Samastipur Division came into existence in the year 1969 and it is one of the five Divisions of East Central Railway. The Division is geographically spread out in flood & seismic affected areas of North Bihar and it mostly caters coaching and developmental needs of region with inward traffic of food-grains, construction materials & POL etc.
Division touches international border with Nepal on the North side plays vital role
for foreign trade with Nepal. Raxaul, Jaynagar and Laukaha Bazar are important Rail heads for Nepal bound traffic. New Rail link (69 km) to Nepal i.e, Jaynagar to Bardibas (Nepal) work is completed by IRCON & train operation is in process. FOUNDING OF THE DIVISION: A BRIEF HISTORY
The Famine Line: Dalsingsarai to Darbhanga via Samastipur
In 1873-74, North Bihar suffered from one of the severest famines. The ravages
of nature inflicted its most devastating wrath on the lives of people. With the destructive famine, that was to take thousands of lives, the food prices had soared two or three times, affecting millions of people. Relief and rescue operations were slow and hindered by lack of adequate infrastructure, of which transport was one.
The first railway line, aptly called “Famine Line” came into existence and
temporarily began operation from Dalsinghsarai to Darbhanga via Samastipur, the most affected famine area covering a distance of 43 miles. It was opened on 1st November, 1875 under the aegis of the ‘Tirhut Railway’, a state owned railway.
Construction work continued on these lines from 1874 to 1890 connecting
Dalsinghsarai to Samastipur, Samastipur to Darbhanga and Samastipur to Muzaffarpur. Finally, in 1876, the Dalsinghsarai – Darbhanga line was made permanent.
The Division at a Glance
Division is presently going through a transition with a lot of on-going Gauge conversion, Doubling and Railway Electrification works.
A Meter Gauge (MG) branch line division converted into Broad Gauge is under transformation for improvement of passenger amenities & freight handling works to serve customers in better way.
2
I. The Tirhoot State Railway
The Tirhoot State Railway which was constituted to bring relief and rehabilitation to thousands of famine affected people, opened on November, 1875 and ran from Mokamah on the left bank of the Ganges through Darbhanga and Muzaffarpur districts north-west into Champaran district as far as Bettia. A ferry over the Ganges at Mokamah connected it with the East Indian Railway.
There were two branches, one extending from Muzaffarpur south-west to Hajipur
(to be connected with the Bengal and North-Western Railway at Sonepur by a bridge over the Gandak), the other (226 miles open for traffic in March 1886) from Samastipur via Darbhanga to Jhanjharpur.
The famine line later culminated in Tirhoot State Railway, a state – owned
railway. Most of these meter gauge lines got interconnected in subsequent years. The Tirhoot State Railway being situated on the western bank of the Ganga
had no railway bridge across the Ganga and was thus cut off, from the main broad gauge route. To facilitate communication across the Ganga ferry service between Barh and Sultanpur Ghat and later on between Mokamah and Semaria Ghat was maintained.
On July 1, 1890 the state owned ‘Tirhut Railway’ was transferred to a private
owned Railway, ‘the Bengal and North Western Railway’.
II. Bengal and North Western Railway:
Bengal and North Western Railway came into being on 23 October, 1882 with the objective of making a railway line from Sonepur to Bahraich in Audh. By the contract of 1896 between the Government and the Bengal and North Western Railway, the latter undertook the working of Tirhoot State Railway in its hand.
III. Oudh & Tirhoot State Railway:
Subsequently, the railway system of this region (Samastipur via Darbhanga to Jhanjharpur) became part of ‘Oudh & Tirhut State Railway’.
On 1 January 1943, the Bengal and North Western Railway and the Rohilkund and Kumaon Railway (R&K worked) were acquired by the Government of India and they were amalgamated with the Tirhut Railway, the Mashrak-Thawe Extension Railway (BNW worked) and the Lucknow-Bareilly Railway (R&K worked) to form the Oudh and Tirhut Railway. Its headquarters was at Gorakhpur.
The Oudh and Tirhut Railway was later renamed the Oudh Tirhut Railway.
3
IV. North Eastern Railway
On 14thApril 1952, the Oudh Tirhut Railway was amalgamated with the Assam Railway and the Kanpur-Achnera section of the Bombay, Baroda and Central India Railway to form North Eastern Railway, one of the zones of the current Indian Railways. Its headquarters was at Gorakhpur.
The Samastipur Railway Division came into existence in year 1969, as part of North Eastern Railway.
V. EAST CENTRAL RAILWAY:
Subsequently, w.e.f. 1st October 2002, when new zones were created in Indian Railways, it became part of East Central Railway with headquarter at Hajipur. Important dates on the opening of the sections:
Dalsingsarai to Samastipur 01.11.1875 Dhang to Bairgania 01.03.1892
Samastipur to Muzaffarpur 22.02.1877 Hajipur to Bachwara 01.04.1990
Samastipur to Darbhanga 01.11.1875 Thana Bihpur to Katereah 01.02.1901
Muzaffarpur to Motihari 01.02.1883 Kursela to Katihar Jn 07.03.1901
Darbhanga to Jhanjharpur 01.02.1883 Katereah to Kursela 01.07.1902
Barauni to Semaria Ghat 01.05.1883 Sakri to Jaynagar 14.01.1905
Bachwara to Samastipur 01.05.1883 Bettiah to Narkatiaganj 17.01.1906
Bachwara to Barauni 01.05.1883 Bhaptiahi to Simri Bakhtiarpur
01.03.1907
Motihari to Bettiah 20.12.1883 Narkatiaganj to Bagaha 01.05.1907
Hajipur to Muzaffarpur 26.10.1884 Simri Bakhtiarpur to Mansi 15.12.1907
Jhanjharpur to Ghoghardiha 08.04.1886 Bairgania to Narkatiaganj 20.12.1907
Ghoghardiha to Nirmali 08.04.1886 Samastipur to Khagaria 21.12.1912 to 01.11.1915 Extension
Sonpur to Hajipur 01.08.1887
Nirmali to Bhaptiyahi 15.11.1887 Sakri to Biraul 2008
Darbhanga to Sitamarhi 01.07.1890 Biraul to Harnagar 12.08.2018
Sitamarhi to Riga 01.01.1891 Runnisaidpur to Sitamarhi 12.04.2011
Riga to Dhang 01.07.1891 Muzaffarpur to Runnisaidpur 27.03.2013
SamastipurDivision comprises of many sections of old ‘Oudh &Tirhut Railway’ and serves Mithila region which was centre of rich cultural heritage and finds mention in Indian Mythology. This region has played a very important role in ancient & medieval history.
Samastipur became a district in 1972 when it was split from Darbhanga District.
This district is under Darbhanga commissionaire. .
4
GEOGRAPHICAL COVERAGE
Major Rivers
▪ Kosi ▪ Bagmati ▪ BudhiGandak ▪ KamlaBalan
▪ Adhwara Group ▪ Lakhandeyee ▪ Sikrana
Samastipur Division serves 15 densely populated districts of North Bihar :-
Mithila Region ▪ Madhubani ▪ Darbhanga ▪ Samastipur ▪ Sitamarhi ▪ Supaul
Kosi Belt ▪ Khagaria ▪ Begusarai ▪ Saharsa ▪ Madhepura ▪ Araria ▪ Purnea.
Champaran Region ▪ East Champaran ▪ West Champaran ▪ Shivhar ▪ Muzaffarpur
PLACES OF TOURIST INTEREST
Samastipur division covers a number of tourist places of historical & mythological importance.Some of these are:
Sitamarhi
Situated in DBG-NKE section. It is famous for being the birth place of Goddess Sita.
Sitamarhi is also directly connected with Muzaffarpur
Madhubani:
It is a cultural center of Mithilanchal and is famous for its rich cultural heritage and Madhubani paintings.
The famous "Shastrartha" with Mandan Mishra and “Adi Guru” Shankaracharya was held at a place nearby
Janakpurdham
It was the Capital of the kingdom of Raja Janak. "Sita Swayambar" was held here.
It is situated in Nepal and is connected by rail from Jaynagar and by road from Sitamarhi and Janakpur Road stations.
It is the birth place of Janaki, or Sita, daughter of King Janak. Janakpur, historically called Mithilanchal, is the centre of the ancient Maithili culture, which has its own language and script.
Darbhanga
It is Commissionaire town having two universities viz. Sanskrit University and Lalit Narayan Mithila University. Several palaces of ancient king and temples are of tourist interest are available here.
Nepal Border Heads
▪ Raxaul ▪ Jaynagar ▪ Laukha Bazar
▪ Forbesganj ▪ Bairgania ▪ Raghopur
5
Valmikinagar: "Valmiki Ashram" is near Valmiki Nagar station in the name of MaharshiValmiki. It is believed that “Luv” and “Kush” the mighty sons of Lord Rama were born and brought up in the above Ashram. Also famous for Project Tiger.
