1.1.1 CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item No. RE 2014-15 1 Amravati - Narkher (138 km) Cap. 30,00,00 2 Ahmednagar - Beed - Parli Vaijnath (250 km) Cap. 37,00,00 EBR 20,00,00 3 Baramati - Lonand (54 km) Cap. 4,30,00 4 Puntamba - Shirdi (16.4 km) Cap. 80,00 5 Wardha - Nanded (via Yevatmal-Pusood) (270 km) Cap. 18,90,00 EBR .. TOTAL-WORKS IN PROGRESS Cap. 91,00,00 EBR 20,00,00 TOTAL-New Lines (Construction) Cap. 91,00,00 EBR 20,00,00 6 Miraj - Latur (359 km) Cap. 2,20,00 DRF .. TOTAL-WORKS IN PROGRESS Cap. 2,20,00 TOTAL-Gauge Conversion Cap. 2,20,00 7 Wardha (Sevagram)-Nagpur - 3rd line (76.3 km) Cap. 6,00,00 8 Bhusawal-Jalgaon - 3rd line (24.13 km) Cap. 13,17,00 9 Kalyan-Kasara - 3rd line (67.62 km) Cap. 3,50,00 10 Panvel-Roha (75.44 km) - Land acquisition Cap. 35,00 C.Fund .. EBR .. 11 Diva-Kalyan - Doubling of 5th & 6th lines Cap. .. Dep(RVN) .. EBR .. 12 Panvel-Jasai-Jawaharlal Nehru Port Trust (28.5 km) Dep(RVN) .. EBR .. 13 Panvel-Pen (35 km) Cap. 27,00,00 14 Pen-Roha (40 km) Cap. 42,00,00 15 Godhani-Kalumna Chord (13.7 km) Cap. 15,00,00 TOTAL-WORKS IN PROGRESS Cap. 107,02,00 Dep(RVN) .. TOTAL-Doubling Cap. 107,02,00 Dep(RVN) .. 16 Jalgaon - Yard remodeling DF(3) 5,00,00 17 Amravati - Provision of platform No.4 DF(3) 1,00,00 Allocation Particulars NEW LINES (CONSTRUCTION) A - Works in Progress GAUGE CONVERSION A - Works in Progress DOUBLING A - Works in Progress TRAFFIC FACILITIES-YARD REMODELLING & OTHERS A - Works in Progress

Upload: vodat

Post on 10-Feb-2017

256 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Central Railway

1.1.1

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15

1 Amravati - Narkher (138 km) Cap. 30,00,00

2 Ahmednagar - Beed - Parli Vaijnath (250 km) Cap. 37,00,00

EBR 20,00,00

3 Baramati - Lonand (54 km) Cap. 4,30,00

4 Puntamba - Shirdi (16.4 km) Cap. 80,00

5 Wardha - Nanded (via Yevatmal-Pusood) (270 km) Cap. 18,90,00

EBR ..

TOTAL-WORKS IN PROGRESS Cap. 91,00,00

EBR 20,00,00

TOTAL-New Lines (Construction) Cap. 91,00,00

EBR 20,00,00

6 Miraj - Latur (359 km) Cap. 2,20,00

DRF ..

TOTAL-WORKS IN PROGRESS Cap. 2,20,00

TOTAL-Gauge Conversion Cap. 2,20,00

7 Wardha (Sevagram)-Nagpur - 3rd line (76.3 km) Cap. 6,00,00

8 Bhusawal-Jalgaon - 3rd line (24.13 km) Cap. 13,17,00

9 Kalyan-Kasara - 3rd line (67.62 km) Cap. 3,50,00

10 Panvel-Roha (75.44 km) - Land acquisition Cap. 35,00

C.Fund ..

EBR ..

11 Diva-Kalyan - Doubling of 5th & 6th lines Cap. ..

Dep(RVN) ..

EBR ..

12 Panvel-Jasai-Jawaharlal Nehru Port Trust (28.5 km) Dep(RVN) ..

EBR ..

13 Panvel-Pen (35 km) Cap. 27,00,00

14 Pen-Roha (40 km) Cap. 42,00,00

15 Godhani-Kalumna Chord (13.7 km) Cap. 15,00,00

TOTAL-WORKS IN PROGRESS Cap. 107,02,00

Dep(RVN) ..

TOTAL-Doubling Cap. 107,02,00

Dep(RVN) ..

16 Jalgaon - Yard remodeling DF(3) 5,00,00

17 Amravati - Provision of platform No.4 DF(3) 1,00,00

AllocationParticulars

NEW LINES (CONSTRUCTION)

A - Works in Progress

GAUGE CONVERSION

A - Works in Progress

DOUBLING

A - Works in Progress

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS

A - Works in Progress

Page 2: Central Railway

1.1.2

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

18 Vasai Road-Diva-Panvel - Automatic signalling Cap. 8,00,33

19 Panvel - Kalamboli coaching terminus (Phase-I) (Stage-I) DF(3) ..

20 Kalamboli Yard - 2nd goods line DF(3) ..

21 Lokmanya Tilak Terminus - Augmentation of coaching facilities DF(3) ..

22 Akola - Yard remodeling DF(3) 4,17,00

23 Bhusawal - New rail level goods siding for handling full rakes DF(3) 3,40,00

24 Mumbai VT - Remodelling of main line complex (Phase-I) Cap. ..

DF(3) 20,00

25 Chhatrapati Shivaji Terminus Mumbai - Kurla - Thane - Kalyan - Train describer

system

DF(3) 2,50,00

26 Gaigaon - Up loop line to achieve standard 4-line layout DF(3) 12,00

27 Lonavala - Extenasion of platform No.1, 2 & 3 for 24/28-coach trains DF(3) 60,50

28 Itarsi-Amla - Intermediate block sections (4 block sections) Cap. 80,67

C.Fund ..

EBR ..

29 Bhivandi - Kharbao - Kaman - Nilje - Taloje Pachhnad - Intermediate block section DF(3) 48,68

30 Bagmar - Standardisation of station layout by loop lines in both directions Cap. 25,00

31 Solapur - High level platforms & covered shed on new jumbo rake siding DF(3) 30,00

32 Amravati - Development of station with terminal facilities DF(3) 10,00

33 Bale - Development of goods shed DF(3) 5,00

34 Igatpuri - Extension of platform lines No 1, 2, 3 & 4 for dealing 24-coach trains

alongwith banker engine

DF(3) 1,50,00

35 Kasara - Extension of receipt & despatch lines (3 Nos each in up & down yards) DF(3) 30,00

36 Karjat - Extension of receipt & despatch lines, addl line connecting up yard to Karjat-

Panvel and 4th line between Karjat-Palasdari

DF(3) 20,00

37 Bhivandi Road - New loop line to deal full rake parcel (710 m) DF(3) 1,89,00

38 Jalgaon - Improvements to goods shed circulating area (rail level) and approach road

by concreting

DF(3) 50,00

39 Manmad - Extension of passenger platform No.1 for 24 coaches, extension of

up/down goods line No.3, 4 & 5 (725 m CSL)

DF(3) 2,00,00

40 Works costing below Rs.2.5 crore each Cap. 1,71,00

DRF 70,00

DF(1) 30,00

DF(3) 11,71,12

TOTAL-WORKS IN PROGRESS Cap. 10,77,00

DRF 70,00

DF(1) 30,00

DF(3) 36,03,30

41 Works costing below Rs.2.5 crore each Cap. 5,00

DRF 30,00

DF(1) 10,00

DF(3) 50,00

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS

B - New Works

Page 3: Central Railway

1.1.3

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

TOTAL-NEW WORKS Cap. 5,00

DRF 30,00

DF(1) 10,00

DF(3) 50,00

TOTAL-Traffic Facilities-Yard Remodelling & Others Cap. 10,82,00

DRF 1,00,00

DF(1) 40,00

DF(3) 36,53,30

42 Central Railway - Extension of unreserved ticketing system to balance A, B, C & D-

category stations

DF(1) ..

43 Central Railway - Extension of unreserved ticketing system to E-category stations DF(1) 20,00

44 Central Railway - Extension of automatice ticket vending machines Cap. 20,62,00

45 Unreserved ticketing through mobiles at Mumbai & Chennai suburban areas DF(1) 4,25,45

46 Works costing below Rs.2.5 crore each DRF 4,36,00

DF(1) ..

DF(3) 4,55

TOTAL-WORKS IN PROGRESS Cap. 20,62,00

DRF 4,36,00

DF(1) 4,45,45

DF(3) 4,55

47 Works costing below Rs.2.5 crore each DRF 38,00

DF(1) ..

DF(3) ..

TOTAL-NEW WORKS DRF 38,00

DF(1) ..

DF(3) ..

