CH2M HILL 135 South 84th Street Suite 325 Milwaukee, Wl 53214-1456 Tel 414.272.2426 CH2MHILL Fax 414.272.4408 June 16,2005 184213.PP.03 235202" Mr. Ronald Murawski Work Assignment Manager (SR-6J) U.S. Environmental Protection Agency, Region 5 77 W. Jackson Boulevard Chicago, IL 60604 Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No. 68-W6-0025 Dear Mr. Murawski: Enclosed are two copies and an electronic file of the Summary Field Oversigt Report describing the observations made of the remedial investigation activities conducted at the Tremont City Landfill site. This plan is being submitted pursuant to Task 03 in the Statement of Work and covers the Phase 1 and 2 investigations. Please do not hesitate to contact me at 414-847-0469 if you have any questions. Thank you. Sincerely, CH2M HILL Jewelle I. Keiser, PG Site Manger Stephen Nathan, PO/U.S. EPA, Region 5 (w/o enclosure) Norvelle Merrill, CO/U.S. EPA, Region 5 (w/o enclosure) Ike Johnson, PM/CH2M HILL, Milwaukee Dan Plomb, DPM/CH2M HILL, Milwaukee Gina Bayer, QAM/CH2M HILL, Milwaukee David Voight, ASM/TN & Associates, Milwaukee Paul Weber, Field Observer/CH2M HILL, Dayton Cherie Wilson, AA/CH2M HILL, Milwaukee

Upload: others

Post on 24-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

CH2M HILL

135 South 84th Street

Suite 325

Milwaukee, Wl 53214-1456

Tel 414.272.2426CH2MHILLFax 414.272.4408

June 16,2005

184213.PP.03 235202"

Mr. Ronald MurawskiWork Assignment Manager (SR-6J)U.S. Environmental Protection Agency, Region 577 W. Jackson BoulevardChicago, IL 60604

Subject: Summary Field Oversight ReportTremont City Landfill Site, Tremont City, OHWA No. 203-RSBD-B5B1, Contract No. 68-W6-0025

Dear Mr. Murawski:

Enclosed are two copies and an electronic file of the Summary Field Oversigt Reportdescribing the observations made of the remedial investigation activities conducted at theTremont City Landfill site. This plan is being submitted pursuant to Task 03 in theStatement of Work and covers the Phase 1 and 2 investigations.

Please do not hesitate to contact me at 414-847-0469 if you have any questions. Thank you.

Sincerely,

CH2M HILL

Jewelle I. Keiser, PGSite Manger

Stephen Nathan, PO/U.S. EPA, Region 5 (w/o enclosure)Norvelle Merrill, CO/U.S. EPA, Region 5 (w/o enclosure)Ike Johnson, PM/CH2M HILL, MilwaukeeDan Plomb, DPM/CH2M HILL, MilwaukeeGina Bayer, QAM/CH2M HILL, MilwaukeeDavid Voight, ASM/TN & Associates, MilwaukeePaul Weber, Field Observer/CH2M HILL, DaytonCherie Wilson, AA/CH2M HILL, Milwaukee

Page 2: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

T E C H N I C A L M E M O R A N D U M CH2JVJHILL

Summary Field Oversight ReportTremont City Landfill, Barrel Fill OU, OhioWA No. 203-RSBD-B5B1, Contract No. 68-W6-0025PREPARED FOR: Ron Murawski, USEPA, Region 5

PREPARED BY: CH2M HILL

COPIES: Jewelle Keiser/CH2M HILLDavid Voight/TN & AIsaac Johnson/CH2M HILL

DATE: June 8, 2005

1.0 IntroductionThis technical memorandum summarizes observations made by CH2M HILL of theremedial investigation (RI) activities at the Tremont City Landfill Barrel Fill Operable Unit(BFOU) outside of Tremont City, Ohio. The RI field efforts were conducted by Haley andAldrich Inc. (H&A) for the Responsible Environmental Solutions Alliance (RESA).

Observations are summarized below for the different characterization and investigationactivities that were conducted during the two phases of RI field efforts. Site photographs areincluded in Attachment A.

2.0 Oversight DatesThe dates that CH2M HILL team members were onsite and the specific activities that wereobserved are presented in Table 1.

