# 10-12-1, Rednam Alcazar, Rednam Gardens, Visakhapatnam - 530002 91 891 257 4517 91 891 257 4703 [email protected]
Web: www.rkecprojects.comDate 30/05/2019
RKEC PROJECTS LIMITED Certified for ISO 9001 : 2015, ISO 14001 : 2015 & OHSAS 18001 : 2007Specialists in Construction of Industrial Projects, Marine Works & Bridges
PROFILE OF THE COMPANY
• RKEC Projects Ltd is a Construction Company, over 34 years old, specialized in thebusiness of Civil Construction such as construction of Buildings, Highways, MarineWorks and bridges for State and Central Govt. Authorities.
• During the last decade, the company has undertaken and successfully completed manyconstruction projects in India covering states of Andhra Pradesh, TamilNadu, Gujarat, Odisha, Rajasthan, Maharashtra and Puduchery. In addition, theCompany has expanded its presence to the States of West Bengal and Karnataka withthe ongoing projects.
• Company has so far completed 92 Projects, worth over Rs 1700 Crores and currentlyhandling Eleven Projects amounting to Rs.1145 Crores. Company achieved aTurn Over of Rs 245.45 Crores during FY 2018-19 and been able to achieve targets byfusing tremendous engineering knowledge with groundbreaking skills, experiencedteam, binding an optimum mix of men, machine and materials across diverse projects.
• RKEC Projects Ltd ranked amongst the top ten companies for designing andexecuting Marine Works in the country. The Company has been executing onshore andinfrastructure projects since 1985 and offshore works since 1994.
• Company is enlisted with the Ministry of Defence for the below Organizations- MES (Military Engineering Services) as Super Special Class Civil Contractors- DGNP (Director General Naval Projects) under S Class Civil Contractors- DRDO (Defence Research & Development Organization) under CIV-IV Category.
• We are registered civil contractors for the following State Governments.- Andhra Pradesh State R&B Dept as “Special Class”- Odisha State PWD as “Super Class” Civil Contractors.
• Company has entered into projects for diverse range of clients including Defencesector like MES and DGNP, NHAI, Indian Railways, Ports like JNPT, CoPT, MbPT.Adani Port, Vedanta Ltd, RINL (Rashtriya Ispat Nigam Limited) and Public WorksDepartment.
CLIENTELE
OUR JOURNEY
1985 2005 2016 2017
Set up as ProprietorshipFirm under the stewardship of Shri G Radha`krishna
5
Converted as Public Limited Company
Incorporated as a Private LimitedCompany Listed on NSE Emerge
OUR STRENGTHS: ENABLERS TO ALLOW GROWTH AND PROFITABILITY
• RKEC Projects Limited gets its core strength from the Founder, Chairman and Managing Director Mr G Radhakrishna. The MD is involved in every stage of the project from the planning, execution and post execution of any project.
• It is a matter of great pride that the company has earned laurels and plaudits in every project undertakensince inception without exception.
• Experienced In-house Design Team.
• Technical staff with experience of more than 20 years particularly in Marine Works.
• Possess Marine Equipment worth Rs. 30 Crore which is capable of executing major offshore pilingworks. Advantage of having own ancillary services cannot be understated.
• One amongst very few contractors in the Country to possess Jack Up Barge of capacity 500 MT.
• Certified for ISO 9001 : 2015 (Quality Management), ISO 14001 : 2015 (EnvironmentalManagement) & OHSAS 18001 : 2007 (Occupational Health and Safety Management)(Standards by INTERCERT, accredited by International Accreditation Service, USA).
