cerner him millennium project walk & talk presentation · • project planning with cerner •...

12
Cerner HIM Millennium Project Walk & Talk Presentation

Upload: others

Post on 26-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cerner HIM Millennium Project Walk & Talk Presentation · • Project Planning with Cerner • Completed Project Kick-Off ... Timeline. Project Teams 11 Project Governed by IT Technical

Cerner HIM Millennium Project

Walk & Talk Presentation

Page 2: Cerner HIM Millennium Project Walk & Talk Presentation · • Project Planning with Cerner • Completed Project Kick-Off ... Timeline. Project Teams 11 Project Governed by IT Technical

Project OverviewNew Cerner Millennium HIM application coming to

Virginia Mason Memorial!

2

NowCerner EDM

(Electronic Document Management)

FutureCerner Millennium HIM

(Health Information Management)

Page 3: Cerner HIM Millennium Project Walk & Talk Presentation · • Project Planning with Cerner • Completed Project Kick-Off ... Timeline. Project Teams 11 Project Governed by IT Technical

Why Are We Doing This?• Patient Safety!

• Improve the patient experience with one Medical Record.

• Improving the Virginia Mason Memorial Experience

• Integrated Information Systems between Virginia Mason and Virginia Mason Memorial.

3

Page 4: Cerner HIM Millennium Project Walk & Talk Presentation · • Project Planning with Cerner • Completed Project Kick-Off ... Timeline. Project Teams 11 Project Governed by IT Technical

4

Project Scope

The HIM Team is implementing VM HIM Cerner Millennium current state as much as

possible along with new functionality such as Chart Deficiency.

o Mapping Notes to current VM Note Types – Virginia Mason Memorial Doc Types are aliased to

Virginia Mason note types where possible. New note types will be created as needed.

o Provider Letters – Virginia Mason and Virginia Mason Memorial will use one set of letters to

provide notification to Providers that documentation is required.

o Provider Message Center – With minor changes Virginia Mason Message Center will be extended

to Virginia Mason Memorial.

o Chart Deficiency – Cerner Millennium Chart Deficiency is new to both Virginia Mason and Virginia

Mason Memorial. A common document deficiency list is used between Virginia Mason and Virginia

Mason Memorial.

o XR/ROI Distribution – New Page master is built to reflect Virginia Mason Memorial logo, phone

and address. New distribution and ops jobs will be built to support Virginia Mason Memorial as well.

o Foreign System Interfaces –HIM team is focused on Dictaphone and 360 Encompass HL7

interfaces. Many other foreign system results interfaces are being worked on by other work streams.

Page 5: Cerner HIM Millennium Project Walk & Talk Presentation · • Project Planning with Cerner • Completed Project Kick-Off ... Timeline. Project Teams 11 Project Governed by IT Technical

Cerner HIM

5

Integrated into Cerner!

Page 6: Cerner HIM Millennium Project Walk & Talk Presentation · • Project Planning with Cerner • Completed Project Kick-Off ... Timeline. Project Teams 11 Project Governed by IT Technical

Impacts – Who & Where?• Virginia Mason HIS

• Virginia Mason Memorial HIM

• ED Department and Staff

• Clinic Departments and Staff

• Inpatient Departments and Staff

• Surgery department and Staff

• Pharmacy department and Staff

• Ancillary Departments and Staff

• None Memorial Clinics

6

Page 7: Cerner HIM Millennium Project Walk & Talk Presentation · • Project Planning with Cerner • Completed Project Kick-Off ... Timeline. Project Teams 11 Project Governed by IT Technical

Benefits of Cerner HIM

7

Supports

Patient Safety across

clinical-specific workflows

Improve Information Sharing across the care team by providing access to an EMR in both the ambulatory and acute care settings

Improves

Clinical Decision Making

Measure and trend Quality Measures with simple

reporting toolsCoordinate workflows

Scheduling, Prior Authorizations & Clinical Services

Page 8: Cerner HIM Millennium Project Walk & Talk Presentation · • Project Planning with Cerner • Completed Project Kick-Off ... Timeline. Project Teams 11 Project Governed by IT Technical

What We’ve Done So Far…• Discovery! We studied the Current State

Workflow

• Project Planning with Cerner

• Completed Project Kick-Off

• Developed Core Project Team

• Engaged Subject Matter Experts

• Aligned Virginia Mason & Virginia Mason Memorial clinical planning.

• Collaborative Joint review of Cerner HIM application to accommodate VMM Message Center, Document scanning, Document Deficiency, Interfaces, & XR (ROI).

8

What is a ‘Sprint’?

‘A brief spell of great activity’

Cerner HIM

Cerner, VM, & VMM

Application Engineers

Yakima VMM HIM

Department

Seattle VM HIS

Department

Page 9: Cerner HIM Millennium Project Walk & Talk Presentation · • Project Planning with Cerner • Completed Project Kick-Off ... Timeline. Project Teams 11 Project Governed by IT Technical

Next Steps

Sprint Sessions Jan – June• Main Module Sessions

Workflow change management Mar –Jul• Identify new workflows

• Finalize & training plans

Outside Eyes Testing – Jun - Jul• Role specific and overview flow

Demo Sessions - Jul• Role specific and overview flow

Training – Sep - Oct• Role specific and overview

9

What Can You Do?

• Stay informed! Visit

????

• Prepare for Sprint Sessions

• Review Cerner Product Guides

• Be open to trying new processes

Page 10: Cerner HIM Millennium Project Walk & Talk Presentation · • Project Planning with Cerner • Completed Project Kick-Off ... Timeline. Project Teams 11 Project Governed by IT Technical

Timeline

Page 11: Cerner HIM Millennium Project Walk & Talk Presentation · • Project Planning with Cerner • Completed Project Kick-Off ... Timeline. Project Teams 11 Project Governed by IT Technical

Project Teams

11

Project Governed by IT Technical Integration

Name Role Department

Amy Bolin-Deon HIS Administrative Director Health Information System

Andy Franz HIM Director Health Information Management

Laura Haroldson Director Communication Communication

Kathleen Paul Vice President Administation

Guiding Team

Name Role Department

Lisa Woodley HIS Manager Health Information Systems

Jason Rosecrans HIS Supervisor Health Information Systems

John Drakes HIM Scanning Supervisor Health Information Management

Jamie Beaman HIM Coding Supervisor Health Information Management

Sirisha Bodempudi HIM Analyst Health information Management

Rakesh Kumar Interface Engineer Clinical Information Systems

Teri West Application Engineer Senior Clinical Information Systems

Dan Braden Application Engineer Clinical Information Systems

Stephen Jones Project Analyst Health Information Systems

Cerner Millennium HIM Project Team

Page 12: Cerner HIM Millennium Project Walk & Talk Presentation · • Project Planning with Cerner • Completed Project Kick-Off ... Timeline. Project Teams 11 Project Governed by IT Technical

Questions? [email protected]; (509) 249-5189 HIM Project Manager

HIM/HIS Subject Matter Experts:

• Woodley, Lisa [email protected]; (206) 223-6895

• Franz, Andy [email protected]; (509) 249-5379

• Rosecrans, Jason [email protected]; (206) 515-5885

• Beaman, Jamie [email protected]; (509) 249-5259

• Jones, Stephen [email protected]; (206) 223-6991

• Drakes, John [email protected]; (509) 249-5349

12