charles burkitt - darwin corporate park - project update: darwin corporate park - construction...

26

Upload: informa-australia

Post on 13-May-2015

239 views

Category:

Business


0 download

DESCRIPTION

Charles Burkitt delivered the presentation at the 2014 Building the Territory Conference. The inaugural Building the Territory Conference 2014 is an opportunity to meet with the project owners and leaders, to hear about the new opportunities and developments for the built environment in the Territory. For more information about the event, please visit: http://bit.ly/BuildingtheNT2014

TRANSCRIPT

Page 1: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 2: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 3: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 4: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 5: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook

DARWIN CORPORATE PARK – Stuart Highway frontage (perspective)

Page 6: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook

DARWIN CORPORATE PARK

Multi-staged Corporate Office Park – 22,430sqm NLA

Location

631 Stuart Highway, Berrimah, Northern Territory, Australia (part of Berrimah

Business Park subdivision)

Prominent central location in the high growth corridor of Greater Darwin.

Directly adjacent to the Stuart Highway, outbound between Amy Johnston Avenue

and Vanderlin Drive. The entrance is highly accessible by a major intersection

designed to be serviced by traffic lights.

Close to transit routes and main arterial roads for the whole of greater Darwin. Stuart

Highway, Amy Johnson Avenue, Vanderlin Drive, Berrimah Road and Tiger Brennan

Drive.

“Berrimah is now the geographical centre of the greater Darwin area.”

Page 7: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook

Developer

Berrimah Holdings – a Darwin based company with developers being long term

residents and successful business operators who will project manage the

development.

Project Value

$85m FULLY FUNDED, not subject to finance or pre-commitments

Employment

In excess of 200 for the life of the project.

All suppliers, ranging from marketing strategy and advice through to contractors and

builders are predominately local.

Completion

Late 2014 (first stage – Buildings 1 & 2)

Page 8: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook

Key Features:

•Stuart Highway address – 631 Stuart Highway, Berrimah NT 0828

•Corporate Park with 8 buildings (3 levels each) including a lift in each

•High quality campus style layout landscaped throughout with extensive shaded trees

and covered walkways interconnecting the entire Park

•Commercial A-Grade Office space

•Targeting 5.5 star NABERS energy rating and associated energy efficiencies (double

glazed windows)

•360-1300sqm floor plates available with state of the art design, construction

techniques and materials. Highly flexible to suit tenants requirements ranging from

Government through to Private Enterprise. Tenancies from 100sqm for lease.

•High speed connectivity with fibre already connected to the site

Page 9: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook

•Secure basement parking for over 500 cars, with direct lift access

•Ground level parking for almost 200 cars for clients and visitors

•Storage facilities in basement

•Gym & End Of Trip Facilities (i.e. showers, change room and lockers) and secure

bicycle storage spaces

•Quality cafe/restaurant with the ability to cater for all tenants and visitors

•Public Transport directly at front on Stuart Highway with direct routes to Darwin,

Casuarina and Palmerston

“A thriving Business-to-Business community atmosphere”

Page 10: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook

Distances:

•Darwin CBD – 10km

•East Arm (Port and Marine Supply Base) – 9km

•Airport – 5.5km

•Northern Suburbs (Casuarina CBD) – 9.5km

•Hospital - 10km

•Palmerston CBD – 9.5km

•Howard Springs (INPEX Accommodation Village) – 16km

•Winnellie GPO – 5.5km

Page 11: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 12: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 13: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 14: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 15: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 16: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 17: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 18: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 19: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 20: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 21: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 22: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 23: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 24: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 25: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook
Page 26: Charles Burkitt - Darwin Corporate Park - PROJECT UPDATE: Darwin Corporate Park - Construction progress and outlook