centre for the creative arts and media (ccam) | gmit general arrangment drawings

17
-04.27 -03.61 01 00.00 00.00 00.00 00.00 00.00 00.00 04.62 +04.62 -00.10 -00.10 00.00 DK DK DK 3415 3510 2025 2025 2000 00.30 Slope: 1:20 SURFACE OF RAMP AND LANDING NON- SLIP FAIR FACED CONCRETE Surface of ramp and landing slip resistant fair faced concrete Surface of ramp and landing slip resistant fair faced concrete Slope: 1:20 Sign Indicating direction to building Sign Indicating direction to building DK -01.09 -00.45 LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS Bus Stop Sign Indicating building -03.07 -02.42 -00.79 -00.10 00.00 -00.10 -00.10 -00.10 -00.10 -00.96 00.00 -03.62 -02.98 -02.35 -01.72 1800 1800 1800 1975 Slope: 1:20 Slope: 1:20 Slope: 1:20 Slope: 1:20 Slope: 1:20 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Proposed Car Park Proposed Green Area and Landscaping Proposed Ramp PROPOSED CAR PARK CCAM Main Entrance Wellpark Road No Access CCAM Main Building DK Legend 0000 2025 2025 2025 -00.00 DK ABOVE ORDINANCE DATUM PUBLIC LIGHT STAND TO COMPLY WITH ESB STANDARDS ACCESS ROUTE DIMENSION LINE EXISTING CHAPEL STRUCTURE EXTENSION STRUCTURE TACTILE SURFACE DISHED KERBING DK 8000 PROPOSED HARD STANDING 1800 Mini Round about Existing Chapel SUDS PERMEABLE PAVING SURFACE WATER DRAINAGE SUDS SURFACE WATER DRAINAGE SUDS MH MH Fall to Centre: 1:60 Proposed Extension ACCESSIBLE ENTRANCE A ACCESSIBLE ENTRANCE B ACCESSIBLE ENTRANCE C PROPOSED LANDSCAPING PROPOSED RESURFACE OF ROAD AND MARKINGS ACCESSIBLE ROUTE FROM CAR PARK TO ENTRANCE C ACCESSIBLE ROUTE FROM CAR PARK TO ENTRANCE A ACCESSIBLE ROUTE FROM CAR PARK TO ENTRANCE B ROADSTONE PAVIERS GRASS MARGIN GRASS MARGIN GRASS MARGIN GRASS MARGIN EXISTING ROADWAY ACCESS JUNCTION MAN HOLE FOUL WATER PIPE RAIN WATER PIPE F.F.L. +00.30 F.F.L. +00.30 MH MH MH AJ HOARDING LINE SUDS 1:50 FALL TO DRAINAGE SITE SUDS SOAK PIT 100mm Ø RAIN WATER PIPE LAID TO FALL 1:50 TO SUDS 100mm Ø FOUL WATER PIPE LAID TO FALL 1:50 Set Down Area/Hardstanding Det.014 DK 2125 ACCESS ROUTE AND FIRE ESCAPE MH AJ LS 00.00 AJ 4025 CCAM MAIN BUILDING 1844 1788 1500 1844 1850 2400 4800 6000 1400 4872 8000 4800 2050 2025 4810 2985 F.F.L. +00.30 +00.30 13090 Fall to Centre: 1:60 ACO 125 DRAIN ACO 125 DRAIN +0.000M -0.100M PERMEABLE PAVING 600x50mm ROADSTONE PLAIN FLAG PAVING LAID ON 50mm SAND BLINDING ON 50mm GRAVEL WITH A ROADSTONE HALF BATTERED KERB AT EDGE PERMEABLE ROAD 25mm PERMEABLE ASPHALT SURFACE COURSE ON 50mm PERMEABLE BASE COURSE ON 100MM GRAVEL ON COMPACTED EARTH 50 50 10 50 25 100 50 DETAIL 014 1:10 SCALE (@ A1) NUMBER TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER REV DRAWN BY DATE Jonathan Flanagan N/A Jonathan Flanagan 80 Gleann Rua, Renmore, Galway. DESIGNERS ADDRESS Construction Information/Working Drawings Galway Mayo Institute of Technology CONTACT DETAILS Phone: 0830054478 Email: [email protected] m G00262330 28/04/2015 28/04/2015 13:08:50 Site Layout Plan 1:200 GA_001 DDS4_P09 Site Layout Plan North 1:200 GA_001 DDS4_P09

Upload: jonathan-flanagan

Post on 15-Apr-2017

1.426 views

Category:

Design


1 download

TRANSCRIPT

Page 1: Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

-04.27-03.61

0100.00

00.00

00.00

00.00

00.00

00.00

04.62

+04.62

-00.10

-00.10

00.00

DK

DK DK

34

15

3510 2025

2025

2000

00.30

Slope:1:20

SURFACE OF RAMPAND LANDING NON-SLIP FAIR FACEDCONCRETE

Surface of ramp and landingslip resistant fair facedconcrete

Surface oframp andlanding slipresistant fairfacedconcrete

Slope:1:20

Sign Indicatingdirection to building

Sign Indicatingdirection to building

DK

-01.09

-00.45

LS

LS

LS

LS

LSLS

LSLS

LS

LS

LS

LSLSLSLSLSLSLS

BusStop

Sign Indicatingbuilding

-03.07

-02.42

-00.79

-00.1000.00-00.10

-00.10

-00.10

-00.10

-00.96

00.00

-03.62

-02.98

-02.35

-01.72

1800

1800

1800

1975

Slope:1:20

Slope:1:20

Slope:1:20

Slope:1:20

Slope:1:20

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

ProposedCar Park

Proposed GreenArea and

LandscapingProposed

Ramp

PROPOSED CAR PARK

CCAM MainEntrance

WellparkRoad

NoAccess

CCAMMain

Building

DK

Legend

0000

2025

2025

2025

-00.00

DK

ABOVE ORDINANCEDATUM

PUBLIC LIGHTSTAND TO COMPLYWITH ESBSTANDARDS

ACCESS ROUTE

DIMENSION LINE

EXISTING CHAPELSTRUCTURE

EXTENSIONSTRUCTURE

TACTILE SURFACE

DISHED KERBINGDK

8000

PROPOSED HARD STANDING

1800

MiniRoundabout

ExistingChapel

SUDS PERMEABLEPAVING

SURFACEWATERDRAINAGE SUDS

SURFACEWATERDRAINAGE SUDS

MH

MH

Fall toCentre:

1:60

ProposedExtension

ACCESSIBLEENTRANCE A

ACCESSIBLEENTRANCE B

ACCESSIBLEENTRANCE C

PROPOSEDLANDSCAPING

PROPOSED RESURFACEOF ROAD AND MARKINGS

ACCESSIBLE ROUTE FROMCAR PARK TO ENTRANCE C

ACCESSIBLE ROUTE FROMCAR PARK TO ENTRANCE A

ACCESSIBLE ROUTE FROMCAR PARK TO ENTRANCE B

ROADSTONEPAVIERS

GRASS MARGIN

GRASS MARGIN

GRASS MARGIN

GRASS MARGIN

EXISTING ROADWAY

ACCESS JUNCTION

MAN HOLE

FOUL WATER PIPE

RAIN WATER PIPE

F.F.L.+00.30

F.F.L.+00.30

MH

MH

MH

AJ

HOARDING LINE

SUDS 1:50 FALL TODRAINAGE SITE

SUDS SOAK PIT

100mm Ø RAIN WATERPIPE LAID TO FALL 1:50TO SUDS

100mm Ø FOUL WATERPIPE LAID TO FALL 1:50

Set D

ow

nA

rea/H

ard

sta

ndin

g

Det.014

DK

2125

ACCESS ROUTE ANDFIRE ESCAPE

MH

AJ

LS

00.00

AJ

4025

CCAM MAINBUILDING

1844

1788

1500

1844

1850

2400

4800

6000

14004872

8000

48002050 2025

4810

2985

F.F.L.+00.30

+00.30

13

09

0

Fall toCentre:

1:60

ACO 125DRAIN

ACO 125DRAIN

+0.000M

-0.100M

PERMEABLE PAVING600x50mm ROADSTONE PLAIN FLAGPAVING LAID ON 50mm SANDBLINDING ON 50mm GRAVEL WITH AROADSTONE HALF BATTERED KERBAT EDGE

PERMEABLE ROAD25mm PERMEABLE ASPHALTSURFACE COURSE ON 50mmPERMEABLE BASE COURSE ON100MM GRAVEL ON COMPACTEDEARTH

50

50

10

5025

100

50

DETAIL 014

1:10

SCALE (@ A1)

NUMBER

TITLE

PROJECT NUMBER

CLIENT

PROJECT

DRAWING NUMBER REV

DRAWN BY DATE

Jonathan Flanagan

N/A

Jonathan Flanagan80 Gleann Rua,Renmore,Galway.

DESIGNERS ADDRESS

ConstructionInformation/Working Drawings

Galway Mayo Institute ofTechnology

CONTACT DETAILS

Phone: 0830054478Email:[email protected]

G00262330 28/04/2015

28/0

4/20

15 1

3:08

:50

Site Layout Plan

1:200

GA_001

DDS4_P09

Site Layout Plan

Nor

th

1:200

GA_001

DDS4_P09

Page 2: Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

UP

ExistingStairs

25285

15338

2425

26525

LegendEXTENT OF WALLDEMOLITION

Existing Walls

EXTENT OF DOORDEMOLITION

EXTENT OF STAINGLASS WINDOWDEMOLITION

2909

8865

897

850

1210

1210

24003596

2510

2554

1494

3253

SCULPTURE

GALWAY FILM CENTRE

STAGING AREA

EXTENT OF FLOORSDEMOLITION

19603

SCALE (@ A1)

NUMBER

TITLE

PROJECT NUMBER

CLIENT

PROJECT

DRAWING NUMBER REV

DRAWN BY DATE

Jonathan Flanagan

N/A

Jonathan Flanagan80 Gleann Rua,Renmore,Galway.

