Presentation Given By: Mark Savoca, USGS Hydrologist

TRANSCRIPT

Page 1: Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal
Page 2: Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal
Page 3: Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal
Page 4: Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal

USGS Numerical Models -Drost and others, 1999 -Johnson and others, 2011

Page 5: Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal
Page 6: Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal

Aquifers and Aquitards

Page 7: Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal

GW and SW Movement

Page 8: Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal

Water Budget

Page 9: Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal
Page 10: Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal

Proposed Time Line

Page 11: Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal

Agency FY2014 FY2015 FY2016 FY2017 FY2018

USGS $64,000 $80,000 $88,000 $88,000 $40,000

Project Partners $96,000 $120,000 $112,000 $112,000 $60,000

Total $160,000 $200,000 $220,000 $220,000 $100,000

The estimated project cost is $900,000 over five fiscal years (FY 2014-2018). All project costs would be shared by the USGS (40%) and the project partners (60%).

Page 12: Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal

Drost, B.W., Ely, D.M., and Lum II, W.E., 1999, Conceptual model and numerical simulation of the ground-water-flow system in the unconsolidated sediments of Thurston County, Washington: U.S. Geological Survey Water-Resources Investigations Report 99-4165, 254 p.

Johnson, K.H., Savoca, M.E., and Clothier, Burt, 2011, Numerical simulation of the groundwater-flow system in the Chambers-Clover Creek Watershed and Vicinity, Pierce County, Washington: U.S. Geological Survey Scientific Investigations Report 2011–5086, 108 p.

Mark Savoca [email protected] http://wa.water.usgs.gov/

USGS Model Reports