 830.4 --

Dissolved

Oxygen (DO) mg/L 5.9 3.7 5.8 --

Biological

Oxygen Demand

(BOD)

mg/L 5.3 5.3 5.3 --

Chemical

Oxygen Demand

(COD)

mg/L 15.0 10.0 14.9 --

Total Coliform

(TC) MPN / 100 ml 400.0 42.0 394.0 Absent

Faecal Coliform

(FC) MPN / 100 ml 240.0 25.2 236.4 Absent

E. Coli MPN / 100 ml 120.0 12.6 118.2 Absent

Total Hardness

(as CaCO3) mg/L 267.0 112.0 262.3 600

Page 33: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 12 of 37

Sr.

No. Particular Details

Calcium

Hardness mg/L 134.0 54.0 131.4 --

Magnesium

Hardness mg/L 133.0 58.0 131.0 --

Total Alkalinity

( as CaCO3) mg/L 459.0 190.0 453.3 600

Carbonate mg/L 0.0 0.0 --

Bi-Carbonate mg/L 459.0 190.0 453.3 --

Sodium (as Na) mg/L 63.0 10.0 62.5 --

Potassium (as K) mg/L 3.7 2.0 3.7 --

Magnesium (as

Mg) mg/L 53.2 23.2 52.4 100

Calcium (as Ca) mg/L 53.6 21.6 52.5 200

Chloride (as Cl) mg/L >10 -- 1000

Sulphates (as

SO4) mg/L

19 BDL 24.9 400

Nitrate (as NO3) mg/L 6.7 BDL 6.7 No Relaxation

Nitrite (as NO2) mg/L 3.0 1.4 3.0 --

Fluoride (as F) mg/L 1.2 0.8 1.2 1.5

Boron (as B) mg/L BDL - 1

Iron (as Fe) mg/L BDL - No Relaxation

Manganese

(as Mn) mg/L BDL - 0.3

Lead (as Pb) mg/L BDL - No Relaxation

Copper (as Cu) mg/L BDL - 1.5

Zinc (as Zn) mg/L 1.6 BDL 1.60 15

Total Arsenic

(as As) mg/L BDL - 0.05

Cynide (as CN) mg/L BDL - No Relaxation

Residual

Chlorine mg/L BDL - 1

• Parameter: - pH, DO, BOD, COD, Others parameters specific to the sector

• Unit: - (mg/1, NA)

i. No. of Ambient Noise Monitoring Locations : 8

j. Details of Noise Monitoring (Multiple Entries Allowed)

Parameter Unit Maximum

Value Minimum Value

98 Percentile

Value

Prescribed

Standard

Industrial

Day Time Leq dB(A) 82.2 -- 75

Night Time Leq dB(A) 73.4 -- 70

Residential

Day Time Leq dB(A) 60.2 39.3 59.9 55

Night Time Leq dB(A) 48.5 33.6 48.4 45

• Parameter: - (Leq (Day), Leq (Night))

• Unit: - A-weighted decibels(dB(A))

k. No. of Soil Monitoring Locations (Multiple Entries

Allowed)

: 8

Criteria Pollutants Unit Maximum Value Minimum Value 98 Percentile

Page 34: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 13 of 37

Sr.

No. Particular Details

Value

Texture Qualitative Clay/ Sandy clay/ Silty clay loam

Bulk Density g/cc 1.8 0.6 1.8

Porosity % 58.0 25.0 57.6

Water holding

capacity % 39.0 32.3 38.7

Organic carbon

(OC) % 1.4 0.4 1.4

Potassium as K mg/kg 587.0 510.0 582.2

Calcium as Ca mg/kg >1000 -

Magnesium as Mg mg/kg 429.0 90.0 425.2

Sodium as Na mg/kg 649.0 365.0 647.7

Cation Exchange

Capacity meq/100g 33.3 12.6 33.2

Exchangable

Sodium Percentage % 8.9 5.4 8.8

pH - 8.3 7.1 8.3

Electrical

Conductivity µS/cm 341.0 237.0 339.6

Available Nitrogen mg/kg 191.0 42.0 186.0

Available Potassium mg/kg 5.9 5.1 5.8

Available

Phosphorus mg/kg 12.5 0.8 11.6

• Parameter: - (pH, N(Nitrogen), P(Phosphorus), K (Potassium), Electric Conductivity)

• Unit: - (Millisiemens per Centimeter, Milligram per Litre, Percent, Centimeter per Second,

Milliequivalents per 100 Gram, Milligram per Kilogram, Kilogram per hectare, Others

l Ground Water Table

i Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)):

From : 2

To : 5

ii Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)):

From : 2

To : 5

iii Whether Ground Water Intersection will be there

(Yes / No)?

: No.

If Yes, --

(i) Upload Copy of Central Ground Water

Authority Letter (Upload PDF only)

: --

(ii) Letter No. : --

(iii) Date of issue : --

15. Details of Water Requirement (During Operation) (Multiple Entries Allowed)

Sr.

No. Particular Details

a. Details

Source Quantity in Method of water Distance from Mode of Transport

Page 35: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 14 of 37

KLD withdrawal Source

GIDC 59 GIDC supply -- GIDC Pipeline

• Source: Surface / Ground Water / Sea / Others

• Mode of Transportation: Pipeline / Canal / Others

• Method of water withdrawal: Barrage / Weir / Intake well / Jackwell / Tube well / Open well /

Others

b. Upload Copy of Permission from Competent

Authority (Upload PDF only)

: --

c. Letter No. : NA/DEE(W/S)/1574

d. Date of issue : 19/09/2018

e. Permitted quantity : 59 KL/day

f. Whether Desalination is proposed (Yes/ No) : No

If Yes, --

(i) Desalination capacity (KLD) : --

(ii) Quality of Brine (KLD) : --

(iii) Mode of Disposal of brine : --

16. Waste Water Management (During Operation)

Sr.

