chaz tekle – tim kern – mark freiermuth – cha thao fargo bank it upgrade
TRANSCRIPT
![Page 1: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade](https://reader034.vdocuments.mx/reader034/viewer/2022051621/56649ec05503460f94bcb666/html5/thumbnails/1.jpg)
CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO
Fargo Bank IT Upgrade
![Page 2: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade](https://reader034.vdocuments.mx/reader034/viewer/2022051621/56649ec05503460f94bcb666/html5/thumbnails/2.jpg)
![Page 3: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade](https://reader034.vdocuments.mx/reader034/viewer/2022051621/56649ec05503460f94bcb666/html5/thumbnails/3.jpg)
Communications
![Page 4: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade](https://reader034.vdocuments.mx/reader034/viewer/2022051621/56649ec05503460f94bcb666/html5/thumbnails/4.jpg)
Fargo Bank 1st Floor
![Page 5: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade](https://reader034.vdocuments.mx/reader034/viewer/2022051621/56649ec05503460f94bcb666/html5/thumbnails/5.jpg)
Old 2nd Floor Datacenter
![Page 6: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade](https://reader034.vdocuments.mx/reader034/viewer/2022051621/56649ec05503460f94bcb666/html5/thumbnails/6.jpg)
Fargo Bank 2nd Floor
![Page 7: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade](https://reader034.vdocuments.mx/reader034/viewer/2022051621/56649ec05503460f94bcb666/html5/thumbnails/7.jpg)
Fargo Bank Roof
![Page 8: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade](https://reader034.vdocuments.mx/reader034/viewer/2022051621/56649ec05503460f94bcb666/html5/thumbnails/8.jpg)
Alternative Power
Schott 225-250 Watt Solar SW WIND POWER Wind Generator
![Page 9: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade](https://reader034.vdocuments.mx/reader034/viewer/2022051621/56649ec05503460f94bcb666/html5/thumbnails/9.jpg)
How Solar Power Works
Our System Technology
![Page 10: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade](https://reader034.vdocuments.mx/reader034/viewer/2022051621/56649ec05503460f94bcb666/html5/thumbnails/10.jpg)
• Solar Radiance: 5.00 kWh/sq m/day • Avg. Monthly Usage 5,000 kWh/month • System Size: 32.41 kW • Roof Size: 3,240 sq ft • Estimated Cost: $226,855.17• Post Incentive Cost: $134,978.83
![Page 11: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade](https://reader034.vdocuments.mx/reader034/viewer/2022051621/56649ec05503460f94bcb666/html5/thumbnails/11.jpg)
Hot & cold Aisle Technology
![Page 12: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade](https://reader034.vdocuments.mx/reader034/viewer/2022051621/56649ec05503460f94bcb666/html5/thumbnails/12.jpg)
Hot & cold Aisle Technology With *HACS Technology
* Hot Air Containment System
![Page 13: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade](https://reader034.vdocuments.mx/reader034/viewer/2022051621/56649ec05503460f94bcb666/html5/thumbnails/13.jpg)
FreeCool® Evaporative Free Air Cooling Technology
Fresh air is brought into the system though primary filtration and wetted filter padsWater detection provides additional securityFilters remove airborne particles
Isolation damper is linked to fire systemCool air is fed into void under raised floor
Temperature compliant air is fed into cold aisleWarm air from hot aisle is re-circulated to
heat incoming air when ambient temperatures are below set point temperature to maintain constant inlet temperature.
Hot air is extracted and exhausted to outside of building
Ventilation Mode Fan Assisted Airflow Only Cooling Mode Evaporative Cooling plus Fan Assisted Airflow
![Page 14: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade](https://reader034.vdocuments.mx/reader034/viewer/2022051621/56649ec05503460f94bcb666/html5/thumbnails/14.jpg)
Section 2. Project Authority and Milestones
2.1 Funding Authority2.2 Project Oversight Authority2.3 Major Project Milestones
![Page 15: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade](https://reader034.vdocuments.mx/reader034/viewer/2022051621/56649ec05503460f94bcb666/html5/thumbnails/15.jpg)
Section 3. Project Organization
3.1 Project Structure
![Page 16: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade](https://reader034.vdocuments.mx/reader034/viewer/2022051621/56649ec05503460f94bcb666/html5/thumbnails/16.jpg)
3.2 Roles and Responsibilities
![Page 17: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade](https://reader034.vdocuments.mx/reader034/viewer/2022051621/56649ec05503460f94bcb666/html5/thumbnails/17.jpg)
Section 4. Points of Contact
Primary ContactProject ManagerChaz TekleGreen Data [email protected]
Secondary ContactChief Financial OfficerTim KernGreen Data [email protected]
![Page 18: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade](https://reader034.vdocuments.mx/reader034/viewer/2022051621/56649ec05503460f94bcb666/html5/thumbnails/18.jpg)
Section 6. Revision History