TABLE 1Field Activates Observed by CH2M HILL

Date Description of Activities Observed

October 8-10, 2003 Background soil sampling and background soil vapor survey

October 13, 2003 BFOU soil sampling

October 15, 2003 BFOU soil vapor survey and monitoring well installation at Cluster 5

October 17, 2003 BFOU soil vapor survey and monitoring well installation at Cluster 5

October 20-21, 2003 BFOU soil vapor survey; test pit activities at cell A-8; monitoring well installationat Cluster 5 and Cluster 6

October 23-24, 2003 BFOU soil vapor survey; test pit activities at cell B-7; monitoring well installationat Cluster 5 and Cluster 6

MKE\051650001 1 1M213.FI.01

Page 3: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIO

WA NO. 203-RSBD-B5B1, CONTRACT NO. 68-W6-0025

TABLE 1

Field Activates Observed by CH2M HILL

Date Description of Activities Observed

October 27, 2003

October 28, 2003

October 29, 2003

October 30-31,2003

November 3, 2003

November 4-7, 2003

November 10, 2003

November 12, 2003

November 13, 2003

November 17, 2003

November 19, 2003

November 20, 2003

November 24, 2003

December 4, 2003

December 9, 2003

December 11, 2003

December 16, 2003

December 23, 2003

December 29, 2003

January 12, 2004

March 9, 2004

April 16, 2004

November 11, 2004

January 20, 2005

January 27, 2005

February 15, 2005

Geophysical survey at BFOU; BFOU soil cover evaluation and measurement;background soil gas survey

Test pit activities at cell F-7; monitoring well installation at Cluster 5 and Cluster 6

BFOU soil sampling at N-10; test pit activities at cell C-3; monitoring wellinstallation at Cluster 1, Cluster 5, and Cluster 6

BFOU soil sampling at N-9; test pit activities at cell C-3; monitoring wellinstallation at Cluster 1 and Cluster 6

Geophysical survey at BFOU; test pit activities at cell C-3 (drums encountered);monitoring well installation at Cluster 1 and Cluster 6

Test pit activities at cell C-3; monitoring well installation at Cluster 1 and Cluster 6

Test pit activities at cell C-3; monitoring well installation at Cluster 6

Test pit activities at cell C-3; monitoring well installation at Cluster 1 and Cluster 4

Test pit activities at cell C-3 (deep excavation on east side of cell); replacementmonitoring well installation

Test pit activities at cell C-3 (deep excavation on east side of cell; 4 drum layersexposed); monitoring well installation at replacement locations, Cluster 3, andCluster 4

Test pit activities at cell B-7; monitoring well installation at replacement welllocations and at Cluster 3; well abandonment

Test pit activities at cell B-7 (drums encountered); well abandonment

Test pit activities at cell B-7

Test pit activities at cell D-7 (drums encountered); monitoring well installation atCluster 2 and Cluster 3

Test pit activities at cell D-7

Test pit activities at cell D-7 (deep excavation on East side of cell), monitoringwell installation at replacement well locations

Monitoring well installation at replacement well locations and at Cluster 2

Test pit activities at cell A-8 (drums encountered)

Clay barrier wall assessment

Test pit activities at cell A-11

Well development

Groundwater sampling

Final drilling of six additional monitoring wells

Aquifer pump testing begins for the 1,075-feet (lower) sand unit on well HPW-2

The second aquifer pump test for the 1,075-feet (lower) sand unit on well HPW-1

The third aquifer pump test on the 1,075-feet (lower) sand unit on well HPW-7

MKB051650001

Page 4: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIO

WA NO. 203-RSBD-B5B1, CONTRACT NO. 68-W6-0025

TABLE 1

Field Activates Observed by CH2M HILL

Date Description of Activities Observed

March 7, 2005 Site wide groundwater sampling begins

March 18, 2005 Site wide groundwater sampling continues

March 21, 2005 Site wide groundwater sampling continues

March 25, 2005 Site wide groundwater sampling is completed

3.0 Field Activities Observed

3.1 Background Soil SamplingSoil samples from the 10 proposed background locations were collected north of the BFOUon October 8 and 9, 2003. Overall, the subsurface soils were dry, except at one location(furthest northwest), which had a thin 2-inch layer of saturated silt. In addition, some near-surface buried refuse was observed at one location.

3.2 Background Soil vaporThe vapor survey was completed at the 10 proposed background locations on October 9 and10, 2003. The vapor survey detected total volatile organic compounds (VOCs) at 6 of the 10locations. The results were used to determine the trigger level that would require soil gassamples to be collected for laboratory analysis. In addition, because of elevated readings oforganic vapor that were measured using a photoionizarion detector (FID) at the backgroundlocations, soil gas samples were collected on October 27 from two of the backgroundlocations (SG-2 and SG-4) for laboratory analysis.

3.3 Soil Gas SurveyThe soil gas survey was conducted at each of the waste cells between October 14 and23, 2003. Samples from 19 locations exceeded the trigger level (18.8 parts per million [ppm]);samples from these locations were collected and submitted for laboratory analysis.