No. Particular Details

Type / Source

Quantity of

Waste Water

Generated

(Kilo Litre per

Day)

Treatment

Capacity (Kilo

Litre per

Day)

Treatment

Method

Mode of

Disposal

Quantity of

Treated

Water Used in

Recycling /

Reuse (Kilo

Litre per

Quantity of

Discharged

Water

(Kilo Litre per

Day)

Domestic 1.8 - To soak pit via

septic tank - -

Washing 3.5 80 KLD Primary,

Secondary and

Tertiary

treatment

Treated effluent

will be

discharged in to

G.I.D.C.

underground

drainage system

and conveyed to

FETP which

ultimately leads

to deep sea for

final disposal

through NCTL

pipeline.

-

79 KLD

(CETP, NCT)

+

1 KLD

(Common

MEE)

Boiler blow

down

0.2

Cooling tower

blow down

0.3

Scrubber 1.0

Process 75.0

a. Total Waste Water Generation : 80 KLD

b. Total Discharged Water : 80 KLD (79 CETP, NCT + 1 Common MEE)

c. Total Reused Water : --

17. Solid Waste Generation Management (Multiple Entries Allowed)

Item Quantity

per Annum Unit

Distance

from Site

Mode of

Transport

Mode of

Disposal

Page 36: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 15 of 37

Item Quantity

per Annum Unit

Distance

from Site

Mode of

Transport

Mode of

Disposal

Discarded

Containers/

Barrels/liner

5.12 MTPA -- Road Collection, storage and send to

authorized recycler.

Process Waste

63.6 MTPA

1.5

Road Collection, storage and

transport to TSDF site.

3.6 MTPA Road Sent for Co-processing or sent

to CHWIF for Incineration.

Used oil 200

Lit/Year MTPA 1.5 Road

Collection, storage and reuse as

lubricants in the machineries

within the premises only or

send to authorized re-

processors

ETP Sludge 72.0 MTPA 1.5 Road Collection, storage and

transport to TSDF site.

Spent Solvent 1435 MTPA -- Road

In-house Distillation and

recovered solvents will be

reused

Distillation Residue 26.6 MTPA 1.5 Road Sent for Co-processing or sent

to CHWIF for Incineration.

Spent Carbon 3.36 MTPA 1.5 Road Sent for Co-processing or sent

to CHWIF for Incineration

Spent Hyflo 5.04 MTPA 1.5 Road Sent for Co-processing or sent

to CHWIF for Incineration.

Acetic Acid 103.2 MTPA -- Road Sell to end users as per rule-9

Methyl Iodide 7.2 MTPA -- Road Sell to end users as per rule-9

Item: - (Industrial waste, Municipal Solid waste, Fly ash, Bottom Ash, Hazardous Waste (as per Hazardous

and Other Waste Management Rules 2016), E Waste, Bio-Medical waste, Construction & Demolition waste,

Plastic Waste, Others)

Unit: - (Tons, Kiloliter)

Mode of Disposal: - (Treatment, Storage and Disposal Facility(TSDF), Authorized cyclers, Landfills,

Sanitary Landfills, Others)

18. Air Quality Impact Prediction (Multiple Entries Allowed)

Criteria

Pollutants Unit

Baseline

Concentration

Minimum

Value

Incremental

Concentration

Total

GLC

Prescribe

Standard

PM10 µg/m3 87.12 72.65 1.665 88.785 100

SO2 µg/m3 14.89 11.07 1.920 16.81 80

NOX µg/m3 23.84 17.27 0.688 24.528 80

NH3 µg/m3 BDL BDL 0.897 0.897 150

• Parameter: - (PM10, PM2.5, SO2, NOx, Others parameters specific to the sector)

• Unit :- Microgram per Meter Cube, NA

19. Power Requirement

Sr.

No. Particular Details

Page 37: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 16 of 37

Sr.

No. Particular Details

a. Quantity (Kilo Volt Amps (KVA)) : 350 KW

b. Source : Dakshin Gujarat Vij Company

c. Upload Copy of Agreement (Upload PDF only) : --

d. Standby Arrangement (Details of DG Sets) : (250 KW x 1 No) + (93 KW x 1 No)

e. Stack Height (in m) : 9 m

20. Land Ownership Pattern (Prior to the project proposal) in Ha

Sr.

No. Particular Details

a. Forest land : -

b. Private Land : 0.47

c. Government Land : -

d. Revenue Land : -

e. Other Land : -

Total land 0.47

21. Present Land Use breakup in Ha

Sr.

No. Particular Details

a. Agriculture Area : 20596

b. Waste/Barren Area : 3297

c. Grazing / Community Area :

d. Surface Water bodies : 2166

e. Settlements : 2731

f. Industrial : 2386

g. Forest : --

h. Mangroves : --

i. Marine area : --

j. Others (Specify) : 515 (scrub)

Total : 31400

22. Land requirement for various activities (Multiple entries allowed) in Ha

Description of Activity / Facility / Plant /

Others Land requirement Remarks

Builtup 0.25 52.3

Open & Road 0.16 33.0

Green belt 0.07 14.6

Total 0.47 100%

• Activity / Facility / Plant / Others include: Main Plant, Township, Greenbelt, Ash pond, Quarry area, OB

dump Area, Safety zone, Tailing pond, Landfill, Water reservoir, Desalination plant, Area for solid waste

management, Built-u area, others

Page 38: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 17 of 37

23. Ecological and Environmental Sensitivity (Within 10 Km): - WLS-Wild Life Species;

NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs- Eco Sensitive Zones

Sr.