Lrwi] uanux<+ v'kksdLraHk]
ykSfj;k fHkfrgjokvkJe
With district headquarters at Motihari."Ashoka Stambha" of King Ashok era is worth seeing at Louria and Bodhya Stup, Nandangarh near Narkatiaganj. This district is also famous for Bhitiharva Ashram.Bhitiharva is a village at about 17 Km from Narkatiaganj Station where Gandhiji stayed and launched 'Champaran Satyagraha' in India for the first time. Bhitiharva Ashram was originally known as Kasturba Sewa Kendra, it was inaugurated by Mahatma Gandhi on 20th November 1917 as a basic school to share knowledge with tribal women and girls later it was hub for freedom fighter.
v'kksdLraHk] vjsjkt xkWa/kh alaxzgky; ,o Le`fr LraHk eksfrgkjh Usiky izos’k ekxZ
With district headquarters at Motihari."Ashoka Stambha" of King Ashok era is worth seeing at Areraj,Gandhi Memorial Statue and Museum at Motihari.Raxaul entry point of Nepal is also situated in this District.
It is a famous pilgrimage of lord Mahadeo in the country. It is situated at a distance of 8 km from Madhepura and about 30 Km from Saharsa Station and is renowned for its historical and religious importance. Devotees not only from Bihar but also from other parts of the country including the neighbouring country Nepal come to Singheshwar Asthan for the worship of lord Shiva. Mahashivratrimela of Singheshwar Asthan is famous in Bihar and Nepal also.
flags'ojLFkku] e/ksiqjk
dkR;k;uheafnj]/kekjk?
It is situated on the bank of river Koshi, between the stations Badlaghat and Dhamaraghat on Mansi-Saharsa rail line. Temples of MaKatyayani, as well as of Ram, Lakshman and Ma Janaki is situated at this place. Every Monday and Friday, large numbers of devotees come to this place for offering Puja. As per the local folk traditions, Ma Katyani is worshiped as Lok Devi- ‘Devi of Milk Cattles’.
West Champaran
East Champaran
Kosi Region
Dhamaraghat
6
kkV
SALIENT INFORMATION
TRACK/ROUTE KILOMETRES
STATE-WISE ROUTE KILOMETRES
Section Blocked for Gauge Conversion
BG
Under Gauge Conversion
Total
Route Kilometers 992.929 161.261 1154.190
Track Kilometers 1008.504 161.261 1169.765
Stations
Block 95 15 110
Halt 69 13 82
Non Block
11 00 11
Total 175 28 203
Passenger Reservation System
PRS 41 46
UPT 5
Unreserved Ticketing 99
Auto Announcement System 20
Human Resource
Sanctioned Strength 12211
Actual Strength 9909
Vacancy 2302
ROUTE-WISE ROUTE KILOMETRES
Group BG Under GC
Total km
Group D 5.02 - 5.02
Group E 987.909 - 987.909
S-3 - 161.261 161.261
Total 992.929 161.261 1154.190
State BG Under GC
Total km
Bihar 992.929 161.261 1154.190
Total 992.929 161.261 1154.190
7
Following connotations are frequently used in this booklet
Section Location Length(Km) Remarks
RGV-FBG 104.60 152.74 48.14 Blocked since 20.01.12.
NKE-BKF 0.00 35.53 35.53 Blocked since 24.04.15.
BAKT-BHGJ 15.853 27.30 11.447 Blocked since 31.01.16.
GGH-NMA 60.30 70.80 10.50 Blocked since 01.04.16.
TMA-GGH 51.85 39.206 12.644 Blocked since 15.09.16.
JJP-LKQ 0.00 43.00 43.00 Blocked since 27.05.17
Total (GC) 161.261
GAUGE ROUTE SECTION SECTION LENGTH (KMS)
TOTAL
Broad Gauge (BG)
“D” route
Samastipur Yard. (SPJ Yd.) 5.02 5.02 Kms
“E” route
Samastipur-Darbhanga (SPJ-DBG) 37.42
992.929
Kms
Muzaffarpur-Sagauli (MFP-SGL) 94.00
Sagauli-Raxaul (SGL-RXL) 29.19
Sagauli-Narkatiyaganj (SGL-NKE) 59.64
Narkatiyaganj-Paniyahwa (NKE-PNYA) 56.90
Mansi-Saharsa (MNE-SHC) 40.00
Darbhanga-Sakri (DBG-SKI) 19.46
Sakri-Jaynagar (SKI-JYG) 49.20
Khagaria-Samastipur (KGG-SPJ) 83.98
Darbhanga-Sitamarhi (DBG-SMI) 68.13
Sitamarhi-Raxaul (SMI-RXL) 82.18
Raxaul-Narkatiyaganj (RXL-NKE) 40.64
Muzaffarpur-Sitamarhi (MFP-SMI) 64.51
Saharsa-Raghopur (SHC-RGV) 62.60
Sakri-Harnagar (SKI-HRGR) 44.29
Saharsa-Purnea (SHC-PRNA) 98.32
Banmanki-Barhara Kothi (BNKI-BAKT) 15.853
Sakri-Tamuria (SKI-TMA) 28.196
Saraigarh-Asanpur Kupha (New Line) 13.40
Section blocked for
gauge Conversion
-
Raghopur-Farbishganj (RGV-FBG) 48.14
161.261 Kms
Barhara kothi-Bihariganj (BAKT-BHGJ) 11.447
Narkatiyaganj-Bhikhnathori (NKE-BKF) 35.53
Tamuriya-Nirmali (JJP-NMA) 23.144
8
Major Construction Projects on Samastipur Division
NEW LINES
SN Name of Project Length
Route KM
Sanctioned
Cost*
Outlay
2020-21*
1 Sakri – Hasanpur 79 355 1.00
2 Muzaffarpur – Sitamarhi 63 580 1.00
3 Khagaria –Kusheshwarasthan 44 571 5.00
4 Kosi Bridge 620 20.00
5 Darbhanga-Kusheshwarasthan 70.14 206 0.10
6 Motihari – Sitamarhi 76.7 946 0.10
7 Sitamarhi-Jainagar-Nirmali-Forbesganj (via
SursandSaharsa)
188 2394 0.10
8 Muzaffarpur -Katra-Aurai-Janakpur Road 66.55 229 0.10
9 Araria – Supaul 92 306 1.00
10 Kursela – Bihariganj 35 193 0.10
11 Muzaffarpur – Darbhanga 66.9 282 0.10
Total 781.29 6682 28.60
GAUGE CONVERSION
SN Name of Project Length Route KM
Sanctioned Cost
Outlay 2020-21
1 Mansi- Saharsa- daurammadhepura – Purnia and
Bihariganj- Banmanki
143 517 15.00
2 Jaynagar-Darbhanga- Narkatiagang 268 1102 20.00
3 Sakri – Laukaha Bazar - Nirmali&Saharsa –
Forbesganj
206.06 305 150.00
4 Jaynagar- Baijalpur and Baijalpur-Bardibas (Nepal)
by IRCON.
69.08 470 120.00
Total 686.14 2394 305.00
DOUBLING
SN Name of Project Length
Route KM
Sanctioned
Cost
Outlay
2020-21
1 Kosi Bridge with Kataria – Kursela 7.24 80 45.00
2 Samastipur – Darbhanga 38 380 90.00
3 Sagauli – Valmikinagar 109.7 744 100.00
4 Muzaffarpur –Sagauli 100.6 730 200.00
5 DBG Bye pass: Sheesho Halt to Kakarghati 7.64 130.5 0.19
Total 263.18 2064.5 435.19
RAILWAY ELECTRIFICATION:
SN Name of Project Length
Route KM
Sanctioned
Cost
Outlay
2020-21
Jhanjarpur-Laukha bazaar (JJP-LKQ) 43.00
Important Sanctioned Projects
9
1 Valmikinagar – Narkatiaganj – Sagauli – Muzaffarpur (incl.Sagauli –Raxaul sec.)
240 377.68 30.00
2 Mansi – Saharsa - DauramMadhepura 63.25 227.13 19.48
4 Darbhanga – Jaynagar 69 80.35 15.00
3 Raxaul –Sitamarhi – Darbhanga-Samastipur 231 304.05 50.00
5 Samastipur – Khagaria 85 115.75 40.00
6 Muzaffarpur–Sitamarhi 64.52 70.99 40.00
7 Dauram Madhepura-Purnea 77.30 81.06 37.33
Total 830.07 1257.01 231.81
ACTIVITYRATING FREIGHT OPERATION
Commodity INWARD OUTWARD
Food-grain
JYG, DBG, SMI, RXL, IDBR, BMKI, BTH, SHC, DMH
MAIZE: HPO, SLNA, SBM, SHC, DMH, SRSI & BHB SUGAR: HIR, NKE & HPO
Gypsum RXL
Coal TPSM (Kanti), RXL
Iron Coil RXL, IDBR
POL RXL
Fertilizer RXL, IDBR, BMKI, BTH, CAA, LSI, SMI,SHC, DMH
Cement RXL, IDBR, BMKI, BTH,CAA, MKPR, LSI,DBG & SMI
Miscellaneous (Fly Ash) RXL & IDBR
Average Number of Rakes dealt/day
16.0 2.3
Interchange Points SPJ, KVC, MFP, PNYA, KGG, MNE, PRNC & FBG (08 Nos.)