DESIGNERS ADDRESS

ConstructionInformation/Workign Drawings

Galway Mayo Institute ofTechnology

CONTACT DETAILS

Phone: 0830054478Email:[email protected]

G00262330 28/04/2015

20/0

4/2

015 1

8:2

9:0

5

Demolition Plan

1:50

GA_002

DDS4_P09

Chapel Ground Floor Plan Demolition

Page 3: Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

UP

UP

30.07 m²Green Room

158 G

EXISTING VICTORIAN TILE

5.23 m²Costume Store

154 K

EXISTING VICTORIAN TILE

5.95 m²Costume Store

155 J

EXISTING VICTORIAN TILE

5.32 m²Costume Store

156 I

EXISTING VICTORIAN TILE

5.74 m²Costume Store

157 H

EXISTING VICTORIAN TILE

14.07 m²Tech Support

161 B

EXISTING PARQUET AND TILE

14.37 m²Prop Store

161 A

EXISTING PARQUET AND TILE

15.12 m²Matrix Chair Store

161 C

EXISTING PARQUET AND TILE15.69 m²Lobby161 M

EXISTING LIESTONE TILEFLOOR

185.87 m²Creative Space

161 L

EXISTING PARQUET ANDVICTORIAN TILE

A-A

678

7.08 m²Disabled Shower/WC

161 E

SOLUS CERAMICS MODULARTILE R11

16.66 m²Matrix Chair Store

161 D

EXISTING PARQUET AND TILE

25.53 m²Changing Room

161 F

SOLUS CERAMICS MODULARTILE R11

1050

4260

Slo

pe:

1:2

0

ModestyScreen

2398

LegendDemolished Walls

EXISTING DOOR TO BERETAINED ANDPAINTED WITH A FIRERESISTANT SELANT,INCHUMESCENT STRIPAND DOOR CLOSER

EXISTING DOOR TO BERETAINED AND PAINTEDWITH A FIRE RESISTANTSELANT,INCHUMESCENT STRIPAND DOOR CLOSER

EXISTING PARTITIONSTO BE DEMOLISHED

EXISTING PARTITIONS TOBE DEMOLISHED

EXISTING DOOR TO BEREMOVED ANDOPENING CLOSED

00.30

00.30

UPGR.

D-01

D-06

FD 30 S

D-08

FD 30 S

D-03

FD 30 S

UPGR.

D-09

Existing Walls

00.3

0

1263

4938

331128552855

897

00.30

00.00

008GA_013

2500

2800

D-02

FD 30 S

D-04

FD 30 S

D-05

FD 30 S

D-11

FD 30 S

D-12

FD 30 S

D-13

FD 30 S

D-14

FD 30 S

D-16

D-15

FD 30 S

D-07

S

D-101200

2850

00.30

3224

3029

1770

1770

1252

1050

NEW WALL OPEFOR FIRE DOOR

ALL EXISTING STAIN GLASS AND FRAMES RETAINED ANDREPAIRED BY USING SUITABLE CONSERVATIONTECHNOLOGIES UNLESS REMOVED IN DEMOLITION PLAN.

STAIN GLASS WINDOW REVEALS AND BORDERS TO BECLEANED.

ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THEEXISTING OPE BEHIND WINDOW.

EXTERIOR GLAZED GUARD REPLACED WITH SINGLEGLAZED WINDOW GUARD. 20mm GAP LEFT ALONGBOTTOM OF GLAZING TO VENTILATE AND MITIGATECONDENSATION.

ALL EXISTING STAIN GLASS AND FRAMESRETAINED AND REPAIRED BY USING SUITABLECONSERVATION TECHNOLOGIES UNLESS REMOVEDIN DEMOLITION PLAN.

STAIN GLASS WINDOW REVEALS AND BORDERS TOBE CLEANED.

ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THEEXISTING OPE BEHIND WINDOW.

EXTERIOR GLAZED GUARD REPLACED WITHSINGLE GLAZED WINDOW GUARD. 20mm GAP LEFTALONG BOTTOM OF GLAZING TO VENTILATE ANDMITIGATE CONDENSATION.

ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BYUSING SUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED INDEMOLITION PLAN.

STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED.

ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPEBEHIND WINDOW.

EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOWGUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATEAND MITIGATE CONDENSATION.

EXISTINGTEMPORARY FLOORREMOVED ANDPARQUET ANDVICTORIAN TILESRETAINED ANDREFURBISHED

1010

STAGING AREA/TV STUDIOFORBO MARMOLEUM REAL

00.30 00.3000.30

00.3000.30

00.30

00.00

EXISTING DOOR TOBE RETAINED ANDPAINTED WITH A FIRERESISTANT SELANT,INCHUMESCENTSTRIP AND DOORCLOSER

W-05

W-04

W-07

W-06

W-16

W-14 W-12 W-10

W-09 W-08

W-03W-02W-01

W-18

W-20

W-17

W-11W-13W-15

W-19

EXISTING FRENCH DRAIN TOBE REMOVED FROMPERIMETER OF CHAPELBUILDING AND REPALCEDWITH PREMEABLE PAVING

DOOR GUARD RAIL1100x1100mm

006GA_013

010GA_013

009GA_013

005GA_013

B-B

PROPOSED WALLOPENINGS TO BEMADE GOOD.FINISHES TO WALLSOF DEMOLITIONWORK TO BE MADEGOOD WITHAPPROPRIATE FILLINGAND LIME RENDERFINISH TO MATCHEXISTING WALLS

FOWL WATERDRAINAGE

RAIN WATERDRAINAGE

PROPOSED WALLCLOSURES TO BEMADE GOOD.FINISHES TO WALLSOF DEMOLITIONWORK TO BE MADEGOOD WITHAPPROPRIATEFILLING AND LIMERENDER FINISH TOMATCH EXISTINGWALLS

450MM MINIMUMACTIVITY TURNINGSPACE

SSOUNDER

EXISTING VICTORIAN TILE,PARQUET AND THEIR ADHESIVESTO BE REPLACED WITH SOLUSCERAMICS MODULAR TILES ANDLAID ON A BED OF TELLING UNILIT45 LIME

EXISTING PARQUET FLOOR TOBE RETAINED AND CLEANEDWITH VACUUM, MOPPED WITHARBO CLEANER 16. 2 COATS OFBONA HARDWAX OIL TO BEAPPLIED TO PARQUET WHENFULLY DRY AND BUFFED TOFINISH

EXISTING VICTORIAN TILES TO BERETAINED, GROUT AND TILES TOBE CLEANED BY VACUUM ANDMOP WITH ARBO CLEANER 16.WHEN DRY APPLY DUPONTSTONE TECH GROUT SEALER.BUFF FLOOR TO FINISH.

EXISTING VICTORIAN TILES TO BERETAINED, GROUT AND TILES TOBE CLEANED BY VACUUM ANDMOP WITH ARBO CLEANER 16.WHEN DRY APPLY DUPONTSTONE TECH GROUT SEALER.BUFF FLOOR TO FINISH.

EXISTING OPE TO BE WIDENEDAND 30 MIN. FIRE DOORINSTALLED. TO BE PERMANENTLYLOCKED AT ALL TIMES.

EXTENT OF PARQUET

EXTENT OF SOLUSCERAMICS MODULARTILES

EXTENT OF VICTORIANTILES

EXTENT OF FORBOMARMOLEUM REAL

1500

300

18

50

OAK LAMINATE FLOORBOARDS

OAK LAMINATE FLOORBOARDS

OAK LAMINATE FLOORBOARDS

OAK LAMINATE FLOORBOARDS

SCALE (@ A1)

NUMBER

TITLE

PROJECT NUMBER

CLIENT

PROJECT

DRAWING NUMBER REV

DRAWN BY DATE

Jonathan Flanagan

N/A

Jonathan Flanagan80 Gleann Rua,Renmore,Galway.

DESIGNERS ADDRESS

ConstructionInformation/Working Drawings

Galway Mayo Institute ofTechnology

CONTACT DETAILS

Phone: 0830054478Email:[email protected]

G00262330 28/04/2015

28/0

4/20

15 1

3:18

:37

Ground Floor Chapel Plan

1:50

GA_003

DDS4_P09

Proposed Ground Floor Chapel Plan

North

Key Plan

Page 4: Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

DN

24.85 m²Gallery161 T

INACCESSIBLE

5.44 m²Existing Stairs

?

?

B-B

A-A

846

UPGR.

D-17

EXISTING DOORTO BE RETAINEDAND PAINTEDWITH A FIRERESISTANTSELANT. TO BEPERMANENTLYLOCKED AT ALLTIMES.

EXISTINGBALUSTRADE TOBE RETAINEDAND PAINTEDWITH A LIGHTVARNISH

W-30

W-28

W-36W-37 W-35 W-34 W-33 W-32 W-31

W-22W-21 W-23 W-24 W-25

W-29W-39

W-38

LegendDemolished Walls

Existing Walls

PROPOSED WALLOPENINGS TO BEMADE GOOD.FINISHES TO WALLSOF DEMOLITIONWORK TO BE MADEGOOD WITHAPPROPRIATE FILLINGAND LIME RENDERFINISH TO MATCHEXISTING WALLS

FOWL WATERDRAINAGE

RAIN WATERDRAINAGE

PROPOSED WALLCLOSURES TO BEMADE GOOD.FINISHES TO WALLSOF DEMOLITIONWORK TO BE MADEGOOD WITHAPPROPRIATEFILLING AND LIMERENDER FINISH TOMATCH EXISTINGWALLS

450MM MINIMUMACTIVITY TURNINGSPACE

SSOUNDER

EXTENT OF PARQUET

EXTENT OF SOLUSCERAMICS MODULARTILES

EXTENT OF VICTORIANTILES

EXTENT OF FORBOMARMOLEUM REAL

SCALE (@ A1)

NUMBER

TITLE

PROJECT NUMBER

CLIENT

PROJECT

DRAWING NUMBER REV

DRAWN BY DATE

Jonathan Flanagan

N/A

Jonathan Flanagan80 Gleann Rua,Renmore,Galway.