No. Particular Details

a. Details of Ecological Sensitivity

Details of Ecological Sensitivity Name Distance from the

Project (Km) Remarks

None Not Applicable -- Project site is located

in GIDC area

• Details of Ecological Sensitivity: - (Critically Polluted Area, WLS, NPA, ESAs, ESZs, Corridors,

Wildlife Corridors)

b. Whether NBWL recommendation is required

(Yes/No)? :

No

If yes : --

Upload NBWL recommendation in PDF : --

c. Details of Environmental Sensitivity

Details of

Environmental Sensitivity

Name Distance from the Pro

project (Km)

Remarks

None Not Applicable -- Project site is located

in GIDC area

• Details of Environmental Sensitivity: - (Forest, Archaeological Sites, Defence, Installations, Others)

d. Whether NOC / Permission from the competent

authority is required (Yes/No)? :

No

If yes : Not Applicable

Upload NOC / Permission from the competent

authority in PDF :

Not Applicable

24. Forest Land

Sr.

No. Particular Details

1 Whether any Forest Land involved (Yes/No)? No.

If Yes --

a. Forests Clearance Status (In-Principle(Stage-I)

Approval Obtained / Final (Stage-Il) Approval

Obtained / Forest Clearance Under Process(Stage-I)

/ Forest Clearance Under Process(Stage-II) /

Application for Forest Clearance yet to be

Submitted)

: --

If In-Principle (Stage-I) Approval Obtained, : --

(i) MoEFCC file number --

(ii) Date of In Principle (Stage-I) approval : --

(iii) Area diverted : --

(iv) Upload FC Letter (Upload PDF only and attach

it as Annexure-FC letter)

: --

If Final (Stage-Il) Approval Obtained, : --

Page 39: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 18 of 37

Sr.

No. Particular Details

(i) MoEFCC file number --

(ii) Date of Final Approval : --

(iii) Date of In-Principle Approval : --

(iv) Area diverted : --

(v) Upload FC Letter (UploadPDFonly and attach it

as Annexure-FC letter)

: --

If Forest Clearance under process (Stage-I), --

(i) MoEFCC file number : --

(ii) Area applied : --

If Forest Clearance under process (Stage-Il), --

(i) MoEFCC file number : --

(ii) Area applied : --

b. Legal Status of Forest Land (Reserved, Protected,

Private, Village, Others)

--

If Others, --

Please Specify Others : --

25. Tree Cutting, if any

Sr.

No. Particular Details

a. No. of Trees Cut for the Project (if Forestland not

involved)

: No trees will be cut for the project.

b. Details of Tree Cutting and Planting of Trees

(UploadPDFOnly)

: --

26. Land Acquisition Status

Sr.

No. Particular Details

a. Acquired Land : Land already acquired.

b. Land yet to be acquired : --

c. Status of Land acquisition if not acquired : --

27. Rehabilitation and Resettlement (R&R): Not applicable

Sr.

No. Particular Details

a. No. of Villages : --

b. No. of Households : --

c. No. of PDFs (Project Displaced Families) : --

d. No. of PAFs (Project Affected Families) : --

e. Funds Allocated for R&R : --

f. Status of R&R (Completed / In-progress / Yet to

start)

: --

Page 40: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 19 of 37

28. Whether there is Presence of Schedule-I Species (Yes/No)? If yes,

Sr.

No. Particular Details

a. Details of Schedule-I Species : Among the study area there is 3 Species

observed under Sch-1 as below:

1. Pavocristatus-Indian pea fowl

2. Varanusbengalensis -Bengal Monitor Lizard

b. Whether conservation plan for Schedule-I Species

has been prepared (Yes/ No)?

: yes

If Yes,

(i) Upload conservation plan (Upload only PDF) : --

(ii) Fund Provision made : --

(iii) Period of Implementation : --

c. Whether conservation plan for Schedule-I Species

has been approved by competent authority (Yes/

No)?

: No

(i) Upload copy of approval (Upload PDF Only) : --

(ii) Letter No. : --

(iii) Date of issue : --

(iv) Recommendations if any : --

29. Whether there is Presence of Water Bodies in Core Area (Yes/No)? If yes,

Sr.

No. Particular Details

a. Details of Water Bodies in Core Area : Talav in villages within study area of 10 km

radius, Amala khadi

b. Whether there is Diversion required (Yes/No)? : No.

If yes, : --

c. Details of diversion required : --

d. Details of study conducted : --

e. Whether permission has been obtained from

competent authority (Yes/No)?

: --

(i) Upload copy of permission (Upload PDF Only) : --

(ii) Letter No. : --

(iii) Date of issue : --

(iv) Recommendations if any : --

30. Whether there is Presence of Water Bodies in Buffer Area (Yes/No)?If Yes

Not Applicable

Sr.

No. Particular Details

a. Details of Water Bodies in Buffer Area : --

b. Direction of Water Bodies in Buffer Area (North /

south / East / West / NorthEast / North West / :

--

Page 41: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 20 of 37

Sr.

No. Particular Details

South East / South West

c. Distance of Water Bodies in Buffer Area (kilo

meters) :

--

31. Manpower Requirement

Sr.

No. Particular Details

a. Permanent employment during construction : -

b. Permanent employment during operation : 35

c. Temporary employment during construction : 10

d. Temporary employment during operation : 05

e. No. of working days : 345

f. Total manpower : 35

32. Green Belt in Ha

Sr.

No. Particular Details

a. In case of new projects : --

i. Total Area of Green Belt : --

ii. Percentage of Total Project Area : --

iii. No. of Plants to be Planted : --

iv. Funds Allocated for Plantation : --

v. Upload Green Belt Plan (Upload PDF only)

b. In case of expansion / modernization / change in product mix etc.

i Description Existing Proposed Total

Total Area of Green Belt 0.80 0.76 1.56

Percentage of Total Project Area 17% 16% 33%

No. of Plants 195 185 380

Funds Allocated 1,20,000 1,10,000 2,30,000

ii Upload Green Belt Plan (Upload PDF Only) : --

33. Project Benefit (Multiple entry allowed)

Type of Project Benefits Details of Project Benefit

Employment Potential Direct and indirect employment generation.

