Quick-ResponseManufacturing Systems
![Page 2: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/2.jpg)
Quick-responsemanufacturing
system
Quick-responsemanufacturing
systemComputer Integrated
Manufacturing System (CIM)
Physicalmanufacturing
system
Physicalmanufacturing
system
Manufacturingresource planning
(MRP II)
Manufacturingresource planning
(MRP II)
CADDCADD CAMCAM MRPMRP
![Page 3: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/3.jpg)
DistributeddatabasesDistributeddatabases
DistributeddatabasesDistributeddatabases
Advanced Integration Technologies
Computer-basedinformation
system
Computer-basedinformation
system
EDIEDIAutomatic
identificationAutomatic
identification
![Page 4: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/4.jpg)
The Physical Manufacturing System
Two subsystems directly support thephysical manufacturing system.
CADD (computer-aided design and drafting)
CAM (computer-aided manufacturing)
![Page 5: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/5.jpg)
Computer-Aided Designand Drafting (CADD)
Solids modeling
Finite element analysis
Automated drafting
![Page 6: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/6.jpg)
Computer-AidedManufacturing (CAM)
Industrial robot
Statistical process control
Flexible manufacturing systems
![Page 7: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/7.jpg)
The Manufacturing Resource Planning (MRP II) System
The MRP II system comprises thematerials requirements planning
(MRP) system and the related systemsfor sales, billing, and purchasing.
![Page 8: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/8.jpg)
Materials RequirementsPlanning (MRP)
MRPMRP
Costaccounting
Costaccounting
Productionplanning
Productionplanning
ProductionschedulingProductionscheduling
ReportingReporting
![Page 9: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/9.jpg)
Advanced Integration Technologies
![Page 10: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/10.jpg)
Production Planning
Production planning involves thedetermination of which products
to produce and the schedulingof production to make optimaluse of production resources.
![Page 11: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/11.jpg)
Production Planning
Demand for a product
Production requirements
Production resources available
![Page 12: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/12.jpg)
Production Planning
Productionplanning
Productionplanning
Bill ofmaterials
Masteroperations list
MarketingMarketing 1
Inventorycontrol
Inventorycontrol
2
3 Productiondepartments
Productiondepartments
4
5
1 Sales forecast2 Finished goods status3 Raw materials status4 Factor availability report5 Production schedule
![Page 13: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/13.jpg)
Production Planning
Productionplanning
program(s)
Masteroperations
file
Productionstatus
file
Bill-of-materials
file
Masterproduction
plan
![Page 14: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/14.jpg)
Production Planning
Updatedproduction
statusfile
Productionorders
Materialrequisitions Routings
![Page 15: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/15.jpg)
Production Scheduling
Productionstatusupdate
Productionstatus
file
Routingfile
Summaryreport
Updatedproduction
statusfile
Productionloading
file
![Page 16: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/16.jpg)
Production Scheduling
Productionschedulingprogram
Summaryreport
Productionschedules
Productionloading
file
![Page 17: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/17.jpg)
Production-Loading File
This is the major input to theproduction-scheduling application.
![Page 18: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/18.jpg)
Cost Accounting
Cost accounting program(s)
Productionstatus file
Productiondata file
• Material requisition data• RTG data
Summaryreport
Updatedproductionstatus file
Completedproductionorder file
Resourceusage
file
![Page 19: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/19.jpg)
Reporting
InventoryupdateInventory
file
Completedproductionorder file
Inventory Processing
Updatedinventory
file
Finished goodsstock status
report
Completedproductioncost report
Summaryreport
![Page 20: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/20.jpg)
Reporting
Resourceusage
file
Reportgenerator
Resourceusage
reports
Resource Usage Reporting
![Page 21: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/21.jpg)
Activity-Based Costing
Traditional cost accounting techniquesmay be inadequate in a computer
integrated manufacturing environment.
Because CIM reduces directlabor and increases overhead.
Variable costs decreaseand fixed costs increase.
![Page 22: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/22.jpg)
Activity-Based Costing
Activity-based costing (ABC) calculatesseveral overhead rates, one for
each manufacturing activity.
![Page 23: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/23.jpg)
Activity-Based Costing
What are some examples of activities?
Machine centers Material handling
Inspection stations
A single department may containseveral different activities.
Manual assembly
![Page 24: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/24.jpg)
Major Processing Modules in MRP II
MRP IIMRP II
Bill-of-materialsmodule
Bill-of-materialsmodule
Routings filemodule
Routings filemodule
Inventory controlmodule
Inventory controlmodule
Productionactivity control
module
Productionactivity control
module
Master productionscheduling
module
Master productionscheduling
module
Production ordermodule
Production ordermodule
![Page 25: Ch 9 (quick response)](https://reader035.vdocuments.mx/reader035/viewer/2022062307/5562129ad8b42a00138b501f/html5/thumbnails/25.jpg)
Implementing JIT in aMRP II/CIM Environment
Less emphasis might be placedon a complete MRP II system.