DESIGNERS ADDRESS

ConstructionInformation/Working Drawings

Galway Mayo Institute ofTechnology

CONTACT DETAILS

Phone: 0830054478Email:[email protected]

G00262330 28/04/2015

28/0

4/20

15 1

4:29

:17

Gallery Floor Plan

1:50

GA_004

DDS4_P09

Proposed Gallery Floor Plan

North

Page 5: Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

UP

26.74 m²Glass Link

161 N

ROADSTONE LIMESTONEPAVING FLAGS

6741

B-B

A-A

700

2240

4.35 m²LobbyWC

SOLUS CERAMICS MODULARTILE R11

6.25 m²Disabled WC

161 Q

SOLUS CERAMICS MODULARTILE R11

3.89 m²LobbyWC

SOLUS CERAMICS MODULARTILE R11

10.61 m²Male WC

161 S

SOLUS CERAMICS MODULARTILE R11

10.33 m²Female WC

161 R

SOLUS CERAMICS MODULARTILE R11

1611

1440

2163

Slo

pe:

1:2

0

00.30

00.30

00.30

00.00

1700

00.30

63.23 m²Reception

161 P

Oak Laminate Floor

00.30

1850

D-21

N/A

D-24

N/A

D-16

N/A

1800

1500

D-18

D-19

1200

1200

C-C

2500

1605

OVER DOORHEATERSRECESSED INCEILING

W-1

8W

-20

W-1

9

W-4

3W

-42

W-4

1

W-4

0

014GA_014

017GA_014

GA_015

GA_014

022

015

GA_015

022GA_015

023

18267

1500

300

100

942

1844

1200

1010

1010

1010

1010

790

1077

LegendDemolished Walls

Existing Walls

PROPOSED WALLOPENINGS TO BEMADE GOOD.FINISHES TO WALLSOF DEMOLITIONWORK TO BE MADEGOOD WITHAPPROPRIATE FILLINGAND LIME RENDERFINISH TO MATCHEXISTING WALLS

FOWL WATERDRAINAGE

RAIN WATERDRAINAGE

PROPOSED WALLCLOSURES TO BEMADE GOOD.FINISHES TO WALLSOF DEMOLITIONWORK TO BE MADEGOOD WITHAPPROPRIATEFILLING AND LIMERENDER FINISH TOMATCH EXISTINGWALLS

450MM MINIMUMACTIVITY TURNINGSPACE

SSOUNDER

EXTENT OF PARQUET

EXTENT OF SOLUSCERAMICS MODULARTILES

EXTENT OF VICTORIANTILES

EXTENT OF FORBOMARMOLEUM REAL

SCALE (@ A1)

NUMBER

TITLE

PROJECT NUMBER

CLIENT

PROJECT

DRAWING NUMBER REV

DRAWN BY DATE

Jonathan Flanagan

N/A

Jonathan Flanagan80 Gleann Rua,Renmore,Galway.

DESIGNERS ADDRESS

Disability Access CertificateApplication

Galway Mayo Institute ofTechnology

CONTACT DETAILS

Phone: 0830054478Email:[email protected]

G00262330 15/01/2015

28/0

4/2

015 1

3:2

0:0

9

Ground Floor Extension Plan

1:50

GA_005

DDS4_P09

Ground Floor Extension Plan

North

Key Plan

Page 6: Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

00 Ground Level

0

01 Ground Floor

300

Chapel Flat Roof Level

4620

Chapel Eaves 1

7935

10 Chapel Ridge Level

11978

001GA_012

012GA_012

004GA_013

003GA_012

004GA_013

185.87 m²Creative Space

161 L

EXISTING PARQUET ANDVICTORIAN TILE

25.53 m²Changing Room

161 F

SOLUS CERAMICS MODULARTILE R11

7.08 m²Disabled Shower/WC

161 E

SOLUS CERAMICS MODULARTILE R11

30.07 m²Green Room

158 G

EXISTING VICTORIAN TILE

3135

3135

007GA_013

EXISTING SLATES TO BE REUSED WHEREPOSSIBLE AND REPLACEMENTS TO BEMADE GOOD WITH RECLAIMED BANGORBLUE AGED SIMILAR WHERE NECESSARY.

ALL EXISTING STAIN GLASS AND FRAMES RETAINED ANDREPAIRED BY USING SUITABLE CONSERVATION TECHNOLOGIESUNLESS REMOVED IN DEMOLITION PLAN.

STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED.

ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPEBEHIND WINDOW.

EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZEDWINDOW GUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TOVENTILATE AND MITIGATE CONDENSATION.

EXISTING STAIN GLAS WINDOWRETAINED ANDREPAIRED/UPGRADED WITH SINGLEGLAZE ISOTHERMAL GLAZING ANDA EXTERIOR GLAZED GUARD.

EXISTING STAIN GLAS WINDOWRETAINED ANDREPAIRED/UPGRADED WITH SINGLEGLAZE ISOTHERMAL GLAZING ANDA EXTERIOR GLAZED GUARD.

EXISTING STAIN GLAS WINDOWRETAINED ANDREPAIRED/UPGRADED WITH SINGLEGLAZE ISOTHERMAL GLAZING ANDA EXTERIOR GLAZED GUARD.

00 Ground Level

0

01 Ground Floor

300

02 Gallery FFL

4525

Chapel Eaves 1

7935

2051

016GA_014

185.87 m²Creative Space

161 L

EXISTING PARQUET ANDVICTORIAN TILE

24.85 m²Gallery161 T

INACCESSIBLE

SCALE (@ A1)

NUMBER

TITLE

PROJECT NUMBER

CLIENT

PROJECT

DRAWING NUMBER REV

DRAWN BY DATE

Jonathan Flanagan

N/A

Jonathan Flanagan80 Gleann Rua,Renmore,Galway.

DESIGNERS ADDRESS

ConstructionInformation/Working Drawings

Galway Mayo Institute ofTechnology

CONTACT DETAILS

Phone: 0830054478Email:[email protected]

G00262330 28/04/2015

28/0

4/20

15 1

3:23

:37

Chapel Sections AA - BB

1:50 DDS4_P05

Section A-A

Section B-B

1:50

GA_006

DDS4_P09

Page 7: Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

00 Ground Level

0

01 Ground Floor

300

Extension Parapet Level

4983

Extension Roof Level

4568

011GA_014

019GA_015

012GA_014

013GA_014

011GA_014

ALUMINIUM PARAPET TOEXTENSION ANODISED BLACK

SVK ORNIMAT FIBRECEMENTRAINSCREEN CLADDINGCOLOUR BLACK

SCHUCO FW60+ALUMINIUM TRIPLEGLAZING

3722

1:60 FALL 1:60 FALL

00 Ground Level

0

01 Ground Floor

300

Extension Parapet Level

4983

Extension Roof Level

4568

3722

3739 2500 10840

2000

150

600 600600

842

1750

1100

63.23 m²Reception

161 P

Oak Laminate Floor

6.25 m²Disabled WC

161 Q

SOLUS CERAMICS MODULARTILE R11

10.33 m²Female WC

161 R

SOLUS CERAMICS MODULARTILE R11

011GA_014

019GA_015

015GA_014

011GA_014

012GA_014

013GA_014

ALUMINIUM PARAPET TOEXTENSION ANODISED BLACK

SVK ORNIMAT FIBRECEMENTRAINSCREEN CLADDINGCOLOUR BLACK

SCHUCO FW60+ALUMINIUM TRIPLEGLAZING

00 Ground Level

0

01 Ground Floor

300

Link Roof Level

4500

016GA_014

024GA_015

120026.74 m²

Glass Link161 N

ROADSTONE LIMESTONEPAVING FLAGS

PILKINGTON PLANARGLAZED WALLS ANDROOF

1:60 FALL

SCALE (@ A1)

NUMBER

TITLE

PROJECT NUMBER

CLIENT

PROJECT

DRAWING NUMBER REV

DRAWN BY DATE

Jonathan Flanagan

N/A

Jonathan Flanagan80 Gleann Rua,Renmore,Galway.

DESIGNERS ADDRESS

ConstructionInformation/Working Drawings

Galway Mayo Institute ofTechnology

CONTACT DETAILS

Phone: 0830054478Email:[email protected]

G00262330 28/04/2015

28/0

4/2

015 1

3:2

4:5

8

Extension Sections A-A & B-B

& C-C

1:50 DDS4_P05

Section A-A

Section B-B

1:50

GA_007

DDS4_P09

Section C-C

Page 8: Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

00 Ground Level

0

Chapel Eaves

7600

10 Chapel Ridge Level

11978

Extension Parapet Level

4983

550 1

100

Ramps and Hand rails inaccordance with TGDPart M 2010

SVK ORNIMAT FIBRECEMENTRAINSCREEN CLADDING COLOURBLACK

ALUMINIUM PARAPET TOEXTENSION ANODISEDBLACK

ALL EXISTING STAIN GLASS AND FRAMESRETAINED AND REPAIRED BY USINGSUITABLE CONSERVATIONTECHNOLOGIES UNLESS REMOVED INDEMOLITION PLAN.

