Formed in 1983, we are a well established ground engineering contractor offering a design and build service to all sectors of the construction industry. With our fleet of continuous flight auger CFA, rotary bored and driven rigs of various sizes we can cater for most piling and retaining wall needs.

TRANSCRIPT

Page 1: Central Piling

1ce

ntra

lpili

ng.c

omIn

tro

du

ctio

n

Page 2: Central Piling

2

cent

ralp

iling

.com

Intr

od

uct

ion

O1 A solid foundation: our markets

Infrastructure Residential Commercial

Public works

Welcome/Formed in 1983, we are a well established ground engineering contractor offering a design and build service to all sectors of the construction industry. With our fleet of continuous flight auger CFA, rotary bored and driven rigs of various sizes we can cater for most piling and retaining wall needs.

Our team’s technical, logistical and operational strengths provide clients with a flexible and reliable solution to their foundation needs across the Midlands and South of England.

We pride ourselves on understanding the environment within which we work and being a responsible contractor. You’ll therefore find that we have a non-confrontational approach to construction and contract variations.

To ensure greater efficiency and meet our growth targets we are continually developing our people, plant and services.

If you wish to discuss how these resources can be used on your projects please contact one of our construction professionals at our Essex office at [email protected]

Steve Hadley Managing Director

O2 Quality, health, safety and environmental

O3 Construction techniques CFA piling Rotary piling Mini piling Driven piling Retaining walls Geothermal piling Anchors Grouting Other products

O4 Ancillary services Load testing Cube testing Integrity testing Engineering

O5 Attendances & platforms

Our clients Where to find us

Page 3: Central Piling

3ce

ntra

lpili

ng.c

omA

so

lid f

ou

nd

atio

n:

ou

r m

arke

ts

A solid foundation: our markets/ ALL STRuCTuRES nEED THE SuPPORT OF FOunDATIOnS TO ACCOMMODATE LOADInGS WITHOuT FAILuRE OR ExCESS SETTLEMEnT. HOWEvER, CEnTRAL PILInG APPRECIATE THAT CuSTOMERS In DIFFEREnT SECTORS OF THE ECOnOMY REQuIRE DIFFEREnT APPROACHES WHEn IT COMES TO MAnAGInG THE COnSTRuCTIOn PROCESS.

InfrastructureCentral Piling have had significant experience of working on Highways schemes, Water Industry projects and works adjacent to Railways. This has required close liaison by us with regulatory bodies such as, network Rail and the Highways Agency, to ensure that the necessary design and health and safety documentation is in place prior to works commencing.

The nature of these structures also tends to require large quantities of materials to be provided in our works. This presents logistical challenges, such as, the use of handling cranes within confined spaces. However, we believe our team can ensure minimal disruption to the surrounding environment.

Recent projects include two road bridges in Essex and a contiguous wall on the A325 in Farnborough for volker Fitzpatrick.

Page 4: Central Piling

This ensures that our customers have equipment allocated to them prior to final design development and contract negotiation.

ResidentialWe have a strong track record in the residential sector, having provided services in this field for 27 years. Projects vary from small scale house extensions, to large scale Public Sector Housing Association developments, such as The vange in Basildon.

The fast moving pace of many of the projects in this sector has led to us developing close ties with companies such as Cala Homes (South East), Hill Partnerships, Asprey Homes and Bugler Developments. This ensures that our customers have equipment allocated to them prior to final design development and contract negotiation.

Where required, Central Piling is able to enter into Collateral Warranty agreements with Main Contractors and Clients. Professional Indemnity cover of up to £10 million is provided. For self-builders or developers new to the Piling industry our estimators take care to ensure that all attendance items are explained and agreed prior to commencement.

4

cent

ralp

iling

.com

A s

olid

fo

un

dat

ion

: o

ur

mar

kets

Page 5: Central Piling

CommercialCentral Piling have undertaken a wide variety of commercial sector projects such as a new Waitrose distribution warehouse in Bracknell for RG Carter, Watford Leisure Centre for Pellikaan, and a 16m deep retaining wall for the rapids ride at Legoland, Windsor on behalf of Dyer and Butler.

These projects come with increased time pressure as delivery is required to ensure opening in time for new seasons or in the case of a number of hotels constructed, in time for the London Olympics.

With this in mind, our customers often request that we assume principal contractor responsibility and carry out the construction of working platforms, guide walls, muck away and other piling attendances. This can help to reduce procurement times and aid contract management.

Public worksWe have successfully completed a large number of schools and colleges as part of the Building Schools for the Future programme. This includes continued business with Willmott Dixon and Kier, where Central Piling has provided value engineered alternatives to the original foundation schemes.

Information for CRB checking and operative accreditation is provided by our contracts management staff at an early stage to ensure the efficient commencement of works.

Other significant achievements in this sector include the construction of the Adult Mental Health unit in Southampton and William Harvey Hospital in Kent for Osborne.