Goods Shed
IDBR, TPSM, KTI, MHL, CAA, BMKI, BTH, KUMB, NKE, HIR, RXL, RIGA, SMI, JNR, MKPR, DBG, SKI, LSI, TRS, KJI, JYG, HPO, SLNA, SBM,SRSI, BHB, SHC, DMH, SRGR (RMC) & RGH (30 Nos.)
NO. OF PASSENGER CARRYING TRAINS
Train Frequency No. of trains Express Daily 52
Weekly 76
Bi-weekly 28
Tri-weekly 12
4-days in a week 04
6-days in a week 10
5-days in a week 02
Passenger Daily Conventional - 34, DEMU-44, MEMU -32 = 110
OPERATING
10
Total 294
➢ Movement of Shramik Special Trains - The Division has operated successfully total 471 (431 trains-Terminating over SPJ Division + 40 trains-Through) during this month across the country to ferry migrant workers, students studying, stranded due to COVID-19 pandemic and subsequently followed by Nationwide lock down to their home states.
➢ Total 406 Special Mail/Express Trains were run during the month of June, 2020.
MAINTENANCE OF RAKES DEPOT-WISE
Depot No. of Rakes
No. of W/Pit
Primary Maintenance
Secondary Maintenance
Express Passenger Express Passenger
SPJ 01 01 -- 01 Pair -- --
DBG 12 02 06 Pair 01 Pair 04 Pair --
JYG 08 01 04 Pair -- -- --
RXL 09 01 04 Pair 01 Pair 02 Pair --
SHC 08 01 04 Pair 01 Pair 01 Pair --
Total 38 08 18 Pair 04 Pair 07 Pair
COACHING TERMINAL :
Terminal
No. of Running
Line
No. of Platform
Line
No. of Originating Trains
No. of Terminating Trains
Exp. Pass. Exp. Pass.
DBG 05 05 12 10 12 10
SPJ 14 07 - 22 - 22
SHC 07 05 12 14 12 14
RXL 04 03 11 12 11 12
NKE 06 03 02 12 02 12
JYG 05 03 13 06 13 06
SMI 04 04 05 01 05 01
BMKI 04 02 01 00 01 00
PRNC 03 02 01 00 01 00
NO. OF TRAINS- SECTION WISE (BG)
Section No. of Pass. Trains No. of M/Exp.
Trains Total Trains
SPJ-DBG 11 pairs 31 pairs 42 pairs
MFP-SGL 07 pairs 16 pairs 23 pairs
SGL-NKE 05 pairs 17 pairs 22 pairs
NKE-VKNR 06 pairs 15 pairs 21 pairs
SGL-RXL 05 pairs 07 pairs 12 pairs
10
10
11
SHC-MNE 08 pairs 15 pairs 23 pairs
SPJ-KGG 06 pairs 08 pairs 14 pairs
DBG-SKI 10 pairs 13 pairs 23 pairs
SKI-JYG 06 pairs 13 pairs 19 pairs
SKI-BRL 03 pairs - 03 pairs
DBG-SMI 05 pairs 09 pairs 14 pairs
SHC-DMH 05 pairs 05 pairs 10 pairs
SMI-RXL 05 pairs 08 pairs 13 pairs
SMI-MFP 03 pairs 04 pairs 07 pairs
DMH-MRIJ 04 pairs 05 pairs 09 pairs
MRIJ-BNKI 04 pairs 05 pairs 09 pairs
BNKI-BAKT 02 pairs - 02 pairs
SHC-SOU 02 pairs - 02 pairs
SECTION WISE LINE CAPACITY UTILIZATION
Section With Block Without Block
UP DN UP DN
VKNR - NKE 114.08 106.26 96.97 90.32
NKE - SGL 104.58 92.21 88.89 78.38
SGL – MFP 105.58 77.60 89.74 65.96
SGL - RXL 110.73 110.73 94.12 94.12
SPJ - DBG 85.97 72.24 73.08 61.40
DBG - SKI 67.23 62.75 57.14 53.33
SKI – JYG 63.35 54.72 53.85 46.51
SKI – HRGR 94.12 94.12 80.00 80.00
KGG - SPJ 55.56 51.28 47.22 43.59
SHC - MNE 68.87 67.23 58.54 57.14
DBG – RXL 76.31 69.95 64.86 59.46
MFP - SMI 28.62 30.96 24.32 26.32
PRNC-SHC 37.95 37.95 32.26 32.26
RXL- NKE 45.25 45.25 45.25 45.25
JJP - NMA
12
LKQ - JJP Under Gauge-Conversion
SRGR2 - FBG
BAKT - BHGJ
NO. OF Goods TRAINS- SECTION WISE
S.N. Section No of Trains
1. DBG-JYG 08
2. DBG-SMI 08
3. DBG-SPJ 10
4. MNE-SHC 06
5. KGG-SPJ 12
6. RXL-MKE 10
7. SHC-PRNA 02
8. SMI-MFP 12
9. SMI-RXL 18
10. RXL-SGL 06
11. VKNR-MFP 22 POSITION OF GOODS SHED
S.N. Goods shed
Inward no of rakes
(Apr to Aug)
Outward no. of rakes
(Apr to Aug)
Commodity
1 JYG 29 - IN F/Grain, Stone chips.
2 DBG 115 - IN Stone chips, Cement, F/Grain & Fertilizer.
3 SMI 143 - IN Stone chips, Cement, F/Grain, fertilizer.
4 RXL 167 - IN
Coal, slag, Stone chips, F/Grain, fertilizer, HSD, Iron, Doc.
5 IDBR 349 244 IN
Container/Grain, fertilizer, Iron, Doc.
6 BMKI 135 - IN Cement, F/Grain, fertilizer.
7 BTH 147 - IN Cement, F/Grain, fertilizer, Stone chips.
8 SHC 112 Maize-25 IN Cement, F/Grain, fertilizer, sand, Stone chips
OUT Maize
9 DMH 126 - IN Cement, F/Grain, fertilizer.
12
13
OUT Maize
10 TPSM 180 - IN Coal
11 CAA 104 - IN
Cement, F/Grain, fertilizer, sand, Stone chips.