STAIN GLASS WINDOW REVEALS ANDBORDERS TO BE CLEANED.

ISOTHERMAL SINGLE GLAZED UNITADDED TO THE EXISTING OPE BEHINDWINDOW.

EXTERIOR GLAZED GUARD REPLACEDWITH SINGLE GLAZED WINDOW GUARD.20mm GAP LEFT ALONG BOTTOM OFGLAZING TO VENTILATE AND MITIGATECONDENSATION.

EXISTING WALL AND QUOIN STONES TO BEREPAIRED AND RE-POINTED ASNECESSARY

EXISTING WALL RENDER TO BE REPAIREDAS NECESSARY TO EXTERIOR AT CRACKSAND WITH SIMILAR PEBBLE DASH RENDER

EXISTING SASH WINDOW TO BE CAREFULLYREPAIRED USING SUITABLE CONSERVATIONTECHNOLOGIES AND MATERIALS BYSPECIALIST JOINER

Extension Roof Level

4568

EXISTING SLATES TO BE REUSED WHEREPOSSIBLE AND REPLACEMENTS TO BE MADEGOOD WITH RECLAIMED BANGOR BLUE AGEDSIMILAR WHERE NECESSARY.

PARAPET ANDFLASHING TO BERETAINED,CLEANED ANDREPAIRED ASNECESSARY WITHSIMILAR

1100

EXISTING DOVE COTRETAINED AND CLEANED,REPAIR AND REPLACELOUVRES AS NECESSARYWITH SIMILAR

SCALE (@ A1)

NUMBER

TITLE

PROJECT NUMBER

CLIENT

PROJECT

DRAWING NUMBER REV

DRAWN BY DATE

Jonathan Flanagan

N/A

Jonathan Flanagan80 Gleann Rua,Renmore,Galway.

DESIGNERS ADDRESS

ConstructionInformation/Working Drawings

Galway Mayo Institute ofTechnology

CONTACT DETAILS

Phone: 0830054478Email:[email protected]

G00262330 28/04/2015

28/0

4/2

015 1

3:3

0:2

2

North Elevation

1:50

GA_008

DDS4_P09

North Elevation

North Elevation (Key)

Page 9: Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

00 Ground Level

0

Chapel Flat Roof Level

4620

Chapel Eaves

7600

10 Chapel Ridge Level

11978

EXISTING WALL RENDER TO BE REPAIRED ASNECESSARY TO EXTERIOR AT CRACKS ANDWITH SIMILAR PEBBLE DASH RENDER

ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BY USINGSUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED IN DEMOLITIONPLAN.

STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED.

ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE BEHINDWINDOW.

EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOW GUARD.20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE AND MITIGATECONDENSATION.

EXISTING WALL AND QUOIN STONES TO BEREPAIRED AND RE-POINTED AS NECESSARY

EXISTING RAIN WATER GOODS TO BEREPAIRED AND RE-PAINTED AS NECESSARYWITH SIMILAR MATERIALS AND COLOUR BYCONSERVATION METALWORKER

BARGE TO BE RETAINED AND CLEANED WITHJET WASHER.

EXISTING SLATES TO BE REUSED WHEREPOSSIBLE AND REPLACEMENTS TO BE MADEGOOD WITH RECLAIMED BANGOR BLUE AGEDSIMILAR WHERE NECESSARY.

PARAPET AND FLASHING TOBE RETAINED, CLEANEDAND REPAIRED ASNECESSARY WITH SIMILAR

SCALE (@ A1)

NUMBER

TITLE

PROJECT NUMBER

CLIENT

PROJECT

DRAWING NUMBER REV

DRAWN BY DATE

Jonathan Flanagan

N/A

Jonathan Flanagan80 Gleann Rua,Renmore,Galway.

DESIGNERS ADDRESS

ConstructionInformation/Working Drawings

Galway Mayo Institute ofTechnology

CONTACT DETAILS

Phone: 0830054478Email:[email protected]

G00262330 28/04/2015

28/0

4/2

015 1

3:3

1:4

4

East Elevation

1:50

GA_010

DDS4_P09

East Elevation

East Elevation (Key)

Page 10: Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

00 Ground Level

0

Chapel Flat Roof Level

4620

Chapel Eaves

7600

10 Chapel Ridge Level

11978

Extension Parapet Level

4983

EXISTING WALL RENDER TO BEREPAIRED AS NECESSARY TOEXTERIOR AT CRACKS AND WITHSIMILAR PEBBLE DASH RENDER

ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BYUSING SUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED INDEMOLITION PLAN.

STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED.

ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE BEHINDWINDOW.

EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOWGUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE ANDMITIGATE CONDENSATION.

EXISTING WALL AND QUOIN STONESTO BE REPAIRED AND RE-POINTED ASNECESSARY WITH SIMILAR

EXISTING SLATES TO BE REUSED WHEREPOSSIBLE AND REPLACEMENTS TO BE MADEGOOD WITH RECLAIMED BANGOR BLUEAGED SIMILAR WHERE NECESSARY.

EXISTING DOVE COT RETAINED ANDCLEANED, REPAIR AND REPLACELOUVRES AS NECESSARY WITH SIMILAR

SCALE (@ A1)

NUMBER

TITLE

PROJECT NUMBER

CLIENT

PROJECT

DRAWING NUMBER REV

DRAWN BY DATE

Jonathan Flanagan

N/A

Jonathan Flanagan80 Gleann Rua,Renmore,Galway.

DESIGNERS ADDRESS

ConstructionInformation/Working Drawings

Galway Mayo Institute ofTechnology

CONTACT DETAILS

Phone: 0830054478Email:[email protected]

G00262330 28/04/2015

28/0

4/2

015 1

3:3

0:5

9

South Elevation

South Elevation

South Elevation (Key)

1:50

GA_009

DDS4_P09

Page 11: Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

00 Ground Level

0

01 Ground Floor

300

Chapel Flat Roof Level

4620

Chapel Eaves 1

7935

10 Chapel Ridge Level

11978

EXISTING RAIN WATER GOODS TOBE REPAIRED AND RE-PAINTED ASNECESSARY WITH SIMILAR COLOUROF ANTI-RUST PAINT

EXISTING WALL RENDER TO BEREPAIRED AS NECESSARY TOEXTERIOR AT CRACKS AND WITHSIMILAR PEBBLE DASH RENDER

ALL EXISTING STAIN GLASS AND FRAMES RETAINED ANDREPAIRED BY USING SUITABLE CONSERVATIONTECHNOLOGIES UNLESS REMOVED IN DEMOLITION PLAN.

STAIN GLASS WINDOW REVEALS AND BORDERS TO BECLEANED.

ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTINGOPE BEHIND WINDOW.

EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZEDWINDOW GUARD. 20mm GAP LEFT ALONG BOTTOM OFGLAZING TO VENTILATE AND MITIGATE CONDENSATION.

EXISTING WALL AND QUOIN STONESTO BE REPAIRED AND RE-POINTEDAS NECESSARY

BARGE TO BE CLEANED WITH JET WASHER.

EXISTING SLATES TO BE REUSED WHEREPOSSIBLE AND REPLACEMENTS TO BE MADEGOOD WITH RECLAIMED BANGOR BLUE AGEDSIMILAR WHERE NECESSARY.

1100

150

300150

300 100

950

1500

00 Ground Level

0

01 Ground Floor

300

Extension Parapet Level

4983

Link Roof Level

4500

Glass Manifestations are 50mm high andplaced at 850mm and 1400mm AboveFloor Level

Extension Roof Level

4568

2400x1200mm SVK ORNIMATFIBRECEMENT RAINSCREENCLADDING COLOUR BLACK

1200

1200

2400

600 600 1500

SCALE (@ A1)

NUMBER

TITLE

PROJECT NUMBER

CLIENT

PROJECT

DRAWING NUMBER REV

DRAWN BY DATE

Jonathan Flanagan

N/A

Jonathan Flanagan80 Gleann Rua,Renmore,Galway.

DESIGNERS ADDRESS

ConstructionInformation/Working Drawings

Galway Mayo Institute ofTechnology

CONTACT DETAILS

Phone: 0830054478Email:[email protected]

G00262330 28/04/2015

28/0

4/2

015 1

3:3

6:1

3

West Elevation

Roof PlanWest Elevation (Extension)

West Elevation (Chapel)

1:50

GA_011

DDS4_P09

West Elevation (Key)

Page 12: Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

RIDGE RESTORATION

EXISTING OAK KING POST TRUSS TO BE INSPECTED AND REPAIRED AS NECESSARY WITH CAST IRONBRACING TO BE RESTORED. VOID REGION BETWEEN EXISTING OAK ROOF PURLINS.

PURLINS TO BE RESTORED AS PART OF ROOF TRUSS INSPECTION. EXISTING 125x50mm OAK RAFTERSAT 600mm CENTRES TO BE INSPECTED AND RESTORED AS NECESSARY. 20mm EXISTING OAK CEILINGBOARDS TO BE INSPECTED AND RESTORED AS NECESSARY.

160mm GUTEX THERMOFLEX WOOF FIBREBOARD INSULATION PLACED ABOVE EXISTING OAK CEILINGWITH A LAYER OF PRO CLIMA INTELLO PLUS BREATHER MEMBRANE TAPED AT JOINTS BETWEEN SHEETSWITH TESCON NO.1.

38x50mm SOFTWOOD COUNTER BATTENS TO ENSURE VENTILATED AIR SPACE. EXISTING SLATES TO BEREUSED WHERE POSSIBLE AND REPLACEMENTS TO BE MADE GOOD WITH RECLAIMED BANGOR BLUEAGED SIMILAR WHERE NECESSARY. EXISTING CLAY RIDGE TILE TO BE RETAINED.