3.4 Cover Evaluation and Cover Thickness MeasurementsSoil cover thickness borings ranging from 4 to 8 feet in depth were completed onOctober 27, 2003. Visual observations of the soil cores did not indicate that the nativematerial had been encountered.

3.5 BFOU Soil SamplingSubsurface soil samples were collected from six (N-2 to N-5, N-9, and N-10) of the nineproposed locations. All of the locations drilled were outside of the cell areas. Borings werecompleted to depths of 12 to 18 feet with water encountered at about 15 feet.

MKEW51650001

Page 5: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIO

WA NO. 203-RSBD-B5B1, CONTRACT NO. 6B-W6-0025

3.6 Test Pit Excavation Activities

3.6.1 Cell A-8

Cell A-8 was initially investigated between October 20 and 23, 2003, with three test pitsexcavated to depths of between 8 and 12 feet. No drums were encountered.

Excavation at this cell resumed on December 17, 2003. From this cell, 10 drums weresampled and organic vapors from drums were not detected using the flame ionizationdetector (FID). The vertically-stacked drums were encountered at a depth of 16.5 feet. Theywere observed to be intact, but rusted and dented. The drums were sampled from a test pitthat was about 20 feet long north to south and about 15 feet long east to west. No seepingwater was observed during test pit operations. The bottom of the cell was not determined orsampled because of time restraints.

3.6.2 Cell B-7Cell B-7 was initially investigated between October 23 and 27, 2003, with three test pitsexcavated to depths of 8.5 feet. No drums were encountered.

Test pit activities resumed at this cell on November 18, 2003. Liquid with a visible blue-graysheen was observed in the cell at about a depth of 14 feet and a sample of the liquid wascollected. Vertically stacked drums were encountered at about 14 feet below ground surface(bgs). Markings were observed on the lids of 2 of the 20 drums that were encountered in thecell. The first lid contained the word "Perchloroethylene" and the other contained writingthat might have indicated a waste code. Ten drums were sampled and the FID headspacereading of these samples ranged from 8.2 to 2,000 ppm. The cell boundaries were notverified during this excavation. As excavation activities continued to the west, the drumswere no longer found in an orderly vertical position—some were lying on their side atdifferent angles. The test pit was backfilled without the sidewall and the shelby tubesampling. In addition, because of the vertical arrangement of the drums and the possibilityof an environmental release, the cell was not excavated to depth.

3.6.3 Cell F-7Excavation at cell F-7 began on October 28, 2003, and consisted of two test pits. The first testpit was excavated to a depth of 8.5 feet and was roughly 12 feet in length. Liquid seeped infrom the eastern wall and about 150 gallons were removed before the test pit wasabandoned. A second test pit, excavated north of the initial test pit, was 7.5 feet deep androughly 20 feet in length. No drums were encountered.

3.6.4 Cell C-3Excavation at cell C-3 began on October 29 and continued to November 17, 2003. Duringinitial operations some metal was encountered at the limits of the backhoe (10 feet). Afterthe excavation was benched, a foreign black fibrous material surrounded by stained soil wasobserved in the southwest corner of the test pit and a FID reading of 18 ppm was recorded.Drums were encountered at a depth of about 10 feet. The drums were lying on their sides inan east-west orientation, 18 of which were uncovered, and about one-third were breachedeither during the excavation or when they were placed in the cell. All visible perforationswere patched. From this cell, 10 drums were sampled; 7 liquid and 3 solid samples were

MKE\051650001

Page 6: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIO

WANO. 203-RSBO-B5B1, CONTRACT NO. 68-W6-0025

obtained. The highest FID reading recorded was 2,193 ppm. On November 12, 2003, the testpit filled with rainwater during the evening. Brownish-black nonaqueous phase liquid(NAPL) was observed on top of the water, and it covered the surface of the drums and thesoil when the test pit was drained.

A deep test pit was excavated on the east side of the cell to a depth of 27 feet, the point atwhich the soils were thought to consist of native material. At 20 feet bgs, visibly impactedsoil was observed and sampled for analysis. At 25 feet bgs, water entered the test pit from aseep in the sidewall. The water was allowed to accumulate and sampling was attemptedusing a disposable sampling bucket attached to the backhoe bucket; this method failed.Instead, the backhoe bucket (which had not been decontaminated) was submerged into thewater and the water sample was collected out of the backhoe bucket. A shelby tube wastaken at a depth of 27 feet. Although this test pit was used to define the depth of the cell, thebottom (seventh) drum layer was only partially exposed.