Employment shall be around 35 personnel.

Benefits of Industry Increase in commercial and economical status of

the locality.

Social Benefits A total amount of Rs. 4.96 Lacs would be utilized

for Entrepreneur Social Commitment for three

years which is 2% of proposed project.

(Project benefits shall include environmental, social and others)

Page 42: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 21 of 37

34. Whether the Project / Activity attracts the provisions of CRZ (Yes/No)? If yes,

NOT APPLICABLE

Sr.

No. Particular Details

1. Project Details

a. CRZ Classification: (CRZ 1 (A), CRZ I(B), CRZ

II, CRZ III, CRZ IV (A), CRZ IV(B)) :

--

b. Location type: (Non-Eroding Coast, Low and

Medium Eroding Coast, High Eroding Coast) :

--

c. Details of Mangroves Land Involved, if Any : --

d. Area of Mangroves Land (hectare) : --

e. EIA (Terrestrial) Studies: (Carried Out, Not Carried Out)

If Carried Out,

1) Summary Details of EIA (Terrestrial)

Studies :

--

2) Upload Recommendation made in EIAs

(Upload PDF only) :

--

3) Period of Study from (EIA Terrestrial) : --

4) Period of Study to (EIA Terrestrial) : --

If Not Carried out,

Give Reason : --

f. EIA (Marine) Studies: (Carried Out, Not Carried Out)

If carried out,

1) Summary Details of EIA (Marine)

Studies :

--

2) Upload Recommendation made in EIAs : --

3) Period of Study from (EIA Marine) : --

4) Period of Study to (EIA Marine) : --

If Not Carried out,

Give Reason : --

g. Disaster Management Plan/National Oil Spill

Disaster Contingency Plan (if Applicable) :

--

2. Description of the Project Under Consideration

a. Type of Project: (Resort/Buildings/civic amenities, Coastal Roads/Roads on Stilt, Pipelines from

Thermal Power Blow Down, Marine Disposal of Treated Effluent, Facility for Storage of

Goods/Chemicals, Offshore structures, Desalination Plant, Mining of Rare Earth/Atomic Minerals,

Sewage Treatment Plants, Lighthouse, Wind Mills, Others)

If Resort/Buildings/civic amenities,

1) Agency Name for Preparing CRZ Maps : --

2) Total Area/Built-up Area (hectare) : --

3) Height of Structure : --

4) FSI Ratio : --

5) The governing Town Planning : --

Page 43: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 22 of 37

Sr.

No. Particular Details

Rules/Regulations

6) Details of Provision of Car Parking Area : --

If Coastal Roads/Roads on stilt,

1) Agency Name for Preparing CRZ Maps : --

2) Area of Land Reclamation : --

3) Estimated Quantity of Muck/Earth for

Reclamation :

--

4) Carrying Capacity of Traffic : --

If Pipelinesfrom Thermal Power Blow Down,

1) Agency Name for Preparing CRZ Maps : --

2) Length of Pipeline : --

3) Length Traversing CRZ Area : --

4) Depth of Excavation : --

5) Width of Excavation : --

6) Length of Pipeline from Seashore to Deep

Sea :

--

7) Depth of Outfall Point from Surface of

Sea Water :

--

8) Temperature of effluent above Ambient at

Disposal Point :

--

If Marine Disposal of Treated Effluent,

1) Agency Name for Preparing CRZ Maps : --

2) Location of Intake/Outfall : --

3) Depth of Outfall Point : --

4) Length of Pipeline : --

5) Length Traversing CRZ Area : --

6) Depth of Excavation : --

7) Width of Excavation : --

8) Length of Pipeline from Seashore to Deep

Sea/Creek :

--

9) Depth of Outfall Point from Surface of

Sea Water :

--

10) Depth of Water at Disposal Point : --

11) Type of Disposal : --

If Facilityfor Storage of Goods/Chemicals,

1) Agency Name for Preparing CRZ Maps : --

2) Name and Type of Chemical : --

3) End use of the Chemical : --

4) No. of Tanks for Storage : --

5) Capacity of tanks : --

If offshore structures,

Page 44: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 23 of 37

Sr.

No. Particular Details

1) Agency Name for Preparing CRZ Maps : --

2) Exploration or Development : --

3) Depth of Sea Bed : --

4) No. of Rigs/Platform : --

5) Details of Group Gathering Stations : --

If Desalination Plant,

1) Agency Name for Preparing CRZ Maps : --

2) Capacity of Desalination : --

3) Total Brine Generation : --

4) Temperature of Effluent Above Ambient

at Disposal Point :

--

5) Ambient Salinity : --

6) Disposal Point : --

If Mining of Rare Earth/Atomic Minerals,

1) Agency Name for Preparing CRZ Maps : --

2) Capacity of Mining : --

3) Volume/Area to be mined : --

4) Type of Mineral to be Extracted : --

5) End use of the Mineral : --

If Sewage Treatment Plants,

1) Agency Name for Preparing CRZ Maps : --

2) Capacity : --

3) Total Area of Construction : --

4) Compliance of effluent parameters as laid

down by CPCB/SPCB/other authorized

agency

:

--

5) Whether discharge is in sea water/creek?

If yes, :

--

Distance of Marine Outfall Point from

Shore/from the tidal river bank :

--

Depth of Outfall Point from Sea Water

Surface :

--

Depth of Sea at Outfall Point : --

If Lighthouse,

1) Agency Name for Preparing CRZ Maps : --

2) Total Area of Construction : --

3) Height of the Structure : --

If Wind Mills,

1) Agency Name for Preparing CRZ Maps : --

2) Capacity (MW) : --

3) Transmission Lines: (Overhead, : --

Page 45: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 24 of 37

Sr.