12 LSI 91 - IN Cement, F/Grain, fertilizer.
13 HPO 28 Maize-13
IN Stone chips
OUT Maize & Molasses
14 SLNA - Maize-11 OUT Maize
15 SBM 30 Maize-17 IN Stone chips.
OUT Maize
16 HIR 67 Sugar -07 IN F/Grain, Stone chips.
OUT Sugar
17 MHL 100 - IN Sand, Stone chips.
18 JNR 89 - IN Sand, Stone chips.
19 TRS 106 - IN Sand, Stone chips.
20 KJI 67 - IN Sand, Stone chips.
21 RGH 59 - IN Stone chips
22 RIGA 64 - IN Stone chips
23 KUMB 71 - IN Stone chips
24 BHB - Maize-22 OUT Maize
25 SRSI - Maize-23 OUT Maize
26 NKE - Sugar-02 OUT Sugar
27 MKPR 52 - IN cement
28 SKI 57 - IN Stone Chips & Cement.
29 KANTI 86 - Stone chips
COMMODITYWISE ORIGINATING LOADING (FWU)
Commodity
2017-18 (Apr to Aug)
2018-19 (Apr to Aug)
2019-20 (Apr to Aug)
2020-21 (Apr to Aug)
Maize 4039 3115 4434 3761
Container 6355 10063 10182 10502
Others 525 1201 2018 1200
Total 10919 14379 16634 15463
COMMODITY WISE LOADING (APRILto Aug) (IN 8 WH)
Commodity 2019-20 2020-21 Variation (In %age)
14500
15000
15500
16000
16500
17000
2019-20(April-Aug)
2020-21(April-Aug)
14
Maize 4434 3761 - 15.1
F/Grain - 21 -
Sugar 168 293 +74.4
Stone 168 331 + 97.7
Fertilizer 84 104 +23.8
RMC 1556 451 -71.0
Container 10182 10502 + 3.1
Misc. Traffic 42 - -
Total 16634 15463 - 7.0
TERMINAL MANAGEMENT 2020-21
Month Loading Unloading
No of Rakes A to D (hrs) No of Rakes A to D (hrs)
April 56 19:18 229 74:15
May 52 10:38 480 36:34
June 97 17:38 806 25:40
July 85 24:28 689 23:47
Aug 82 38.05 509 19.13
FOIS
Terminal Nos. Location
Rake Management System (RMS) 01 SPJ Control
Terminal Management System (TMS) 13 RXL, BTH, BMKI, DBG, HPO, SHC, LSI, HIR, DMH, TRS, JNR, SMI & JYG
Crew Management System (CMS) 04 SPJ, NKE, SHC & DBG
Integrated Coach Management System 02 SPJ & DBG
Control Office Application (COA) 01 SPJ Control
OPERATING PERFORMANCE
BG WAGON HOLDING
Originating Loading April to Aug
2019-20 2020-21
1.06 MT 0.99 MT
Month 2017-18 2018-19 2019-20 2020-21
April 1865 1692 1917 1855
May 1838 2003 1849 2159
June 1983 2140 1851 2886
July 2265 1939 1641 2455
Aug 1841 2032 1701 1857
Average 1958 1961 1792 2242
15
DIESEL UTILIZATION
MONTH 2017-18 2018-19 2019-20 2020-21
April 358 311 265 306
May 352 323 242 286
June 331 303 349 298
July 308 333 447 393
Aug 304 305 410 295
Average 331 315 343 317
OPERATING PERFORMANCE
Item Head
Target 2020-
21 (Apr-Aug)
2019-20
(Apr-Aug)
2020-21
(Apr-Aug)
%age variation
with Target
%age variation with last
year
MAIZE LOADING In Rakes 0 106 108 - 1.8
OVERALL FREIGHT LOADING
No. of wagons
13700 16634 15463 + 12.8 - 7.0
Tonnage (In MT)
0.88 1.06 0.99 + 12.5 - 6.6
PUNCTUALITY %
Mail/Exp 75.0 67.0 - - -
Passenger 60.0 50.0 - - -
Over all - 58.0 - - -
TOTAL NO. OF INWARD RAKES
BG 0 2305 2713 - + 17.7
DETENTION TO INWARD RAKES
BG 20.00 Hrs
23.05 30.00 + 50.0 + 29.9
WAGON TURNROUND (In Days)
BG 1.7 1.5 1.9 + 11.7 + 26.6
WAGON HOLDING (No. of Wagons)
BG 1800 1792 2242 + 24.5 + 25.1
DIESEL UTILISATION (KM/Day/Diesel)
BG 350 343 317 - 9.4 -7.6
ELECTRIC LOCO UTILISATION (KM/Day/Diesel)
BG 350 303 382 +9.1 +26.0
THROUGH PUT (No. of wagons Interchanged)
BG 2200 2423 2517 +14.4 +3.8
LOADED RECEIPT BG - 1053 1139 - +8.2
NTKM/Wagon Day BG 4500 4400 3549 +21.1 -19.3
WagonKM/WagonDay BG 100 114 82.0 -18.0 -28.0
Speed(KMPH) BG 17 14.1 41.7 +145.3 +195.7
16
* Avg. Daily Wagon Holding, Terminal Performance & Wagon Turn Round-Affected
adversely due to heavy accumulation of inward rakes at the terminals leading to poor
release of inward rakes due to restricted provision of labours and means of
transportation by the State Government on account of nationwide Lockdown initiated
as a preventive measures against COVID-19 pandemic.
** NTKM/ Day & Wagon KM/Wagon day affected due to congestion of section due to
heavy movement of goods trains, several cautions imposed by Engg.Dept and to
ensure the better punctuality of Special Mail/Express trains.
*** Running of Passenger carrying trains remained suspended due to Nationwide
Lockdown.
PUNCTUALITY % Upto Aug
Type of Train 2019-20 (in %)
2020-21 (in %)
Variation w.r.t. last year (%)
Mail/Express 67.0 - -
Passenger 50.0 - -
Overall 58.0 - -
➢ Running of Passenger carrying trains remained suspended due to Nationwide Lockdown.
Action taken to Improve Punctuality: ➢ Reduction in PSR & TSR. ➢ Control over ACP. ➢ Regular Foot-Plate inspections by Officers and Supervisors. ➢ All the temporary speed restrictions are being analyzed and time bound action
plan is being ensured for removal of PSRs. ➢ Deputing RPF at busy Level Crossing gates and escorting of RPF in ACP prone
trains.
17
PASSENGER AMENITIES
COMMERCIAL
18
PASSENGER TRAFFIC AND EARNING
Item Available Proposed Remarks
Retiring Room 16 -- --
Manual Public Address System 108 -- --
Auto Announcement System 20 -- --
National Train Enquiry System 12 -- --
Deluxe Pay & Use Toilets 00
12 (DBG, SPJ, BMKI,
BTH, CAA, MBI, SGL, NKE, SKI, BUG, RXL,
JYG)
DBG contract has been
awarded.
Pay & Use Toilets 21 stations (24 units)
02 (Bio Toilet at MBI & JYG)
04 (DSKG, BTH, SHC, SMI)
--
Parking contract (including car parking)
31
stations (44 UNITS) Cycle-15,Taxi-16
Mixed-13
Mixed Stand -03
--
Health ATM 02 stations
(SPJ, DBG)
-- --
Covid Precaution Kiosk 02 stations
(SPJ, DBG)
-- --
ATM 05 stations
(SPJ, DBG, SHC, DMH, NKE)
12 By PNB
Refreshment room 04 stations
(DBG, NKE, BTH, SMI) -- --
Vending Contract
(A, B, D, E & F)
Catgstn. Stall Trolley Khomcha -- --
A1 09 08 18
A 79 39 27
B 10 15 07
D, E,F 26 11 07
Total 124 73 59
Terminal Management System
(TMS) 18 stations
-- --
Outsourcing Contract for Sanitation (by commercial
department)
02 stations (SKI, SMI)
--
Outsourcing Contract for
Sanitation (by mechanical
department)
10 stations
(SPJ, SHC, DBG, NKE, BMKI, JYG,
MBI, RXL, SGL,BTH)
--
Station sanitation
(by operating department ) Rest stations
Jansadharan Ticket Booking Sewak( JTBS)
12 stations (50 Locations)
35 stations (fresh notification issued)
--
Station Ticket Booking
Agent(STBA) 55 stations
Remaining 11
stations (KIT, TRS, JUBS, MGI, BGDS,
MHL, LNO, VPH, TB, LKQ, KVC -fresh
notification issued
--
Yatri Ticket Booking
Kendra(YTSK)
03 stations
(SHC, BMKI & CAA)
07 stations (application received
– under process of finalization)
--
Electronic Train Running Display
Board at Enquiry Office
09 stations
(SHC, SPJ, MBI, BMKI, SKI, DBG, RXL,NKE,BTH)
-- --
Electronic Reservation chart display Board
06 stations (SPJ, DBG, JYG, SHC, RXL, SMI)
Video Wall 06 stations
(SPJ, DBG, SMI, BTH, SHC & BMKI)
19
(Fig in. Cr.)
Description
Annual Target
2020-21
Prop. Target
for 2020-21
Up to Aug.’20
Actual (up to Aug.) % Var.
last
Year 2018-19 2019-20 2020-21
No. of Pass. NA NA 2.16 0.07 -99.97
Pass. Earning NA NA 251.99 41.03 -83.72
ORIGINATING PASSENGER TRAFFIC & EARNING
Fig. in Crore
Particulars Actual (Up to Aug.) %Var
(Last Year) 2018-19 2019-20 2020-21
No. of Passenger 2.12 2.16 0.07 -99.97
Passenger Earnings 245.46 251.99 41.03 -83.72
Other Coaching Earnings 12.51 15.86 0.26 -98.36
Goods Earnings 76.35 93.84 69.19 -26.27
Sundry Earnings 1.63 4.30 0.20 -95.35
Gross Earnings 335.95 365.99 110.68 -69.76
TICKET CHECKING PERFORMANCE
Particulars 2017-18 2018-19 2019-20 2020-21 % Var.
H. P. Cases:
No. of Passengers 273558 264768 273785 0 -
HP Amount :
Amount (Rs. in lakh) 105.32 101.99 164.68 0 -
U.B.L. Cases:
UBL Cases 107037 98618 49516 0 -
Freight (Rs in lakh) 53.60 49.31 25.20 0 -
Total No. of cases (HP+UBL) 380595 363386 323301 0 -
Total Amount (Rs. in lakh) 158.92 151.30 189.88 0 -
N.P. Cases & Reservation
20
No. of Passengers 16095 15328 11530 0 -
Fare realized (Rs in lakh) 36.56 30.02 23.09 0 -
Grand Total 1143.33 1099.22 212.97 0 -
Note :-
1. Operation of normal passenger and mail/express trains had been cancelled since 24th March/2020
due to COVID-19.
2. Operation of special mail/express trains has been started from 01.06.2020, but TTEs are not allowed
to book passenger in route.