3.6.5 Cell D-7Excavation at cell D-7 began after the completion of cell C-3 and continued toDecember 17,2003. From the test pit, 10 drums were sampled—7 liquid and 3 sludge sampleswere obtained—and the FID headspace readings of the samples ranged from 0 to 3,010 ppm.The drums appeared to be intact, but they were rusted and dented and one drum had nolid. The eastern edge of the top layer of drums was determined, but, after digging deeper,drums were found at a lower level farther east. The southern edge of the excavation waslocated when the adjacent cell (B-8) was encountered. Some NAPL was observed on thewater in the eastern portion of the test pit.

The deep test pit was excavated on the east side. Initially, the excavation debris consisted ofwood and metal buckets (about 5-gallon). The scraping of the backhoe bucket on drums washeard and one drum lid was brought up among the other debris. After hitting debris at thislocation, the excavation was moved to a location farther east where foreign materials werenot encountered. The eastern test pit was excavated to a depth of about 24 feet (12 feetbelow the top of drums). At this depth, seepage problems made the working conditionsunsafe. The excavation exposed four layers of drums in D-7 and one and half drum layersfrom the next cell to the east.

3.6.6 Cell B-10Test pit activities were reported by Greg Laird/H&A. Test pit activities started at this cellthe week of January 6, 2004. The test pit was excavated to a depth of 4 to 5 feet. At thisdepth, a reddish material (reported by H&A to be asbestos) was observed and was visuallyidentified by the backhoe operator for Proterra (the subcontractor). The test pit was moved15 to 20 feet west of the original test pit, and the same material was observed at a similardepth. The test pit was then moved 15 feet north, and the material was encountered again atabout 4 to 5 feet bgs. Because the material was encountered at about the same depth at allthree excavations, it was assumed that the material is widely distributed over the area andthe excavation of Cell B-10 was abandoned.

MKE\051650001

Page 7: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIO

WA NO. 203-RSBD-B5B1, CONTRACT NO. 68-W6-0025

3.6.7 CellA-11

Test pit activities were conducted at this location following the abandonment of Cell B-10.The tops of drums were observed at 12 to 13 feet bgs at the access road. The drums werevertically stacked and 20 to 30 drums were exposed. Some of the exposed drums hadidentification information available, which was recorded by H&A. From the exposeddrums, 10 samples were collected and the cell was backfilled. No seep water was observedduring the test activity at Cell A-ll.

3.7 Clay Barrier Wall EvaluationEvaluation of the clay barrier wall began on December 29, 2003, with the excavation of an80-foot-long, 8-foot- deep trench aligned in an east to west direction. The trench wasexcavated from about 13 feet from the fence proceeding west. The lithology of thesubsurface materials encountered in the majority of the trench appeared to be a tan-brownclay. In the area of greatest slope near the barrel fill, the soils turned to a hard gray clay,consistent with observations made during test pit operations in the barrel fill.

Two other trenches were excavated in the same orientation further south of the originaltrench. Neither showed any visible signs of a clay barrier wall in this area.

3.8 Monitoring Well InstallationTable 2 summarizes the observations of the monitoring well installation activities.

TABLE 2Monitoring Wells Installed

Well ID

Cluster 1

HMW-101

HMW-102

HMW-103

Cluster 2

HMW-201

HMW-203

Cluster 3

HMW-301

HMW-302

HMW-304

HMW-305

Cluster 4

HMW-402

Screened Interval(feet bgs)

99-109

73-78

64-69

70-80

38-43

8-13

161-166

49-5

33-38

157-167

MonthCompleted Notes

Oct 2003

Nov 2003

Nov 2003

Dec 2003

Dec 2003

Nov 2003 FID detections were observed in the soil

Nov 2003 FID detections were observed in the soil

Apr 2004

Apr 2004

Apr 2004

MKB051650001

Page 8: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORT

TREMONT CITY LANDFILL, BARREL FILL OU, OHIO

WANO. 203-RSBD-B5B1, CONTRACT NO. 68-W6-0025

TABLE 2Monitoring Wells

Well ID

Cluster 5

HMW-501

HMW-502

HMW-504

HMW-505

Cluster 6

HMW-601

HMW-602

HMW-604

Installed

Screened Interval(feet bgs)

129-139

93-103

29-39

15-20

145-155

83-93

18-23

MonthCompleted

Oct 2003

Oct 2003

Oct 2003

Nov 2003

Oct 2003

Oct 2003

Nov 2003

Notes

On October 23, the drilling at Cluster 6 was shut downdue to problems with containing water from the drillingoperations. The water was flowing toward the creek.*

On November 3, water was observed leaking from thedrill rig during drilling operations.*

