Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
Projects
Jim Fineis P.G.Atlas Geo-Sampling Company
www.atlas-geo.com
2016 South Eastern States Vapor Intrusion Symposium April 28th and 29th 2016
Crown Plaza Hotel Atlanta, Atlanta Georgia
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
Projects
Case Studies:
1. VI Investigation Conducted On Base and Off Base at the Former Fort Gillem Army Base
2. Environmental Justice VI Investigation in Central Mississippi3. Pending Environmental Justice Investigation in North Central
Mississippi4. Bank Portfolio Purchase in Wisconsin
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
Projects
Challenges/Discussion Topics:
Shear size and duration of projects Communication challenges (residents, media, regulators and
client) Samples storage/security issues Sample receiving and shipping challenges Laboratory capacity issues Geographic challenges
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation Conducted On Base and Off Base at the Former Fort
Gillem Army BaseChallenges Overview
Shear size and duration of projects• Project schedule required an 18 month commitment of resources• Hundreds of 6 liter and 1 liter summa canisters were required• Hundreds of trips to individual homes was necessary• Additional scope items (removal of household chemical products) was
added half way thru the project• Chemical product removal added a third day to each house that was
sampled (33% more time)• Poor weather conditions caused numerous scheduling changes• Changing security protocols on the base provided access challenges• Documenting, tracking and securing the necessary paperwork and
electronic documents was very challenging
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation Conducted On Base and Off Base at the Former Fort
Gillem Army BaseChallenges Overview
Very High Profile• Intense local media coverage (ABC, CBS, Fox and NBC)• Daily updates being sent to the pentagon in Washington
DC• Non EPD interest within the State of Georgia government
Geographic Challenges• Two separate groundwater plumes potentially impacting
homes on the north side and the south side of the base boundary
• Due to homeowner availability, houses were not able to be scheduled in geographic blocks which resulted in numerous trips between the north and south side of the base.
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation Conducted On Base and Off Base at the Former Fort
Gillem Army BaseChallenges Overview
Summa Canister Availability• The availability of enough summa canisters from the laboratory
occasionally impacted the sampling schedule• Scheduling of pickup and delivery of summa canisters added to
the scheduling challenges• Quality of the laboratory hardware varied depending on which
air laboratory within the large laboratory chain of labs provided the summa canisters
Summa Canister Security and Sample Handling• Finding a location to house, secure and process up to 100 6 liter
summa canisters at any one time• Transporting the summa canisters to the houses• Ensuring that the summa canisters were kept under the proper
chain of custody for the length of the project
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
ProjectsChallenges #1:
Shear size and duration of projects• All the following number are approximate estimates of the work performed
• 102 total houses sampled (83 sampled twice and 19 sampled once)• 115 separate mobilizations occurred to complete the project• 375 helium leak test were performed• 400 6 liter summa canisters were deployed for indoor air / ambient
air collection• 175 6 liter summa canisters were deployed for crawl space sample
collection• 50 sub-slab vapor implants were installed• 290 1 liter summa canisters were deployed for soil gas collection• 650 shut in tests were performed on the summa canisters and
sampling system
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
ProjectsShear size and duration of projects
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
Projects:Shear size and duration of projects
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
ProjectsShear size and duration of projects
SolutionYou must have a schedule and a plan
• Organization is MANDATORY• Consistent personnel is MANDATORY• Relationship with residents is critical
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
Projects
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
ProjectsSolution
You must have a schedule and a plan
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
Projects
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
ProjectsYou must have a schedule and a plan
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
Projects
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
ProjectsSolution:
You must have a schedule and a plan
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation Conducted On Base and Off Base at the Former Fort
Gillem Army BaseChallenge #2:
Summa Canister Availability• The availability of enough summa canisters from the laboratory
occasionally impacted the sampling schedule• Scheduling of pickup and delivery of summa canisters added to the
scheduling challenges• Quality of the laboratory hardware varied depending on which air
laboratory within the large laboratory chain of labs provided the summa canisters
Summa Canister Security and Sample Handling• Finding a location to house, secure and process up to 100 6 liter summa
canisters• Transporting the summa canisters to the houses• Ensuring that the summa canisters were kept under the proper chain of
custody for the length of the project
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
Projects
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
ProjectsChallenge #2:
Proper management of summa canisters• 865 total summa canisters were used for this project• All indoor air and ambient air samples were 6 liter summa
canisters• Soil gas summa canisters were 1 liter in volume
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
Projects
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
Projects
Solution:You must have a secure location to manage your equipment
Challenge #2:Proper management of summa canisters
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
Projects
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
ProjectsSolution:
You must have a secure place to store you equipment
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation Conducted On Base and Off Base at the Former Fort
Gillem Army BaseVery High Profile
• Intense local media coverage (ABC, CBS, Fox and NBC)• Daily updates being sent to the pentagon in Washington
DC• Non EPD interest within the State of Georgia government
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation Conducted On Base and Off Base at the Former Fort
Gillem Army BaseVery High Profile
• Intense local media coverage (ABC, CBS, Fox and NBC)• Daily updates being sent to the pentagon in Washington
DC• Non EPD interest within the State of Georgia government
Governor
Deal
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation Conducted On Base and Off Base at the Former Fort
Gillem Army BaseSolution:
Communication• USEPA Occupied Dwelling Questionnaire
• Access Agreement
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation Conducted On Base and Off Base at the Former Fort
Gillem Army BaseSolution:
Communication• Community Outreach encompasses many different avenues of
communication and is vital to getting your project off the ground, and subsequently keeping the participants updated with clear and open lines of communication.