TOTAL-Computerisation Cap. 20,62,00

DRF 4,74,00

DF(1) 4,45,45

DF(3) 4,55

48 Leased Assets - Payment of Capital component of lease charges to Indian Railway

Finance Corporation

C.Fund 476,92,00

TOTAL-WORKS IN PROGRESS C.Fund 476,92,00

TOTAL-Leased Assets - Payment of Capital Component C.Fund 476,92,00

49 Nagpur Division - Interlocking of manned level crossing gates (21 Nos) S.Fund 11,96

50 Nagpur Division - Repl.of cables, relays, booms & accessories (A-route) (10 level

crossing gates)

S.Fund 2,87,75

51 Manmad - Electrically operated lifting barriers in lieu of mechanical barriers outside

station limits (13 level crossing gates)

S.Fund 1,00,00

COMPUTERISATION

A - Works in Progress

B - New Works

LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT

A - Works in Progress

ROAD SAFETY WORKS-LEVEL CROSSINGS.

A - Works in Progress

Page 4: Central Railway

1.1.4

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

52 Bhusawal-Igatpuri - Quarters for gatekeepers of manned level crossings (RB-I type -

127 units)

S.Fund 50,00

53 Nagpur Division - Repl. of duty bunks (48 Nos) S.Fund 2,12

54 Central Railway - Manning of unmanned level crossings (60 Nos) S.Fund 2,26,80

55 Works costing below Rs.2.5 crore each S.Fund 22,66,39

TOTAL-WORKS IN PROGRESS S.Fund 29,45,02

56 Works costing below Rs.2.5 crore each S.Fund 1,00,00

TOTAL-NEW WORKS S.Fund 1,00,00

TOTAL-Road Safety Works-Level Crossings. S.Fund 30,45,02

57 Mhasavad - Road over bridge in lieu of level crossing No.144 S.Fund 1,60,00

EBR ..

58 Nagpur Division - Elimination of level crossings by limited height subways (7 Nos) S.Fund 1,00,00

59 Nandgaon-Chalisgaon Nagar Road - Road over bridge in lieu of level crossing

No.118 on state highway No.24

S.Fund 70,00

EBR ..

60 Thane-Kalyan - Road over bridge in lieu of level crossing No.28/C S.Fund 70,00

EBR ..

61 Itarsi-Nagpur - Road over bridge in lieu of level crossing No.247 S.Fund ..

EBR ..

62 Jasai-Jawahar Lal Nehru Port Trust - Road over bridge in lieu of level crossing No.6 S.Fund ..

EBR ..

63 Jawaharlal Nehru Port Trust-Jasai - Road over bridge in lieu of level crossing No.2 S.Fund ..

EBR ..

64 Diva-Vasai - Road over bridge in lieu of level crossing No.9 S.Fund ..

EBR ..

65 Panvel-Roha - Road over bridge in lieu of level crossing No.20 S.Fund ..

EBR ..

66 Panvel-Jasai - Road over bridge in lieu of level crossing No.26 S.Fund ..

EBR ..

67 Panvel-Jasai - Road over bridge in lieu of level crossing No.23 S.Fund ..

EBR ..

68 Diva-Panvel - Road over bridge in lieu of level crossing No.6 S.Fund ..

EBR ..

69 Diva-Vasai - Road over bridge in lieu of level crossing No.4 S.Fund ..

EBR ..

70 Diva-Vasai - Road over bridge in lieu of level crossing No.8 S.Fund ..

EBR ..

ROAD SAFETY WORKS-LEVEL CROSSINGS.

B - New Works

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

A - Works in Progress

Page 5: Central Railway

1.1.5

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

71 Jasai-Jawaharlal Nehru Port Trust - Road over bridge in lieu of level crossing No.3 S.Fund ..

EBR ..

72 Diva-Panvel - Road over bridge in lieu of level crossing No.9/C S.Fund ..

EBR ..

73 Diva-Vasai - Road over bridge in lieu of level crossing No.1 S.Fund ..

EBR ..

74 Diva-Panvel - Road over bridge in lieu of level crossing No.10 S.Fund ..

EBR ..

75 Diva-Vasai - Road over bridge in lieu of level crossing No.6 S.Fund ..

EBR ..

76 Kurduwadi-Miraj - Elimination of level crossing by road under bridges (20 Nos) S.Fund 14,62,78

77 Kurduwadi-Latur - Elimination of level crossings by limited height subways (7 Nos) S.Fund 3,32,94

78 Diva-Panvel - Road under bridge in lieu of level crossing No.3 S.Fund ..

79 Diva-Panvel - Road under bridge in lieu of level crossing No.4C S.Fund ..

80 Diva-Vasai - Road under bridge in lieu of level crossing No.7 S.Fund 1

81 Latur-Miraj - Road under bridges / limited height subways for elimination of

unmanned level crossing gates (8 Nos)

S.Fund 4,36,00

82 Thakurli - Road over bridge in lieu of level crossing gate No.38-C S.Fund 10,00

EBR ..

83 Itarsi-Nagpur - Road over bridge in lieu of level crossing No.269 S.Fund ..

EBR ..

84 Kurduwadi-Miraj - Elimination of level crossings by road under bridges (11 Nos) S.Fund 2,08,50

85 Diva - Road over bridge in lieu of Railway crossing No.29-C S.Fund ..

EBR ..

86 Pune-Miraj-Kopargaon - Limited height subways for elimination of unmanned level

crossing gates (4 Nos)

S.Fund 1,40,00

87 Daund-Baramati - Limited height subways for elimination of unmanned level crossing

gates (3 Nos)

S.Fund 2,22,97

88 Niphad - Road over bridge in lieu of level crossing No.99-A S.Fund 50,00

EBR ..

89 Vikhroli - Road over bridge in lieu of level crossing No.14-C S.Fund 10,00

EBR ..

90 Kalyan - Road over bridge in lieu of level crossing No.1/A S.Fund 4,25,00

EBR ..

91 Kalyan - Road over bridge in lieu of level crossing No.47/B S.Fund 55,00

EBR 3,30,00

92 Shegaon - Road over bridge in lieu of level crossing No 27 S.Fund 4,33,81

EBR 3,30,00

93 Katol - Road over bridge in lieu of level crossing No.283-A S.Fund 60,00

EBR 3,30,00

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

Page 6: Central Railway

1.1.6

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

94 Narkhed - Road over bridge in lieu of level crossing No.275 S.Fund 90,00

EBR ..

95 Phulgaon - Road over bridge in lieu of level crossing No.80 S.Fund ..

EBR ..

96 Mangalwari - Road over bridge in lieu of level crossing No.297/A S.Fund ..

EBR ..

97 Warora - Road over bridge in lieu of level crossing No.28/B S.Fund 7,00

EBR ..

98 Kalamboli - Road over bridge in lieu of level crossing No.14 S.Fund 1

EBR ..

99 Khanda - Road over bridge in lieu of level crossing No.16 S.Fund 1

EBR ..

100 Nagargaon - Road over bridge in lieu of level crossing No.32 S.Fund ..

EBR ..

101 Rajapeth - Road over bridge in lieu of level crossing No.S-4 S.Fund 1,00

EBR ..

102 Pune-Miraj, Pune-Daund, Pune-Lonavala & Chalisgaon-Dhule - Elimination of level

crossings by subways (10 Nos)

S.Fund 5,65,11

103 Road over bridge in lieu of level crossing No.83-B, Solapur Division S.Fund 1,00,00

EBR ..

104 Works costing below Rs.2.5 crore each S.Fund 25,10,55

TOTAL-WORKS IN PROGRESS S.Fund 75,20,69

EBR 9,90,00

105 Ahmednagar-Daund - Road over bridge in lieu of level crossing No 12 with land

aquisition for approaches (State Highway No.60)

S.Fund ..

EBR ..

106 Jalgaon - Road over bridge in lieu of level crossing No.147 S.Fund ..

EBR ..

107 Akolner - Subway in lieu of level crossing No.25 S.Fund 10,00

108 Works costing below Rs.2.5 crore each S.Fund ..

TOTAL-NEW WORKS S.Fund 10,00

TOTAL-Road Safety Works-Road Over/Under Bridges. S.Fund 75,30,69

EBR 9,90,00

109 Bhusawal-Badnera - TRR (P) - 43.30 km DRF 9,50,00

Complete Track Renewal

110 Bhusawal-Badnera - TRR - 24.576 km (P) DRF 5,00,00

111 Itarsi-Amla - CTR(P) - 5.40 km & TRR(P) - 0.60 km DRF 1,50,00

R.

112 Wardha-Ballarshah - CTR(P) - 14.20 km DRF 1,00,00

R.

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

B - New Works

TRACK RENEWALS

A - Works in Progress

Page 7: Central Railway

1.1.7

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

113 Badnera-Wardha - CTR(P) - 19 km DRF 60,00

R.

114 Badnera-Wardha - CTR(P) - 3 km DRF 1,00,00

R.

115 Lonavla-Pune - CTR(P) - 3.4 km DRF 75,00

R.