DETAIL 002

1:5

EAVES RESTORATION

EXISTING SLATES TO BE RETAINED/RE-USED WHERE POSSIBLE ANDREPLACEMENTS TO BE MADE WITH RECALIMED BANGOR BLUE AGES SIMILARWHERE NECESSARY. LEAD FLASHING AT EAVES TO EXISTING CAST IRONGUTTER TO BE INSPECTED AND REPAIRED WITH ASPHALT OVER SMALL LEAKSAND REPLACED IN AREAS OF MAJOR DAMAGE EVIDENT. EXISTING CORNICE TOBE CLEANED AND RETAINED. 38x50mm SOFTWOOD COUNTER BATTENS TOENSURE VENTILATED AIR SPACE.

PRO CLIMA INTELLO PLUS BREATHER MEMBRANE LAID ON 160mm GUTEXTHERMOFLEX WOOD FIBREBOARD INSULATION ON 20mm EXISTING OAKCEILING BOARDS TO BE INSPECTED AND RESTORED AS NECESSARY.EXISTING 125x50mm OAK RAFTERS AT 600mm CENTRES TO BE INSPECTED ANDRESTORED AS NECESSARY. 80mm GUTEX WOOD FIBREBOARD INSULATION ONEXISTING SURFACE OF INTERNAL WALL WITH 12.5mm GYPSUM WALL BOARDWITH A 3mm SKIM COAT OF TELLING UNILIT 45 FINISHED WITH A WHITERENDER.

DETAIL 001

1:5

+0.000M

+0.300M

INTERIOR WALL RESTORATION

SURFACE OF INTERIOR WALL CLEANED WITH NON ABRASIVECLEANER AND WATER WITH ANY LOOSE DEBRIS BEINGREMOVED AND ALLOWED TO DRY CREATING A FLAT EVENSURFACE.

ALL INTERIOR SKIRTING BOARDS TO BE CAREFULLYREMOVED AND RE-PAINTED WITH A LIGHT VARNISH ANDBONDED TO NEW WALL SURFACE.

80mm GUTEX THERMOROOM ADHESIVELY FIXED TO INTERNALSURFACE OF EXISTING WALL WITH A LAYER GUTEX KLEBE-UND SPACHTELPUTZ. 12.5mm GYPSUM WALL BOARDADHESIVELY FIXED WITH A LAYER OF GUTEX KLEBE-UNDSPACHTELPUTZ AND A 3mm SKIM COAT OF TELLING UNILIT 45FINISHED WITH A WHITE RENDER.

EXISTING FLOOR BUILD UP

NOTE: THIS IS WHAT IS BELIEVED TO BE UNDER THEFLOOR BUT CANNOT BE DETERMINED UNTIL TRIAL HOLESARE DUG

20mm EXISTING CLAY VICTORIAN TILE AND PARQUET FLOORON 10mm SAND CEMENT ADHESIVE BEDDING ON 100mmCONCRETE SLAB ON 365mm LAYER OF COMPACTEDRUBBLE TO COMPACTED EARTH WITH EXISTING EXTERIORWALL LAID 900mm DEEP FROM INTERIOR FLOOR TO ASTEPPED FOOTING WITH A WEARING COURSE OF STONEUNDERNEATH

PERMEABLE PAVING

FRENCH DRAIN REMOVED FROMPERIMETER OF BUILDING ANDREPLACED WITH 50mm ROADSTONEPLAIN FLAG PAVING LAID ON 50mmSAND BLINDING ON GRAVEL BED TOCOMPACTED EARTH WITH A 1:50FALL TO SUDS

DETAIL 003

1:5

12.5 80 580

50

50

100

365

100

102

0

35

160

20

125

100

250

35

250

250

100

125

20

160

35

580 80 12.5

SCALE (@ A1)

NUMBER

TITLE

PROJECT NUMBER

CLIENT

PROJECT

DRAWING NUMBER REV

DRAWN BY DATE

Jonathan Flanagan

N/A

Jonathan Flanagan80 Gleann Rua,Renmore,Galway.

DESIGNERS ADDRESS

ConstructionInformation/Working Drawings

Galway Mayo Institute ofTechnology

CONTACT DETAILS

Phone: 0830054478Email:[email protected]

G00262330 28/04/2015

28/0

4/20

15 1

3:53

:20

Chapel Details Pt. 1

1:5

GA_012

DDS4_P09

Page 13: Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

SKIRTING

150x40mm OAK CHAMFEREDSKIRTING BOARD PAINTED WITH ALIGHT VARNISH AND BONDED WITHEVOSTIK GRIP FILL TO PARTITION

BASE FIXING

50x70mm TREATED SW TIMBERFRAME SCREW FIXED TO BASE OFPARTITION SEALED WITH A BEADOF GYPROC ACOUSTIC SEALANTEITHER SIDE

PARTITION

2NO. 12.5mm GYPROC MOISTURERESISTANT WALL BOARDSCREWFIXED EITHER SIDE TO70x50mm TREATED SW TIMBERFRAME @600 CENTRES WITHNOGGINS @600 CENTRES

WALL IS FINISHED WITH A 3MMSCRATCH COAT OF TELLING UNILIT45 FINISHED AND TILED WITHTILESTYLE SABBIA LAPPATO300X600MM

HEAD FIXING

50x70mm TREATED SW TIMBERFRAME SCREW FIXED TO 12MMOSB

GYPROC ACOUSTIC SEALANTPLACED BETWEEN DOOR JAMB ANDPARTITION

150X40MM WHITE OAKCHAMFERED AND PAINTED WITH ALIGHT VARNISH AND GLUE FIXEDWITH EVOSTIK GRIPFILL TOPARTITION

50

70

150

40

30MIN. FIRE DOOR

SOLID HARDWOOD OAKFIRE DOOR TO GIVE 30 MIN. FIREPROTECTION. 30 MIN. INTEGRITYTOUGHENED VISION PANELS.30 MIN. FIRE AND SMOKE INTUMESCENTSTRIPS ON FRAME AND FIRE DOOR.

BEHIND GYPROC SEALANT IS A50X70MM SW TIMBER STUDSCREW FIXED EITHER SIDE WITH 2NO.12.5mm GYPROC MOISTURE RESISTANTWALLBOARD WITH A 3mm PLASTERFINISH

WALL IS FINISHED WITH A 3MMSCRATCH COAT OF TELLING UNILIT 45AND TILED WITH TILESTYLE SABBIALAPPATO 300X600MM

12 12.570

150

DETAIL 010

1:10

BASE FIXING

50x70mm TREATED SWTIMBER FRAME SCREWFIXED TO BASE OF PARTITIONSEALED WITH A BEAD OFGYPROC ACOUSTIC SEALANTEITHER SIDE

PARTITION

12.5mm GYPROC SOUNDBLOCWALLBOARD SCREWFIXEDEITHER SIDE TO 70x50mmTREATED SW TIMBER FRAME @600 CENTRES WITH NOGGINS @600 CENTRES

WALL IS FINISHED WITH A 3mmSKIM COAT OF TELLING UNILIT 45FINISHED WITH A WHITE RENDER.

HEAD FIXING

50x70mm TREATED SW TIMBERFRAME SCREW FIXED TO12MM OSB

GYPROC ACOUSTIC SEALANT PLACEDBETWEEN DOOR JAMB ANDPARTITION

150X40MM WHITE OAK CHAMFERED ANDPAINTED WITH A LIGHT VARNISH AND GLUEFIXED WITH EVOSTIK GRIPFILL TOPARTITION

50

70

150

40

30MIN. FIRE DOOR

SOLID HARDWOOD OAKFIRE DOOR TO GIVE 30 MIN. FIREPROTECTION. 30 MIN. INTEGRITYTOUGHENED VISION PANELS.30 MIN. FIRE AND SMOKE INTUMESCENTSTRIPS ON FRAME AND FIRE DOOR.

BEHIND GYPROC SEALANT IS A50X70MM SW TIMBER STUDSCREW FIXED EITHER SIDE WITH 12.5mmGYPROC SOUND BLOC WALLBOARD WITH A3mm SKIM COAT OF TELLING UNILIT 45FINISHED WITH A WHITE RENDER.

70 12.5

70 12

.5

70

DETAIL 009

1:10

PIVOTING DOCK DOOR

STAINLESS STEEL PIVOT HINGE SECURED TO BASEOF EXISTING FLOOR AND HEAD OF DOOR FRAME

DOCK DOOR CONSISTS OF 70x195mm TONGUE ANDGROOVE TREATED OAK ADHESIVELY FIXEDTOGETHER AND PAINTED WITH A LIGHT VARNISH

195

DOCK DOOR JAMB

80x60mm TREATED OAK DOOR STOP TONGUE ANDGROOVED TO 230x80mm MULLION WITH A DRAUGHTEXCLUDER TO RUN AROUND FRAME SCREWFIXED TOTREATED HARDWOOD STUD COUNTERSUNK BOLTFIXED TO EXISTING WALL WITH A 10MM SILICONEMOVEMENT JOINT

80

60

80

230

DETAIL 008

1:10

70

50

600

195

225

100

30MIN. CONCERTINA FIRE DOOR

SOLID HARDWOOD OAK CONCERTINA FIREDOOR TO GIVE 30 MIN. FIRE PROTECTION.30 MIN. FIRE AND SMOKE INTUMESCENTSTRIPS ON FRAME AND CONCERTINADOOR.

FIRE INCHUMESCENT AND SMOKE STRIPSTO FOLLOW OPE OF ARCH

30MIN. CONCERTINA FIRE DOOR

CONCERTINA DOOR SLIDES OVER AALUMINIUM C CHANNEL GUIDED WITH ASTEEL PIN FIXING FROM THE DOOR.

