central ptw proposed barging point (temporary …
TRANSCRIPT
Environmental Permit No.: EP-322/2008/G環境許可證編號: EP-322/2008/G
DROP SHAFT
SITE PORTION CTL - (TEMPORARY REQUIREMENT) - AREA ~ 2010m2
- WORKS AREA
CENTRAL PTW SITE PORTION CTL - (TEMPORARY REQUIREMENT) - AREA ~ 700m2
- WORKS SITE SITE PORTION CTL – (TEMPORARY REQUIREMENT) - AREA ~1000m2
- WORKS AREA
PTW BOUNDARY
WORKS AREA
SHAFT LOCATION
TUNNEL ALIGNMENT
LOCATION PLAN 1:4 000 000
PTW BOUNDARY
WORKS AREA
SHAFT LOCATION
TUNNEL ALIGNMENT
LOCATION PLAN 1:4 000 000
SITE PORTION SYP - (TEMPORARY REQUIREMENT) - WORKS AREA / BARGING POINT - AREA ~ 4130m2
- WORKS SITE
PROPOSED BARGING POINT AT SAI YING PUN
SITE PORTION SYP -(PERMANENT REQUIREMENT) - REQUIRED EARLY 2009 - AREA ~ 620m2
- SHAFT CONSTRUCTION & ASSOCIATED FACILITIES
(WITH SURFACE EXCAVATIONWORKS)
PRODUCTION SHAFT /DROP SHAFT
PRODUCTION SHAFT /RISER SHAFT
SITE PORTION SYP – (TEMPORAY REQUIREMENT)- AREA ~ 1200m2
- WORKS AREA
ADDITIONAL WORKS AREA
LOCATION PLAN 1:4 000 000
PTW BOUNDARY
WORKS AREA
SHAFT LOCATION
TUNNEL ALIGNMENT
LOCATION PLAN 1:4 000 000
SANDY BAY PTW
PTW BOUNDARY
WORKS AREA
SHAFT LOCATION
TUNNEL ALIGNMENT PRODUCTION SHAFT
SITE PORTION SB -(TEMPORARY REQUIREMENT) - AREA ~ 3600m2
- PRODUCTION SHAFT - WORKS SITE (WITH SURFACE EXCAVATION WORKS)
PRODUCTION SHAFT /DROP / RISER SHAFT
SITE PORTION SB -(PERMANENT REQUIREMENT) - AREA ~ 2690m2
- SHAFT CONSTRUCTION+ANCILLARY FACILITIES FOR PTW UPGRADING
(WITH SURFACE EXCAVATIONWORKS)
Project Title: Harbour Area Treatment Scheme (HATS) Stage 2A 工程名稱: 淨化海港計劃 – 第二期甲
Figure 1c: Location Plan 圖 1c: 位置圖