CESM/RACM/RASM Update
May 15, 2012
![Page 2: CESM/RACM/RASM Update May 15, 2012. Since Nov, 2011 ccsm4_0_racm28:racm29:racm30 – vic parallelization – vic netcdf files – vic coupling mods and “273.15”](https://reader035.vdocuments.mx/reader035/viewer/2022072014/56649e7d5503460f94b80093/html5/thumbnails/2.jpg)
Since Nov, 2011
• ccsm4_0_racm28:racm29:racm30– vic parallelization– vic netcdf files– vic coupling mods and “273.15” fixes– wrf update to remove u* averaging– new datm forcing for pop/cice “H” cases– update racm utilities (post-processing tools)
![Page 3: CESM/RACM/RASM Update May 15, 2012. Since Nov, 2011 ccsm4_0_racm28:racm29:racm30 – vic parallelization – vic netcdf files – vic coupling mods and “273.15”](https://reader035.vdocuments.mx/reader035/viewer/2022072014/56649e7d5503460f94b80093/html5/thumbnails/3.jpg)
RACM Component Model Performance
• racm29+, parallel vic, wr50a_ar9v4, raptor, out-of-box I/O, 10 day tests, no restarts
0 0.5 1 1.5 2 2.5 3 3.50
50
100
150
200
250
300
350
400
450
500
wrfviccicepop
sec/model_day
processors
1 10 100 1000
![Page 4: CESM/RACM/RASM Update May 15, 2012. Since Nov, 2011 ccsm4_0_racm28:racm29:racm30 – vic parallelization – vic netcdf files – vic coupling mods and “273.15”](https://reader035.vdocuments.mx/reader035/viewer/2022072014/56649e7d5503460f94b80093/html5/thumbnails/4.jpg)
CCSM pe layouts• For science, surface fluxes must be computed with latest atm state. So
land (in land), sea ice (in ice), and ocean flux calculation (in coupler) must be run sequentially with the atm model.
land
ice
ocean
atm
coupler
land ice
oceanatm
couplerland ice ocean
atm
coupler
sequential hybridconcurrent
hybridconcurrent “2”
![Page 5: CESM/RACM/RASM Update May 15, 2012. Since Nov, 2011 ccsm4_0_racm28:racm29:racm30 – vic parallelization – vic netcdf files – vic coupling mods and “273.15”](https://reader035.vdocuments.mx/reader035/viewer/2022072014/56649e7d5503460f94b80093/html5/thumbnails/5.jpg)
RACM Throughputtotal pes throughput
(model years / wall day)
cost (pe-hrs/model year)
atm pes
lnd pes
ice pes
ocn pes
layout
256 0.30* 20200 256 1 256 256 seq
336 0.54 14900 272 16 256 64 hyb conc
432 0.66 15800 336 16 320 96 hyb conc
512 0.71 17400 512 16 512 512 seq
656 0.83 19800 528 16 512 128 hyb conc
1040 0.97 25700 656 16 1024 384 hyb conc2
* old setup with faster cice
![Page 6: CESM/RACM/RASM Update May 15, 2012. Since Nov, 2011 ccsm4_0_racm28:racm29:racm30 – vic parallelization – vic netcdf files – vic coupling mods and “273.15”](https://reader035.vdocuments.mx/reader035/viewer/2022072014/56649e7d5503460f94b80093/html5/thumbnails/6.jpg)
Ongoing RASM Work• RACM version
– Continued scientific validation– vic exact restart testing
• RASM version of the model based on CESM1.1– New features
• Supports gregorian calendar• Updated vector mapping over pole• Other features like pio
– WRF/CLM “PK, PF” cases running– WRF/VIC/POP/CICE wr50a_ar9v4 “RB” next then
• datm/pop/cice “H”• WRF/CLM/?• CISM configurations?• runoff?