CONCERTINA FRAME IS MADE FROM100x80mm TREATED OAK WITH A 195x30mmOAK MULLION FIXED TO THE EXISTING OPEOF THE ARCH AND A 245x30mm OAKMULLION FIXED TO THE EXISTING WALL ANDFRAME

DETAIL 005

1:10FLAT ROOF UPGRADE

EXISTING ASPHALT FLAT ROOF COVERING WITH WRAPOVER PARPAET TO BE RETAINED AND REPAIRED WHERENECESSARY ON A 20mm OAK HARD WOOD WITHEXISTING TIMBER JOISTS TO BE INSPECTED ANDREPAIRED WHERE NECESSARY. 160mm GUTEXTHERMOFLEX WOODFIBREBOARD INSULATION. 80mmGUTEX WOOD FIBREBOARD INSULATION ON EXISTINGSURFACE OF INTERNAL WALL WITH 12.5mm GYPSUMWALL BOARD WITH A 3mm LIME PLASTER RENDER.

DETAIL 004

1:5

12.5 80 580

850

215

12

.5160

12

.5

STAIN GLASS WINDOW UPGRADE

SURFACE OF WINDOW REVEALS CLEANED WITH NON ABRASIVECLEANER AND WATER WITH ANY LOOSE DEBRIS BEING REMOVEDAND ALLOWED TO DRY CREATING A FLAT EVEN SURFACE.

ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPEBEHIND WINDOW HELD IN PLACE WITH A TREATED HW TIMBERWINDOW FRAME WITH A TREATED SW STUD SCREW FIXED TOFRAME TO HOLD IN PALCE AND 5mm ø DRILL HOLES ALONG TOP OFSINGLE GLAZE TO VENTILATE AND MITIGATE BUILD UP OFCONDENSATION.

EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZEDWINDOW GUARD FIXED IN PLACE AROUND OPE OF WINDOW WITHLIME PUTTY. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TOVENTILATE AND MITIGATE CONDENSATION.

80mm GUTEX THERMOROOM ADHESIVELY FIXED TO INTERNALSURFACE OF EXISTING WALL AND WINDOW REVEALS WITH ALAYER OF GUTEX KLEBE-UND SPACHTELPUTZ. 12.5mm GYPSUMWALL BOARD ADHESIVELY FIXED WITH A LAYER OF GUTEX KLEBE-UND SPACHTELPUTZ AND A 3mm SKIM COAT OF TELLING UNILIT 45FINISHED WITH A WHITE RENDER.

DETAIL 007

1:5DETAIL 006

1:5

12.5 80 580

20

79 24

SCALE (@ A1)

NUMBER

TITLE

PROJECT NUMBER

CLIENT

PROJECT

DRAWING NUMBER REV

DRAWN BY DATE

Jonathan Flanagan

N/A

Jonathan Flanagan80 Gleann Rua,Renmore,Galway.

DESIGNERS ADDRESS

ConstructionInformation/Workign Drawings

Galway Mayo Institute ofTechnology

CONTACT DETAILS

Phone: 0830054478Email:[email protected]

G00262330 28/04/2015

28/0

4/20

15 1

4:05

:59

Chapel Details Pt. 2

1:5/1:10

GA_013

DDS4_P09

Page 14: Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

PERMEABLE PAVING

600x50mm ROADSTONE PLAINFLAG PAVING LAID ON 50mmSANDBLINDING ON GRAVEL BED TOCOMPACTED EARTH WITH A 1:50FALL TO SUDS

+0.000M

+0.300M

GROUND FLOOR

20mm OAK LAMINATE FLOOR ADHESIVE BONDED TO 75MM SANDCEMENT SCREED.

150mm BALLYTHERM PIR INSULATION ACHIEVING A U-VALUE OF 0.14W/m²K WITH A 25mm PIECE AT END OF SLAB TO PREVENT THERMALBRIDGE. IN ACCORDANCE WITH TGD PART L 2011.

MIN. 1200 GAUGE D.P.M. RADON BARRIER LAID ON TOP OF 175MMSLAB LAPPING AT STRUCTURAL UPSTAND.

50MM SAND BLINDING ON COMPACTED HARDCORE IN MAX. LAYERSOF 225mm.

CURTAIN WALL

SCHUCO FW60+TRIPLE GLAZEDTHERMALLY BROKEN ALUMINIUMGLAZING SYSTEM ACHIEVING A U-VALUE OF 0.8 W/m²K INACCORDANCE WITH TGD PART L2011.ENSURE TESCON

NO. 1 V.C.L TAPE ISSEALED TOMULLION ANDSCREED

PRO CLIMA INTELLO PLUS V.C.L.MEMBRANE LAPPED INTOMULLION AND TAPE SEALED WITHTESCON NO.1 TAPE

ENSURE TYVEK BREATHERMEMBRANE IS LAPPED OVERHORIZONTAL ALUMINIUMD.P.C. WEDGED INTOMULLION

12.5

EXTERIOR WALL

SVK ORNIMAT BLACK FIBRE CEMENTCLADDING PANEL AND RAIL SYSTEMFIXED BACK TO 12mm OSB SCREW FIXEDTO 150x50mm TREATED SW TIMBER IJOISTS AND NOGGINS AT 600mmCENTRES. 150MM GUTEX THERMOROOMFIXED BETWEEN I JOISTS WITH A 25mmGUTEX THERMOROOM LAYER FIXED TOINTERNAL FACE OF STUD WORKMINMIMISING THERMAL BRIDGE AT I JOISTACHIEVING A U-VALUE OF 0.11 W/m²K. INACCORDANCE WITH TGD PART L 2011.

VERTICAL TYVEK BREATHER MEMBRANEOVERLAPS ALUMINIUM VERTICAL D.P.C.@100mm WEDGED INTO SCHUCO FW60+MULLION.

CURTAIN WALL INTERFACE

150x70mm TREATED SW TIMBER LINTELSFIXED EITHER SIDE OF 10mm STEELFLANGE WELDED TO 10mm STEEL PLATEBOLT FIXED TO TRANSOM

MIN

.150

Fall 1:60

1250 12 104

40

150

25

212

18

50 52 340

27890

15025

50

50

50

225

50

175

150

75

20

CURTAIN WALL BASE FIXING

SCHUCO FW60+ TRANSOM BOLTFIXED TO 10mm STEEL FLANGEWELDED TO 10mm STEEL PLATEBOLT FIXED TO BASE OFCONCRETE UPSTAND

68

60

60

50

INTERIOR WALL

PRO CLIMA INTELLO PLUS VAPOUR BARRIER FIXED TO FACE OFGUTEX WITH 50x25mm TREATED SW TIMBER STUDWORK TOCREATE SERVICE CAVITY WITH 12.5MM GYPSUM PLASTERBOARDFINISHED WITH A 3MM SKIM COAT AND RENDER TO ARCHITECTSSPECIFICATION.

DETAIL 013

1:5

DETAIL 012

1:5

DETAIL 011

1:5

PARAPET

ALUMINIUM PARAPET FORMED AROUNDSTEEL FRAME @600 CENTRES BOLT FIXEDTO 12mm OSB AND 50x25mm TREATED SWTIMBER STUD FRAMED BOX.

SVK ORNIMAT BLACK FIBRE CEMENTCLADDING PANEL AND RAIL SYSTEM FIXEDBACK TO 12mm OSB SCREW FIXED TO150x50mm TREATED SW TIMBER I JOISTSAND NOGGINS AT 600mm CENTRES. 150MMGUTEX THERMOROOM FIXED BETWEEN IJOISTS WITH A 25mm GUTEXTHERMOROOM LAYER FIXED TO INTERNALFACE OF STUD WORK MINMIMISINGTHERMAL BRIDGE AT I JOIST ACHIEVING AU-VALUE OF 0.11 W/m²K. IN ACCORDANCEWITH TGD PART L 2011.

VERTICAL TYVEK BREATHER MEMBRANELAPPED AROUND TREATED SW TIMBERSTUD FRAME BOX

FLAT ROOF

SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAILSYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mmTREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES.150MM GUTEX THERMOROOM FIXED BETWEEN I JOISTS WITH A25mm GUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OFSTUD WORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING AU-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011.

VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUMVERTICAL D.P.C. @100mm WEDGED INTO SCHUCO FW60+ MULLION.

CURTAIN WALL INTERFACE

150x70mm TREATED SW TIMBER LINTELS FIXED EITHER SIDE OF10mm STEEL FLANGE WELDED TO 10mm STEEL PLATE BOLT FIXEDTO TRANSOM

EXTERIOR WALL

SVK ORNIMAT BLACK FIBRE CEMENTCLADDING PANEL AND RAIL SYSTEMFIXED BACK TO 12mm OSB SCREWFIXED TO 150x50mm TREATED SWTIMBER I JOISTS AND NOGGINS AT600mm CENTRES. 150MM GUTEXTHERMOROOM FIXED BETWEEN I JOISTSWITH A 25mm GUTEX THERMOROOMLAYER FIXED TO INTERNAL FACE OFSTUD WORK MINMIMISING THERMALBRIDGE AT I JOIST ACHIEVING A U-VALUE OF 0.11 W/m²K. IN ACCORDANCEWITH TGD PART L 2011.

ALUMINIUM FORMED TO STEEL FRAMEPLACED BEHIND FIBRECEMENTCLADDING.