No. Particular Details

Underground)

4) Diameter of Windmill : --

5) Length of Blade : --

6) Speed of Rotation : --

7) Height of the Structure : --

If Others,

1) Agency Name for Preparing CRZ Maps : --

2) Please Specify with salient features : --

3) Upload relevant Document

(UploadPDFonly) :

--

3. Distance of Project (In Meters) from LTL/HTL to be Stated

a. Clause of CRZ Notification Under which the

Project is a Permissible/Regulated Activity :

--

b. Whether CU Map Indicating HTL, LTL

Demarcation in 1:4000 Scales Prepared? (Yes/No) :

--

If Yes,

1) Distance of Project (in meters) from HTL

to be Stated :

--

2) Upload Maps(km/ File) : --

3) Distance of Project(in meters) from LTL

to be Stated :

--

4) Upload Maps (kml File) : --

c. Whether Project Layout Superimposed on CRZ

Map 1 :4000 Scales? (Yes/No) :

--

If Yes;

1) Upload Maps (kml File) --

d. Whether CRZ Map 1 :25000 Covering 7 km

Radius Around Project Site Prepared? (Yes/No) :

--

If Yes,

1) Upload Maps (kml File) --

e. Whether CRZ Map Indicating CRZ-I, II, III and IV

Including Other Notified ESAs Prepared?

(Yes/No)

: --

If Yes,

1) Upload Maps (kml File) --

f. NOC from State Pollution Control Boards

Obtained: (Yes/No) :

--

If Yes

1) Upload Copy of NOC (Upload PDF only) --

g. Details of Rain Water Harvesting System : --

4. Recommendation of State Coastal Zone Management Authority

a. Upload Copy of CZMA (Upload PDF Only) : --

Page 46: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 25 of 37

Sr.

No. Particular Details

b. State the Conditions Imposed : --

c. Social and Environmental Issues and Mitigations

Measures Suggested

Including but not Limited to R&R, Water, Air,

Hazardous Wastes,

Ecological aspects, etc. (Brief Details to be

Provided)

:

--

35. Sector Specific Details

I. Whether the proposal is mining of minerals (coal / non-coal) project (Yes/No)?If yes,

NOT APPLICABLE

Sr.

No. Particular Details

1 No. of Mineral to be Mined (Multiple Entries Allowed)

Minerals To be Mined Major or Minor Mineral

-- --

-- --

2 Mine Capacity in ROM (Run of Mine) :

3 Upload 500 meters Cluster Certificate from State

Mines and Geology in case of minor minerals

(Upload PDFOnly)

:

--

4 Mining Plan

a. Approval Letter No. : --

b. Date of Approval : --

c. Upload Approved Letter (Upload

PDFOnly) :

--

d. Approved by State Mines & Geology

Department / Indian Bureau ofMines /

Ministry of Coal / Ministry of Mines / State

Government / Atomic Mineral Directorate /

Others

:

--

e. If Others, : --

Please specify : --

f. Approved Mining Lease Area : --

g. Approved Capacity : --

5 Technical Details

a. Total Geological Reserves (Million Ton) : --

b. Mineable Reserves (Million Ton) : --

c. Extractable Reserves (Million Ton) : --

d. Percent of Extraction (%) : --

e. Grade of Coal /Ore /Mineral : --

f. Stripping Ratio : --

Page 47: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 26 of 37

Sr.

No. Particular Details

g. Category of Gaseousness (Only for Coal

Mining, Others may write Not applicable) :

--

h. Average Gradient(Degree) : --

i. Maximum Thickness of Seams(meters)

(Only for Coal Mining, Others may write

Notapplicable)

:

--

j. Mining Method (Opencast / Underground /

Mixed (Opencast + Under round) /Adit :

--

k. Life of Mine (Years) : --

6 Details of beneficiation (including crushing / screening/others)

a. Whether it is proposed to install crusher

within the mining lease area (Yes/No)? :

--

If yes, : --

b. No. of crushers : --

c. Details of crusher (Multiple entries allowed)

Crusher ID Capacity (in TPH) Remarks

-- -- --

-- -- --

-- -- --

d. Whether it is proposed to install

beneficiation plant / Coal washery within

the mining lease area (Yes/No)?

:

--

If yes, : --

e. Beneficiation / washing Technology : --

f. Capacity : --

7 Details of Seams if applicable

a. No. of seams : --

b. Thickness of seams to be worked on : --

c. Maximum Thickness of Seams(meters) (if

not Applicable, may Write NA) :

--

8 Details of Mining Lease

a. Details of Mining Lease : --

b. Upload Letter of Intent (Upload PDF only) : --

c. Date of Execution of Mining Lease with

Reference Number :

--

d. Validity of Mining Lease : --

e. Upload Copy of Executed Lease deed valid

as on Date (Upload PDF only) :

--

f. Earlier Renewals (Multiple Entries

Allowed) :

--

Uploaded Co of Earlier Lease Date of Renewal

-- --

-- --

Page 48: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 27 of 37

Sr.

