Page 1: Central-Wan Chai Reclamation A case study of sustainable development

Central-Wan Chai Reclamation

A case study of sustainable development

Page 2: Central-Wan Chai Reclamation A case study of sustainable development
Page 3: Central-Wan Chai Reclamation A case study of sustainable development
Page 4: Central-Wan Chai Reclamation A case study of sustainable development

Why is reclamation necessary in Central and Wan Chai?

to provide land for transport land use, e.g. the Hong Kong Station of the Airport Railway and the extended overrun tunnel of the Airport Railway; Central-Wan Chai Bypass and Island Eastern Corridor Link; future Shatin to Central Link; future North Hong Kong Island Line; To provide land for recreational purpose, e.g. construction of a world class waterfront promenade;to improve the environment of adjoining crowded districts by providing additional open space on the new reclamation; andto integrate the development with the existing area.

Page 5: Central-Wan Chai Reclamation A case study of sustainable development

Project detailsAt present three projects are completed. They include: Central Reclamation Phase I (Hong Kong Station

of the Airport Railway) Central Reclamation Phase II (Tamar Basin) Wan Chai Reclamation Phase I (HK Convention

Exhibition Centre Extension)

In addition to the above completed works, the remaining two projects are: Central Reclamation Phase III (Star Ferry & Tamar

Extension Reclamation) Wan Chai Development Phase II

Page 6: Central-Wan Chai Reclamation A case study of sustainable development
Page 7: Central-Wan Chai Reclamation A case study of sustainable development
Page 8: Central-Wan Chai Reclamation A case study of sustainable development

Waterfront promenade

Page 9: Central-Wan Chai Reclamation A case study of sustainable development

Other related issues

construction of HKSAR Government Headquarters construction of Central-Wan Chai Bypass

Page 10: Central-Wan Chai Reclamation A case study of sustainable development
Page 11: Central-Wan Chai Reclamation A case study of sustainable development
Page 12: Central-Wan Chai Reclamation A case study of sustainable development
Page 13: Central-Wan Chai Reclamation A case study of sustainable development
Page 14: Central-Wan Chai Reclamation A case study of sustainable development
Page 15: Central-Wan Chai Reclamation A case study of sustainable development

Turning Tamar site to recreational area

Increase space for recreationImprove air qualityReduce building densityAlleviate the urban heat island effectHelp building a feeling of community if space can allow mass activity participation

Page 16: Central-Wan Chai Reclamation A case study of sustainable development
Page 17: Central-Wan Chai Reclamation A case study of sustainable development
Page 18: Central-Wan Chai Reclamation A case study of sustainable development

Locational disadvantages of the old Gov’t Headquarters

Small and limited spaceExpansion is not possibleHigh cost of redevelopment

Page 19: Central-Wan Chai Reclamation A case study of sustainable development

Locational advantages of Tamar site

Has the advantage of high centrality / accessibility

To the east, it connects to the cultural, performance arts and conventional facilitiesTo the south, it connects to the financial, commercial, business and tourism hubs

To the southwest, it connects to the area which is rich in historical and of heritage values

Coastal flatland available for development / relatively crowded than the old site

Further expansion is possible from reclamation

Good scenic views along Victoria Harbour

Page 20: Central-Wan Chai Reclamation A case study of sustainable development

Is it a sustainable development?

It will become a new landmark in Hong Kong, e.g. favourable for tourismLand price of the surrounding buildings may increaseLand value of surrounding buildings may decrease because they are near to government (institutional) uses and not the competitive commercial complexWith better traffic arrangement, traffic congestion will be alleviatedFavour the development on the HK Island sideProvide more job opportunitiesMore land for building / office supplyEase the unemployment problemNegative impacts

Page 21: Central-Wan Chai Reclamation A case study of sustainable development

Major principles of development

Minimize impact on physical environmentPreserve the public resource – harbourProvide recreational land use or open space

Page 22: Central-Wan Chai Reclamation A case study of sustainable development

Central-Wan Chai Bypass

Page 23: Central-Wan Chai Reclamation A case study of sustainable development

Central-Wan Chai By-passEconomic benefits

Reduce time costSave time for deliveryFavour for logistics development

Drawbacks

High construction costNo toll fee is collected

Page 24: Central-Wan Chai Reclamation A case study of sustainable development

Central-Wan Chai By-passSocial benefits

Higher accessibility to attract business more convenient, divert traffic flowreduce traffic congestion in Causeway Bay / Wan Chaireduce travel timeimprove the coastal area’s land planning in North pointReclamation work includes waterfront promenade

Negative social impacts

Require reclamationMay face strong public oppositionblock the Victoria harbour’s view

Page 25: Central-Wan Chai Reclamation A case study of sustainable development

Central-Wan Chai By-pass

Environmental benefits

Provide an elegant place for pedestrians to walk--improve air quality—better ventilating system in the tunnel-- drivers breath fresh air

Environmental impacts

--Reclamation-> Water pollution--VC(victoria harbour) narrowedlow-lying area in sheung wan will be flooded -- pollution during the construction period