ENSURE TESCON NO. 1V.C.L TAPE SEALSINTELLO MEMBRANETO OSB

SKIRTING

150x40mm OAK CHAMFEREDSKIRTING BOARD PAINTED WITHA LIGHT VARNISH AND BONDEDWITH EVOSTIK GRIP FILL TOPARTITION

BASE FIXING

50x70mm TREATED SW TIMBERFRAME SCREW FIXED TO BASEOF PARTITION SEALED WITH ABEAD OF GYPROC ACOUSTICSEALANT EITHER SIDE

PARTITION

2NO. 12.5mm GYPROC MOISTURERESISTANT WALL BOARDSCREWFIXED EITHER SIDE TO70x50mm TREATED SW TIMBERFRAME @600 CENTRES WITHNOGGINS @600 CENTRES

WALL IS FINISHED WITH A 3MMSCRATCH COAT AND TILED WITHTILESTYLE SABBIA LAPPATO300X600MM

HEAD FIXING

50x70mm TREATED SW TIMBERFRAME SCREW FIXED TO 12MMOSB

GYPROC ACOUSTICSEALANT PLACEDBETWEEN DOOR JAMBAND PARTITION

150X40MM WHITE OAKCHAMFERED ANDPAINTED WITH A LIGHTVARNISH AND GLUE FIXEDWITH EVOSTIK GRIPFILLTO PARTITION

50

70

150

1

2.5

40

30MIN. FIRE DOOR

SOLID HARDWOOD OAKFIRE DOOR TO GIVE 30 MIN. FIREPROTECTION. 30 MIN. INTEGRITYTOUGHENED VISION PANELS.30 MIN. FIRE AND SMOKEINTUMESCENT STRIPS ON FRAMEAND FIRE DOOR.

BEHIND GYPROC SEALANT IS A50X70MM SW TIMBER STUDSCREW FIXED EITHER SIDE WITH2NO. 12.5mm GYPROC MOISTURERESISTANT WALLBOARD WITH A3mm PLASTER FINISH

WALL IS FINISHED WITH A 3MMSCRATCH COAT AND TILED WITHTILESTYLE SABBIA LAPPATO300X600MM 12 12.570

150

70

DETAIL 015

1:10

STRUCTURAL GLASS ROOF AND EXISTING WALL INTERFACE

PILKINGTON 10mm PLANAR SINGLE GLAZING FIXED IN PLACEWITH PILKINGTON 905J SPIDER FIXINGS FIXED TO 100x10mmSTAINLESS STEEL JOIST SECURED TO 100MM STAINLESSSTEEL BEAM WITH A STAINLESS STEEL BRACE AND BOLTCONNECTION.

PLANAR GLAZING WEDGED INTO 50x50MM ALUMINIUM GLAZINGCHANNEL CONSISTING OF NEOPRENE GUIDES AND A SILICONESEALANT SECURED IN EXISTING WALL WITH A 150x10mmSTAINLESS STEEL PLATE WATER BAR.

STRUCTURAL GLASS FIXING TO EXISTING STRUCTURE

PILKINGTON 10mm PLANAR SINGLE GLAZING WITH A 10MM OPEN JOINTFIXED IN PLACE USING PILKINGTON 905J SPIDER FIXINGS FIXED TO10mm STEEL FLANGE WELDED TO 100mm VERTICAL STEEL COLUMN

PLANAR GLAZING WEDGED INTO 50x50MM ALUMINIUM GLAZINGCHANNEL CONSISTING OF NEOPRENE GUIDES AND A SILICONESEALANT SECURED IN EXISTING WALL WITH A 150x10mm STAINLESSSTEEL PLATE WATER BAR.

STRUCTURAL GLASS ROOF INTERMEDIATE FIXING

PILKINGTON 10mm PLANAR SINGLE GLAZING WITH A10MM SILICONE SEALED JOINT FIXED IN PLACEWITH PILKINGTON 905J SPIDER FIXINGS FIXED TO100x10mm STAINLESS STEEL JOIST SECURED TO100MM STAINLESS STEEL BEAM WITH A STAINLESSSTEEL BRACE AND BOLT CONNECTION.

580

10

100580 109

205

100

10

10

DETAIL 016

1:10

DETAIL 017

1:10

DETAIL 018

1:10

EXTERIOR WALL

SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAILSYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mmTREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES.150MM GUTEX THERMOWALL FIXED BETWEEN I JOISTS WITH A25mm GUTEX THERMOWALL LAYER FIXED TO INTERNAL FACE OFSTUD WORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVINGA U-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011.

VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUMVERTICAL D.P.C. @100mm WEDGED INTO SCHUCO FW60+ MULLION.

INTERFACE BETWEEN SCHUCO GLAZING SYSTEM ANDRAINSCREEN CLADDING SEALED WITH 10mm ORCON F JOINT AND150x50mm STUD.

SCHUCO ADS 65HD SINGLE DOOR WEDGED INTO SCHUCO MULLIONAND TRANSOM

60

2525

SCHUCO FW60+ ALUMINIUMGLAZING SYSTEM

5025

150

12

104

12

DETAIL 014

1:10

SCALE (@ A1)

NUMBER

TITLE

PROJECT NUMBER

CLIENT

PROJECT

DRAWING NUMBER REV

DRAWN BY DATE

Jonathan Flanagan

N/A

Jonathan Flanagan80 Gleann Rua,Renmore,Galway.

DESIGNERS ADDRESS

ConstructionInformation/Workign Drawings

Galway Mayo Institute ofTechnology

CONTACT DETAILS

Phone: 0830054478Email:[email protected]

G00262330 28/04/2015

28/0

4/2

015 1

2:1

6:1

1

Extension Details Pt. 1

1:5/1:10

GA_014

DDS4_P09

Page 15: Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

EXTERIOR WALL

SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAIL SYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO150x50mm TREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES. 150MM GUTEX THERMOROOM FIXEDBETWEEN I JOISTS WITH A 25mm GUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OF STUD WORKMINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING A U-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L2011.

VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUM VERTICAL D.P.C. @100mm WEDGED INTO SCHUCOFW60+ MULLION.

INTERFACE BETWEEN SCHUCO GLAZING SYSTEM AND RAINSCREEN CLADDING SEALED WITH 10mm ORCON F JOINTAND 150x50mm STUD.

12

104

12

150

25

50

13

13 50 25 150 12 104 12

278

38

60

2525

INTERIOR WALL

PRO CLIMA INTELLO PLUS VAPOUR BARRIER FIXED TO FACE OFGUTEX WITH 50x25mm TREATED SW TIMBER STUDWORK TOCREATE SERVICE CAVITY WITH 12.5MM GYPSUM PLASTERBOARDFINISHED WITH A 3MM SKIM COAT AND RENDER TO ARCHITECTSSPECIFICATION.

DETAIL 022

1:5

DETAIL 023

1:5

+0.300M

DOOR THRESHOLD

SCHUCO ADS65HD DOUBLE GLAZED ALUMINIUM DOUBLE DOORSECURED ON CONCRETE UPSTAND SET IN BETWEEN WAVIN 100SKCHANNEL DRAIN, INSULATION AND OAK LAMINATE FLOOR.

600x50mm ROADSTONE PLAIN FLAG PAVING LAID ON 50mm SANDBLINDING.

PRO CLIMA INTELLO PLUS V.C.L.MEMBRANE LAPPED INTOMULLION AND TAPE SEALED WITHTESCON NO.1 TAPE

DPC LAPS OVERTYVEK @100mm ANDINTO CURTAIN WALLJOINT

GROUND FLOOR

20mm OAK LAMINATE FLOOR ADHESIVE BONDED TO 75MM SANDCEMENT SCREED.

150mm BALLYTHERM PIR INSULATION ACHIEVING A U-VALUE OF 0.14W/m²K WITH A 25mm PIECE AT END OF SLAB TO PREVENT THERMALBRIDGE. IN ACCORDANCE WITH TGD PART L 2011.

MIN. 1200 GAUGE D.P.M. RADON BARRIER LAID ON TOP OF 175MMSLAB LAPPING AT STRUCTURAL UPSTAND.

50MM SAND BLINDING ON COMPACTED HARDCORE IN MAX. LAYERSOF 225mm.

ENSURE PRO CLIMA INTELLO V.C.L. ISWRAPPED FROM SCREED TO DOORSADDLE WEDGE AND SEALED WITHTESCON NO.1 V.C.L. TAPE

20

150

75

175

50

50

50

200

50 150 12 104 1225 12.5

60

65

225

DETAIL 020

1:5

DETAIL 021

1:5

EXTERIOR WALL

SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAILSYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mmTREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES.150MM GUTEX THERMOROOM FIXED BETWEEN I JOISTS WITH A 25mmGUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OF STUDWORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING A U-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011.

VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUMVERTICAL D.P.C. @100mm WEDGED INTO SCHUCO FW60+ MULLION.

CURTAIN WALL DOOR INTERFACE

150x70mm TREATED SW TIMBER LINTELS FIXED EITHER SIDE OF 10mmSTEEL FLANGE WELDED TO 10mm STEEL PLATE BOLT FIXED TOTRANSOM. SCHUCO ADS65HD DOUBLE GLAZED ALUMINIUM DOUBLEDOOR WEDGED INTO SCHUCO GLAZING TRANSOM

11210190

+0.300M

12

+0.000M

+0.300M

GROUND FLOOR

20mm ENGINEERED OAK LAMINATE FLOOR BONDED TO 75MMSAND CEMENT SCREED.

150mm BALLYTHERM PIR INSULATION ACHIEVING A U-VALUE OF0.14 W/m²K WITH A 25mm PIECE AT END OF SLAB TO PREVENTTHERMAL BRIDGE. IN ACCORDANCE WITH TGD PART L 2011.

MIN. 1200 GAUGE RADON BARRIER LAID ON TOP OF 175MM SLABLAPPING AT STRUCTURAL UPSTAND.

50MM SAND BLINDING ON COMPACTED HARDCORE IN MAX.LAYERS OF 225mm.