To be the most admired and responsible DIVERSIFIED company dealing in Integrated Marine and all-purpose
construction and also to diversify into areas such as Rural Electrification, National Highways, Smart
City Projects, Firefighting system and Pipeline projects with a National and International footprint, delivering
sustainable value to all stakeholders
OUR VISION
Shri G RadhakrishnaChairman & Managing Director
Smt G Parvathi DeviWhole Time Director
Vice Admiral Satish Soni, PVSM, AVSM, NM (Retd)Independent Director
Shri Peter Lucas, Commissioner of Income Tax (Retd)Independent Director
Dr Smt G Sita RatnamDirector
THE BOARD
BUSINESS SEGMENTS
MARINE WORK
BRIDGE CONSTRUCTION WORK ROADS & BUILDINGS
TURNOVER
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022Actual 100. 79.3 57.2 70.8 112. 200. 240. 245.PBT 5.12 4.71 2.94 3.45 6.15 20.2 32.54 34.6PAT 2.97 2.96 2.01 2.25 3.34 12.93 20.36 24.1
In Crores
40%
46%
3%
11%
Works In Progress : 1145Crores
Marine
Bridges
Buildings & Infrastructure
Others
59%17%
7%
17%
Works Executed : 1700 Crores
Marine
Bridges
Buildings & Infrastructure
Others
BUSINESS VOLUME :: 2845 Cr
Revenue Statement
RKEC PROJECTS LTD | PRESENTATION 12
ParticularsAmount In (Rs. In Cr) As At
31-3-2019 31-3-2018 31-3-2017 31-3-2016 31-3-2015
Total Sales 245.45 240.77 200.12 113.45 71.76
Total Expenses 210.85 199.17 168.73 99.36 61.24
EBIT 40.04 38.51 28.65 11.48 6.88
EBIT Margin % 16.32 15.99 14.32 10.12 9.59
PBT 34.60 32.54 20.25 6.16 3.44
PBT Margin % 14.10 13.51 10.12 5.43 4.79
PAT 24.13 20.36 12.93 3.35 2.24
PAT Margin% 9.83 8.45 6.46 2.95 3.12
71.76113.45
200.12240.77 245.45
2014-15 2015-16 2016-17 2017-18 2018-19
Revenue (Rs. in Cr.)
10.5214.09
31.39
41.6 43.58
2014-15 2015-16 2016-17 2017-18 2018-19
EBITDA (Rs. in Cr.)
• EBITDA - Earnings before interest, tax, depreciation and amortization
2.24 3.35
12.93
20.3624.13
2014-15 2015-16 2016-17 2017-18 2018-19
PAT (Rs. in Cr.)
• PAT - Profit After Tax
18.4724.91
78.19
50.6140.82
2014-15 2015-16 2016-17 2017-18 2018-19
ROCE %
• ROCE - Return On Capital Employed
Strong Financial Performance
Financial Performance
Profit After Tax
CAGR ( 5 YearsFY 15 – FY19)
Revenue
27.88% 60.87%
RKEC PROJECTS LTD | PRESENTATION
• CAGR - Compound annual growth rate
Investment Rationale
Robust Order Book Strong Clientele Strong Geographical Presence“Super Special Class”
Registered ContractorWith Ministry Of Defence
Healthy Financial Performance And Robust
Growth
No Long Term Debt In Company
Strong Track Recorded Of Timely Project Completion
Strong And Experienced Management Team
Credit Rating Has Been Upgraded From BBB (Minus)
Stable To BBB + (Stable)
One amongst very few contractors in the Countryto
possess Jack Up Barge of capacity 500 MT
RKEC PROJECTS LTD | PRESENTATION
WORKS IN PROGRESS
“AUGMENTATION OF SHORE SUPPLY AT N-4 TO N-26 JETTIES, DRY DOCKS, SLIPWAYSAND DEGAUSSING BAY INCLUDINGASSOCIATED WORKS AT NAVALDOCKYARD(VISAKHAPATNAM) ”Work Value : Rs.1989 LakhsClient : DGNP, VisakhapatnamTarget for Completion : Sept 2019Percentage of Completion Physically : 93% Completed work (Financially) : Rs.1571 Lakhs
30 May 2019
“Construction of Jetty With Loading Facility atVisakhapatnam”Work Value : Rs.14973 LakhsClient : DGNP VisakhapatnamTarget for Completion : June 2019Percentage of Completion Physically : 99% Completed work (Financially) : Rs.13400 Lakhs
