Hamilton County CCTV
Overview of Design Concept• 63 Camera System • First System in Tennessee to Utilize Ethernet
Protocols to Each Field Device• Field Hardened Routers• Leased T1 Lines• Dome Cameras• Demarcation Points• Layout of Temporary TMC
Design Concept
• 63 Camera System• Ethernet Protocol
• Dome Cameras
Design Concept• At each Demarcation Point
– Field-hardened routers
– Single and dual-camera demarcations
– Routers could be configured to serve 2 cameras
Design Concept
• BellSouth provides leased T1 lines
• TDOT Plans Future Fiber Backbone
Design Concept• Layout of Temporary
TMC
• System Fully Equipped to Assist Incident Management
Design Plans
• Contract Let, Bid Awarded for $3.8 Million
• Construction Began March 2006
Considerations in Construction• Site Selection Factors
– View from Camera
– Constructability
– Utility Service
– Future Maintenance
Considerations in Construction
• Coordination with Other Agencies– City of Chattanooga– TVA– Avoid Conflicts
Wherever Possible
Considerations in Construction• Equipment
– Technological Advances– Discontinued Equipment– Flexibility in Pole and
Camera Configuration
Considerations in Construction
• Equipment (cont.)– Compatibility of
Communication Protocols
– Tech Involvement with Specified Equipment
Considerations in Construction• Utility Coordination
– Schedules for Placement & activation
– Provisions for Future Costs/Financial Projections
Considerations in Construction
• Adjacent Project Impact
• Environmental
– EPSC QA/QC
Considerations in Construction• TMC Coordination
– Architectural Coordination
– TMC Construction Contractor Coordination
FINAL STAGES OF PROJECT
• Conditional Acceptance: End of September
• 6 month Burn In Period
• Camera images will be available to public through TDOT’s website www.tdot.state.tn.us/tdotsmartway
TDOT WEB PAGE