116 Kalyan-Lonavla - CTR (P) - 9.2 km, TRR (P) - 6.15 km & TSR(P) - 0.7 km DRF 3,93,84

R.

117 Diva-Panvel - CTR(P)- 27.74 km & TRR(P) - 0.8 km DRF 4,65,00

R.

118 Itarsi-Amla - CTR (P) - 2 km & TRR (P) - 1.124 km DRF 1,00,00

R.

119 Amla-Nagpur - TRR(P) - 0.93 km & CTR(P) - 10.27 km DRF 1,00,00

R.

120 Diva-Vasai Road - TRR (P) - 3.915 km & CTR (P) - 4.10 km and Diva-Panvel -

TRR(P) - 1 km

DRF 4,00,00

R.

121 Gulbarga-Wadi - TRR (P) - 7.49 km DRF 1,00,00

122 Mumbai-Kalyan - TSR (P) - 9.45 km & CTR (P) - 0.45 km DRF 2,00,00

R.

123 Mumbai Division - CTR (S) - 3.3 km DRF 1,00,00

124 Solapur-Gulbarga - CTR (P) - 1.7 km & TRR (P) - 3 km DRF 3,00,00

R.

125 Kalyan-Lonavala - CTR (P) - 17.05 km & TRR (P) - 3 km DRF 8,00,00

R.

126 Badnera-Wardha - CTR (P) - 6 km DRF 1,20,00

R.

127 Solapur-Gulbarga - CTR (P) - 9.35 km & TRR (P) - 6.70 km DRF 5,00,00

R.

128 Wardha-Balharshah - CTR (P) - 10.60 km & TRR (P) - 4.10 km DRF 1,00,00

R.

129 Pune-Lonavala - CTR (P) - 2.20 km & TRR (P) - 1.25 km DRF 32,54

R.

130 Mumbai-Kalyan - TRR(P) - 2.30 km, TSR(P) - 1 km & CTR(P) - 2.20 km DRF 2,50,00

R.

131 Kalyan-Igatpuri - TSR(P) - 3 km, CTR(P) - 6 km & TRR(P) - 2.05 km DRF 3,00,00

R.

132 Daund-Manmad - CTR(P) - 6.03 km & TRR(P) - 20.6 km DRF 8,00,00

R.

133 Wardha-Balharshah - CTR(P) - 9.3 km & TRR(P) - 2.7 km DRF 1,00,00

R.

134 Kalyan-Igatpuri - TSR (P) - 11.9 km & CTR(P) - 3 km DRF 3,00,00

R.

TRACK RENEWALS

Page 8: Central Railway

1.1.8

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

135 Panvel-Roha (SL) - CTR(P) - 3 km & TSR(P) - 9.9 km DRF 2,00,00

R.

136 Kalyan-Lonavala - CTR(P) - 1.2 km, TSR(P) - 4.6 km & TRR(P) - 2.1 km DRF 2,00,00

R.

137 Mumbai-Kalyan - CTR(P) - 0.49 km, TRR(P) - 7.25 km DRF 50,00

R.

138 Gulbarga-Wadi - CTR(P) - 4.13 km & TRR(P) - 1 km DRF 1,00,00

R.

139 Diwa-Vasai Road - CTR(P) - 3.8 km & TRR(P) - 6.3 km DRF 2,00,00

R.

140 Ballarshah Yard - CTR(S) - 10.86 km (loops & sidings) DRF 1,00,00

141 Kalyan-Igatpuri - CTR(S) - 8.35 km (loop & yards) DRF 50,00

142 Kalyan - Lonavla (Down) - CTR (P) - 0.8 km, TRR (P) - 4, 0.3 km & 3rd line - CTR (P)

- 2.4 km, 1.5 km, TRR (P) - 1.3, 2..1 km, CTR (P) - 3.9, 1.2 km

DRF 48,21

R.

143 Daund - Solapur (Loops / Yard) - CTR (S) 17.33 km DRF 36,00

R.

144 Wardha - Nagpur (Loops / Yard) - CTR (S) - 9.9 km DRF 60,98

145 Wardha - Ballarshah (Loops / Yard) - CTR (S) - 5.3 km & TRR (S) - 6.2 km DRF 64,49

146 Igatpuri - Manmad - CTR (P) - 3.604 km, 5.187 km & 9.45 km DRF ..

R.

147 Kalyan - Lonavala - CTR - 10 km (S) DRF 3,07,96

148 Wani - Pimpalkuti - CTR - 4.08 km & TRR - 0.68 km (S) DRF 23,57

149 Pune - Daund - Ghorparhi Yard - CTR - 11.26 km (S) DRF ..

150 Amla - Nagpur - CTR - 11 km (P) DRF 16,90

R.

151 Amla - Nagpur - CTR - 8.3 km (P) DRF 13,74

R.

152 Pune - Miraj - CTR - 4.97 km (S) DRF 2,00,00

153 Daund - Wadi - CTR - 6.57 km (S) DRF 7,76

154 Manmad - Bhusawal - CTR - 10.24 km (P) DRF ..

R.

155 Bhusawal - Badnera - CTR - 3.5 km (P) DRF 15,59

R.

156 Igatpuri - Manmad - CTR - 16.888 km (S) DRF 33,65

157 Itarsi - Amla - CTR- 23.25 km (P) DRF 25,22

R.

158 Itarsi - Amla - CTR- 9 km (P) DRF 34,41

R.

159 Amla - Nagpur - CTR - 12.15 km & TRR - 0.4 km (P) DRF 93,53

R.

TRACK RENEWALS

Page 9: Central Railway

1.1.9

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

160 Amla - Nagpur - CTR - 20 km (P) DRF 1,34,51

R.

161 Nagpur - Wardha - CTR - 23 km (P) DRF 58,70

R.

162 Badnera - Wardha - CTR - 3 km (P) DRF 17,93

R.

163 Mumbai - Kalyan - CTR - 7.4 km (P) DRF 1,00,00

R.

164 Kalyan - Igatpuri - CTR - 4 km (P) & TSR - 2 km DRF 73,74

R.

165 Amla-Nagpur - CTR - 19.215 km (S) DRF 1,41,55

166 Amla - Nagpur - CTR - 11.31 km & TRR - 4.43 km (P) DRF 1,53,97

R.

167 Wardha - Nagpur - CTR - 31.03 km (P) DRF 1,60,00

R.

168 Wardha - Ballarsah - TRR - 9.9 km (P) DRF 70,00

169 Badnera - Wardha - CTR - 4 km (P) DRF 16,36

R.

170 Hawarha-Nagpur - CTR - 2.12 km (P) DRF 64,33

R.

171 Gulbarga - Wadi - CTR - 4.6 km & TRR - 15.97 km (P) DRF 8,00

R.

172 Pune - Lonavala - CTR - 2.6 km (P) DRF ..

R.

173 Kalyan - Igatpuri - CTR - 7 km & TRR - 3.25 km (P) DRF 2,08,97

R.

174 Chhatrapati Shivaji Terminus, Mumbai - Panvel - TRR - 3.8 km (P) DRF 27,02

175 Panvel - Roha - CTR - 6.5 km & TRR - 0.5 km (P) DRF 2,00,00

176 Wani - Rajur - CTR - 7.05 km (P) DRF 1,02,74

177 Daund - Wadi - CTR - 6.17 km (S) DRF 1,13

178 Kurla Car Shed - CTR - 7.25 km (S) DRF 1,00,00

Through Rail Renewal

179 Wardha-Ballarshah - TRR(P) - 6.84 km & CTR(P) - 1.25 km DRF 80,00

R.

180 Badnera-Wardha - TRR(P) - 31.57 km DRF 3,00,00

181 Solapur-Gulbarga - TRR(P) - 3.7 km DRF 14,67

182 Daund-Manmad - TRR(P) - 8.7 km & CTR(P) - 0.8 km DRF 1,00,00

183 Kurduwadi-Pandharpur - TRR(P) - 13.72 km DRF 73,01

184 Panvel-Jasai - TRR(P) - 8.561 km, CTR(P) - 0.432 km & TSR(P) - 0.9 km DRF 4,00,00

R.

185 Bhusawal-Khandwa - CTR(P) - 2.54 km & TRR(P) - 10.08 km DRF 5,00,00

R.

TRACK RENEWALS

Page 10: Central Railway

1.1.10

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

186 Wardha-Badnera - TRR(P) - 16 km DRF 1,00,00

187 Daund-Manmad - CTR(P) - 18.07 km DRF 12,80,00

R.

188 Bhusawal-Badnera - TRR(P) - 37.12 km DRF 16,80,00

189 Manmad-Bhusaval - TRR - 6 km (P) DRF 50,00

190 Solapur-Gulbarga - TRR(P) - 10.75 km & CTR(P) - 3.75 km DRF 8,00,00

R.

