CF116 - Malta South Sewage Treatment Infrastructure Operational Programme I 2007-2013 Stefan Cachia Manager Wastewater Treatment & Polishing Plants 26 th April 2017

Upload: others

Post on 01-Feb-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • CF116 - Malta South Sewage Treatment Infrastructure

    Operational Programme I 2007 -2013

    Stefan CachiaManagerWastewater Treatment & Polishing Plants 26th April 2017

  • OVERVIEW OF PRESENTATION

    � CF116 - Background and Scope

    � CF116 - Key Infrastructure

    � CF116 - Project Financing & Timeline

    � CF116 - National Wastewater Treatment Context

    � Ta’ Barkat UWWTP – pre-Site Visit Brief

    � Synergy with MORISO and Reclamation Plant Project

  • CF116 - BACKGROUND & SCOPE

    Project Inception & Studies

    � Requirement stemmed from environmental and health considerationspertaining to raw wastewater discharges to sea.

    � These concerns were initially addressed in 1975 when the MediterraneanAction Plan (MAP) was adopted. This was followed by the Barcelona‘Convention for the Protection of the Mediterranean Sea’ in 1976. Maltaratified both these agreements.

    � A Sewerage Master Plan (COWI 1992) was drawn up to appraise the island’swastewater transmission and treatment infrastructure. A number of projects wereproposed to strengthen the key collection and transmission network. Therequirement for three new wastewater treatment plants was identified at theheart of this plan.

    � The Sewerage Master Plan was subsequently revisited during 2000 through afeasibility study focusing on the South of Malta (Sewerage InfrastructuralUpgrading in the South of Malta – KOCKS 2000 ). Study took into account theprevailing situation of the sewerage network and elaborated further on a numberof alternative wastewater transmission and treatment options.

  • CF116 - BACKGROUND & SCOPE

    Sewerage Master Plan - 1992

    GOZO CATCHMENT

  • CF116 - BACKGROUND & SCOPE

    Sewerage Master Plan - 1992

    MALTA NORTH CATCHMENT

  • CF116 - BACKGROUND & SCOPE

    Sewerage Master Plan - 1992

    MALTA SOUTH CATCHMENT

  • CF116 - BACKGROUND & SCOPE

    Sant Antnin Wastewater Treatment Plant

  • � Plant has been in operation since 1982.

    � The plant underwent an extensive refurbishment in1998. Civil Works, Mech/Elec equipment renovation andintroduction of automation.

    � Currently treats an annual average of 4,000-5,000m3/day of sewage a day, meeting the irrigation waterdemand of circa 240 hectares of arable agriculturalland.

    � High conductivity effluent (10,000 microS) is an issuethat will be addressed via projects targeting seawaterinfiltration and the NEW water reclamation plants.

    CF116 - BACKGROUND & SCOPE

    Sant Antnin Wastewater Treatment Plant

  • Circa 80% of wastewater produced on the island was formerly discharged through a 700m submarine outfall at WiedGħammieq next to Rinella in Kalkara.

    CF116 - BACKGROUND & SCOPE

    Malta South Situation before June 2011

  • When the sewage pumping station at Wied Għammieqpumping used to malfunction, the situation worsened andthe whole shoreline extending all the way to Żonqor Point(Marsascala) was contaminated.

    Former sewage pumping station atWied Għammieq. Station was 30years old and in need of replacement.

    The coastal area was characterized by regular crude sewage discharges

    CF116 - BACKGROUND & SCOPE

    Malta South Situation before June 2011

  • CF 116 – KEY INFRASTRUCTURE

    Project Components

    The KOCKS 2000 Feasibility Study identified the following projects forstrengthening the collection system (UWWD 91/271/EC – Article 3) andtreatment (Article 4) of 80% of wastewater generated by the MalteseIslands, and namely:

    1. The construction of a new 500,000 PE Urban WWTP at Ta’ Barkat inXghajra

    2. The construction of a new wastewater pumping station at Rinella inKalkara

    3. The upgrading of an existing wastewater pumping station in Xghajra.

    4. Construction of a new 1.7 km gallery from Rinella to Barkat

    5. Construction of a 1 km submarine pipeline

    The above interventions formed the final scope of Project CF116 –Cohesion Fund Programme – 2007-2013.

