chanti status
DESCRIPTION
CHANTI status. CHANTI team. CHANTI TR setup. Outside the beam next to LAV1 Inside a vacuum capable tank which has been emptied in 29th November Using LAV signal flange to set V bias and read signals from the station inside the tank. 1. CHANTI TR DCS/ Readout. Beam OFF. Beam ON. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/1.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
CHANTI status
CHANTI team
![Page 2: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/2.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
CHANTI TR setup• Outside the beam next to LAV1• Inside a vacuum capable tank which has
been emptied in 29th November• Using LAV signal flange to set Vbias and
read signals from the station inside the tank
1
![Page 3: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/3.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
CHANTI TR DCS/ Readout• Standalone DCS using a laptop with serial communication and LabView to
drive CHANTI prototype board and serial comm to LAV-ToT board • Only 32 out of 46 ch can be powered and read simultaneously. • 1 TEL62 + 1 TDCB (64 ch, high and low th)
Beam OFF
Beam ON
2
![Page 4: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/4.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
CHANTI TR setup
Only 32 CHANTI channels, corresponding to 64 TDC channels, can be instrumented using prototype board. Three possible configuration A-B A-C B-C but only two used: A-C B-C
3
![Page 5: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/5.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
CHANTI Setup
4
![Page 6: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/6.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
CHANTI B-C Setup
4
![Page 7: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/7.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
CHANTI A-C Setup
4
![Page 8: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/8.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
CHANTI standalone acquisition• Very simple scripts with both .txt and .root output created by D. Di Filippo, M.Mirra
and F.A.• Always matches well the start of burst• Able to collect about 600 CHANTI evts/burst. • Acquisition limited to first ≃100 ms of the burst due to filling up of the buffer• «Event» is defined offline since it is acquired triggerless
BEAM ONBEAM OFF
5
![Page 9: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/9.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
Occupancy• 64 electronic channels , with alternating Low/High thresholds
(=80/250 mV) corresponding to 32 physical channels. Occupancy coherent with the type of bar used.
Long bars
Medium bars
Short bars«Noisy» bar
6
![Page 10: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/10.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
Time slewingEvents with hits from both thresholds used to find average time slewing correction using logarithmic fit
7
![Page 11: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/11.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
Time resolution (1)• Events with more than one bar fired used for evaluating time
difference to estimate time resolution. Both without slewing correction
Trailing only hits have been dropped
8
![Page 12: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/12.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
Time resolution (2)• And with slewing corrections. • RMS 2.17 ns means about 1.3 ns single channel resolution. • No XY correction applied yet • Expect 4 channels will be actually fired by a MIP
9
![Page 13: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/13.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
Time resolution (2 bis)• And with slewing corrections. • RMS 2.17 ns means about 1.3 ns single channel resolution. • No XY correction applied yet • Expect 4 channels will be actually fired by a MIP
9
![Page 14: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/14.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
ToT response• Due to triangular shape of the bars adjacent bars should show
anticorrelated response (i.e. anticorrelated ToT at same threshold)
10
![Page 15: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/15.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
Common acquisition
Channel recodification: 1 2 1 0 8 1
11
![Page 16: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/16.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
Common acquisition
Channel recodification: 1 2 1 0 8 1
Station ID
11
![Page 17: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/17.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
Common acquisition
Channel recodification: 1 2 1 0 8 1
Ring ID Vertical = 1Horizontal = 2
11
![Page 18: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/18.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
Common acquisition
Channel recodification: 1 2 1 0 8 1
If it’s a half bar up (right) = 0, down (left) = 1
11
![Page 19: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/19.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
Common acquisition
Channel recodification: 1 2 1 0 8 1
Channel ID in the Ring (between 0 to 16)
11
![Page 20: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/20.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
Common acquisition
Channel recodification: 1 2 1 0 8 1
Threshold Low = 1High = 2
11
![Page 21: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/21.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
Common acquisition
Channel recodification: 1 2 1 0 8 1
Station ID
Ring ID Vertical = 1Horizontal = 2
If it’s a half bar up (right) = 0, down (left) = 1
Channel ID in the Ring (between 0 to 16)
Threshold Low = 1High = 2
11
![Page 22: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/22.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
Common acquisition
N hits
N hits
Ring occupancy for the different rings:X Ring and Y Ring
12
![Page 23: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/23.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
Common acquisitionPosition in the Ring (1 X, 2 Y)
X (mm)
Y (mm)
Hole
Hole
13
![Page 24: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/24.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
Vacuum Test• Al least 10-4 mbar immediately reached and no changes in the currents. Now al
least 10-5 mbar reached. In the next days a outgassing test planned
14
![Page 25: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/25.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
Conclusion• Acquired data with the A-C and B-C configuration in both standalone mode and
common acq
• Acquired data with different thresholds (more than 100k events for each configuration) both in standalone acq and in common acq
• Acquired data different Vbias (nominal Vbias ± 250 mv and 500 mv)
• Tested the detector operation and response in vacuum
• Good response from the prototype board
• We have to analyse data collected using both the acquisitions
15
![Page 26: CHANTI status](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816758550346895ddc1630/html5/thumbnails/26.jpg)
Paolo Massarotti Photon Veto WG 11/12/12
Construction status• Bars for three station have been already tested
• CHANTI Vessel design ready
• As soon as possible there will be a meeting in Frascati in order to discuss of the CHANTI board finalization
16