191 Amla-Nagpur - TRR(P) - 3.95 km DRF 1,00,00

192 Daund-Solapur - TRR(S) - 4.12 km & Daund Yard - CTR(S) - 2.22 km DRF 3,00,00

193 Amla - Nagpur - TRR - 5.1 km (S) (various loops), Nagpur - Wardha - TSR (S) - 4.9

km, Itarsi - Amla & Wardha - Balharshah - CTR(S) - 2.17 km

DRF 73,08

R.

194 Mumbai - Kalyan (Loops / Yard) - TRR - 2 km, 5.2 km (S) DRF 2,38,59

195 Pune - Kolhapur (Loops / Yard) - TRR (S) - 9.7 km & CTR (S) - 12.58 km DRF 4,00,00

196 Chstrapati Shivaji Terminus Yard (Masjid) - TRR - 2.7 km, 0.25 km, 3 km & 1.3 km

(S)

DRF 2,79,93

197 Challishgaon - Dhuliya - TRR - 6.45 km (S) DRF 45

198 Daund-Manmad - TRR- 5 km (P) DRF 82

199 Itarsi-Amla - TRR - 12.9 km (P) DRF 1,00

200 Majri-Wani - TRR - 13.5 km (P) DRF 2,36,73

201 Igatpuri - Bhusawal - TRR - 5.023 km (P) (15 major & important bridges) DRF 1,20,00

202 Bhusawal-Badnera - TRR - 10.48 km (P) (28 major/important bridges) and Bhusawal-

Khandwa - TRR - 1.295 km(P) (3 major/important bridges)

DRF 5,00,00

203 Chhatrapati Shivaji Terminus, Mumbai - Kalyan - TRR - 1 km, CTR - 5.1 km & TSR -

20.02 km (P)

DRF 1,22,48

R.

204 Kalyan - Lonavala - TRR - 13.2 km & CTR - 5 km (P) DRF 1,20,00

R.

205 Panvel - Javaharlal Nehru Port Trust - CTR - 12.78 km (P) DRF 2,35,83

206 Jasai - Uran - TRR - 12.41 km (S) DRF 3,00,00

207 Wardha - Badnera - TRR - 17 km (P) DRF 1,40,69

208 Wardha - Badnera - TRR - 31 km (P) DRF 43,06

Through Sleeper Renewal

209 Butibori-Umrer - TSR(P) - 10.6 km DRF 3,00,00

R.

210 Mumbai-Kalyan - TSR(P) - 4.6 km & TRR(P) - 1 km DRF 1,97,44

211 Kalyan-Igatpuri - TSR(P) - 8.70 km DRF 3,00,00

R.

212 Panvel-Javaharlal Nehru Port Trust - TSR (S) - 22.40 km DRF 2,00,00

213 Pune-Miraj - TSR (P) - 5.42 km DRF 2,50,00

R.

TRACK RENEWALS

Page 11: Central Railway

1.1.11

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

214 Thane-Vashi - TSR(P) - 8.68 km (down Harbour line) & CTR(P) - 1.68 km (up

Harbour line)

DRF 20,00

R.

215 Wani - Pimpalkutti - TSR - 30 km (S) DRF 1,80,03

216 Wani - Pimpalkutty (Single Line) - TSR - 43.13 km (S) DRF 96,50

R.

Ballast

217 Bhusawal Division - TBR - 62.486 km , CMS crossing & switches - 140 Nos &

derailing switches - 80 Nos

DRF 10,00,00

218 Daund-Manmad - TBR - 22.70 km & formation treatment - 2.50 km DRF 2,00,00

219 Bhusawal Division - TBR - 67.36 km DRF 2,72,00

R.

220 Nagpur Division - TBR - 88.11 km DRF 1,00,00

R.

221 Bhusawal Division - TBR - 122.74 km DRF 2,00,00

R.

222 Solapur Division - TBR - 57.07 km DRF 2,00,00

R.

223 Diva-Vasai Road - TBR - 22.5 km DRF 1,40,00

R.

224 Kalyan-Igatpuri - TBR - 22 km and TFR - 42 km & Diwa-Vasai Road - TBR - 11.5 km DRF 20,00

R.

225 Daund-Solapur - TBR - 20.3 km DRF 20,00

R.

226 Chatrapati Shivaji Terminus Mumbai - Kalyan, Kalyan (platforms), Kalyan - Igatpuri &

Apta - Roha - TBR - 46.94 km

DRF 61,46

R.

227 Igatpuri - Bhusawal - TBR - 43.362 km DRF 50,00

R.

228 Bhusawal - Badnera - TBR - 52.262 km (up/down), Bhusawal - Khandwa - 37.359

km (up/down)

DRF 5,00

R.

229 Itarsi - Amla, Amla - Nagpur & Wardha - Badnera - TBR - 74.46 km DRF 18,47

R.

230 Igatpuri - Manmad -TBR - 9.53 km, TTR (30 Nos) DRF 20,00

R.

231 Badnera - Wardha - TBR - 22 km, TFR - 84 km, TWR - 24 km, TTR (14 Nos) DRF 4,68,12

R.

232 Wardha - Balharshah -TBR - 102.6 km & TTR (11 Nos) DRF 72,61

R.

233 Amla - Nagpur - TBR - 21.7 km , TFR -1 km & TTR (7 Nos) DRF 1,05,05

R.

TRACK RENEWALS

Page 12: Central Railway

1.1.12

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

234 Pune - Lonawala -TBR - 16 km & TTR (17 Nos) DRF ..

R.

Points & Crossings

235 Bhusawal Division - Crossings (92 Nos) DRF 20,00

236 Itarsi - Balharshah - TTR (220 Nos) DRF 10,00

237 Bhusawal Division - TTR (88 Nos) DRF 60,00

238 Bhusawal Division - Turnout renewal (100 sets) DRF 50,00

R.

239 Mumbai-Kalyan - TTR (40 Nos) DRF 2,00,00

R.

240 Daund - Wadi - TTR (59 Nos) DRF 2,20,00

241 Amla - Nagpur - TTR (P) (28 Nos), Nagpur - Wardha (18 Nos) DRF 1,01,88

R.

242 Daund - Wadi - TTR (P) (38 Nos) & Solapur - Wadi - TWR -3.18 km (down), FT - 1.6

km (single line)

DRF 2,80,00

R.

243 Bhusawal - Badnera - TTR (P) (20 Nos) DRF 10,00

R.

244 Manmad - Bhusawal - TTR (53 Nos), TBR - 3.13 km , TFR -13.75 km DRF 1,00,00

R.

245 Pune Yard - TTR (50 Nos) DRF ..

R.

246 Wardha - Nagpur - TTR (55 Nos) DRF 3,00,00

R.

Others

247 Nagpur Division - TFR - 76.09 km, TFTR - 4.10 km, CMS crossings - 156 Nos & TBR

- 51.30 km

DRF 1,00,00

248 Mumbai Division - TBR - 76.22 km & repl of switch expansion joints (140 Nos) DRF 3,11,00

R.

249 Bhusawal-Badnera - TFR - 51.1 km DRF 50,00

250 Nagpur-Wardha - TFTR - 9 km DRF 20,00

R.

251 Itarsi - Balharshah - SEJs (198 Nos) DRF 1,00,00

252 Bhusawal Division - SEJs (149 Nos) DRF 40,00

253 Bhusawal Division - TFR - 143.97 km DRF 1,00,00

254 Mumbai Division - Repl of steel channel sleepers (1818 Nos) DRF 1,00,00

255 Daund - Manmad - TWR - 17.5 km DRF 20,00

256 Daund - Wadi - SEJs (150 Nos) DRF 3,20,00

257 Igatpuri - Bhusawal - TTR (P) (39 Nos), TFR - 37.335 km, TBR - 7.2 km, TWR -

50.284 km

DRF 20,00

R.

TRACK RENEWALS

Page 13: Central Railway

1.1.13

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

258 Daund - Solapur - TTR (P) (35 Nos) & TFR - 1.5 km DRF 1,74,91

R.

259 Amla - Nagpur - TWR - 7.7 km, TBR - 64.5 km, TFR - 28.9 km & TTR (P) - 7 Nos DRF 56,15

R.

260 Itarsi - Amla - TWR - 14.2 km, TBR - 4.3 km & FT - 2.5 km DRF 48,48

R.

261 Nagpur - Wardha - TTR (P) - 13 Nos & FT - 2.5 km DRF 3,35,97

R.

262 Badnera - Wardha - TBR-11 km, TWR-38.87 km, TTR (8 Nos) & FT-1.6 km DRF 1,54,55

R.

263 Wardha - Balharshah - TWR - 12 km, TTR (P) (9 Nos) & FT - 2.5 km DRF 41,79

R.

264 Chhatrapati Shivaji Terminus Mumbai - Panvel - TBR - 10.55 km, TFR - 20.6 km &

TTR (P) (10 Nos)

DRF 10,67

R.