Replacement Wells

HBF-15S

HBF-16

HBF-04

HBF-15D

HBF-05A

HBF-05B

HBF-05C

HBF-05D

HBF-10S

HBF-10D

HBF-13

HBF-14

HBF-19S

HBF-03

HBF-20D

Deep Borings

DB-02

8-11

33-38

15-20

39^t4

10-20

10-20

10-20

10-20

5-10

24-31

21-26

14-19

40-45

25-30

130.5-135.5

150

Nov 2003

Nov 2003

Nov 2003

Nov 2003

Nov 2003

Nov 2003

Nov 2003

Nov 2003

Dec 2003

Dec 2003

Dec 2003

Dec 2003

Jan 2004

Jan 2004

Jan 2004

Jan 2004

This information is further discussed in Section 4

MKR051650001

Page 9: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIO

WA NO. 203-RSBD-B5B1, CONTRACT NO. 68-W6-0025

3.9 Monitoring Well DevelopmentMonitoring wells were developed by purging the well of at least 10 well volumes. Duringdevelopment, field parameters were collected for temperature, pH, conductivity, turbidity,dissolved oxygen, and oxygen reduction potential. Turbidity readings for the majority of thewells were high, often exceeding the limits of the multiparameter meter.

During well development, headspace readings were also recorded using a FID. Of the wells,five had detected headspace readings. The wells and the readings are listed in Table 3.

TABLE 3Monitoring Well Headspace Readings

Well

HMW-201

HMW-204

HMW-305

HBF-13

HBF-14

FID Reading(ppm)

1300 ppm

2960 ppm

25.7 ppm

138 ppm

1 04 ppm

3.10 Aquifer TestingH&A prepared for aquifer testing and the first pump test was initiated on the morning ofJanuary 19, 2005, using a Grundfos® pump, a 220-volt pump controller, and a YSI650 formonitoring groundwater parameters. CH2M HILL staff went to the site on January 20and 27, and February 15 to observe the aquifer testing. The following information wasobtained from H&A regarding these three tests:

The first test of the 1,075-feet (lower) sand unit began on January 19,2005, at the HPW-2 well.

• The pumping rate was about 750 milliliters per minute (mL/min) with a stable waterlevel at about 49 feet bgs (originally, water depth was around 46.9 feet).

• The purged water was clear with no visible turbidity.

• Minor drawdown was observed in wells screened in the 1,050-feet sand unit (between0.05-0.11 feet).

• The 1,075-feet sand unit wells exhibited some increase in water level since the test began.

- The pumping was completed on Sunday, January 23, 2005, and recovery of waterlevels monitored.

- The second aquifer test began on Thursday, January 27, 2005, at the HPW-1 welllocated within the 1,075-feet (lower) sand unit.

• Pumping stabilized late in the day at about 700 mL/min.

MKB051650001

Page 10: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIO

WA NO. 203-RSBD-B5B1, CONTRACT NO. 68-W6-0025

• Minor drawdown was observed in wells screened in the upper 1,050-feet sand unit thatvaried between 0.05 and 0.14 feet.

• As seen in the previous test, the wells screened in the 1,075-feet (lower) sand unitexhibited minor (0.05 feet) water level increase towards the end of the testing.

The second pump test ended on Wednesday, February 2, 2005. Monitoring of sitewide waterlevel recovery began that afternoon and lasted until Friday, February 4, when water levelsstabilized near pretest levels.

The third (and final) aquifer pumping test began on Tuesday, February 15, 2005, at theHPW-7 screened in the 1,075-feet (lower) sand unit. This was also the day that Shawn Fiore,Dave Hagan, and Mark Pomfrey (all of H&A) led a site visit with Ronald Murawski and JylLapachin (U.S. Environmental Protection Agency [USEPA] and Ohio EnvironmentalProtection Agency [OEPA], respectively) and Drue E. Roberts (CH2M HILL).

• The pumping rate stabilized at 1,325 mL/min in the afternoon of February 15, 2005.

• Minor drawdown was observed in the upper 1,050-feet sand unit well that variedbetween 0.05 and 0.20 feet.

• Pumping was completed for the third aquifer test on March 4, 2005.

3.11 Monitoring Well SamplingThe Phase 1 groundwater sampling effort was observed on April 16, 2004. The groundwatersampling was performed using ultralow flow technology. Field parameters similar to thosecollected during well development were recorded while purging. The samples wereanalyzed for the analytes identified in the Field Sampling Plan (FSP).

On March 7, 2005, after the completion of the aquifer pump tests, a final round ofgroundwater sampling was observed. Field parameters similar to those collected duringprevious sampling rounds were recorded while purging. The samples were analyzed for theanalytes identified in the FSP.