ROSSINGS
LEVEL CROSSINGS
Gauge
CLASS
Spl. A B C
(Manned) C
(Unmanned) D Total
BG 13 22 46 590 0 0 671
Under GC 0 0 7 161 0 9 177
Total 13 22 53 751 0 9 848
NUMBER OF BRIDGES
Type BG Under GC Total
Important Bridges 15 00 15
Major Bridges 217 59 276
Minor Bridges 840 266 1106
Total 1072 325 1397
TRACK STRUCTURE – RAILS
ENGINEERING
21
Section 60 Kg 52 Kg 90R 75R 60R Total
BG 172.336 820.593 00 00 00 992.929
Blocked for GC - - - - - 161.261
Total 172.336 820.593 00 00 00 1154.190 TRACK STRUCTURE - SLEEPERS
Section PSC CST-9 ST Wooden /Mix Total
BG 992.929 00 00 00 992.929
Blocked for GC 161.261 - - - 161.261
Total 1154.19 00 00 00 1154.19
POSITION OF FOOT OVER BRIDGES (FOB)
S.N. No. FOB sanctioned (2019-20)
Name of stations
Position of Estimate
Position of Tender
Remarks
1. 02
Bapudham Motihari (Extn.)
Sanctioned Awarded Completed
Narkatiyaganj (Extn.)
Sanctioned Awarded Work in progress.
2. 03
Chauradano Sanctioned Awarded Work completed.
Kundwachainpur Sanctioned Awarded Work completed.
Dhang Sanctioned Awarded Work in progress.
3. 01 Saharsa Sanctioned Awarded Work in progress.
4.
02 Rajnagar Sanctioned Awarded Work completed.
Khajauli Sanctioned Awarded Work in progress.
02 Motipur Sanctioned Awarded Work completed.
Mehsi Sanctioned Awarded Work completed.
5. 01 Darbhanga
(Extn.) Sanctioned Awarded Work in progress
6. 11 Kakerghati
Awarded Work in progress
Tarsarai
22
Pandul
Sanctioned
Mohmadpur
Awarded Work in progress
Kamtul
Jogiyara
Bajpatti
Parsauni
Jubbasahani
Awarded
Work in progress
Pramjiwar-Tarajiwar
Rounisaidpur
7. 02 Ramgrahwa Sanctioned
Awarded Riga
8. 07
Budhma
Sanctioned Awarded Work in progress.
Murliganj
Jankinagar
Banmankhi
Sarsi
Krityanand nagar
Purnia Court
9
06
Sanctioned Awarded Work in progress. Narhan
Imli
Badhla Bhagwanpur Desua ghat Sanctioned Awarded Work in progress.
Koparia
Janakpur Road
Total- 37 Nos TARGET FOR REMOVAL OF PERMANENT SPEED RESTRICTION (2020-21)(
S.N. Target (01 Nos.) 2020-21 Remarks/Progress
1 NKE-PNYA, Km267/3-4, 30 Kmph on Br. No.-325 Girder Launched. Deck slab casting under progress.
POSITION OF LHS
Sanctioned Scope
Target 20-21
CRS Sanction received
Tender finalized
Tender opened
Tender invited
Date of opening
111 (Feasible-49)
- 19 36 Nil Nil -
GPS BASED OMS
23
S. N. Ordinary OMS available
GPS based OMS required (Nos.)
Procurement status
Remarks
1 01 01 Procured- 01 GPS based OMS commissioned.
STATUS OF GPS TRACKER
Purpose
Scope (Nos.)
Provided (Nos.)
Balance to be provided (Nos.)
Procurement status for balance qty.
Remarks
Keymen 183 Nil
- -
patrolmen 272 Nil
Trolleyman 45 Nil
USFD 10 Nil
Other - Nil
Total 510 Nil
MAINTENANCE OF TRAINS
C&W Depot
Primary Secondary Turn Round
No. of trains
No. of Rakes
No. of trains
No. of Rakes
No. of M/Exp trains
No. of Pass trains
DBG 09 12 03 11 0 06
RXL 06 09 01 01 6 11
JYG 05 08 01 01 8 7
SMI - - - - 4 1
SPJ 01 05 - - 0 18
SHC 07 09 01 01 8 12
MECHANICAL (C&W)
24
NKE - - - - 2 12
TOTAL 28 43 6 14 28 67
COACH HOLDING
TRAIN LIGHTING STATISTICS
Combined Crew LOBBIES Dual Trained Crew
S.N. Lobby LP ALP CLI
S.N. Category of coach No. of coach in SPJ Division (Holding)
1 LHB AC Coaches 118
2 LHB Non AC reserved class 96
3 LHB Un reserved Coaches 200
4 ICF AC Coaches with CBC 18
5 ICF Non AC reserved class with CBC 53
6 ICF Un reserved Coaches with CBC 171
7 ICF AC Coaches with Screw Coupling 52
8 ICF Non AC reserved class with Screw Coupling 76
9 ICF Un reserved Coaches with Screw Coupling 441
10 ICF Un reserved Dindayalu Coaches with CBC 27
11 Total no. of coaches at SPJ Holding 1252
Type of Coach Total in Division
AC (1A, 2A, 3A) 70
GSCN,GS,SLR 768
EOG LHB TL COACHES 296
EOG LHB AC COACHES 118
MECHANICAL (POWER)
25
Dual Train ing
Diesel Total Dual Train ing
Diesel Total Dual Train ing
Diesel Total
1 SPJ 34 00 77 111 44 04 56 104 08 00 06 14
2 SHC 25 00 46 71 37 02 39 78 05 00 00 05
3 DBG 20 00 56 76 21 03 46 70 03 01 01 05 4 NKE 46 00 72 118 54 00 66 120 08 00 00 08
5 MFP 24 00 10 34 17 03 18 38 02 01 00 03
6 RXL 00 00 00 00 01 00 02 03 01 00 00 01
7 JYG 00 00 00 00 02 00 03 05 00 00 00 00
8 SMI 00 00 00 00 00 00 00 00 00 00 00 00
RUNNING ROOMS
Location Maintained by
Bed Capacity
Occupancy
Average Peak
Samastipur Mech./Power 36 40 50
Darbhanga Mech./Power 32 29 35
Saharsa Mech./Power 37 35 42
Narakatiaganj Mech./Power 36 32 38
Jaynagar Mech./Power 42 42 51
Raxaul Mech./Power 79 80 92
Banmankhi Mech./Power 12 12 14
Sitamarhi * Mech 12 12 12 * Only Bed facility at SMI.
DIESEL LOCO HOLDING
Type of Loco WDM3D WDM3A WDG3A WDM3B Total
Effective Loco Holding
23 00 41 02 66
Under GRS Loco 03 31 30 00 74
Temporarily deleted 01 00 01 00 02
Total Loco Holding of SPJ Shed 142
MECHANICAL (TRAIN SET)
26
RAILWAY DSL INSTALLATION (RDI)
Place Oil supplied by
Capacity Issue Per Day (approx)
RDI/SHC M/S IOCL 2 x 140 KL 3.3 KL
RDI/NKE M/S BPCL 2 x 70 KL 7.1 KL
RDI/ SPJ M/S IOCL 2 x 230 KL 8.2 KL
COMPOSITION OF ART/SPJ
S. N. Vehicle No. & Type
Rly Bas
e Used
as
Type of brake
Year
Built
POH done
POH due
Max. Spee
d
Over Aged
1 3113075
1012 BCNAHS
NCR
SPJ ART AB - 04.06.1
9 07/25 100 NO
2 9407146
0696 BRNEHS
SER
SPJ ART AB - BSCL
24.07.14
07/20 100 NO
3 91399WR
T ECR
SPJ ART AB - HRTS 9.2.17
08/20 100 NO
4 91215WR
T ECR
SPJ ART AB - HRTS
23.1.17 08/20 100 NO
5 91361RS
V ECR
SPJ ART AB - HRTS
22.3.17 10/20 100 NO
COMPOSITION OF 140 T BD CRANE/SPJ
S. N Vehicle No. & Type
Rly
Base
Used as
Type of brake
Year
Built
POH done
POH due
Max. Spee
d
Over
Aged
Remarks
1 96434 GS ECR
SEE ART AB 1996
HRPS 09.08.
19 03/21 100 NO -
2 93906 WRT
ECR
SEE ART AB - GKPS 30.12.