• Newspaper announcements
• Neighborhood mailers or Fact Sheets
• Social Media
• Hotline Phone
• Door Knocking
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation Conducted On Base and Off Base at the Former Fort
Gillem Army BaseSolution:
Communication
• Once your study has begun and residents and homeowners have consented to indoor sampling of their homes, maintaining their trust with an open line of communication and project transparency is fundamental to continuation and completion of the project.
• In-home one-on-one meetings
• Direct phone communication
• Community Meetings
• Neighborhood mailers
• Social Media
• Direct Emails/Mass Emails
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation Conducted On Base and Off Base at the Former Fort
Gillem Army BaseSolution:
Communication
• Timely distribution of results demonstrates a sense of urgency and care to the participating residents of the study.
• Verbal notification of result receipt (telephone)
• Individual results provided to each participant (certified mail, or hand deliver)
• Community Meetings to discuss “big picture” results of study as a whole
• Library Repositories
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation Conducted On Base and Off Base at the Former Fort
Gillem Army BaseChallenge #4
Geographic Challenges• Two separate groundwater plumes potentially impacting
homes on the north side and the south side of the base boundary
• Due to homeowner availability, houses were not able to be scheduled in geographic blocks which resulted in numerous trips between the north and south side of the base.
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation Conducted On Base and Off Base at the Former Fort
Gillem Army BaseChallenges:#4
Geographic Challenges
Solution:Communication, Flexibility and Patience
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation Conducted On Base and Off Base at the Former Fort
Gillem Army BaseSolution:
Communication, Flexibility and Patience
Approximately 60 miles driven between
houses
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation Conducted On Base and Off Base at the Former Fort
Gillem Army BaseSolution:
Communication, Flexibility and Patience
Multiple daily updates given to office staff in order to change the schedule as needed
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation Conducted On Base and Off Base at the Former Fort
Gillem Army BaseConclusions:
1. Teamwork between consultant, regulators, responsible party and contractors is MANDATORY
2. Flexibility in allowing field staff to make adjustments to the schedule is key
3. Patience, Patience Patience….......
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation – Middle Mississippi on a Confidential Site
Challenges/Discussion Topics:
Three concerned parties involved – responsible party (RP), Attorney group (my client) and EPA
Communication challenges Quality control issues Laboratory capacity issues
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation – Middle Mississippi on a Confidential Site
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation – Middle Mississippi on a Confidential Site
xxxx
x
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation – Middle Mississippi on a Confidential Site
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation – Middle Mississippi on a Confidential Site
Site History
• History of spills and leaks on the plant property since the 1970’s
• Suspected dumping of hazardous material throughout the neighborhood and surrounding areas
• Documented releases chlorinated solvents and petroleum solvents in the soil and groundwater
• Barrier wall installed during the 1980’s to protect surface water
• No fishing or swimming signs posted in nearby creeks and streams
• 80+ homes adjacent to the plant property• Depth to groundwater is <5’
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation – Middle Mississippi on a Confidential Site
Site History• 8 houses have been tested multiple times• Indoor air, sub-slab air and ambient air have had
exceedances during the investigation• Large scale soil gas / sub-slab investigation planned for
the summer months
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation – Middle Mississippi on a Confidential Site
Challenge #1 Three concerned parties involved – responsible party (RP),
Attorney group (my client), EPA and MDEQ
• Different objectives• RP – limit investigation area, limit chemicals of concern, slow down the
pace of investigation and keep the RP as a client• Attorney group – expand the area of investigation to gain more clients for a
potential law suit, expand the chemicals of concern, investigate quickly so the money can be recouped and residents can be get a settlement
• EPA/MDEQ – Can only approve submitted work plans but can’t direct the investigation as long as the RP is paying the bill, is initiating their own investigation is battling a bad perception by the residents (not forcing any action for 20 + years).
