check for cv

3
o Responsible for Cluster level optimization of the swapped networks through statistical analysis, parametric changes, and physical redesigns and drive tests. o Achieving strict KPI target's for CSSR, DCR, HSR, SD-TCH Blocking etc. o Daily worst cells list analysis and optimization. o Traffic Zone Shifting for maximizing traffic on DCS (1800) than GSM (900) to ensure better DL Quality in the network through tuning different RF parameters of DCS (1800) and GSM (900). o Traffic Shifting from HR to FR for ensuring Quality/MOS improvement considering GOS and keeping in mind risk factor o Neighbor Audit, Neighbor Radio Parameters Tuning, Traffic balancing between zones and SDCCH/TCH Re-dimensioning/Shuffling to improve Network KPIs o Identification and resolution of Overshooting Cells, missing neighbors (Inter/Intra Vendor), Co/Adjacent Channel Interference, and BCCH, BSIC, HSN, LAC, MAL and MAIO discrepancies o Handover Distributions optimization to ensure that maximum HOs Distributions should be due to PBGT. o Optimization of Major roads/Highways/Coverage holes/capacity issues by making proper/dominant servers both by soft and hard parameters .i.e. suggesting any change in antennas (Azimuth or tilt). o Responsible for Expansions on Swap Sites mainly Soft Expansion, Hard Expansion. o Identification of Hardware, Path Balance, Diversity issues and TRX efficiency issues. o Re-design of network including tilts, and azimuth change recommendations based on rollout and cluster quality/customer requirements. o Responsible for sharing Frequency and Neighbor plan for swapped sites. o Neighbor and Frequency Audit to improve KPIs. o MAIO re-planning to improve DCR and interference in the area. o Conforming Timers T3113, T3126, T3101 and T3120 to improve re-paging by MSC. o Improve Paging overload/Discards by adding extra CCH channel where required. o Macro development for parameter Audit to find out inconsistent parameters. 2G RF Optimization Engineer Huawei May 2013 July 2013 (3 months)Nigeria Huawei-Etisalat Managed Services Project(2G RF Optimization) o Daily Radio Network Performance Management, Identifying worst cells of clusters (DCR, CSSR, HOSR, SD-TCH Blocking) and resolving the issues. o Responsible for Expansions on Swap Sites mainly Soft Expansion, Hard

Upload: usmanghani8257

Post on 17-Sep-2015

220 views

Category:

Documents


2 download

DESCRIPTION

CV

TRANSCRIPT

o Responsible for Cluster level optimization of the swapped networks through statistical analysis, parametric changes, and physical redesigns and drive tests.o Achieving strict KPI target's for CSSR, DCR, HSR, SD-TCH Blocking etc.o Daily worst cells list analysis and optimization.o Traffic Zone Shifting for maximizing traffic on DCS (1800) than GSM (900) to ensure better DL Quality in the network through tuning different RF parameters of DCS (1800) and GSM (900).o Traffic Shifting from HR to FR for ensuring Quality/MOS improvement considering GOS and keeping in mind risk factoro Neighbor Audit, Neighbor Radio Parameters Tuning, Traffic balancing between zones and SDCCH/TCH Re-dimensioning/Shuffling to improve Network KPIso Identification and resolution of Overshooting Cells, missing neighbors (Inter/Intra Vendor), Co/Adjacent Channel Interference, and BCCH, BSIC, HSN, LAC, MAL and MAIO discrepancieso Handover Distributions optimization to ensure that maximum HOs Distributions should be due to PBGT.o Optimization of Major roads/Highways/Coverage holes/capacity issues by making proper/dominant servers both by soft and hard parameters .i.e. suggesting any change in antennas (Azimuth or tilt).o Responsible for Expansions on Swap Sites mainly Soft Expansion, Hard Expansion.o Identification of Hardware, Path Balance, Diversity issues and TRX efficiency issues.o Re-design of network including tilts, and azimuth change recommendations based on rollout and cluster quality/customer requirements.o Responsible for sharing Frequency and Neighbor plan for swapped sites.o Neighbor and Frequency Audit to improve KPIs.o MAIO re-planning to improve DCR and interference in the area.o Conforming Timers T3113, T3126, T3101 and T3120 to improve re-paging by MSC.o Improve Paging overload/Discards by adding extra CCH channel where required.o Macro development for parameter Audit to find out inconsistent parameters.

2G RF Optimization EngineerHuaweiMay 2013July 2013(3 months)NigeriaHuawei-Etisalat Managed Services Project(2G RF Optimization)

o Daily Radio Network Performance Management, Identifying worst cells of clusters (DCR, CSSR,HOSR, SD-TCH Blocking) and resolving the issues.o Responsible for Expansions on Swap Sites mainly Soft Expansion, Hard Expansion.o Analyzing and Optimizing KPIs such as DCR, CSSR, HSR on BSC level.o To Remove Co- and adjacent BCCH/TCH interference and to purpose new frequencies and identify wrong neighbors and propose new ones.o Neighbor and Frequency Audit to improve KPIs.o BSC Level maintenance and identification and escalation of hardware issues to BSS.o Neighbour Audit, Neighbour Radio Parameters Tuning, Traffic balancing between zones and SDCCH/TCH Re-dimensioning/Shuffling to improve Network KPIso Identification and resolution of Overshooting Cells, missing neighbours (Inter/Intra Vendor), Co/Adjacent Channel Interference, and BCCH, BSIC, HSN, LAC, MAL and MAIO discrepancieso Identification of Hardware, Path Balance, Diversity issues and TRX efficiency issues.o Weekly presentation to customer (Etisalat) to defend the KPIs of region and provide reasons for degradation and plans for improvement.

3G RF Optimization EngineerLCCJuly 2011May 2013(1 year 11 months)Pakistan GWS Project (AT&T 3G(UMTS) Optimization Project for AROK States)

o Remote post processing of drive test datao Adhoc Reports of AT&T UMTS network in Arkansas and Oklahoma USA.o Initial testing phase of AT&T LTE deployment in Arkansas and Oklahoma USA. Daily KPI monitoring.o AT&T Voice and data benchmarking Reports for three major operators in USA (Verizon, TMobile and Sprint)o Analysis of CS calls with Actix Analyzer. Coverage, Quality, Missing Neighbors, Pilot Pollution, Handover Issues and cell designations confirmation.o Macro development and scripting in Actix to automate the Reporting procedure.

Huawei- Mobilink 2G (GSM) Swap Project Pakistano Worked as a GSM Post processing Engineer to analyze the RF issues faced during the drive test and provide technical assistance to overcome the RF coverage & issues.o Logfile analysis using TEMS and highlight overshooting, bad coverage cell and made recommendations to improve coverageo Daily monitoring of basic KPI stats.

Mexico Roll out UMTS Projecto KPIs verification of siteso Generating Single site verification Reports using Huawei Genex Assistant and Probe

UK Vodafone Projecto KPIs verification of Cluster drive.o Generating Cluster reports using TEMS discovery.

TMobile Backhaul National Disconnect Project (July 11 Aug 11)o Ensuring the disconnection of circuits assigned, generating access service request on Verizon CSG and AT&T WAOo Updating the disconnected circuits on TMobiles central database (Granite) and LCCs database QB.