4.0 Problems Encountered/Solutions4.1 Soil Vapor Survey

The process of soil vapor sampling was discussed with OEPA and H&A onOctober 10, 2003. The issue discussed was whether the soil vapor sample was intended to becollected from only the bottom interval (that is, at a depth of about 5 feet) or from the entiresoil column (at depths of 0.5 to 5 feet). The process that was agreed upon included drivingthe probe to a depth of about 5 feet, sealing the top of the hole with bentonite, and purgingand drawing the vapor sampling into a tedlar bag for field screening.

4.2 Soil Cover EvaluationSoil cover evaluation borings were not performed to the depth of native soil. This problemhas not been rectified.

MKE\051650001

Page 11: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIO

WA NO. 203-RSBD-B5B1, CONTRACT NO. 68-W6-0025

4.3 Monitoring Well InstallationOn October 23, 2003, the drilling at well Cluster 6 was shut down due to problems withcontaining water from drilling operations. The water was flowing toward the creek. Thedrillers resolved the problem by obtaining a different tub, and drilling was resumed laterthat afternoon. However, a layer of gray sediment was observed coating the creek bed to atleast the northeast corner of the BFOU fence —it was obvious that the source was the drillingat Cluster 6 and the H&A staff was notified of the problem. Unfortunately, heavy rainwashed the sediments downstream before the problem could be addressed.

On November 3, water was observed leaking from the drill rig during drilling operations atCluster 6. The leak was mitigated through the use of a holding pool that was emptiedperiodically. This method prevented the water from entering into the creek area.

4.4 Test Pit ActivitiesOn November 24, 2003, CH2M HILL received an electronic copy of a memorandum,prepared by H&A regarding waste characterization activities at the Tremont City Landfill,from USEPA. In the memorandum, H&A presented findings of the investigation andconcluded that the objectives of the waste characterization have been met and thatadditional test pits and drum sampling were not considered necessary. CH2M HILLparticipated in a conference call with USEPA and OEPA to discuss whether the proposeddeviations from the FSP were appropriate. A second conference call was conducted thatincluded H&A and other representatives of the potentially responsible party (PRP) group.During the call, USEPA and OEPA expressed their concern that the objectives of the wastecharacterization had not been met and that work needed to be performed in accordancewith the FSP.

On December 3, 2003, CH2M HILL received an electronic copy of the revised memorandum,prepared by H&A, from USEPA regarding waste characterization activities at the TremontCity Landfill. Comments on the revised memorandum were submitted to USEPA onDecember 10 and discussed with the work assignment manager (WAM) on December 11.

4.5 Impacted Soil AreaOn January 9, 2004, a 20- by 30-foot area of soil was impacted by an overflow of the Fractanks storing the investigation-derived waste (IDW) water for the project. The aerators,which were installed in each Frac tank to prevent the IDW water from freezing, caused theliquid in both tanks to froth up and overflow. The impacted soil from this overflow wasexcavated down to a depth of about 1 foot, placed on plastic ground sheeting, and covered.An analytical sample was taken to determine the extent of contamination within theimpacted soil. H&A submitted analytical results for the stockpiled soil sample onFebruary 5,2004. The analytical results were reviewed and the findings were discussed withUSEPA and OEPA. Additional information pertaining to the evaluation of the stockpiledsoils was submitted by H&A on February 17, 2004. The major issue was whether the results,based on the concentrations of Target Analyte List (TAL) and Target Compound List (TCL)analyses, were sufficient to determine where the stockpile soils should be disposed of. Theevaluation of the analytical results, based on the "20 x Rule," indicated that the soils wouldnot likely exhibit toxicity characteristics that would cause it to be hazardous.

MKE\051650001

Page 12: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

Attachment APhoto Log

Page 13: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

ATTACHMENT A

Site Photographs

This photo log does not include all photographs taken during oversight activities to avoidincluding those that are considered to be either not relevant or redundant.

10/23/04. Clusters Drilling Operation, BFOU_C6_Pic1J02304.Water leaking from the drill rig tub during drilling operations at Cluster 6.

10/23/04. Cluster 6 Drilling Operation, BFOU_C6_Pic2_102304.Water leaking from the drill rig tub during drilling operations at Cluster 6.

MK6051650001 A-1

Page 14: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL. BARREL FILL OU. OHIOWA NO. 203-RSRB-B5B1, CONTRACT NO. 68-W6-0025 ATTACHEMENT A-PHOTO LOG

10/23/04. Cluster 6 Drilling Operation, BFOU_C6_Pic3_102304.Water leaking from the drill rig tub during drilling operations at Cluster 6.

