central states water environment association collection system seminar
DESCRIPTION
Central States Water Environment Association Collection System Seminar. Mark Bushnell P.E. Trotter and Associates Inc. Village of Port Barrington Low Pressure Sanitary Sewer System Phase I. Collection System Seminar. Low Pressure Sanitary Sewer System - Phase I Project Location - PowerPoint PPT PresentationTRANSCRIPT
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Central States Water Environment Association
Collection System Seminar
Central States Water Environment Association
Collection System Seminar
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Mark Bushnell P.E.Trotter and Associates Inc.
Village of Port Barrington Low Pressure Sanitary Sewer System
Phase I
Mark Bushnell P.E.Trotter and Associates Inc.
Village of Port Barrington Low Pressure Sanitary Sewer System
Phase I
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Low Pressure Sanitary Sewer System - Phase I
Project Location Village Port Barrington
West-Il 59 South-ll 176 Adjacent to Fox River Within NMWRD FPA
Collection System SeminarCollection System Seminar
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Project Team Village of Port Barrington
Village Engineer – Smith Engineering Consultants Inc. Village Attorney – Diamond and LeSueur Financial Consultant – Public Finance Resource Ltd
Contractor- Joel Kennedy Construction
Northern Moraine Wastewater Reclamation District District Engineer – Trotter and Associates Inc.
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Project Goals Provide Reliable Sanitary Sewer Service to 117 Homes Abandon Failing Septic Systems Eliminate Septic Fields within Floodplain Increase Water Quality of Fox River
Project Scope Installation of Low Pressure Sanitary Sewer System Public Infrastructure
Forcemain and Grinder Pumps Serving all Existing Homes Connection into Existing NMWRD Gravity System
Private Improvements Sanitary Sewer Service Lateral Plumbing and Electrical
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Project Infrastructure Owned by Village Maintained by NMWRD Grinder Pumps / Forcemain Air Release / Isolation Valves
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Project Funding - Infrastructure Federal STAG Grant (U.S. Rep. Don Manzullo) - $ 482,100 Mc Henry County Community Block Grant - $ 61,101 IEPA Low Interest Loan (SSA) - $ 910,133 Village of Port Barrington- $ 209,299
Total Project Cost - $ 1,662,633
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Project Funding – IEPA Loan / Special Service Area SSA approved by residents Each resident served pays an annual assessment Repays the IEPA Low Interest Loan This is assessment is added to the tax bill Annual repayment of less than $500 per resident
Project Funding – Grants Funded almost one-third of the project Required to make the project fiscally feasible
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Project Construction – Infrastructure Completed During 2006- 07 Designed by SEC Group Inc. Completed by Joel Kennedy Construction
All Items lie within limited Right of Way or Easements Minimize Disturbance by
Directional Drilling of HDPE Main
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Project Testing - Infrastructure Pressure Testing of Forcemain Flow Meter Testing Vacuum Testing of Manholes Manufacturer Test of Grinder Pumps
Upon successful testing residents were permitted to connect to the Low Pressure Sanitary Sewer System. The District required
residents to connected within one year.
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Village Ownership Forcemain Air Release/ Manholes Grinder Pumps
Resident Ownership Service Lateral Control Panel Electrical Service Floodplain Vents
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Procedure for Connection Coordination of Village of Port Barrington and NMWRD to streamline the
connection process Workshops Mailings and Notifications Open Houses
Private Improvements were funded by individual residents Residents hired their own contractors
Phases of Connection Interior Plumbing Sanitary Sewer Service Extension / Electrical Improvements Septic Abandonment
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Procedure for Connection
Step 1 - Interior Plumbing Plumbing Inspection by Village Removal of Illicit Discharges Ensure that all drains are connected Check for Connections that my Surcharge Grinder Pump Possible Rerouting of Interior Plumbing
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Procedure for Connection- Continued
Step 2A - Connection to Grinder Pump- NMWRD Paperwork and Forms Standard for any Sanitary Sewer Connection Certificate of Insurance and Permit Bond from Contractor Payment of Connection Fee to Sanitary District NMWRD provides Control Panel to Resident
Prevents Homeowners from running pumps or connecting prior to payment
Schedule an Inspection of Sewer Service
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Procedure for Connection- Continued
Step 2B- Installation of Electrical Panel / Sanitary Service Electrical Panel Installed on Home Visible from Pump
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Procedure for Connection- Continued
Step 2B- Installation of Service Lateral and Electrical Sanitary Lateral
Schedule 40 PVC Inspected by NMWRD
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Low Pressure Sanitary Sewer System - Phase I
Procedure for Connection- Continued
Step 2B- Inspection of Grinder Pump Lid Lids must remain exposed Floodplain Lids properly vented
Transfer of Service Step 3-Abandonment of Septic System
Collection System SeminarCollection System Seminar
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Procedure for Connection
Finished Product
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Connection Issues Issue -Outstanding Connections
117 Total - Few have yet to connect Foreclosures and Fire
Results Grinder Pump equipment remaining idle Warranty expiring prior to use NMWRD- Loss of revenue
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Connection Issues Resolution – Timely Connections
Public Notification Payment Plans Frozen Connection Fees Ultimately District reserves the right for legal proceedings
Resolution – Idle Equipment Extended warranties are offered
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Connection Issues Resident Concern – Service Interruptions
Power Outages Equipment Malfunction
Resolution Residents are on Wells IEPA requires - 150 Gallon Storage NMWRD provides Emergency Response
Spare Pump Cores are kept at NMWRD Core can be replaced w/in hours
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Connection Issues District Concern – Landscaping
Non- Floodplain Lids must be kept dry NMWRD must have access for maintenance
Resolution Coordination with Resident
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Project Accomplishments Provided Sanitary Sewer Service to 117 Homes Abandon Failing Septic Systems Removed Septic Systems from Floodplain Enhanced Water Quality within Fox River Completed with Minimal Disruption to Sewer Service
Central States Water
Environment Association
2009 Collections
Seminar
June 11, 2009
Collection System SeminarCollection System SeminarLow Pressure Sanitary Sewer System - Phase I
Next Steps by Village and NWMRD Implementation of Phase II
Provide Service ninety-three additional residential homes Construction scheduled for Fall of 2009 Funded through IEPA Loan and Stimulus Program
NMWRD working with other areas within their FPA to inform residents about Low Pressure Sanitary Sewer Systems
Questions?