16 07/20 100 NO
3 144025 CRANE
ECR
SPJ ART AB NOV./2011
15.06.20
06/28
100 NO -
POSITION/FUNCTIONING OF 140 T BD CRANE/SPJ
27
SI.No. Div. Locati
on Crane No. &
Design Crane AMC
parts Make
AMC Dt. & Validity
1 SPJ SPJ 144025New
Design Gottwal
Main Engine Cummins
India
15.06.20 POH of 01 years warranty
2 SPJ SPJ 144025New
Design Gottwal
SLI Hy- tech
New Delhi
05.07.19 04.07.22
COMPOSITION OF SPART/SPJ
S. N Vehicle No. & Type
Rly
Base
Used as
Type of brake
Year
COMM
POH done
POH due
Max. Spee
d
Over
Aged
Remarks
1 17901 SVC
ECR
SPJ SPART AB 12.4.18
21 100 NO
2 17902 T/V
ECR
SPJ SPART AB 12.4.18
21 100 NO
3 179013M
V ECR
SPJ SPART AB 12.4.18
21 100 NO
COMPOSITION OF ART/SHC
S. N Vehicle No. & Type
Rly Base
Used as
Type of brake
Year
Built
POH done
POH due
Max. Spee
d
Over
Aged
Remarks
1 96901 TOOL VAN
ECR SPJ BG-ART AB 1996
GKPS 24.11.
16 6/20 100 NO -
COMPOSITION OF SPARMV/SHC
S. N Vehicle No. & Type
Rly
Base
Used as
Type of brake
Year
Built
POH done
POH
due
Max. Spee
d
Over
Aged
Remarks
1
993995 SPRMV TOOL VAN
ECR
SPJ SPRMV AB 1999
KGPW 21.7.17
2/21 80 NO
Not working in Self-
propelled
2 993999 ARMVAC
ECR
SPJ SPRMV AB 1999
KGPW 21.7.17
2/21 80 NO do
COMPOSITION OF ART/RXL
28
COMPOSITION OF ARMV/NKE
COMPOSITION OF ART/DBG
HRE and other M&P related to ART are presently kept at DBG Coaching Depot due to non availability of suitable coaches. Four coaches (GS-98602, 98645 & GSR-96566, 96579) are being allotted and will be used after necessary medication.
STATUS OF GPS AVAILABILITY a
Description
Current Status CONNECTIVITY OF GPS TRACKER
ART/SPJ WORKING FROM 01.10.19 Connected to Rail Netra (Trackway GPS) app. 140T crane WORKING FROM 01.10.19
SPART/SPARMV WORKING FROM 26.11.2019 Do
ART/RXL WORKING FROM 10.08.2020 (Lets track plus+ Jagdamba Enterprises)
S. N Vehicle No. & Type
Rly
Base
Used as
Type of brake
Year
Built
POH done
POH due
Max. Spee
d
Over
Aged
Remarks
1 91218 WRH
ECR
NKE BG-ART AB. 1991
GKPS 03.05.
18 12/21
100 KMPH
No ELECTRICEQUIPMENT VAN
2 88225 ESRB
ECR
NKE BG-ART AB. 1988
HRPS 19.06.
19 01/23
100 KMPH
No GUTKHA M/S VAN
3 91336WR
H ECR
NKE BG-ART AB. 1991
GKPS 29.07.
19 04/23
100 KMPH
No EQUIPMENT VAN
S. N Vehicle No. & Type
Rly
Base
Used as
Type of brake
Year
Built
POH done
POH due
Max. Spee
d
Over
Aged
Remarks
1 89900W
RH ECR
NKE BG-
ARMV AB.
1989
GKPS 17.03.
18 10/21
100 KMPH
No T&P
ARMV
2 87907 WRH
ECR
NKE BG-
ARMV AB
1987
GKPS 16.03.
18 10/21
100 KM[P
H NO
FOR MEDICAL
VAN (HOSPIT
AL)
29
BLOCK WORKING
S.N. Type Block Sections
1 Double Line Token less Block Working.
04 Block-Section: SPJ-MKPR, MKPR-KSP, TLWA-
LSI, LSI-DBG
2 Single Line Token-Less.
94 Block Sections: KSP – TLWA (3), DBG - SKI – JYG (8), DBG – RXL (15), SMI – JUBS (6), SPJ – KGG (11), MNE - SHC – BNKI – PRNC (16), KVC – SGL (11), SGL – VKNR (12), SGL-RXL (2), RXL-NKE (5) and SHC-SRGR (5).
3 One Train Only Syst. 05 Sections: SKI-BIRL-HRGR, SKI-TMA, & BNKI-BAKT,SRGR-RGV, SRGR-Asanpur Kupha.
4 Under GC 14 Block sections are under Gauge conversion: JJP – LKQ (4), TMA-NMA (2),NKE – BKF (3), SRGR-FBG (4) & BAKT-BHGJ (1)
STATION WORKING
CONTROL WORKING Name of Board Board Section Type of Alignment
BMKI Board KVC – SGL-NKE – VKNR, SGL – RXL OFC +Quad Cable
SMI Board DBG – SMI – BGU – RXL & RXL -NKE OFC +Quad Cable
SMI-RUSD-JUBS-MFP Quad Cable
NMA Board SPJ – DBG – JYG & SPJ – KGG OFC +Quad Cable
SKI – BIRL - HRGR Quad Cable
SHC Board MNE – SHC – BNKI-PRNA, PGC – GEB-SOU
OFC+ Quad Cable
TB - SRGR Quad Cable
AUTO ANNOUNCING (PC BASED) Samastipur, Hasanpur Road, Laheriasarai, Darbhanga, Sakri, Madhubani, Jaynagar, Sitamarhi, Raxaul, Sagauli, Bapudham Motihari, Chakia, Bettiah, Narkatiaganj, Salauna, Saharsa, Dhamaraghat, Simribakhtiyarpur, Harinagar & Banmankhi (20 Stations).
TIB (LED BASED AND LCD BASED)
S.N. Type of Signaling Junction Yards
Way Side Stations
Total Stations
1 Multiple Aspect Colour Light Signal Std. II(R) PI/EI Stations
PI 05 75 80
EI 04 11 15
2. Non Block station (OTS) 00 11 11
Total 09 97 106
SIGNAL AND TELECOMMUNICATIONS
30
Samastipur,Hasanpur Darbhanga, Sakari, Madhubani, Raxaul, Bapudham Motihari, Narkatiyaganj, Bettiah & Saharsa (10 Stations)
COACH GUIDANCE (LED BASED) BOARD Darbhanga, Samastipur, Bapudham Motihari, Saharsa & Sitamarhi (05 Stations)
Wi-Fi FACILITY (82 Stations) Motihari, Bettiah, Samastipur, Darbhanga, Madhubani, Jaynagar, Narkatiaganj, Sagauli, Raxaul, Saharsa, Purnia Court, Rajnagar, Khajauli, Thalwara, Kamtaul, Tarsarai, Krityanand
Nagar, Banmankhi, Sarshi, Sakari, Mukhtapur, Bhagwanpur Desua, Angarghat, Narhan,
Janakpur Road, Sitamarhi, Riga, Kishanpur, Dhang, Kakarghatti, Laheriasarai, Pandaul,
Hayaghat, Bargania, Kundwachainpur, Roseraghat, Bajpatti, Jogiyara, Hasanpur, Parsauni,
Rambhadrapur, Gadhpura, Salauna, Imli, Nayanagar, Kaparpura, Mohammadpur,
Jankinagar, Pipra, Bhelva, Sikta, Marjadwa, Olapur, Chakiya, Gokhula, Chamua, Kumarbagh, Sathi, Chanpatia, Baijnathpur, Dauram Madhepura, Budhama, Murliganj, Simribakhtiyarpur,
Sonversa Kacheri, Koparia, Dhamaraghat, Badlaghat, Kanti, Motipur, Piprahan, Jivdhara,
Semra, Majholia, Choradanno, Ghorasahan, Adapur, Mahwal, Bhairoganj, Valmikinagar &
Kharpokhra.
Provision Of Video Wall (06 Stations)
In Samastipur, Darbhanga, Saharsa, Sitamarhi, Bettiah & Bapudham Motihari stations: 3 X 3 Matrix of 47” screen each (Video wall of 10’ X 6’ size). ELECTRONIC EXCHANGES
S.N. Station Make Capacity No. of Port used
1 Samastipur KAREL 1344 1264
2 Darbhanga KAREL 672 110
3 Narkatiaganj KAREL 672 100
4 Raxaul KAREL 512 60
5 Saharsa KAREL 512 150
6 Jaynagar KAREL 96 12
7 Diesel Shed/Samastipur ACCORD 48 20
DETAIL OF CONTROL PATCHING
Sl No.
Name of
Control
Board
BSNL Channel patching at Station Railway channel
patching at Station
A BMKI MTR, BMKI, RXL, NKE & BUG. MFP & VKNR
B SMI SMI SMI & MFP
C NMA JYG, BIRL, HPO KGG
D SHC SHC PRNA & MNE
NO. OF LEASED LINE CIRCUITS
Sl.
No.