Solution:None really found yet
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation – Middle Mississippi on a Confidential Site
Challenge #1 Three concerned parties involved – responsible party (RP),
Attorney group (my client), EPA and MDEQ
• Problems encountered• RP’s work plans never received in time to prep for field
work• Different methods of collecting sub-slab data• Not allowing true duplicate samples to be collected• Questionable QA/QC procedures in the field• EPA has not ability to force the RP to “play nice” in the
fieldSolution:
None really found yet
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation – Middle Mississippi on a Confidential Site
Challenge #2 Communication challenges
• Problems encountered• Homeowners have been in the dark about possible VI
issues for 20 years• Over 150 residents attended a recent “open” house
regarding the upcoming VI investigation• Work plans not being submitted and approved in time for
field work to be planned• Work plans not being consistent with EPA guidance• Residents are VERY suspicious of EPA and RP personnel
– no trust Solution:None really found yet
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
VI Investigation – Middle Mississippi on a Confidential Site
Challenge #3 & #4 Quality control issues Laboratory capacity issues
• Problems encountered• No agreement of the level of QA/QC needed for the
project due to inadequate detail in the work plans• Work plans not approved far enough in advance to give
the laboratory advance notice of the work planned• Not following industry standards when conducting the
scope of workSolution:
Documentation of QA/QC lapses, begging the laboratory of enough individually certified summa
canisters to complete the project
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Pending VI Investigation in North Central Mississippi
Challenges:• Very large chlorinated solvent plume that underlays thousands of acres of
land• Potential VI receptors include a hospital, jail, school, day care and senior
citizen home• Groundwater plume is poorly defined, groundwater is <6’ bgs• RP does not seem to be very well versed in conducting VI investigations• Property values have been diminished(Walmart backed out of a deal)• Local government and residents are scared of the potential health effects
from VI• Gaining access to all the necessary property (fortunately the local
government is on board with the VI investigation and owns a larges part of the land. Six other landowners account for over 80% of the remaining land
Solution• Conduct a systematic vapor intrusion investigation working from the
groundwater up to the structure and then inside the structure if necessary• Develop relationships with local land owners and government officials.
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Bank Portfolio Purchase in Wisconsin
Challenges:• 10 branch locations located across the entire state of
Wisconsin• Work had to be completed in one week• Project cost was a concern• Only allowed to work “bankers hours”, 9 am to 5 pm• Sub-slab implants need to equilibrate a minimum of 2 hours
(Wisconsin guideline) to 8 hours (EPA ORD research suggest)• Due to equilibration time, sites could not be drilled and
samples in the same day, this caused major logistical issues• Client decided to collect slab specific attenuation factor data
from each site so samples had to be shipped out each day for overnight delivery
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Bank Portfolio Purchase in Wisconsin
Site Locations
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Bank Portfolio Purchase in Wisconsin
Statics:• 1300 + miles in 6 days• 10 sites sampled and installed in 6 days• 28 sub-slab samples and 40 slab attenuation samples
shipped
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Bank Portfolio Purchase in Wisconsin
Solutions:• The client did a great job of communicating with all bank branches• My client had a representative with with me at all times to facilitate access, etc.• The laboratory provided numerous shipping boxes, chain of custodies and pre-
paid shipping labels• Slab attenuation lab worked around the project schedule and was flexible with
sample receiving• Although work could only be performed during “banking hours”, drive time
before or after “banking hours” was used to get between locations
Challenges:• 10 branch locations located across the entire state of Wisconsin• Work had to be completed in one week• Only allowed to work “bankers hours”, 9 am to 5 pm• Due to equilibration time, sites could not be drilled and samples in the same day,
this caused major logistical issues
Atlas Geo-Sampling Company
http://www.atlas-geo.com
File Edit View History Bookmark Window Help
Search EPA Vapor Intrusion
http://www.epa.gov/oswer/vaporintrusion/documents/PVI-Guide-Final.pdf, http://www.epa.gov/oswer/vaporintrusion/documents/OSWER-Vapor-
Intrusion-Technical-Guide-Final.pdf
Challenges of Conducting Large Scale, High Profile Vapor Intrusion
Projects
Jim Fineis P.G.Atlas Geo-Sampling Company
www.atlas-geo.com
Questions ?????