10/29/03. Test Pit C-3, Photo BFOU_C-3_Pic1_102903.Haley and Aldrich personnel sampling seep water from C-3 Test Pit.

MKB051650001 A-2

Page 15: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIOWA NO. 203-RSRB-B5B1, CONTRACT NO. 68-W6-0025 ATTACHMENT A—PHOTO LOG

10/29/03. Test Pit C-3, Photo BFOU_C-3_PIC3 102903.

Haley and Aldrich personnel sampling seep water from C-3 Tesf Pit.

10/29/03. Test Pit C-3, Photo BFOU_C-3J>IC4_102903.

C-3 test pit and exclusion zone, marked by the orange construction fencing.

MKB051650001 A-3

Page 16: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIOWA NO. 203-RSRB-B5B1, CONTRACT NO. 68-W6-0025 ATTACHMENT A—PHOTO LOG

li-

11/13/03. Test Pit C-3, Photo BFOU_C-3_PIC7_110303.Haley and Aldrich subcontractor digging around drums at test pit C-3 using a nonsparking shovel.

11/04/03. Test Pit C-3, Photo BFOU_C-3_PIC9_110403.C-3 test pit and the benching/sloping.

MKEI051650001 A-4

Page 17: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIOWA NO. 203-RSRB-B5B1, CONTRACT NO. 68-W6-0025 ATTACHMENT A-PHOTO LOG

11/04/03. Test Pit C-3, Photo BFOU_C-3_PIC11_110403.

Facing northeast, sampling of second drum from C-3 test pit (HDR004-110403).

11/04/03. TEST PIT C-3, Photo BFOU_C-3_PIC12_110403.

What appears to be a broken fiber drum at C-3 test pit—note the black staining in the surrounding soil.

MKB051650001 A-5

Page 18: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIOWA NO. 203-RSRB-B5B1, CONTRACT NO. 68-W6-0025 ATTACHMENT A-PHOTO LOG

11/04/04. C-3 Test Pit, Photo BFOU_C-3_PIC13_110403.

Contents of the assumed fiber drum.

11/10/03. Test Pit C-3, Photo BFOU_C-3_PIC14_110403.

Facing northeast, drums at C-3 test pit.

MKB051650001 A-6

Page 19: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIOWA NO. 203-RSRB-B5B1, CONTRACT NO. 68-W6-0025 ATTACHMENT A—PHOTO LOG

-r V^ 'l^

11/13/03. TEST PIT C-3, Photo BFOU_C-3_PIC19_111303.Nonaqueous phase liquid covering soil and drums at C-3 test pit after recent rain event.

11/13/03. Test Pit C-3, Photo BFOU_C-3_PIC22 J11303.Facing north, showing water rapidly entering the C-3 test pit at the southern end.

MKB051650001 A-7

Page 20: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIOWA NO. 203-RSRB-B5B1, CONTRACT NO. 68-W6-0025 ATTACHMENT A—PHOTO LOG

11/13/03. Test Pit C-3, Photo BFOU_C-3_Pic23_111303.Deep excavation at eastern side of cell C-3

11/24/03. Test Pit B-7, Photo BFOU_B-7_Pic1_112403.Facing east, B-7 test pit.

MKB051650001 A-8

Page 21: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIOWA NO. 203-RSRB-B5B1, CONTRACT NO. 68-W6-0025 ATTACHMENT A-PHOTO LOG

I

11/24/03. Test Pit B-7, Photo BFOU_B-7_Pic2_112403.Facing northeast, B-7 test pit.

11/24/03. Test Pit B-7, Photo BFOU_B-7_Pic3_112403.Drums at B-7 test pit.

MKB051650001 A-9

Page 22: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORT

TREMONT CITY LANDFILL. BARREL FILL OU, OHIOWANO. 203-RSRB-B5B1, CONTRACT NO. 68-W6-0025 ATTACHMENT A—PHOTO LOG

12/04/03. Test Pit D-7, Photo BFOU_D-7_Pic1 J20403.Facing east, drum in D-7 test pit. Note—drum in northeast comer does not have a lid.

12/09/03. Test Pit D-7, Photo BFOU_D-7_Pic4_120903.D-7 test pit. Orange paint indicates drums that were sampled.

MKB051650001 A-10

Page 23: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIOWA NO. 203-RSRB-B5B1, CONTRACT NO. 68-W6-0025 ATTACHMENT A—PHOTO LOG

12/09/03. Test Pit D-7, Photo BFOU_D-7_Pic5_120903.D-7 tost pit.

12/09/03. Test Pit D-7, Photo BFOU_D-7_Pic6J 20903.D-7 tost pit.