Purpose of circuit No. of leased BSNL
Channel No. of Rly Channel
1 BMKI Control Patching 05 02
2 SMI Control Patching 01 02
31
3 NMA Control Patching 03 01
4 SHC Control Patching 01 02
5 PRS working 20 18
6 UTS working 25 118
7 PRI 00 05, INGN
8 FOIS 05 17
PASSENGER RESERVATION SYSTEM (PRS)
S.N . Equipment No. of Stations
1 Passenger Reservation System 41 Stations (including V-SAT-05, NRH-03)
2 Unreserved Ticketing System 99 Stations (including V-SAT-10)
OTHER FACILITIES
ELECTRICAL INSTALLATION STATISTICS
S.N. Description Total Scope Total Done
1. Electrified Stations (BG) 200 150
2. 33/11 KV substation 01 01
3. 11/0.4 KV substation 26 26
4. Water coolers 18 66
5. High masts 34 131
6. DG sets 27 94
7. Solar lighting at station 40 40
8. Solar lighting at Level crossing gate 671 96
Name of
facility
No. of
Stations Remarks.
FCT Phone at
Stations 56
SPJ,MKPR, KSP, RBZ, TLWA, LSI, DBG, KKHT, TRS, SKI, MBI, RJA, KJI, JYG, BIRL,BHB, DHT, KFA, SBV, SBM,
SHC, BYP, DMH, BDMA, MRIJ, JNKR, BNKI, SRSI, KTNR,
PRNC, CAMU, SAHI, KVC, SGL, BMKI, SRA, JDR, KTI,
BGU, MHL, KPB, PPRH, VKNR, BGDS, ARG, NRN, ROA,
NWC, HPO, GRPA, SLNA, IML, OLP, RUSD, PATR & JUBS
Fax 06 DRM, ADRM, Sr.DSTE, Sr.DOM, Commercial & Security
control.
VHF (25 Watts) 111 All Stations are working. All ARTs (SPJ, DBG, SHC & NKE)
Intercom 03 DRM (NEC), GM Intercom& Control (SAMSUNG)
FOIS 01 SPJ
CMS 05 SPJ, NKE, SHC, RXL & DBG
COIS 02 SPJ & DBG
NTES 12 SPJ, SHC, LSI, DBG, SKI, MBI, JYG, RXL, BMKI, SGL, BTH
& NKE
COA 09 SPJ, DBG, JYG, SMI, NKE, RXL, SGL, SHC & PRNC
TMS 20 SPJ, HPO, SHC, LSI, RXL, BMKI, BTH, NKE, DMH, HIR,
JNR, JYG, TRS, SBV, SMI, SRSI,CAA, SKI, KTI& DBG
Railnet Facility 14 SPJ, DBG, SHC, NKE BUG, RXL, JYG, MBI, SMI, BMKI,
BTH, SGL, MTR, BNKI ELECTRICAL
32
9. Inverter for emergency lighting 42 47
10. Green Stations 150 150
11. Electrified Level crossing gate 671 581
A.MAJOR INSTALLATION.
Sr.
No. Section Electrified RKM/TKM Commissioning date
1. MFP(Excl)-MHL 31.776 RKM, 45.770 TKM Commissioned on 09/02/18
2. MHL-JDR 39.25 RKM, 49.83 TKM Commissioned on 29/03/18
3. JDR-BTH 51.214 RKM, 67.836 TKM Commissioned on 17/09/18
4. SGL-RXL 30.213 RKM, 35.706 TKM Commissioned on 07/12/18
5. BTH-VKNR 93.221 RKM, 125.840 TKM Commissioned on 29/03/19.
6. MNE-SHC-DMH 63.25 RKM, 83.00 TKM Commissioned by PGCIL
on 31/03/18
7. Kanti thermal siding
(KBUNL) 2 RKM, 5.28 TKM Commissioned on 04/01/19
8. SPJ-KGG 84.84 RKM, 115.863 TKM Commissioned on date:
24/08/2019.
9. SPJ-DBG (with SPJ-
KSP doubling) 39.865 RKM, 75.474 TKM
Commissioned on date:
21/03/2020.
10. DBG-JYG 67.262 RKM , 96.81TKM Commissioned on date:
21/03/2020.
11. TLWA-DBG (with
doubling) 10.00 RKM
Commissioned on date:
28/06/2020.
12. MFP-SMI 65 RKM, 77.727 TKM Commissioned on date:
05/08/2020.
TOTAL-512.891 RKM and 779.136 TKM
B. RE sanctioned work/work in progress:
Sr.
No. Section Electrified RKM/TKM TDC
1. DBG-SMI-RXL 150 RKM 31.10.2020
2. SHC-SRGR 51 RKM 31.12.2020
TOTAL- 201.00 RKM
C. RE work yet to be sanctioned/awarded:
Sr.
No. Section
Electrified
RKM/TKM TDC
1. DMH-PRNC 78 RKM Under TC.
2. RXL-NKE 42 RKM Tender is being awarded by
ECR/Const./MHX.
3. SRGR-FBG 65 RKM Tender has been awarded
by ECR/Const./MHX.
ELECTRICAL-TRD
33
TOTAL- 185.00 RKM
D.Planning for Man power & Maintenance of the assets:
S.N Activities Nos. Remarks
1 BOS - 185 posts (Sanctioned) On roll staff-
119
MNE-SHC-DMH
MFP(Excl.)-VKNR incl
SGL,RXL.
2
BOS proposal - 188 posts (Vetted
proposal sent to HQ for approval on
03/10/18)
RXL-SMI-DBG-SPJ
DBG-JYG
SPJ-KGG.
3 Post created 141 SPJ division
E.MAJOR INSTALLATION.
S.N TSS Remarks
1. MHL Operational.
2. JDR Commissioned on date: 27.05.2020 and operational.
3. MJL Commissioned on date: 24.07.2019 and operational.
4. PDW Commissioned on date: 10.06.2020 and operational.
5. HIR Under Construction, TDC- Dec 2020.
6. HPO Under Construction, TDC- Dec-2020
F.ASSISTANCE REQUIRED
1. Total 04 nos. SSE & 01 nos. JE has to be released from other division of ECR to SPJ, which has already been transferred.
2. 01 nos. Tower Wagon is also required for MFP-SMI section.
3. Staffs quarters required at SPJ, SHC, HPO, SKI, KVC, NKE & RXL.
4. OHE/PSI depot made to functional at KVC, NKE, HPO, RXL & SKI.
5. HIR/TSS to be made operational.
6. Tower Wagon shed made to functional at KVC, NKE, SGL, SHC, HPO, RXL & SKI.
7. Work uploaded on IRPSM under PH-35 as Electrification of all leftover siding line i.e. Diesel shed at SPJ, DD siding line at SHC, Freight terminal siding line at RGH etc. in SPJ division needs to be sanctioned.
SAFETY ACCIDENT RELIEF ARRANGEMENTS
S.N. Type SPJ NKE SHC DBG RXL
1.
ART 01 (A class) 01* 01* 01* 01*
2. ARMV 01 (Scale I)
SPARMV 01 (Scale I)
ARMV NIL NIL NIL
*Only MFD has been made operative.
34
SAFETY PERFORMANCE UP TO JULY’20
SUMMARY OF ACCIDENTS
DEPARTMENT WISE ANALYSIS OF TRAIN ACCIDENTS
Category of Accidents 2019-20 2019-20
Up to Aug/19 2020-21
Up to Aug/2020
Consequential 01 00 00
Indicative 02 01 00
Yard & Misc. 12 5 01
Total 15 6 01
TYPE 2019-20 2019-20
Up to Aug/19 2020-21
Up to Aug/2020
Collision 00 00 00
Derailment 10 05 01
L-Xing (Manned) 00 00 00
L-Xing (Unmanned) 00 00 00
Fire in Trains 02 00 00
Misc. 01 00 00
Averted Collision 01 01 00
SPAD 01 00 00
Total 15 06 01
S.N Department 2019-20 2019-20
Up to Aug/19 2020-21
Up to Aug/2020 % Share
RB H.Q Total RB H.Q. Total RB H.Q Total
1 Engg. 00 03 03 0 00 00 00 00 00
2 C&W 01 01 0 01 01 00 00 00
3 Loco 01 01 0 00 00 00 00 00
4 Optg. 03 03 0 02 02 00 01 01 100.00
5 Road Users 00 00 00 0 00 00 00 00 00
6 Combined effect
05 05 0 03 01 00 00 00
7 S&T 00 00 0 00 00 00 00 00
35
DETAILS OF TRAIN ACCIDENTS (2020-21)
SL No.
Description Enquiry finalized
on Responsible
Charge Sheet
issued on
NIP issued on
Remarks
1 Derailment of 4
wheels of front
trolley of Wagon
no. 22131724495
BOXNHL/NCR
24th from T/E of
Train no. - UP
MHL DC, while
entering in line no.
-3 of MTR yard on
22.05.2020.