265 Mumbai - Kalyan (Down) - TBR -18 km & TTR (20 Nos) DRF 1,23,69

R.

266 Igatpuri - Manmad - TBR - 10.53 km & TTR (16 Nos) DRF 72

R.

267 Manmad - Bhusawal - TBR - 5.55 km & TTR (36 Nos) DRF 50,00

R.

268 Pune - Miraj - TBR - 32.03 km, TFR - 58.7 km & Miraj - Kolhapur - TBR - 3.62 km DRF 80,00

R.

269 Itarsi - Amla - TBR - 17 km, TFR - 5.5 km & TTR (27 Nos) DRF 55,95

R.

270 Wardha - Nagpur - TBR - 1.58 Kms & TTR (19 Nos) DRF ..

R.

271 Wardha - Ballarsha - TBR - 7 km & TTR (18 Nos) DRF 53,33

R.

272 Badnera - Wardha - TBR - 21.5 km & TTR (17 Nos) DRF 1,03,90

R.

273 Daund - Manmad - TFR - 59.3 km & TTR (20 Nos) DRF 40,00

R.

274 Solapur - Wadi - TTR (25 Nos) DRF 2,21,57

R.

275 Central Railway - Through renewal of turnout (excluding sleepers) by thick web

swtiches & weldable CMS crossings (1:12 & 1:8.5) (707 sets)

DRF 1,00,00

276 Pune Division - TBR - 20.35 km, TFTR - 14.53 km, TTR (164 Nos), thick web

switches with weldable CMS crossings (51 Nos) & TFR - 11.9 km

DRF 4,00,00

R.

277 Solapur Division - TTR (20 Nos), thick web switches with weldable crossings (43

Nos), TBR - 33.1 km & TFR - 13.6 km

DRF 2,00,00

R.

TRACK RENEWALS

Page 14: Central Railway

1.1.14

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

278 Bhusawal Division - TBR - 50.2 km, TFR - 94.34 km, TTR (120 Nos), thick web

switches with weldable CMS crossings (82 Nos) & TWR - 55.7 km

DRF 2,00,00

R.

279 Nagpur Division - TBR - 46.45 km, TFR - 48.5 km, TFTR - 4.8 km, TTR (170 Nos) &

TWR - 5.28 km

DRF 3,00,00

R.

280 Mumbai Division - TBR - 11.4 km, TBTR (1640 Nos), thick web switches with

weldable CMS crossings (111 Nos) & TFR - 64.63 km

DRF 26,00

R.

281 Nagpur Division - TTR (139 Nos), TBR - 38.05 km & TFR - 210.08 km DRF 4,00,00

R.

282 Bhusawal Division - TTR (204 Nos), TBR - 84.81 km, TFR - 311.45 km & TWR -

167.7 km

DRF 10,00,00

R.

283 Solapur Division - TBR - 65.13 km, TFR - 42.9 km & TWR - 54.4 km DRF 4,00,00

R.

284 Pune Division - TTR (36 Nos), PTW - 19.81 km & TFTR - 2 km DRF 4,12,00

R.

285 Mumbai Division - TTR (703 Nos), TBR - 106.11 km & TFR - 39.63 km DRF 1,00,00

R.

286 Works costing below Rs.2.5 crore each DRF 38,12,23

TOTAL-WORKS IN PROGRESS DRF 354,39,15

287 Manmad-Aurangabad (SL) - CTR(P) - 13 km DRF 3,00,00

R.

288 Itarsi-Amla (up) -CTR(P) - 5.04 km & TRR(P) - 0.769 km DRF 1,00,00

R.

Complete Track Renewal

289 Wani - Pimpalkutty (SL) - CTR(P) - 12.18 km DRF 1,00,00

R.

290 Mumbai-Kalyan - CTR(P) - 0.35 km ,TRR(P) - 6.05 km & TSR(P) - 7.1 km DRF 1,00,00

R.

291 Bhusawal-Khandawa (up) - CTR(P) 24.55 km DRF 1,00,00

R.

Through Rail Renewal

292 Bhusawal-Badnera - TRR(P) - 32.5 km DRF 6,00,00

293 Wardha-Badnera (dn) - TRR(P) - 5.91 km DRF 70,00

294 Daund - Baramati (SL) -TRR (P) - 8.04 km DRF 3,90,85

TOTAL-NEW WORKS DRF 17,60,85

TOTAL-Track Renewals DRF 372,00,00

TRACK RENEWALS

B - New Works

Page 15: Central Railway

1.1.15

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

295 Wardha-Badnera - Elimination of 9.14 m girders by inserting reinforced concrete

cement boxes/psc slabs (bridge No.724/1)

DRF 10

296 Karjat-Lonavla - Strengthening (bridge No.117/3) DRF 1,00

297 Wani-Pimpalkutti - Protection works (bridge Nos.881/3, 882/2, 898/2 & 912/4) DRF 30,00

298 Panvel-Rohe - Strengthening of sub-structure & foundation by jacketing (bridge

No.101/5 & 131/2)

DRF 10

299 Bhusawal Division - Rehabilitation (20 arch bridges) DRF 5,00

300 Parsik Tunnel - Track improvement work for rebuilding of retaining wall & side drains DF(3) 60,00

301 Igatpuri-Bhusawal - Rehabilitation of arch bridges by reinforced concrete cement

arch top boxs with extension of barrel length (11 Nos)

DRF 35,00

302 Diva-Vasai - Repl. of floor system (up line of Ulhas bridge No 51/1) DRF 60,00

303 Wardha-Badnera - Jacketing to abutments, piers, wing & return wall (bridge

No.727/1) (Wardha river)

DRF 3,60,00

304 Works costing below Rs.2.5 crore each DRF 11,82,80

TOTAL-WORKS IN PROGRESS DRF 16,74,00

DF(3) 60,00

305 Works costing below Rs.2.5 crore each DRF 30,00

TOTAL-NEW WORKS DRF 30,00

TOTAL-Bridge Works DRF 17,04,00

DF(3) 60,00

306 Amla-Parasia - Repl of signalling equipment by route setting type central panel (8

stations) & colour light signalling (14 level crossing gates)

DRF 4,00,00

307 Dadar & Parel (Route Relay Interlocking) - Repl. of signalling gears DRF 1,46,81

308 Solapur Division - Repl. of conventional color light signal lamps by LED lamps with

current regulators (various locations)

DRF 1,50,00

309 Kurla (Goods Cabin) - Repl.of signalling gears by electronic / route relay interlocking

(C-route)

DRF 2,16,67

310 Talni, Malkapur Road, Hatnapur & Yenor - Repl. of relays & signaling gears (C-class

stations)

DRF 19,00

311 Mumbai Division - Light emitting diode signals for main, shunt & route with relay

modifications

DF(4) 45,00

312 Pune Division - Route relay interlocking at GC-I, GC-II & GF-10 DRF 3,00,00

313 Kurla (Route Relay Interlocking) - Repl. of signalling gears DRF 7,34,00

314 Pune Division - Route relay interlocking at GC-III & GC-IV DRF 1,50,00

315 Chalisgoan-Dhule - Repl of Bharat Sanchar Nigam Ltd overhead alignment with 6-

quad cable (56 km)

DF(3) 13,05

316 Duskheda & Nimbhora - Repl.of panel & signalling gears by centralised operation of

points & signals with panel interlocking

DRF 50,00

BRIDGE WORKS

A - Works in Progress

B - New Works

SIGNALLING AND TELECOMMUNICATION

A - Works in Progress

Page 16: Central Railway

1.1.16

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

317 Igatpuri (Route Relay Interlocking) - Repl. of gears with new interlocking DRF 1,04,89

318 Kiratgarh, Jaulkhera & Multai - Repl.of signalling gears & signal by centralised

operation of points & signals with route setting type interlocking

DRF 2,00,00

319 Karjat (Route Relay Interlocking) - Repl. of outdoor gears with new interlocking DRF 1

320 Ajni - Repl.of mechanical signalling gears (7 goods cabins) DRF 1,56,82

321 Igatpuri-Bhusawal-Badnera & Badnera-Wardha - Block proving by axle counters DF(4) 50,00

322 Pune-Lonavla - Continuous track circuiting with automatic block signalling (63.83 km)

(B-route)

DF(4) 30,00

323 Kalyan-Titwala & Kalyan-Badlapur - Repl. of gears (A & B-routes) DRF 37,90

324 Kasara - Repl. of interlocked installation DRF 30,00

325 Central Railway - Data loggers at panel stations (A & B-routes) DF(4) 1,75,00

326 Bhusawal Division - Repl. of conventional signal lamps at panel & route relay

interlocking cabins by light emitting diode signals

DF(4) 1

327 Nagpur Division - Repl. of conventional signal lamps by light emitting diode signals (A-

route)