– Testing and validation
![Page 7: CESM/RACM/RASM Update May 15, 2012. Since Nov, 2011 ccsm4_0_racm28:racm29:racm30 – vic parallelization – vic netcdf files – vic coupling mods and “273.15”](https://reader035.vdocuments.mx/reader035/viewer/2022072014/56649e7d5503460f94b80093/html5/thumbnails/7.jpg)
NCAR/CESM1.1 update
• target CESM1.1 version due out late-2011 or mid-2012 late 2012
• WRF now part of CESM1.1 development version for internal NCAR testing (wrf will NOT be part of CESM1.1 community release)
• WRF coupling in CESM validation continues within NCAR• Runoff may become separate component in summer 2012• Still need to address
– CESM vs WRF repositories/compatability/relationship– WRF integration in CESM (build, namelist generation, I/O unit
numbers, file name convention, restart validation, limitiations on input file streaming, etc)
![Page 8: CESM/RACM/RASM Update May 15, 2012. Since Nov, 2011 ccsm4_0_racm28:racm29:racm30 – vic parallelization – vic netcdf files – vic coupling mods and “273.15”](https://reader035.vdocuments.mx/reader035/viewer/2022072014/56649e7d5503460f94b80093/html5/thumbnails/8.jpg)
![Page 9: CESM/RACM/RASM Update May 15, 2012. Since Nov, 2011 ccsm4_0_racm28:racm29:racm30 – vic parallelization – vic netcdf files – vic coupling mods and “273.15”](https://reader035.vdocuments.mx/reader035/viewer/2022072014/56649e7d5503460f94b80093/html5/thumbnails/9.jpg)
Performance
• time in seconds/model day (vic on 1 pe)• Limited by vic running on 1 pe, should be solved soon.• Next slowest component is wrf.
– time steps are expensive– scaling fine to about O(100) gridcells/pe, that’s O(500) pes for wr50a
resolution– standard weather case are run O(days), we want to run O(years)
• pop and cice scaling not currently an issue.
pes wrf vic pop cice cpl64 550 335 288 215 22128 307 332 114 104 11256 190 334 56 54 6512 137 332 29 27 3
![Page 10: CESM/RACM/RASM Update May 15, 2012. Since Nov, 2011 ccsm4_0_racm28:racm29:racm30 – vic parallelization – vic netcdf files – vic coupling mods and “273.15”](https://reader035.vdocuments.mx/reader035/viewer/2022072014/56649e7d5503460f94b80093/html5/thumbnails/10.jpg)
Overview of RACM version
• based on CCSM4.0 (released April 2010)– add wrf as atm component– add vic as lnd component– extend pop/cice to allow distinct coupling grid– coupling non-identical regional grids– no changes to coupling fields relative to ccsm4
• lives in NPS repository• raptor, garnet, chugach primary compute platforms• other users• wrf coupling being reviewed at NCAR
![Page 11: CESM/RACM/RASM Update May 15, 2012. Since Nov, 2011 ccsm4_0_racm28:racm29:racm30 – vic parallelization – vic netcdf files – vic coupling mods and “273.15”](https://reader035.vdocuments.mx/reader035/viewer/2022072014/56649e7d5503460f94b80093/html5/thumbnails/11.jpg)
RACM Configurations
• Compsets– H = datm, slnd, pop, cice– RB = wrf, vic, pop, cice– RI = datm, vic, socn, sice– RJ = wrf, dlnd, pop, cice– RK = wrf, vic, docn, dice– RL = wrf, dlnd, docn, dice
• Grids– wr50a, w5a = wrf 50 km grid (205x275)– ar9v3, a93 = ocean/ice RACM 9 km grid (1280x720)– ar9v4, a94 = extended ocn/ice RACM grid (1560x1080)
![Page 12: CESM/RACM/RASM Update May 15, 2012. Since Nov, 2011 ccsm4_0_racm28:racm29:racm30 – vic parallelization – vic netcdf files – vic coupling mods and “273.15”](https://reader035.vdocuments.mx/reader035/viewer/2022072014/56649e7d5503460f94b80093/html5/thumbnails/12.jpg)
RACM Regional Non-Uniform Gridspop/cice extended region values
specified from observations, set inside pop and cice at top level coupling interface
3 regions• blue: standard atm/ocn
2-way coupling• pink: atm + extended
ocean (atm needs forcing, ocean does not forcing but it exists)
• purple: no atm + extended ocn (coupling unimportant)
pop/cice (extended)
wrf/vic
pop/cice