MKB051650001 A-11

Page 24: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIOWA NO. 203-RSRB-B5B1, CONTRACT NO. 68-W6-0025 ATTACHMENT A-PHOTO LOG

12/11/03. Test Pit D-7, Photo BFOU_D-7_Pic9_121103.South boundary of cell D-7 and the north boundary of the next cell.

12/11/03. Test Pit D-7, Photo BFOU_D-7_Pic11_121103.Facing west, D-7 test pit.

MKB051650001 A-12

Page 25: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIOWA NO. 203-RSRB-B5B1, CONTRACT NO. 68-W6-0025 ATTACHMENT A-PHOTO LOG

12/11/03. Test Pit D-7, Photo BFOU_D-7_Pic15J21103.Facing south, D-7 test pit.

12/11/03. Test Pit D-7, Photo BFOU_D-7_Pic16J21103.Facing south, breached drum at D-7 test pit. Drum was breached during test pit operations.

MKE\051650001 A-13

Page 26: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIOWA NO. 203-RSRB-B5B1, CONTRACT NO. 68-W6-0025 ATTACHMENT A—PHOTO LOG

12/11/03. Test Pit D-7, Photo BFOU_D-7_Pic18J21103.Facing east, stained soil at deep test pit and breached drum at D-7 test pit.

01/12/04. Test Pit A-11, Photo BFOU_A-11_Pic1_011204.A-11 test pit.

MKEI051650001 A-14

Page 27: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIOWA NO. 203-RSRB-B5B1, CONTRACT NO. 68-W6-0025 ATTACHMENT A—PHOTO LOG

01/12/04. Test Pit A-11, Photo BFOU_A-11_Pic2_011204.A-11 test pit.

12/29/03. Clay Barrier Wall Assessment, Photo BFOU_CBJ»ic1J22903.Facing east, first excavation completed to determine if there are visual characteristics of a Clay Barrier Wall.

MKB051850001 A-15

Page 28: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIO

WA NO. 203-RSRB-B5B1, CONTRACT NO. 68-W6-0025 ATTACHMENT A—PHOTO LOG

12/29/03. Clay Barrier Wall Assessment, Photo BFOU_CB_Pic2_122903.Facing west, firstexcavation completed to determine if there are visual characteristics of a Clay Barrier Wall.

.-•.if

I

12/29/03. Clay Barrier Wall Assessment, Photo BFOU_CB_Pic3_122903.First excavation completed to determine if there are visual characteristics of a Clay Barrier Wall.

MKB051650001 A-16

Page 29: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIOWA NO. 203-RSRB-B5B1, CONTRACT NO. 68-W6-0025 ATTACHMENT A-PHOTO LOG

01/12/04. Impacted Soil Area, BFOU_SE_Pic1_011204.Area of excavated soil where soil was impacted from overflow from Frac tanks containing investigation-derived waste water.

01/12/04. Impacted Soil Area, BFOU_SE_Pic1J)11204.Soil removed from the area of impact as a result of Frac tank overflow.

MKE\051650001 A-17

Page 30: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIOWA NO. 203-RSRB-B5B1, CONTRACT NO. 68-W6-0025 ATTACHMENT A—PHOTO LOG

01/12/04. Soil Impact Area, BFOU_SE_Pic3_011204.Photo showing the investigation-derived waste water that impacted the soil surrounding the Frac tanks.

01/20/2005. Aquifer pump test.Portable shelter used during periods of extreme cold and inclement weather.

MKB051650001 A-18

Page 31: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIOWA NO, 203-RSRB-B5B1, CONTRACT NO. 68-W6-0025 ATTACHMENT A-PHOTO LOG

The set up for aquifer pump test on monitoring well HPW-2, which is situated in the 1,075 feet lower sand unit.

Measuring the pumping rate during the aquifer pump test on the 1075 feet lower sand unit at monitoring well HPW-1. Notethe low turbidity of this sample, characteristic of all the pump tests performed at Tremont Landfill.

MKB051650001 A-19

Page 32: CH2M HILL - SUMMARY FIELD OVERSIGHT REPORT FOR BARREL … · Subject: Summary Field Oversight Report Tremont City Landfill Site, Tremont City, OH WA No. 203-RSBD-B5B1, Contract No

SUMMARY FIELD OVERSIGHT REPORTTREMONT CITY LANDFILL, BARREL FILL OU, OHIOWA NO. 203-RSRB-B5B1. CONTRACT NO. 68-W6-0025 ATTACHMENT A—PHOTO LOG

Haley and Aldrich geologist taking a depth to water measurement during the start up of the final aquifer pump test ofmonitoring well HPW-7, which is screened in the 1075 feet lower sand unit.

MKB051650001 A-20