Environmental Permit No.: EP-322/2008/G 環境許可證編號:EP-322/2008/G DROP SHAFT SITE PORTION CTL - (TEMPORARY REQUIREMENT) - AREA ~ 2010m 2 - WORKS AREA CENTRAL PTW SITE PORTION CTL - (TEMPORARY REQUIREMENT) - AREA ~ 700m 2 - WORKS SITE SITE PORTION CTL – (TEMPORARY REQUIREMENT) - AREA ~1000m 2 - WORKS AREA PTW BOUNDARY WORKS AREA SHAFT LOCATION TUNNEL ALIGNMENT LOCATION PLAN 1:4 000 000 PTW BOUNDARY WORKS AREA SHAFT LOCATION TUNNEL ALIGNMENT LOCATION PLAN 1:4 000 000 SITE PORTION SYP - (TEMPORARY REQUIREMENT) - WORKS AREA / BARGING POINT - AREA ~ 4130m 2 - WORKS SITE PROPOSED BARGING POINT AT SAI YING PUN SITE PORTION SYP - (PERMANENT REQUIREMENT) - REQUIRED EARLY 2009 - AREA ~ 620m 2 - SHAFT CONSTRUCTION & ASSOCIATED FACILITIES (WITH SURFACE EXCAVATION WORKS) PRODUCTION SHAFT / DROP SHAFT PRODUCTION SHAFT / RISER SHAFT SITE PORTION SYP – (TEMPORAY REQUIREMENT) - AREA ~ 1200m 2 - WORKS AREA ADDITIONAL WORKS AREA LOCATION PLAN 1:4 000 000 PTW BOUNDARY WORKS AREA SHAFT LOCATION TUNNEL ALIGNMENT LOCATION PLAN 1:4 000 000 SANDY BAY PTW PTW BOUNDARY WORKS AREA SHAFT LOCATION TUNNEL ALIGNMENT PRODUCTION SHAFT SITE PORTION SB - (TEMPORARY REQUIREMENT) - AREA ~ 3600m 2 - PRODUCTION SHAFT - WORKS SITE (WITH SURFACE EXCAVATION WORKS) PRODUCTION SHAFT / DROP / RISER SHAFT SITE PORTION SB - (PERMANENT REQUIREMENT) - AREA ~ 2690m 2 - SHAFT CONSTRUCTION+ANCILLARY FACILITIES FOR PTW UPGRADING (WITH SURFACE EXCAVATION WORKS) Project Title: Harbour Area Treatment Scheme (HATS) Stage 2A 工程名稱: 淨化海港計劃 第二期甲 Figure 1c: Location Plan 1c位置圖

Upload: others

Post on 24-Dec-2021

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CENTRAL PTW PROPOSED BARGING POINT (TEMPORARY …

Environmental Permit No.: EP-322/2008/G環境許可證編號: EP-322/2008/G

DROP SHAFT

SITE PORTION CTL - (TEMPORARY REQUIREMENT) - AREA ~ 2010m2

- WORKS AREA

CENTRAL PTW SITE PORTION CTL - (TEMPORARY REQUIREMENT) - AREA ~ 700m2

- WORKS SITE SITE PORTION CTL – (TEMPORARY REQUIREMENT) - AREA ~1000m2

- WORKS AREA

PTW BOUNDARY

WORKS AREA

SHAFT LOCATION

TUNNEL ALIGNMENT

LOCATION PLAN 1:4 000 000

PTW BOUNDARY

WORKS AREA

SHAFT LOCATION

TUNNEL ALIGNMENT

LOCATION PLAN 1:4 000 000

SITE PORTION SYP - (TEMPORARY REQUIREMENT) - WORKS AREA / BARGING POINT - AREA ~ 4130m2

- WORKS SITE

PROPOSED BARGING POINT AT SAI YING PUN

SITE PORTION SYP -(PERMANENT REQUIREMENT) - REQUIRED EARLY 2009 - AREA ~ 620m2

- SHAFT CONSTRUCTION & ASSOCIATED FACILITIES

(WITH SURFACE EXCAVATIONWORKS)

PRODUCTION SHAFT /DROP SHAFT

PRODUCTION SHAFT /RISER SHAFT

SITE PORTION SYP – (TEMPORAY REQUIREMENT)- AREA ~ 1200m2

- WORKS AREA

ADDITIONAL WORKS AREA

LOCATION PLAN 1:4 000 000

PTW BOUNDARY

WORKS AREA

SHAFT LOCATION

TUNNEL ALIGNMENT

LOCATION PLAN 1:4 000 000

SANDY BAY PTW

PTW BOUNDARY

WORKS AREA

SHAFT LOCATION

TUNNEL ALIGNMENT PRODUCTION SHAFT

SITE PORTION SB -(TEMPORARY REQUIREMENT) - AREA ~ 3600m2

- PRODUCTION SHAFT - WORKS SITE (WITH SURFACE EXCAVATION WORKS)

PRODUCTION SHAFT /DROP / RISER SHAFT

SITE PORTION SB -(PERMANENT REQUIREMENT) - AREA ~ 2690m2

- SHAFT CONSTRUCTION+ANCILLARY FACILITIES FOR PTW UPGRADING

(WITH SURFACE EXCAVATIONWORKS)

Project Title: Harbour Area Treatment Scheme (HATS) Stage 2A 工程名稱: 淨化海港計劃 – 第二期甲

Figure 1c: Location Plan 圖 1c: 位置圖