channel maintenance dredging and placement of dredged … · 2019-10-29 · • corps is required...
TRANSCRIPT
BUILDING STRONG®
US Army Corp of Engineers
Channel Maintenance Dredging and
Placement of Dredged Materials
Upper Mississippi River Conference Beneficial Use of Dredged Material
October 24, 2019
Matt Afflerbaugh
U.S. Army Corps of Engineers
Rock Island District
Operations Division
Technical Support Branch
(309) 794-5384
MVR CHANNEL MAINTENANCE
Mississippi River • 314 River Miles • Below L/D 22 Saverton, MO
• Below L/D 10 Guttenberg, IA
Illinois Waterway • 268 River Miles • LaGrange L/D RM 80.2 – confluence of
Des Plaines and Kankakee Rivers RM 273
• Des Plaines River to CS&SC
• CS&SC – S. Branch of the Chicago River
RM 325.6
• Cal-Sag, Little Calumet, Calumet to T.J.
O’brien L/D RM 326.4
3
2019
MVR Mississippi River Dredging - Historical Perspective
4
MVR Illinois Waterway Dredging - Historical Perspective
Hydrographic Survey
6
Mechanical Dredging
7
Hydraulic Dredging
Upland
Floodplain
Bankline
Open Water
General Placement Type Concept
Upland Bankline
General Categories of Placement
Floodplain
Open Water
9
Channel Maintenance Dredging and Regulation
Title 33 of the Code of Federal Regulations part 335.7 defines the Federal Standard as “the dredged
material placement alternative or alternatives identified by the Corps which represent the least
costly alternatives consistent with sound engineering practices and meeting environmental
standards established by the 404(b)(1) evaluation process or ocean dumping criteria.”
Adapted from: Thomas Turner, Fundamentals of
Hydraulic Dredging, Second Edition, 1996
10
Channel Maintenance Dredging and Other Requirements
Photo: Sara Schmuecker, USFWS
Photo: Andrew King, USFWS
Rock Island County, Public Mapping App, http://ricogis.maps.arcgis.com
• Corps is required to develop long-term (> 10 yrs) dredging plans 33
CFR, Parts 335-338
• The District has developed Dredged Material Management Plans for
individual dredging reaches. Minimum of 20 year plan ER 1105-2-100
• ID potential sites and group into alternatives
• Alternatives compared using Matrix (Channel Maintenance Handbook)
• Dredging Cost
• Natural Resources
• Beneficial Use
• Recreational Resources
• Cultural Resources
• Social Impacts
Channel Maintenance Dredging and Long-term Plans
Each Dredged Material Management Plan will contain an
Environmental Assessment (EA) and Section 404(b)(1) – Compliance with the National Environmental Policy Act
– Compliance with the Clean Water Act
On-Site Inspection Team (OSIT) – Federal and State partners with regulatory or management jurisdiction
– Proposed placement areas are coordinated with OSIT
Site
Specific
Issues?
Placement Site Compliance and Considerations
13
Beneficial Use of Dredged Materials
Photo provided by P.J. Anglin
Photo: Sara Schmuecker, USFWS
14
Beneficial Use Sites
https://www.mvr.usace.army.mil/Missions/Navigation/Dredging/Beneficial-Use/
15
Other Authorities, Programs, Actions
• Section 204 - Beneficial Use of Dredged Materials • Creation of aquatic and wetland habitats in conjunction with construction or
maintenance dredging of Federal Navigation Projects (65%/35% cost share)
• Section 1122 Pilot Projects
• Regional Sediment Management
• Engineering With Nature
• ERDC (Environmental Research and Development Center)
• Support For MVR
• DOTS
16
Summary
Matt Afflerbaugh
U.S. Army Corps of Engineers
Rock Island District
Operations Division
Technical Support Branch
(309) 794-5384