SIMS ID -
20200510002
21.07.20 Primary -1.GS/SHK/DNR Blameworthy – 1.SS/SHK/DNR
DETAILS OF TRAIN ACCIDENTS (2019-20)
SL No.
Description Enquiry finalized
on Responsible
Charge Sheet
issued on
NIP issued on
Remarks
1 Derailment of Brake Van of IDBR on line no.3 SGL while attaching loco on 05.5.2019 ( SIMS ID- 20190510002)
03.6.2019
Primary 1. Sri BhajamanSah, Goods Guard /MFP (SPJ division) Secondary 1. Sri Kedar Das, P/Man/SGL
Primary 1. 12.6.2019.
Secondary 1. 12.6.2019
1. 02 set P/pass stopped on 17.7.19. 2. WIT one year on 24.7.2019
Closed
2 Averted collision between Train no. 13043 Up and 53132 Dn in SPJ yard on 23.5.2019 . ( SIMS ID- 20190510006)
18.06.2019
Primary 1.Sri Prakash kumarsinha, SM/Panel/SPJ. Blameworthy Sri Ashok kumar , SS/SPJ
1.10.7.2019. 2. 10.7.2019.
WIT 03 years on 02.8.19 Warning issued on 02.8.19
Closed
8 Miscreants/Sabotage
02 02 0 00 00 00 00 00
9 Others. 00 00 00 00 00 00 00 00
10 Total 00 15 15 00 06 04 00 01 01 100.00
36
3 Derailment of SLR No. SC13714 of empty rake of 07005 at RXL washing pit over point No. 53A on 09.6.2019 (SIMS ID- 20190610003)
12.6.2019
Primary 1 Sri Rajesh Kumar Verma, SSE (C&W)/ RXL.
Censured on 29.7.2019 by Sr.DME (C&W)/SPJ
Closed
4 Derailment of Power No. 16260 R /WDM3A at Hnad point No. 51/A during shunting in SHC yard on 26.6.2019. (ID 20190610011)
11.7.2019
Primary 1. Gopal Kumar, Pointsman/SHC . Secondary 2.Ambuj Kumar Loco shunter/SHC. 3. Ranjay Kumar Outdoor SM/SHC.
1.1.7.2019. 2. 23.7.2019. 3.17.7.2019.
1.WIT 1 YEAR on 19.7.19 2. 02 sets P/Pass stopped on 07.08.19 3. 01 set P/Pass stopped on 07.08.19
Closed
5
Derailment of 2 wagons of DMH DC while being placed in shunting neck of DMH on 02/08/2019. (SIMS ID – 20190810001)
19.8.19
Primary 1. Sri Pranav Vats, Goods guard/SHC . 2. Sri Niranjan Kumar LP/SHC. 3. Sri Anuj Kumar Singh ALP/SHC. Secondary 1.Sri Rakesh Kumar SM/DMH.
1.SF -11 issued on 6.9.19 2.SF -11 issued on 21.8.19 3 SF -11 issued on 22.8.19 Secondary 1.SF -11 issued on 6.9.19
Primary 1.WIT- 01 Yr. on 15.11.19 2. WIT-01 year -10.10.19 3 WIT-01 year -24.10.19 Secondary 1.02 set P/pass stopped on 16.12.19
Closed
37
6.
Derailment of wagon no 30059362613 BCN NFR of SMI/DC by front trolley 2 wheels in line no 3 of SMI yard on 13.8.19 ( ID 20190810004).
26.8.19
Primary 1. Sri JeevachhPaswan, SSE(P.Way) /KML. 2.Sri Sanjay Kr.Pandey, APWS/ SMI 3.Jai Mangal Baitha, Mate, Gate No. 17/SMI Secondary: 1. Sri Babloo Rai, Gatemain, 56/A /SMI. Blameworthy : 2. Sri Madan Prasad, SS/SMI.
1. SF-11 on 13.11.19 2. SF-11 on 13.11.19 3. Not issued. 1. SF.-11 issued on 9.9.19 2. SF.-11 issued on 9.9.19
1 One set P/Pass stopped on 06.01.20 2 One set P/Pass stopped on 05.12.19 3.WIT one year on 2712.2019 1. One set P/Pass stopped on 9.10.19. 2. One set P/Pass stopped on 9.10.19.
Closed
7
During shunting Fire Incident in coach no.- 05210/C/ - WGSCN/WCR of incoming rake of 12566 DN in DBG yard on 04.09.2019. ( ID-20190910002).
09.09.19
Primary :- Miscreant Activity.
Nil
Nil
Closed
8 Fire Incidence in passenger coach no.- 08481/C-GS/EC stable in Line no.-08 in DBG yard on 07.09.2019.. ( ID-20190910003).
05.11.19.
Miscreant Activity
Nil
Nil
Closed
9 Derailment of 04 wheels of front trolley of Engine no.- 70559/JHS of DN BOBYN
18.10.2019
Primary 1. Sri Om Prakash , SSE(P.Way)/SG
- 1. One set P/Pass
Closed
38
RMC DC in KUMB yard at Line no.- 04 at KUMB Yard on 09.09.2019. ( ID 20190910004).
L stopped on 05.12.19
10 Derailment of sick line shunting from line no.-10 to 11 of coach no.- 18429/LS/ECR by four wheels LSI end at L.No.-11 at DBG Yard on 10.9.19. ( ID 20190910005).
11.10.2019
Primary 1. Sri Krishna Kr.Mishra, SSE(P.Way)/DBG
1. SF.-11 issued on 16.09.19
1. One set P/Pass stopped on 05.12.19
Closed
11 Derailment of wagon no.- 70160300746/WCR BOBYN & 70101200753/ECR BOBYN of DN BOBYN empty DC at km. 98/8-7 of SHC Yard on 10.10.2019. ID- 20191010004
25.10.2019
Primary 1. Sri Rakesh Kumar , SSE(P.Way)/KGG at SHC 2. Sri Ajay Kumar, SSE/P.Way/KFA 3. Sri P(Goods)/SHC 4. Sri Pankaj Kr. Pashwan, Guard(Goods)/SHC 5. SSE/(C & W)/PKR/ HWH/ER. Blameworthy : 1. Sri Mahesh Kr. Sinha, SSE/TRD/SHC.
1. SF.-11 issued on 05.12.19 2. SF.-11 issued on 05.12.19 3. SF.-11 issued on 05.11.19 4.SF-11 on 13.11.19 5. Deleted 1.Warning Letter issued on 13.12.1
1. Warning issued. 2. One set P/Pass stopped 3.One set P/Pass stopped on 16.12.19 4. One set P/Pass stopped 5. Deleted 1. Warning dated 13.12.19
Closed
12 Over shooting of UP Home Signal (SPAD) of RBZ
Under Progress
Primary 1. Sri Dharmnath
1.SF 5 issued
Letter to
Sr.DSO/S
EE
39
station by Train no.- 13185 UP on 30.11.2019. ID- 20191110005
Yadav LP/BJU/SEE 2. Sri Pawan Kumar, Sr.ALP/BJU/SEE Secondary: 1. Sri Satyam Kumar CLI/BJU/SEE 2. Sri Ramashankar Singh, SM/RBZ/SPJ 3. Sri Manish Kr. Paswan Guard/BJU/SEE
2. SF 5 issued 1. SF 11 issued 2. 3.
1.WIT 3months 2.Censured
&Sr.DOM
/SPJ on
24.12.19
13 Derailment of Rear Trolley of Wagon No. 12070741066 of UP JNR DC in line no. 4 of JNR yard on 01.01.2020
07.02.20 Primary
1. Sri Ashwani
Kumar,
Goods Clerk,
Shekhpura
Blameworthy :
1. Sri
Dharmendra
Kumar
CTI/KG/DNR
Letter to SrDCM/DNR 17.03.20, Reminder on 13.05.20, 03.07.20
14 Derailment of 4
wheels of B/Van
no. –
861609760720 of
train no. –
UPBCNE HL in
line no. – 3 of
BYP yard on
10.01.2020.
SIMS ID -
20200110005
07.02.202
0 Primary
1. Sri Sneh
Ranjan ,
JE/W/SHC
Secondary:
1. Sri Sanjai
Kumar
Pointsman/BYP
Blameworthy :
1. Sri Jeevan
Prakash
SS/BYP
2.Sri Sunil
Kumar
SSE/P.Way/SHC
1.SF-11 issued on
26.02.20
1. SF-11 issued
on 12.03.20
1. SF-11 issued
on 12.03.20
2.SF-11 on
24.03.20
1.01 set P/pass
stopped on
24.04.20
1. Censured on
04.05.20
1. Censured on
04.05.20
2.Warning
on 28.04.20
Closed
15 Incidence at LC Gate No. 2/C/E (Km 42/0-1) between (NWC- HPO) section with train No.
Under CRS Enquiry Final report awaited
40