  • CF 116 – KEY INFRASTRUCTURE

    Layout of the Various Components

  • Component 1 - UWWTP

    CF 116 – KEY INFRASTRUCTURE

    Project Components

  • Component 2 – Rinella PS

    Substation, Generator and Control Room

    CF 116 – KEY INFRASTRUCTURE

    Project Components

  • Component 2 – Rinella PS

    Pumping Station Sump

    CF 116 – KEY INFRASTRUCTURE

    Project Components

  • Component 4 - Gallery

    Tunnel Lining – Shotcrete

    CF 116 – KEY INFRASTRUCTURE

    Project Components

  • Component 4 - Gallery

    U – Channel installation

    CF 116 – KEY INFRASTRUCTURE

    Project Components

  • Component 5 - Outfall

    Towing of pre-fabricated pipeline from Norway

    CF 116 – KEY INFRASTRUCTURE

    Project Components

  • Component 5 - Outfall

    Concrete sinkers attached to floating pipeline

    CF 116 – KEY INFRASTRUCTURE

    Project Components

  • CF 116 – PROJECT FINANCING & TIMELINE

    Eligible Cost

    (net of VAT)

    EU Co-finance

    MT Co-finance

    Other Funding Gap

    Total

    €68 mill. €57.8 mill.

    85%

    €10.2 mill. €12.1 mill. €0 €80.1 mill.

  • CF 116 – PROJECT FINANCING & TIMELINE

    Ref: Activity Completion1 Urban Wastewater Treatment

    PlantPlant fully operational – Q1 2011

    2.1 Rinella Pumping Station : Civil Works

    Civil Works completed - Q1 2011

    2.2 Rinella Pumping Station : Mechanical & Electrical Works

    Equipment installed – Q4 2010

    2.3 Rinella Pumping Station : Standby Generator Supply

    Generator delivered, tested and commissioned – Q4 2010

    3 Xghajra Pumping Station –Mechanical & Electrical Works

    Project installation, testing and commissioning - completed Q3 2011

    4 Gallery from Rinella to Ta’ Barkat

    Gallery was completed – Q2 2010.

    5 Submarine Outfall Operational – Q2 2011 Full completion – Q4 2011

  • CF 116 – PROJECT FINANCING & TIMELINE

    TENDER LAUNCH 13 Apr 2007

    AWARD & CONTRACTING 12 Jun 2008

    MEPA PERMIT AND ACCESS TO SITE

    15 Dec 2008

    PLANT INAUGURATED 02 Jun 2011

  • Mobilisation - Dec 2008

    CF 116 –TIMELINE & FINANCING

    Construction Progress - UWWTP

  • Progress Jun 2009

    Progress - Dec 2009

    CF 116 –TIMELINE & FINANCING

    Construction Progress - UWWTP

  • Progress - Dec 2010

    Progress March 2011

    CF 116 –TIMELINE & FINANCING

    Construction Progress - UWWTP

  • June 2011 – Full Completion

    CF 116 –TIMELINE & FINANCING

    Construction Progress - UWWTP

  • Ta’ Mgarr ix-Xini44,000 PE

    Nov 2007

    Ic-Cumnija60,000 PE

    Oct 2008

    Wastewater Treatment Plant Locations

    Ta’Barkat500,000 PE

    Jun 2011

    Sant Antnin120,000 PE

    1982

    Ta’ Barkat UWWTP – pre-Site Visit Brief

    Treatment Plant Locations

  • Ta’ Barkat UWWTP – pre-Site Visit Brief

    Gozo STP Aerial View

  • Ta’ Barkat UWWTP – pre-Site Visit Brief

    North STP Aerial View

  • Ta’ Barkat UWWTP – pre-Site Visit Brief

    Barkat STP Aerial View

  • Ta’ Barkat UWWTP – pre-Site Visit Brief

    Plant Annual Comparative Stats - 2016

    Treated Volume

    (million m 3)

    Sewage Sludge Disposed to

    Landfill (tonnes)

    Annual Energy Consumption

    (GWh)

    South STP 17.4 25,379 11.71 GWh +(5.4 GWh RES)

    North STP 3.7 3,577 2.08

    Gozo STP 1.4 7,075 2.46

    Sant Antnin STP 1.4 0.0 1.87

    Effluent reused at Sant Antnin STP – 1.05 million

  • Ta’ Barkat UWWTP – pre-Site Visit Brief

    Conventional UWWTP Layout

  • Ta’ Barkat UWWTP – pre-Site Visit Brief

    DENSADEG Primary Treatment

  • Ta’ Barkat UWWTP – pre-Site Visit Brief

    BIOFOR Integrated Secondary Treatment

  • Ta’ Barkat UWWTP – pre-Site Visit Brief

    Plant Layout

  • Thank You