50

ENSURE PRO CLIMAINTELLO PLUSMEMBRANE ISSEALED TO SCREENWITH TESCON NO. 1TAPE V.C.L ISSEALED TO SCREED

20

150

175

50

225

75

DETAIL 019

13 15050 25 12 104 12 EXTERIOR WALL

SVK ORNIMAT BLACK FIBRE CEMENTCLADDING PANEL AND RAIL SYSTEM FIXEDBACK TO 12mm OSB SCREW FIXED TO150x50mm TREATED SW TIMBER I JOISTS ANDNOGGINS AT 600mm CENTRES. 150MM GUTEXTHERMOROOM FIXED BETWEEN I JOISTSWITH A 25mm GUTEX THERMOROOM LAYERFIXED TO INTERNAL FACE OF STUD WORKMINMIMISING THERMAL BRIDGE AT I JOISTACHIEVING A U-VALUE OF 0.11 W/m²K. INACCORDANCE WITH TGD PART L 2011.

VERTICAL TYVEK BREATHER MEMBRANEOVERLAPS ALUMINIUM D.P.C. @100mm ANDBOLT FIXED TO 12mm OSB.

EXTERIOR WALL BASE FIXING

2NO. 150x50mm TREATED SW TIMBER SOULPLATES SECURED TO CONCRETE UPSTANDWITH ANCHOR BOLT.

PERMEABLE PAVING

600x50mm ROADSTONE PLAIN FLAGPAVING LAID ON 50mm SANDBLINDING ON GRAVEL BED TOCOMPACTED EARTH WITH A 1:50 FALL TOSUDS

PLINTH

ROADSTONE LIMESTONE PAVING FLAGSFIXED BACK TO CONCRETE PLINTH WITHHALFEN STONE ANCHOR FIXINGS.

+0.300M

STRUCTURAL GLASS BASE FIXING

PILKINGTON 10mm PLANAR SINGLE GLAZING FIXED IN PLACE WITHPILKINGTON 905J SPIDER FIXINGS BOLTED TO 100x90mm STAINLESSSTEEL FLANGE WELDED TO 100mm ø STAINLESS STEEL COLUMN SETIN CONCRETE BASE SHEAR CONNECTED TO BASE WITH STAINLESSSTEEL BASE PLATE SECURED WITH HOLDING DOWN BOLTS

PLANAR GLAZING WEDGED INTO 50x42mm ALUMINIUM GLAZINGCHANNEL CONSISTING OF NEOPRENE GUIDES AND A SILICONESEALANT WEDGED INTO CONCRETE BASE.

600x30mm ROADSTONE LIMESTONE PAVING FLAGS ON 50mm SANDBLINDING

LANDSCAPING AND DRAINAGE

ACO MODULAR 125 GALVANISED STEEL DRAINAGECHANNEL LAID AGAINST ROADSTONE LIMESTONEPAVING FLAGS FIXED BACK TO CONCRETE PLINTHWITH HALFEN STONE ANCHOR FIXINGS.

PERMEABLE PAVING

50mm ROADSTONE PLAIN FLAG PAVING LAID ON50mm SANDBLINDING ON 50mm GRAVEL TO COMPACTED EARTHWITH A 1:50 FALL TO SUDS

50

50

50

10

50

30

340

100

170

42

10

250

+0.000M

DETAIL 024

1:10

SCALE (@ A1)

NUMBER

TITLE

PROJECT NUMBER

CLIENT

PROJECT

DRAWING NUMBER REV

DRAWN BY DATE

Jonathan Flanagan

N/A

Jonathan Flanagan80 Gleann Rua,Renmore,Galway.

DESIGNERS ADDRESS

ConstructionInformation/Workign Drawings

Galway Mayo Institute ofTechnology

CONTACT DETAILS

Phone: 0830054478Email:[email protected]

G00262330 28/04/2015

28/0

4/2

015 1

2:1

6:2

9

Extension Details Pt. 2

1:5/1:10

GA_015

DDS4_P09

Page 16: Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

Galway Mayo Institute of Technology

Door ScheduleLevel Mark Count Fire Rating Width Height Phase Created

01 Ground Floor D-01 1 Fire Upgrade 1620 3000 Existing

01 Ground Floor D-02 1 FD 30 S 2425 2800 New Construction

01 Ground Floor D-03 1 FD 30 S 1212 2110 New Construction

01 Ground Floor D-04 1 FD 30 S 2425 2800 New Construction

01 Ground Floor D-05 1 FD 30 S 2425 2800 New Construction

01 Ground Floor D-06 1 FD 30 S 1080 2110 Existing

01 Ground Floor D-07 1 FD 30 S 1212 2110 New Construction

01 Ground Floor D-08 1 FD 30 S 1263 2110 New Construction

01 Ground Floor D-09 1 Fire Upgrade 795 2100 Existing

01 Ground Floor D-10 1 FD 30 S 1252 2110 New Construction

01 Ground Floor D-11 1 FD 30 S 2425 2800 New Construction

01 Ground Floor D-12 1 FD 30 S 2425 2800 New Construction

01 Ground Floor D-13 1 FD 30 S 2425 2800 New Construction

01 Ground Floor D-14 1 FD 30 S 2425 2800 New Construction

01 Ground Floor D-15 1 FD 30 S 1080 2110 New Construction

01 Ground Floor D-16 1 N/A 2000 2000 New Construction

02 Gallery FFL D-17 1 Fire Upgrade 970 2100 Existing

01 Ground Floor D-18 1 N/A 980 2910 New Construction

01 Ground Floor D-19 1 N/A 1927 2810 New Construction

01 Ground Floor D-21 1 N/A 1212 2110 New Construction

01 Ground Floor D-24 1 N/A 1212 2110 New Construction

01 Ground Floor D-25 1 FD 30 S 2425 2800 New Construction

01 Ground Floor D-26 1 N/A 910 1800 New Construction

01 Ground Floor D-27 1 N/A 910 1800 New Construction

01 Ground Floor D-28 1 N/A 910 1800 New Construction

01 Ground Floor D-29 1 N/A 1212 2110 New Construction

01 Ground Floor D-30 1 FD 30 S 1212 2110 New Construction

01 Ground Floor D-31 1 N/A 1212 2110 New Construction

Grand total: 28

Design Detail

Page 17: Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

Window ScheduleLevel Mark Description Count Width Height Phase Created

01 Ground Floor W-01 Retained & Upgraded 1 600 1680 Existing

01 Ground Floor W-02 Retained & Upgraded 1 600 1680 Existing

01 Ground Floor W-03 Retained & Upgraded 1 600 1680 Existing

01 Ground Floor W-04 Retained & Upgraded 1 600 1680 Existing

01 Ground Floor W-05 Retained & Upgraded 1 600 1680 Existing

01 Ground Floor W-06 Retained & Upgraded 1 600 1680 Existing

01 Ground Floor W-07 Retained & Upgraded 1 600 1680 Existing

01 Ground Floor W-08 Retained & Upgraded 1 600 1680 Existing

01 Ground Floor W-09 Retained & Upgraded 1 600 1680 Existing

Level 1 W-10 Retained & Upgraded 1 600 1680 Existing

01 Ground Floor W-11 Retained & Upgraded 1 600 1680 Existing

Level 1 W-12 Retained & Upgraded 1 600 1680 Existing

01 Ground Floor W-13 Retained & Upgraded 1 600 1680 Existing

Level 1 W-14 Retained & Upgraded 1 600 1680 Existing

01 Ground Floor W-15 Retained & Upgraded 1 600 1680 Existing

Level 1 W-16 Retained & Upgraded 1 600 1680 Existing

01 Ground Floor W-17 Retained & Upgraded 1 600 1680 Existing

01 Ground Floor W-18 Retained & Upgraded 1 380 1126 Existing

01 Ground Floor W-19 Retained & Upgraded 1 600 2175 Existing

01 Ground Floor W-20 Retained & Upgraded 1 1174 1650 Existing

01 Ground Floor W-21 Retained & Upgraded 1 530 2120 Existing

01 Ground Floor W-22 Retained & Upgraded 1 530 2120 Existing

01 Ground Floor W-23 Retained & Upgraded 1 530 2120 Existing

01 Ground Floor W-24 Retained & Upgraded 1 530 2120 Existing

01 Ground Floor W-25 Retained & Upgraded 1 530 2120 Existing

01 Ground Floor W-28 Retained & Upgraded 1 600 1680 Existing

Chapel Flat Roof LevelW-29 Retained & Upgraded 1 1000 1500 Existing

01 Ground Floor W-30 Retained & Upgraded 1 600 1680 Existing

01 Ground Floor W-31 Retained & Upgraded 1 530 2120 Existing

01 Ground Floor W-32 Retained & Upgraded 1 530 2120 Existing

01 Ground Floor W-33 Retained & Upgraded 1 530 2120 Existing

01 Ground Floor W-34 Retained & Upgraded 1 530 2120 Existing

01 Ground Floor W-35 Retained & Upgraded 1 530 2120 Existing

01 Ground Floor W-36 Retained & Upgraded 1 530 2120 Existing

01 Ground Floor W-37 Retained & Upgraded 1 530 2120 Existing

01 Ground Floor W-38 Retained & Upgraded 1 1000 1500 Existing

Chapel Flat Roof LevelW-39 Retained & Upgraded 1 1000 1500 Existing

01 Ground Floor W-40 Schüco AWS 65 1 480 470 New Construction

01 Ground Floor W-41 Schüco AWS 65 1 480 510 New Construction

01 Ground Floor W-42 Schüco AWS 65 1 480 510 New Construction

01 Ground Floor W-43 Schüco AWS 65 1 480 510 New Construction

01 Ground Floor W-44 Retained & Upgraded 1 530 2120 Existing

01 Ground Floor W-45 Retained & Upgraded 1 530 2120 Existing