DRF 1

328 Vasai-Diva-Panvel - 6-quad cable (70 km) DF(4) 30,00

329 Bhusawal - Repl.of lever frames & signaling gears with centralised operation of

points & signals and merger of goods cabin-2 & 4 with goods yard cabin

DRF 1,00,00

330 Bhusawal Division - Repl of panel & signalling gears (C-cabin) (A-route) DRF 30,00

331 Akola - Repl.of lever frame & signalling gears with centralised operation of points &

signals by panel interlocking (A-route)

DRF 2,50,00

332 Raver - Repl.of panel & signalling gears with centralised operation of points & signals

and solid state interlocking

DRF 30,00

333 Waghoda - Repl.of panel & signalling gears with centralised operation of points &

signals and solid state interlocking

DRF 80,00

334 Ajni - Repl of lever frames & signalling gears with centralised operation of points &

signals with panel interlocking

DRF 5,72

335 Chhatrapati Shivaji Terminus, Mumbai - Repl of networking equipment DRF 83,03

336 Betul - Repl of signalling gears by centralised operations of points & signals by route

setting type interlocking

DRF 25,00

337 Gudankhapa & Tadali - Repl. of signalling gears by centralised operations of points &

signals by route setting type interlocking

DRF 1

338 Pune-Lonavla-Karjat - Train protection & warning system (78 rkm) DF(4) 1

339 Central Railway - Isolation and upgradation /alteration of signalling (9 stations) DF(4) 1,86,70

340 Mumbai Division - Digital axle counter for track circuits in water logged area / critical

locations

DF(4) 6,17,00

341 Junnardeo & Palachuri - Isolation & upgradation of signalling DF(4) 1

342 Itarsi-Nagpur - Mobile train radio communication (without master switching centre) (A-

route) (290 km)

DF(3) 1

SIGNALLING AND TELECOMMUNICATION

Page 17: Central Railway

1.1.17

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

343 Works costing below Rs.2.5 crore each DRF 9,05,12

DF(3) 15,00

DF(4) 7,78,25

TOTAL-WORKS IN PROGRESS DRF 42,04,99

DF(3) 28,06

DF(4) 19,11,98

343a Kalamboli (A&B-Cabins) - Repl of signalling gears with panel interlocking DRF 1

344 Works costing below Rs.2.5 crore each DRF ..

DF(4) ..

TOTAL-NEW WORKS DRF 1

DF(4) ..

TOTAL-Signalling and Telecommunication DRF 42,05,00

DF(3) 28,06

DF(4) 19,11,98

345 Mumbai - Direct metering of Railway quarters in Maharashtra State Electricity Board

area

DRF 61,38

346 Mumbai Division - Direct metering of individual railway quarters by Maharstra State

Electricity Board (Phase-II)

DRF 50,00

347 Mumbai - Direct metering of individual railway quarters by Maharashtra State

Electricity Board (Phase-III)

Cap. 50,00

348 Central Railway - Use of renewable energy sources for improving energy efficiency &

energy conservation

DF(3) 14,18

349 Igatpuri-Bhusawal - Direct metering of individual Railway quarters by Maharashtra

State Electricity Board (1250 quarters)

DRF 1

350 Kalyan (Electric Loco Shed) - Offloading of 2.2 kv power supply system DRF 50,00

351 Works costing below Rs.2.5 crore each Cap. 88,83

DRF 2,52,61

DF(2) 30,00

DF(3) 40,82

TOTAL-WORKS IN PROGRESS Cap. 1,38,83

DRF 4,14,00

DF(2) 30,00

DF(3) 55,00

352 Works costing below Rs.2.5 crore each Cap. ..

DRF 1,00,00

DF(2) ..

DF(3) ..

TOTAL-NEW WORKS Cap. ..

DRF 1,00,00

DF(2) ..

DF(3) ..

SIGNALLING AND TELECOMMUNICATION

B - New Works

OTHER ELECTRICAL WORKS EXCL TRD

A - Works in Progress

B - New Works

Page 18: Central Railway

1.1.18

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

TOTAL-Other Electrical Works excl TRD Cap. 1,38,83

DRF 5,14,00

DF(2) 30,00

DF(3) 55,00

353 Mumbai Division - 1500 v DC traction system to 25 kv AC Cap. ..

DRF 9,00,00

354 Chhatrapati Shivaji Terminus Mumbai & Byculla - Repl. of head span towers DRF 35,00

355 Igatpuri - Arrangement of 110 kv, 3-phase 18 mva addl power supply (total 30 mva) DF(3) 50,00

356 Mumbai (Traction Distribution) - Repl. of contact wire (110 km) DRF 3,03,64

357 Nagpur - Control & relay panel with numerical protection relays for 25 kv AC traction

sub-stations (11 Nos) & shunt capacitor banks (6 Nos)

DRF 1

358 Mumbai Division - Repl. of catenary wire (242 sq mm) (25 km) DRF 1

359 Diwa-Kalyan-Igatpuri & Vangni-Lonavla - Repl.of anchor structures DRF 1,50,00

360 Diva-Igatpuri & Kalyan-Lonavala - Repl. of overhead structures (200 masts) DRF 1,00,00

361 Chhatrapati Shivaji Terminus Mumbai - Repl of copper contact wire (193 sq mm) (40

km)

DRF 2,00,00

362 Bhusawal-Igatpuri - Removal of critical implantation of overhead equipment masts

(100 masts)

DRF 50,00

363 Pachora & Manmad - Repl of 10.5 mva Scott connected transformer by 21.6 / 30

mva with HV & LV switchgears (2 Nos)

DRF 3,10,00

364 Mumbai - Repl. of catenary wire (242 sq mm - 25 km and 323 sq mm - 5 km) by 129

sq mm

DRF 25,00

365 Nagpur (Traction Distribution) - Repl of aluminium cross feeder & parallel feeder by

37/2.25 mm 150 sq mm stranded copper conductor at switching posts

DRF 25,00

366 Mumbai (Traction Distribution) - Repl. of 193 sq mm copper contact wire (30 km) &

242 sq mm catenary wire (16 km)

DRF 1

367 Mumbai (Traction Distribution) - Repl.of 250 mt steel structure DRF 10,38

368 Kalyan-Igatpuri & Kalyan-Khadki - Rehabilitation of 110 kv transmission line fittings

(NE-1, NE-2 & SE-1, SE-2) (Phase-IV) (36 km)

DRF 49,76

369 Betul & Multai - Repl of transformers by 132 kva 21.6 mva DRF 51,32

370 Mumbai - Repl. of 500 mt steel structure DRF 25,00

371 Vangani & Kasara - Line sectioning arrangement (2 Nos) (110 kv) DF(3) 25,00

372 Burhanpur (Traction Sub-station) - Repl of 12.5 mva CGL make transformer by 30

mva (1 No)

DRF 1

373 Malkapur - Repl. of 13.5 / 20 mva traction transformers by 21.6 / 30 mva (2 Nos) DRF 1,50,00

374 Wardha - 3rd bay of 220 / 25 kv 21.6 mva traction power transformer DF(3) 1

375 Kalyan-Igatpuri (Traction Distribution) - Repl of anchor structure (Phase-IV) DRF 1

376 Mumbai Division - Repl. of 500 mt steel structure DRF 1,75,00

377 Mumbai Division - Repl. of 193 sq mm copper contact wire (16 km) & 242 sq mm

catenary wire (16 km)

DRF 5,00

378 Kalyan-Igatpuri & Kalyan-Lonavla - Rehabilitation of 110 kv transmission line fittings

(NE-I, NE-II & SE-I, SE-II) (Phase-VI)

DRF 1

TRACTION DISTRIBUTION WORKS

A - Works in Progress

Page 19: Central Railway

1.1.19

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

379 Thakurli - Repl. of vital equipment & relays of 110 kv switch yard and Asangaon,

Karjat Kadavli & Igatpuri - Line sectioning equipment

DRF 1

380 Chalisgaon (Traction Distribution) - Repl.of 10.5 mva traction transformer by 21.6

mva with required switchgear (1 No)

DRF 25,00

381 Nasik (Traction Distribution) - Repl.of 10.5 mva traction transformer by 21.6 mva with

required switchgear (1 No)

DRF 25,00

382 Akola (Traction Distribution) - Repl.of 13.5 mva traction transformer by 21.6 mva with

required switchgear (1 No)

DRF 50

383 Mumbai - Repl of 250 mt steel structure DRF 1,50,00

384 Mumbai - Repl. of 242 sq mm catenary wire (18 km) DRF 1

385 Bhusawal - Repl of power supply installation assets DRF 60,00

386 Works costing below Rs.2.5 crore each DRF 7,18,31

DF(3) 60,00

TOTAL-WORKS IN PROGRESS DRF 35,43,99

DF(3) 1,35,01

387 Mumbai Division - Repl of 193 sq mm copper contact wire (65 km) DRF 5,00

388 Pune Division - Conversion of cross type corssovers to overlap type crossovers DRF 25,00

389 Mumbai Division - Repl of 242 sq mm catenary wire by 129 sq mm catenary wire (25

km)

DRF 5,00

390 Works costing below Rs.2.5 crore each DRF 1,01

DF(3) ..