“RURAL ELECTRIFICATION WORKS OFPRATAPGARH DISTRICT IN UTTARPRADESH”Work Value: Rs.12036 LakhsClient : Purvanchal Vidyut Vitran
Nigam Limited, VaranasiTarget for Completion : Mar 2020Percentage of Completion : 71%Completed work (Financially) : Rs.8,492.97 Lakhs
“CONSTRUCTION OF COASTAL BERTHAT JN PORT, MUMBAI ”Work Value : Rs.14332 LakhsClient : JNPT, MumbaiTarget for Completion : May 2020Percentage of Completion Physically : 45 %Completion of work financially: Rs.5823 Lakhs
“CONSTRUCTION OF INDOOR SPORTSARENA UNDER SMART CITYPROGRAM, VISAKHAPATNAM”
Work Value : Rs.1990 LakhsClient : GVMCTarget for Completion : 08 Aug 2019 Percentage of Completion : 19%Completion of work financially: Rs.178 Lakhs
CONSTRUCTION OF NEW 4-LANEBRIDGE (2 X 12.5M WIDE TWIN TWOLANE STRUCTURES) OVER RIVERGANGA AT DOWNSTREAM OF FARAKKABARRAGE ”
Work Value: Rs.52100 LakhsClient : NHAI, WB Completion: Dec 2021Percentage of Completion Physically : 24 %Completion of work financially: Rs.9167 Lakhs
30 May 2019
“DEMOLITION OF EXISTING OLDBUILDING AND RE-CONSTRUCTION OFNEW BUILDING FOR OFFICE ANDSTORE ACOMMODATION FOR WATERFRONT FACILITY AND SLIPWAY ATVISAKHAPATNAM ”Work Value : Rs.719.64 LakhsClient : MESTarget for Completion : Apr 2020 Percentage of Completion Physically : 2%Completion of work financially: Rs.0.64 Lakhs
30 May 2019
“CONSTRUCTION OF JETTY TO SEMISUBMERSIBLE PONTOON (SSP) FORDRY DOCKING OF SUBMARINES(PHASE-I:ON SHORE ) ATVISAKHAPATNAM ”Work Value : Rs.4695.99 LakhsClient : DGNPTarget for Completion : 09 Jul 2020 Percentage of Completion Physically : 8 %Completion of work financially: Rs.377 Lakhs
“CONSTRUCTION OF BERTH AND APPROACHTRESTLES FOR DEVELOPMENT OF ABARGE/VESSEL LOADING BERTH ATHONNAVAR”Work Value : Rs.9594 LakhsClient : Honnavar Port Private LimitedTarget for Completion : 14 June 2020Status of work : Mobilization
BEAUTIFICATION OF VINAYAK SAGAR LAKE
Work Value : Rs.840.41 LakhsClient : Tirupati Smart CityTarget for Completion : 29 Aug 2019Status of work : Mobilization
SPORTS ARENA AT INDIRA MAIDAN AND SRI SRINIVASA SPORTS COMPLEXWork Value : Rs.1223.39 LakhsClient : Tirupati Smart CityTarget for Completion : 04 July 2019Percentage of Completion Physically: 10 %
MARINE WORKS EXECUTED
“Construction of Multi-user Liquid Terminal atPuthuvypeen, Cochin Port”Work Value : Rs.21732 LakhsClient : Cochin Port Trust, CochinYear of Completion: 2018
30 May 2019
“Multipurpose berth at Hazira”
Work Value: Rs.3,652.64 LakhsClient: Adani; Year of Completion: 2016
“Beacon at Mumbai Harbour”
Work Value: Rs.635.62 LakhsClient: MbPTYear of Completion: 2016
“Liquid Chemical/POL BerthOff Pir Pau, Mumbai”
Work Value: Rs.12,920 LakhsClient: MbPTYear of Completion: 2016
“Liquid Cargo Jetty at JNPort”
Work Value: Rs.911.78 LakhsClient: JNPTYear of Completion: 2015
“Coal Berth & Approach atSalaya”
Work Value: Rs.10,000 LakhsClient: ESSAR Year of Completion: 2012
“Gandhar Hazira TransmissionProject across Narmada River”
Work Value: Rs.3,450 LakhsClient: ESSARYear of Completion: 2012
“Jetty N-14A at NavalDockyard, Visakhapatnam”
Work Value: Rs.6,250 LakhsClient: DGNP Year of Completion: 2011
“Product Berth 2 & 3 at Vadinar”