No. Particular Details

9 OB (Over Burden) Management (Only if Mining Method: Opencast)

a. Details of External Dumps

i) No. ofOB Dumps : --

ii) Total Area (in Hectare) : --

iii) Height (in meter) : --

iv) Quantity (in Million Cubic meter) : --

v) No. of year back fill up : --

b. Details of Internal Dump

i) No. of Internal Dumps : --

ii) Total Area (in Hectare) : --

iii) Height (in meter) : --

iv) Quantity (in Million Cubic meter) : --

10 Details of Topsoil Management

a. Quantity of Topsoil excavated during the

entire life of the mine (in Million Cubic

meter)

:

--

b. Quantity of Topsoil proposed for utilization

for reclamation during the entire life of the

mine (in Million Cubic meter)

:

--

c. Quantity of Topsoil proposed for utilization

for other activities during the entire life of

the mine (in Million Cubic meter)

:

--

11 Detail of Final Mine Void (Only if Mining Method: Opencast)

a. Area (in Hectare) : --

b. Depth (in meter) : --

c. Volume (in Million Cubic meter) : --

12 Details of Quarry (Only if Mining Method: Opencast)

a. Final Void of (hectare) : --

b. At a Depth of (meter which is proposed to

be converted into a Water Body) :

--

c. Total Quarry Area (ha) : --

13 Details of Transportation

a. In Pit/Underground to Surface : --

b. Surface to Siding/Loading : --

c. Transportation / Conveyor Details : --

14 Details of Land Usage (Pre-Mining)

Land Use Within ML

Area

(Hectare)

Outside ML

Area

(Hectare)

Total

Agriculture Land -- -- --

Forest Land -- -- --

Waste Land -- -- --

Page 49: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 28 of 37

Sr.

No. Particular Details

Grazing Land -- -- --

Surface Water Bodies -- -- --

Settlements -- -- --

Others (Specify) -- -- --

15 Details of Transportation

a. In Pit/Underground to Surface : --

b. Surface to Siding/Loading : --

c. Transportation / Conveyor Details : --

16 Details of Land Usage (Pre-Mining)

Land Use Within ML Area

Hectare

Outside ML

Area Hectare Total

Agriculture Land -- -- --

Forest Land -- -- --

Waste Land -- -- --

Grazing Land -- -- --

Surface Water Bodies -- -- --

Settlements -- -- --

Others (Specify) -- -- --

17 Details of Land Usage (Post-Mining)

Land Use Plantation Water Body Public Use Others

Excavation /

quarry

-- -- -- --

To Soil Storage -- -- -- --

External OB

dumps

-- -- -- --

Internal OB

dumps

-- -- -- --

Roads -- -- -- --

Built Up Area

(Colony/Office)

-- -- -- --

Green Belt -- -- -- --

Virgin Area -- -- -- --

Other -- -- -- --

Total -- -- -- --

18 Details of Reclamation (Only if Mining Method: Opencast) Total Afforestation Plan shall be

Implemented Covering of Mining. This will include:

a. External OB Dump (in hectare) : --

b. Internal Dump (in hectare) : --

c. Quarry (in hectare) : --

d. Safety Zone (in hectare) : --

e. Final Void of (hectare) : --

Page 50: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 29 of 37

Sr.

No. Particular Details

f. At a Depth of (meter which is proposed to

be converted into a WaterBody)

: --

g. Density of Tree Plantation per ha (in no.) : --

h. Others in ha (such as Excavation Area

along ML Boundary, along Roads and

Infrastructure, Embankment Area and in

Township Located outside the Lease etc.

:

--

i. Total afforestation plant (in hectare) : --

19 Status of Progressive Mining Closure Plan (For Expansion Projects only)

a. Implementation of Various Activities as per

Approved Progressive Mine Closure Plan

(in Bar Chart)(upload PDF Only)

:

--

b. Any Deviation from the Approved

Progressive Mine Closure Plan :

--

c. Total Area Excavated (in hectare) : --

d. Total Area Backfilled after Excavation (in

hectare) :

--

e. Total Area Reclaimed (in hectare) : --

20 Actual Coal/Ore Production vis-a-vis sanctioned capacity Since inception (Multiple Entries Allowed)

Financial Year

Sanctioned

Capacity as per

EC (MTPA)

Sanctioned

capacity as per

CTO

Sanctioned

capacity as per

approved

Mining Plan

Actual

Production

Excess

Production

Beyond the

EC/CTOMining

Plan Sanctioned

Capacity

(MTPA)

-- -- -- -- -- --

-- -- -- -- -- --

II. Whether proposal is for Thermal Project (including captive power plant and Waste Heat

Recovery Plant) (Yes/No)?If Yes,

NOT APPLICABLE

Sr.

No. Particular Details

1 Specifications of the Plant

a. Technology proposed (Supercritical, Sub-

Critical, CFBC, AFBC,PFBC, IGCC,

Incineration, Pyrolysis, Gasification, Bio-

methanation, Others

: --

b. Plant Load Factor (%) : --

c. Station Heat Rate (Kcal/Kwh) : --

d. Steam Rate/Flow Rate : --

e. Boiler Temperature : --

f. Boiler Pressure : --

Page 51: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 30 of 37

Sr.

No. Particular Details

g. Type of Stack (Single flue / Bi-flue / Tri-flue) : --

h. No. of Stacks : --

Stack ID Stack height

(m)

Stack Diameter

at exit (m)

Exit velocity of

stack gas (m/s)

Exit temperature of

stack gas (C)

-- -- -- -- --

-- -- -- -- --

2 Details of fuel linkage (please specify if multiple linkages are involved)

a. Type of linkage (Linkage / Fuel Supply

Agreement / e-auction / MOU / LOA /

Captive / Open market / Others)

:

--

b. Quantity of linkage granted : --

c. Date of Linkage : --

d. Duration of linkage : --

3. Details of Transportation of fuel

Details / Mode Distance (km) Quantity (TPA)

Rail -- --

Road -- --

Pipeline -- --

Conveyor -- --

Other mode (Please specify) -- --

4. Details of Fuel Characteristics

a. Gross Calorific Value (Kcal/Kg) : --

b. Ash content (%) : --

c. Sulphur Content (%) : --

d. Moisture (%) : --

e. Mercury (mg/kg) : --

f. Fixed Carbon (%) : --

g. Volatile Matter (%) : --

5. Details of Cooling system

a. Type of cooling system: Air cooled/Water

cooled :

--

b. Type of draft: Natural draft/Forced draft : --

c. Type of air circulation: Parallel flow/ Counter

flow :

--

d. Cycles of Cooling (COC): : --

e. Water requirement for cooling (m3/day): : --

f. Boiler blow down temperature: : --

III. Whether proposal is for River Valley & Hydroelectric Project (Yes/No)?If Yes,

NOT APPLICABLE

Page 52: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 31 of 37

Sr.