TOTAL-NEW WORKS DRF 36,01

DF(3) ..

TOTAL-Traction Distribution Works DRF 35,80,00

DF(3) 1,35,01

391 Kurla (Diesel Loco Shed) - Infrastructural development for homing of Alco diesel

locos

DF(3) 1,59,37

392 Daund - Setting up of new electric loco shed for homing 3-phase electric locos (200

Nos)

Cap. 1

393 Kalyan (Diesel Loco Shed) - Augmentation of facilities for maintenance of heavy

assemblies and improvement to pit lines

DF(3) 95,76

394 Pune (Diesel Loco Shed) - Infrastructural maintenance facility for homing new

generation diesel locomotives

DF(3) 1,00,00

395 Bhusawal (Electric Loco Shed) - Augmentation of maintenance facilities to increase

holding from 150 to 175 locos

Cap. 95,10

396 Kalyan - Renovation of electric loco shed for development of facilities for

maintenance of AC locos

DRF 70,00

397 Lokmanya Tilak Terminus (Coaching Depot) - Extension of intermediate overhauling

shed

DF(3) 29,83

TRACTION DISTRIBUTION WORKS

B - New Works

WORKSHOPS INCLUDING PRODUCTION UNITS

A - Works in Progress

Page 20: Central Railway

1.1.20

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

398 Parel Workshop - Mid life rehabilitaiton of coaches DF(3) 3,08,97

399 Matunga - Modernisation of workshop Cap. 6,07

DRF 15,50

DF(3) 3,03,02

400 Chhatrapati Shivaji Terminus Mumbai - Facilities for terminal attentiion DF(3) 67

401 Ghorpuri Yard - Pit & stabling lines (3 Nos each) and intermediate overhauling shed

for 26-coach trains (Phase-II)

DF(3) 5,90,24

402 Solapur - Coach maintenance facilities DF(3) 20,78

403 Ajni - Augmentation of coaching maintenance facilities DF(3) 45,00

404 Bhusawal - New intermediate overhauling workshop and zonal stores depot for track

machines

Cap. 1

405 Ajni (Electric Loco Shed) - Augmentation of homing capacity from 120 to 175 electric

locos

Cap. 95,00

406 Kalyan (Electric Loco Shed) - Facilities for maintenance of 3-phase WAG-9 locos Cap. 2,00,00

407 Kurduwadi Workshop - Facilities for rehabilitation of wagons DF(3) 3,46,94

408 Wadi Bunder - Four maintenance sidings & extension of intermediate overhauling

shed

DF(3) 1,96,18

409 Bhusawal (Electric Loco Workshop) - Augmentation of wheel-set manufacturing

capacity

DF(3) 1,20,00

410 Pune (Diesel Loco Shed) - Extension & upgradation of infrastructural maintenance

facilities

DF(3) 64,06

411 Badnera - Setting up of wagon repair (peridocal overhauling) workshop Cap. 53,97

412 Works costing below Rs.2.5 crore each Cap. ..

DRF 1,34,50

DF(3) 2,83,57

TOTAL-WORKS IN PROGRESS Cap. 4,50,16

DRF 2,20,00

DF(3) 26,64,39

413 Works costing below Rs.2.5 crore each Cap. ..

DRF ..

DF(3) ..

TOTAL-NEW WORKS Cap. ..

DRF ..

DF(3) ..

TOTAL-Workshops including Production Units Cap. 4,50,16

DRF 2,20,00

DF(3) 26,64,39

414 Mumbai (Cuffe Parade) - Repl. of quarters, type-V - 12 units DRF ..

415 Pune - Transit accommodation for officers, type-IV - 24 units Cap. 8,45

WORKSHOPS INCLUDING PRODUCTION UNITS

B - New Works

STAFF QUARTERS

A - Works in Progress

Page 21: Central Railway

1.1.21

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

416 Gun Powder Road Colony (East) - Repl. of K-type - 80 units quarters by type-II - 75

units

DRF ..

417 Break Down Chawl - Repl. of K-type quarters (22 units) by type-II - 40 units DRF ..

418 Bhusawal Division - Repl.of quarters, type RB-I - 120 units DRF 1,00,00

419 Lonavala - Repl. of K-type quarters, type-I - 27 & type-II - 45 units DRF 1,25,00

420 Nagpur Division - Repl.of K-type quarters, type RB-I - 90 units DRF 6,86

421 Solapur - Reconstruction of quarters, type-I - 40 & type-II - 43 units DRF 4,96

422 Panvel - Repl. of K-type quarters, type-I - 36 & type-II - 11 units, Karjat - Type-I - 13

& type-II - 6 units

DRF 1

423 Nagpur Division - Repl. of K-type quarters, type-II - 71 units DRF 10,00

424 Bhusawal Division - Repl. of quarters, type RB-I - 80 units DRF 15,00

425 Parel - Repl. of quarters, type RB-I - 80 & RB-II - 24 units DRF 63,00

426 Manmad - Repl. of quarters, type RB-I - 38 units DRF 15,00

427 Pune Division - Repl. to quarters, type-II - 77 units DRF 1,59,96

428 Pune - Type- V - 10 units & type-Spl - 1 unit Cap. 17,00

429 Nagpur Division - Repl. of K-type quarters with RB-II - 30 units (various stations) DRF 50,00

430 Lonavla & Daund - Repl. of K-type quarters, type-II - 64 units DRF 41,83

431 Parel - Repl. of RB-I type quarters with RB-II - 80 units DRF 50,00

432 Works costing below Rs.2.5 crore each Cap. 1,01,01

DRF 2,53,38

TOTAL-WORKS IN PROGRESS Cap. 1,26,46

DRF 8,95,00

433 Works costing below Rs.2.5 crore each Cap. ..

DRF 5,00

TOTAL-NEW WORKS Cap. ..

DRF 5,00

TOTAL-Staff Quarters Cap. 1,26,46

DRF 9,00,00

434 Guru Tegh Bahadur Nagar - Major improvement to colony DF(2) 51,90

435 Kurduwadi - New building for railway school DF(2) 10,00

436 Daund - Water supply to railway quarters DF(2) 4,15

437 Ajni - Augmentation of water supply by laying 300 mm dia cast iron pipeline from

Dantoli overhead tank to pump house No 1 & repl.of underground tank

DRF 9,63

438 Byculla Hospital - Repl. of air-conditioning plants of auditorium, operation theatre,

post operative & ICCU

DRF 33,29

439 Wardha - 300 mm dia cast iron pipeline from Pawnar pumphouse to filteration plant DRF 2,98

STAFF QUARTERS

B - New Works

AMENITIES FOR STAFF

A - Works in Progress

Page 22: Central Railway

1.1.22

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

440 Byculla Hospital - Construction of patients' rest house DF(2) 2,00,00

441 Kurla - Major improvement to railway colony DF(2) 1,00,00

442 Mumbai - Rewiring of quarters (4752 units) DRF 70,00

443 Pune - Officers' club & improvement of Railgaon DF(2) 1,00,00

444 Parel - Major improvement to colony DRF 1,48,30

445 Bhusawal Division - Rewiring of residential quarters & service buildings (3000

quarters & 300 service buildings)

DRF 20,00

446 Kalwa - Major improvement to colony DF(2) 5,00

447 Bhusawal - Improvement in street lighting & infrastructure (various colonies) DF(2) 10,00

448 Works costing below Rs.2.5 crore each Cap. 17,00

DRF 2,95,80

DF(2) 3,67,53

TOTAL-WORKS IN PROGRESS Cap. 17,00

DRF 5,80,00

DF(2) 8,48,58

449 Works costing below Rs.2.5 crore each Cap. 3,00

DRF ..

DF(2) ..

TOTAL-NEW WORKS Cap. 3,00

DRF ..

DF(2) ..