Work Value: Rs.4,139 LakhsClient: EssarYear of Completion: 2010
“Product Berth at Vadinar”
Work Value: Rs.2,866 LakhsClient: EssarYear of Completion: 2006
“Slipway facilities at NavalDockyard (V)”
Work Value: Rs.1,015 LakhsClient: DGNP(V)Year of Completion: 2001
MAJOR & MINOR BRIDGES
“Construction of Road Over Bridge at Lc-43Aat Km.38/175 Of NH 45A in Puducherry ”Work Value : Rs.3496 LakhsClient : PWD, PuducherryYear for Completion : May 2018
ROAD WORKS COMPLETED
“Major Bridge 63 &66 Delang-PuriSection of KUR Division in betweenKm.482.40 to Km. 499.180”
Work Value: Rs.1,432 LakhsClient: East Coast RailwayYear of Completion: 2015
“Major Bridge across GodavariRiver at Nanded”
Work Value: Rs.6,023 LakhsClient: JNNURMYear of Completion: 2012
“Major Bridge across River Beas”Work Value: Rs.3,709 Lakhs
Client: IVRCLYear of Completion: 2010
“ T Girder Parallel Bridge atVisakhapatnam”
Work Value: Rs.766.51 LakhsClient: DGNP(V)Year of Completion: 2006
“Major bridge in connection withTomka Baspani Rail LinkProject”
Work Value: Rs.1,209.17 LakhsClient: E Co RlyYear of Completion: 2006
“Major Bridges in Vijayawada-Visakhapatnam section”
Work Value: Rs.1,171.82 LakhsClient: Punj Lloyds
Rail Bridge on RiverBirupa at Cuttack
Road Over Bridge on River Birupa at Cuttack
BUILDINGS &
INFRASTRUCTURE WORKS
“Provn of OTM Accn No.1 at Leimakhong”Work Value : Rs.1973.74 LakhsClient : MES, ShillongYear of Completion: Dec 2017
“Overhauling facilities at INSEKSILA, Visakhapatnam”
Work Value: Rs.1,061.82 LakhsClient: DGNP(V) Year of Completion: 2015
“Additional Storage House atSBC (V)”
Work Value: Rs.680.57 LakhsClient: DGNP(V) Year of Completion: 2011
“Steam System RepairInfrastructure System at NDV”Work Value: Rs.1,335.83 Lakhs
Client: DGNP(V) Year of Completion: 2010
“Indoor Gymnasium cumSports Complex at SainikSchool, Korukonda, AP”
Work Value: Rs.176.73 Lakhs
EQUIPMENT OWNED
Hydraulic RigSR-60
JACK UP BARGE -MARUTHI RK
PILING RIGS
VEER TUG
100MT CRANE
20MT CRANE
HYDRA -14 TON & 12 TON
Thank You
RKEC PROJECTS LIMITEDDoor No. 10-12-1, Rednam Alcazar, 3rd Floor, Opp: SBI Main Branch, Old Jail Road, Rednam Gardens, Visakhapatnam, Andhra Pradesh -530020Telephone: +91 891 – 257 – 4517E-mail ID: [email protected]: www.rkecprojects.com
Disclaimer:• This document is provided for assistance only and not intended to be taken alone for the basis for an investment decision.• Our presentation/proposal may include predictions, estimates, management opinions or other information that might be considered forward-looking. These forward-looking statements
represent our current judgment on the future, they are subject to risks and uncertainties that could cause actual results to differ materially. Such forward-looking statements are subjectto risks and uncertainties like regulatory changes, local political or economic developments, and many other factors that could cause actual results to differ materially from thosecontemplated by the relevant forward-looking statements.
• Hem Securities Limited and The Company will not be in any way responsible for any action taken based on such statements and undertakes no obligation to publicly update these forward-looking statements to reflect subsequent events or circumstances.