No. Particular Details

1. Sub Sector: (Multipurpose Project / Hydroelectric

Project / Irrigation project)

--

2. Name of the River : --

3. Whether Cumulative Impact Assessment and

Carrying Capacity Study of River Basin Carried

Out? (Yes/No)

: --

If Yes : --

a. Status of Cumulative Impact Assessment and

Carrying Capacity Study of River Basin:

(Recommended / Not Recommended,)

--

If Recommended --

b. Details of Cumulative Impact Assessment and

Carrying Capacity Study of River Basin

--

c. Upload Relevant Document

(UploadPDFonly)

--

4. Type of Project: (Construction of Dam Barrage /

Run of the River / Lift Irrigation Scheme)

: --

5. Dam Height (meter) if applicable : --

6. Dam Length (meter) if applicable --

7. Total Submergence Area (hectare) : --

8. Details of Gross Command Area (GCA) (hectare) : --

9. Details of Irrigable Command Area (ICA) (hectare) : --

10. Details of Culturable Command Area (CCA)

(hectare)

: --

11. Total Command Area (hectare) : --

12. Powerhouse Installed Capacity

a. Type of Powerhouse: (Underground /

Surface) :

--

b. Capacity (megawatts) : --

c. No. of Tunnels : --

d. No. ofUnits : --

e. Bank of River: (Left /Right / Both) : --

13. Generation of Electricity Annually

a. Quantity of Generation of Electricity

Annually (in Giga Watt Hours (GWh)) :

--

b. Water availability at various percentages : --

Percentage Water availability

(Cusecs) Dependable year Remarks

At 50% -- -- --

At 75% -- -- --

At 90% -- -- --

c. Machine Availability (%) : --

d. Cost of Electricity Generation (in INR) : --

Page 53: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 32 of 37

Sr.

No. Particular Details

e. Internal Rate of Return (%) : --

f. Year of achievement of Internal Rate of

Return :

--

14. Catchment Area Treatment Plan (Upload PDF) : --

15. Muck Management Plan

a. Upload Muck Management Plan in PDF : --

b. Total Excavation Muck (Cubic Meter) : --

c. Utilized for Construction (Cubic Meter) : --

d. No. of Muck Disposal sites : --

e. Total Muck Disposal Area (Ha) : --

16. Fishery Development and Management Plan

a. Upload Fishery Development and

Management Plan in PDF

: --

b. No. of Fingerlings : --

c. No. of Fish Species : --

d. Name of the umbrella Fish Species (Scientific

Name)

: --

17. Status of Environmental Flow

Season Average Inflow (in Million Cubic

Meter)

Percent of Flow

Lean -- --

Non-Lean -- --

Monsoon -- --

Non-Monsoon -- --

18. Free Flow Stretch (km) : --

19. Approval of Central Water Commission

a. Approval Reference No. : --

b. Date of Approval : --

c. Upload Copy of Approval (UploadPDFonly) : --

20. Approval of Central Electricity Authority

a. Approval Reference No. : --

b. Date of Approval : --

c. Upload Copy of Approval (UploadPDFonly) : --

21. Details of Coffer Dam (upstream) if applicable

a. Quantity of the material (m3) : --

b. Length of the dam (m) : --

c. Quantity of muck to be used (m3) : --

d. Quantity of borrow material to be used (m3) : --

e. Decommissioning plan (upload in PDF) : --

22 Details of Coffer Dam (downstream) if applicable

a. Quantity of the material (m3) : --

Page 54: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 33 of 37

Sr.

No. Particular Details

b. Length of the dam (m) : --

c. Quantity of muck to be used (m3) : --

d. Quantity of borrow material to be used (m3) : --

e. Decommissioning plan (upload in PDF) : --

IV. Whether the proposal is Infrastructure projects (Yes/No) If yes?

NOT APPLICABLE

Sr.

No. Particular Details

1 Details of Building Construction

a. Maximum Height of the Building (Meters) : --

b. Total No. of Flats to be Build : --

c. No. of Buildings : --

d. Total plot area (sqm) : --

e. Total built up area (sqm) : --

2 Foreshore Facilities And/or Marine Disposal

a. Whether Project Involves Foreshore

Activities and/or marine Disposal (Yes/No)? :

--

If Yes, : --

b. Upload Shoreline Study (Upload PDF only) : --

c. Type of Cargo : --

d. Quantity of Cargo : --

e. Control Measures of Cargo : --

f. Dust Control Measures : --

g. Quantum : --

h. Quantity of Dredging (Cubic meter per day) : --

i. Type of Dredging (Capital, Maintenance) : --

j. Disposal of Dredge Material : --

k. Details of Outfall Diffusers : --

m. No. of Dilution Expected : --

n. Distance at which the outlet will Reach

Ambient Parameters :

--

o. Details of Monitoring at outfall : --

p. Copy of NoC from PCB in case of Marine

Disposal (Upload PDF only) :

--

3 Rain Water Harvesting

a. No. of Storage : --

b. Capacity : --

c. No. of Recharge Pits : --

d. Capacity : --

4 Parking

Page 55: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 34 of 37

Sr.