TOTAL-Amenities for Staff Cap. 20,00

DRF 5,80,00

DF(2) 8,48,58

450 Thane - Foot over bridge (1 No) (6 m) DF(1) 50,00

451 Bhusawal - Addl foot over bridge (4.88 m) towards Chhatrapati Shivaji Terminus

Mumbai end

DF(1) 1,50,00

452 Kalyan - Remodelling & improvement of station DF(1) ..

453 Thane - Improvement & renovation to passenger amenities (Phase-II) DF(1) 1,50,00

454 Dadar - Improvement in passenger amenities (Phase-I) (Stage-II) DF(1) 1

455 Miraj - Water supply scheme for station & colony DF(1) 4,99

456 Lokmanya Tilak Terminus Kurla - New station building DF(1) 80,00

457 Lokmany Tilak Terminus - Subway between platforms & development of circulating

area

DF(1) 80,00

458 Amravati - New terminal station building with circulating area & new platforms DF(1) 1,00

459 Central Railway - Escalators at major stations (8 Nos) (4 stations) (Supplementary 08-

09 item)

DF(1) 5,19,46

AMENITIES FOR STAFF

B - New Works

PASSENGER AMENITIES

A - Works in Progress

Page 23: Central Railway

1.1.23

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

460 Amravati - Washable apron on 3 lines & water pipeline DF(1) 1

461 Bhandak, Multai, Narkhed & Niphad - Raising of platforms and Wadi - Extension of

platform

DF(1) 10,00

462 Daund - Repl.of foot over bridge at Solapur end (6 m wide) DRF 2,50,00

463 Nagpur - Improvement to drainage system by laying 1800 mm dia pipeline from West

to East side

DF(1) 10,00

464 Pune - Widening of foot over bridge by 12 m & provision of ramp in 2nd foot over

bridge at Mumbai end

DF(1) 2,01,99

465 Dadar - New foot over bridge (6 m wide) with elevators cum staircases at Chhatrapati

Shivaji Terminus Mumbai end connecting all platforms

DF(1) 1

466 Central Railway - Escalators at various stations (33 Nos) (15 stations) DF(1) 10,00

467 Works costing below Rs.2.5 crore each DRF 27,50,00

DF(1) 34,32,64

TOTAL-WORKS IN PROGRESS DRF 30,00,00

DF(1) 47,00,11

468 Works costing below Rs.2.5 crore each DRF ..

DF(1) ..

TOTAL-NEW WORKS DRF ..

DF(1) ..

TOTAL-Passenger Amenities DRF 30,00,00

DF(1) 47,00,11

469 Chhatrapati Shivaji Terminus Mumbai - New running room building at Carnac Bunder DF(3) 5,00

470 Bhusawal - Comprehensive sewage treatment plant (4 mld capacity) DRF 24,93

471 Pune - New division Cap. ..

DF(3) 2,20,00

472 Mumbai - Conservation work of Chhatrapati Shivaji Terminus main building (Phase-I) DF(3) 25,00

473 Bhusaval - Upgradation of training facilities at zonal railway training institute DF(3) 1

SRSF ..

474 Pune (Koregaon Park) - New Indian Railway Institute for Civil Engineering building DF(2) 1,54,92

475 Nasik Road - Shifting of training centre from Chink Hill (Phase-II) DF(3) 1,37,11

476 Pune (Koregaon Park) - New Indian Railway Institute for Civil Engineering building

(Phase-II)

DF(2) 3,65,90

477 Byculla - Centralised hostel building at signalling & telecommunication workshop DF(3) 1,00

478 Lonavala - Development of regional rail museum (Phase-I) DF(3) 10,45

479 Nasik - Facilities for training of electrical supervisors (Phase-I) DF(3) 5,00,00

PASSENGER AMENITIES

B - New Works

OTHER SPECIFIED WORKS

A - Works in Progress

Page 24: Central Railway

1.1.24

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

480 Thakurli - Construction work for 12th battalion Railway Protection Special Force DF(3) 1,50,00

481 Mumbai (Suburban) - Integrated security system (6 stations) Cap. 9,00,00

482 Central Railway - Integrated security system (11 stations) Cap. 5,00,00

483 Pune - Setting up of remaining divisional office (Phase-II) DF(3) 5,00,00

484 Bhusawal - Hostel at zonal railway training institute DF(2) 10,00

485 Mulund - Model railway protection force barrack DF(3) 70,00

486 Karjat - Lonavala - Protection of tunnel face to prevent boulder falling & flattening of

steep cutting

DF(3) 35,00

487 Pune - Centralised training institute for supervisors of Engineering department DF(3) 1,00,00

488 Chink Hill - Upgradation / development of Railway Protection Force training centre DF(3) 1

489 Central Railway - Boundary wall / fencing to prevent encroachment on railway land

(PB 821/2012-13/NR)

DF(3) 1,45,00

490 Nagpur - Setting up of Indian Railway Institute for Advanced Electronic Technology

(IRIAET)

DF(3) 26,12

491 Augmentation of administrative / office infrastructure, Solapur Division, Gulbarga Cap. ..

492 Works costing below Rs.2.5 crore each Cap. 5,00

DRF 8,07

DF(2) 13,06

DF(3) 1,88,43

TOTAL-WORKS IN PROGRESS Cap. 14,05,00

DRF 33,00

DF(2) 5,43,88

DF(3) 21,13,13

493 Works costing below Rs.2.5 crore each Cap. 10,00

DRF 10,00

DF(3) 30,00

TOTAL-NEW WORKS Cap. 10,00

DRF 10,00

DF(3) 30,00

TOTAL-Other Specified Works Cap. 14,15,00

DRF 43,00

DF(2) 5,43,88

DF(3) 21,43,13

494 Belapur-Panvel - Doubling of commuter double line as part of East-West corridor MAC 1,00,00

EBR ..

OTHER SPECIFIED WORKS

B - New Works

METROPOLITAN TRANSPORT PROJECTS

A - Works in Progress

Page 25: Central Railway

1.1.25

CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

495 Thane-Turbhe-Nerul-Vashi - Part of corridor No.1 in New Mumbai MAC 3,50,00

EBR ..

496 Belapur-Seawood-Uran - Electrified double line MAC 41,43,00

EBR ..

497 Mumbai Urban Transport Project (Phase-II) MAC 373,00,00

EBR ..

498 Chhatrapati Shivaji Terminus Mumbai - Panvel / Andheri - Running of 12-coach

electrical multiple unit trains on Harbour corridor

MAC 35,00,00

EBR ..

499 Estimated investment through EBR EBR 834,50,00

TOTAL-WORKS IN PROGRESS MAC 453,93,00

EBR 834,50,00

TOTAL-Metropolitan Transport Projects MAC 453,93,00

EBR 834,50,00

TOTAL-WORKS IN PROGRESS MAC 453,93,00

Cap. 252,98,45

C.Fund 476,92,00

DRF 505,10,13

DF(1) 51,75,56

DF(2) 14,22,46

DF(3) 86,63,44

DF(4) 19,11,98

S.Fund 104,65,71

Dep(RVN) ..

EBR 864,40,00

TOTAL - NEW WORKS Cap. 18,00

DRF 20,09,87

DF(1) 10,00

DF(2) ..

DF(3) 80,00

DF(4) ..

S.Fund 1,10,00

GRAND TOTAL MAC 453,93,00

Cap. 253,16,45

C.Fund 476,92,00

DRF 525,20,00

DF(1) 51,85,56

DF(2) 14,22,46

DF(3) 87,43,44

DF(4) 19,11,98

S.Fund 105,75,71

Dep(RVN) 0

EBR 864,40,00

METROPOLITAN TRANSPORT PROJECTS

Page 26: Central Railway

1.2.1

CENTRAL RAILWAY

MACHINERY AND PLANT PROGRAM FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15

500 Kurla - EMU simulator for MTC Cap. 1

501 Parel Workshop - Milling machine table size (6 x 2 m), spindle motor (30 kw AC) DRF 52,20

502 System of Online Monitoring of Rolling Stock (OMRS) (5 nos) DF(3) 1

503 Bhusawal - CNC Surface wheel lathe DRF 4,75,40

504 Eight colour roll to pack web offset printing machine with numbering station,

perforation, punching facility (1 No) and roll making machines (5 Nos)

DF(3) 1

505 Modernisation of general printing press DRF 1

506 Modernisation of general printing press Cap. 45,00

507 Pune Diesel Shed - Underfloor wheel lathe DRF 1,95,18

508 Matunga Workshop - Hydraulic wheel press (capacity 500 ton) Cap. 1

509 Parel Workshop: Wheel Press - 500 Ton Hydraulic (BG & MG) DRF 3,15,67

510 Works costing below Rs.2.5 crore each Cap. 3,00,97

DRF 11,23,21

DF(2) 90,29

DF(3) 2,01,06

DF(4) 3

TOTAL-PROGRAMMED DELIVERIES Cap. 3,45,99

DRF 21,61,67

DF(2) 90,29

DF(3) 2,01,08

DF(4) 3

511 Matunga Workshop - CNC Surface Wheel Lathe Cap. 1

512 Matunga Workshop - Crane EOT-25 Ton (3 Nos.) DRF 1

513 Works costing below Rs.2.5 crore each Cap. 4,00

DRF 2,20

DF(2) 2,00

DF(3) 1,50

TOTAL-NEW ACQUISITION Cap. 4,01

DRF 2,21

DF(2) 2,00

DF(3) 1,50

TOTAL-Machinery & Plant Cap. 3,50,00

DRF 21,63,88

DF(2) 92,29

DF(3) 2,02,58

DF(4) 3

B - NEW ACQUISITION

AllocationParticulars

A - PROGRAMMED DELIVERIES