No. Particular Details

a. Details of 4-Wheeler/ 2-Wheeler Parking : --

5. Energy Saving Measures

a. Source/Mode : --

b. Percentage : --

c. Quantity : --

6. Other Details

a. Details of impact on Water Bodies and

Drainage patters of catchment area, if any :

--

b. Details of Traffic Density ImpactAssessment

and Modelling Study (Upload PDF only) :

--

c. In case of Underground Tunnel projects

below the Forest Land — Subsidence 1mpact

Study report (Upload PDF only)

:

--

7. Type of Industries to be established with Industrial Estate as per their category A/B

Sl. No Type of Industry No. of Units Category A/B

-- -- -- --

-- -- -- --

8. Length of the alignment in case of

highwayprojects :

9. Details Bridges/ROB/Interchanges, Flyovers, Vehicle Underpass and Pedestrian Underpass (in case of

Highway Projects)

a. Total No. of Bridges : --

b. Total No. of ROB : --

c. Total No. of Interchanges : --

d. Total No. of Flyovers : --

e. Total No. of Vehicle Underpass : --

f. Total No of Pedestrian Underpass : --

g. Details of other utilities rail and road

corridors :

--

36. Details of Court Cases if any: Not Applicable

Sr.

No. Particular Details

a. Whether there is any Court Cases pending against

the project and/or land in which the project is

proposed to be setup(Yes/No)?

:

No.

If Yes, : --

b. Name of the Court (Districts Court / High Court /

NGT/ Tribunals / Supreme Court of India) :

--

Ifname ofCourt: (Districts Court, High Court,

NGT, Tribunals) :

--

c. Name of the Sub-court : --

d. Case No. : --

Page 56: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 35 of 37

Sr.

No. Particular Details

e. Orders / Directions of the court, if any and its

relevance with the proposed project :

--

f. Case Details : --

g. Upload Court Order if any (Upload PDF Only) : --

37. Detail of direction issued under Environment (Protection)Act/Air (Prevention &

Control of Pollution)Act

Sr.

No. Particular Details

a. Whether any direction issued under Environment

(protection) Act /Air (Prevention & Control of

Pollution) Act /Water (Prevention &control of

Pollution) Act(Yes/No)?

:

No.

If Yes, : --

b. Detail of direction issued under Environment

(Protection) Act /Air (Prevention & Control of

Pollution) Act /Water (Prevention & Control of

Pollution) Act

:

--

c. Upload copy of directions issued under

Environment (Protection) Act /Air (Prevention &

Control of Pollution) Act /Water (Prevention

&control of Pollution) Act

:

--

d. Compliance status of the directions : --

38. Details of EIA Consultant

Sr.

No. Particular Details

a. Have you hired Consultant for preparing

document (Yes/No)?

: Yes

If No, --

i. Reason for not engaging the Consultant : --

If Yes, --

ii Accreditation No. : --

iii Name of the EIA Consultant : En-Tech Laboratories

iv Address : 202, Trade Square, Opp. Torrent Power

House, Sabarmati, Ahmedabad - 380005

v Mobile No. : 9824012121

vi Landline No. : 079-2757 2758

vii E-mail Id : [email protected]

[email protected]

viii Category of Accreditation (Eligible for Category

A / Eligible for Category B)

: --

ix Sector of Accreditation : --

x Validity of Accreditation : --

Page 57: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 36 of 37

Sr.

No. Particular Details

xi Upload Certificate of Accreditation certified by

QCI/NABET (Upload PDF Only)

: Stay order against QCI/NABET

39. Documents to be attached

I. If Project Type is New / Expansion / Modernization / one-time capacity expansion for coal mining.

NOT APPLICABLE

Sr.

No. Particular Details

a. Upload Copy of EIA/EMP Report : --

b. Upload Copy of Risk Assessment Report : --

c. Upload Copy of Feasibility Report/ Detailed

Project Report(DPR) /Detailed Engineering

Report /Detailed Conceptual Plan / Approved

Mining Plan (in case of Mining proposals)

(Upload PDF Only)

:

--

d. Upload Copy of Final Layout Plan (Upload PDF

Only) :

--

e. Upload Cover Letter (Upload PDF Only and

attach it as Annexure-document of Cover letter) :

--

f. Upload a copy of documents in support of the

competence/authority of the person making this

application to make application on behalf of the

User Agency(uploadPDF only and attach it as

Annexure-authorization)

:

--

g. Upload copy of District Survey Report (for

mining of minor minerals only) :

--

h. Upload copy of Replenishment Study Report &

Baseline Survey data (for river sand mining

proposals only)

:

--

i. Upload Additional File, if any (Upload PDF only) : --

II. If Project Type is other than New /Expansion /Modernization / one-time capacity expansion or

coal mining:-

NOT APPLICABLE

Sr.

No. Particular Details

a. Upload Copy of Feasibility Report / Detailed

Project Report(DPR) /Detailed Engineering

Report /Detailed Conceptual Plan (Upload PDF

only)

:

--

b. Upload Copy of Final Layout Plan (Upload PDF

only) :

--

c. Upload Cover Letter (Upload PDF only and attach

it as Annexure-document of Cover letter) :

--

d. Upload a copy of documents in support of the : --

Page 58: Check list – Industrial Projectsenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional_Report/... · Check list – Industrial Projects For submission of Environmental Clearance

FORM-2 OF GOKLESH LIFESCIENCES

Page 37 of 37

Sr.

No. Particular Details

competence/authority of the person making this

application to make application on behalf of the

User Agency(Upload PDF only and attach it as

Annexure-authorization)

e. Upload Additional File, if any (Upload PDF only) : --

f. Upload Updated Form I (Upload PDF only) : --

40. Undertaking

a. I hereby give undertaking that the data and information given in the application and enclosures are true

to be best of my knowledge and belief and I am aware that if any part of the data and information

found to be false or misleading at any stage, the project will be rejected and clearance given, if any to

the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no

activity / construction / expansion has since been taken up.

b. Name : Mansukh Radadia

c. Designation : Partner

d. Company : Goklesh Lifesciences

e. Address :

Plot No. 9112/ 1, 2 & 3, G.I.D.C Estate Ankleshwar-393002,

Dist: Bharuch, Gujarat