5ce

ntra

lpili

ng.c

omA

so

lid f

ou

nd

atio

n:

ou

r m

arke

ts

Page 6: Central Piling

This includes a training programme for employees involving:

Safety awareness and manual handling courses •

CSCS (Construction Skills Certification Scheme) for •100% of our site and management staff

In house training programmes to develop plant •operator skills under close supervision

Industry recognised qualifications such as CPCS •(Construction Plant Competence Scheme) and IPAF (International Powered Access Federation) for plant operators

6

cent

ralp

iling

.com

Qu

alit

y, h

ealt

h,

safe

ty &

en

viro

nm

enta

l

SMSTS (Site Management Safety Training •Scheme) for Contracts Management staff SSSTS (Site Supervisor Safety Training Scheme) for Site Foremen

Quality, health, safety & environmental/WE ACKnOWLEDGE PILInG IS An ACTIvITY WITH A LARGE AMOunT OF POTEnTIAL HAzARDS. AS SuCH, WE SEEK TO MInIMISE POTEnTIAL HEALTH AnD SAFETY RISKS THROuGH THE IMPLEMEnTATIOn OF OuR OHSAS18001:2007 InDEPEnDEnTLY AuDITED MAnAGEMEnT SYSTEM.

Page 7: Central Piling

7ce

ntra

lpili

ng.c

omQ

ual

ity,

hea

lth

, sa

fety

& e

nvi

ron

men

tal

All sites are visited by a qualified construction manager prior to mobilisation to identify hazards and ensure that appropriate temporary works such as piling platforms and ramps are in place.

Our ISO 14001:2004 certified environmental management system ensures that all aspects of our activities that can impact the environment are considered and that we comply with all legal requirements.

With regular meetings, news updates through our membership of the British Safety Council and RoSPA are fed through our management team to ensure continual enhancement of our working practices.

Both the Environmental and the Health and Safety systems are integrated with a quality management plan, ISO 9001:2008. This ensures continuous improvement of all procedures and the immediate addressing of non-conformance issues.

Roger Cox Contracts Director

Our people are encouraged to take a proactive approach to safety in order to improve systems of work.

Page 8: Central Piling

8

cent

ralp

iling

.com

Co

nst

ruct

ion

tec

hn

iqu

es

CFA piling Construction technique & application

Continuous flight auger piles are constructed by injecting concrete through the hollow stem of the auger, with the spoil being extracted in one continuous movement as the auger is withdrawn. After the pile head is cleared of debris steel reinforcement is submerged into the high slump concrete.

CFA piling is a particularly economical choice of piled foundation in sands, gravels and low grade rock as this process requires no casings or drilling fluids.

Construction techniques/AS A COMPAnY, WE BELIEvE In BuILDInG LOnG TERM RELATIOnSHIPS WITH OuR CuSTOMERS. TO HELP ACHIEvE THIS WE POSSESS A vARIETY OF FOunDATIOn TECHnIQuES In ORDER THAT WE CAn FInD THE RIGHT PROCESS FOR EACH jOB.

Plant & equipment

We offer an expanding fleet of CFA rigs from 5T to 65T. Pile sizes range from 300mm to 900mm and up to 26m depth. To help us ensure pile integrity all rigs are fitted with computer monitoring systems which record pile dimensions, concrete pressures and volumes.

In addition to the piling rig, all machines will be supplied with concrete pumps and on larger sites concrete holding drums.

Page 9: Central Piling

9ce

ntra

lpili

ng.c

omC

on

stru

ctio

n t

ech

niq

ues

Where piles are used for deep basements it may be permissible to leave the concrete at a low level in order to reduce pile trimming.

Plant & equipment

We have a wide variety of hydraulic and crane mounted rotary rigs ranging from 2.5T to 65T. This provides pile sizes ranging from 250mm to 1800mm and up to 66m depth. The short mast height and small footprint of some of the rigs mean that most sites are accessible with our equipment.

Rotary piling Construction technique & application

Rotary rigs create the pile bore by removing the soil in sections, approximately a metre deep, until the design depth has been reached. At this stage full depth reinforcement cages, steel sections or permanent casings can be easily installed prior to the placement of concrete. Where piles are used for deep basements it may be permissible to leave the concrete at a low level in order to reduce pile trimming.

Rotary piling is generally used in dry stable soils and rocks. However in cohesionless soils, piles may still be formed with the use of casing or drilling fluid to support the bore.

Page 10: Central Piling

Central Piling can also supply you with a range of testing methods for materials and piles.

Driven piling Construction technique & application

Driven piles are installed by dropping a hammer weight on a pre-formed pile. When the pile moves a predetermined distance for a given hammer drop height, the pile capacity has been achieved.

Central Piling offer a bottom driven steel cased system with additional sections of casing being welded on as required. Reinforcement and concrete is then placed in the casing to provide a connection to the overlying structure. On selected contracts we can also provide pre-cast concrete piles.

Driven piling is particularly appropriate where soft and alluvial soils overlay dense sands and gravels.

Plant & equipment

To carry out driven piling we utilise 25T crane mounted crawler rigs, 55T hydraulic rigs and where access is restricted a 2.5T mini rig. If necessary machines can be supplied to pre-bore through the upper material.

10

cent

ralp

iling

.com

Co

nst

ruct

ion

tec

hn

iqu

es

Mini pilingCentral Piling has a variety of bored and driven piling rigs suitable for house extensions, basement construction and restricted access sites.

Personnel are trained to adopt safe systems of working in confined spaces and additional equipment can be provided to insure fumes are extracted from the working area.

To discuss your project and arrange an obligation free site visit please contact one of our construction professionals.

Page 11: Central Piling

Secant walls

Secant piles are installed by overlapping reinforced male piles and female piles which are installed with a low strength gain concrete. They are adopted to restrict groundwater and fines inflow with retained heights of up to 8m common. Greater excavation depths may be achieved. However the geological and hydrological conditions need to be considered along with installation tolerances when determining the suitability of the application.

Contiguous walls

Contrary to their name, contiguous piles are actually installed with a gap of 100-200mm per pile. This means that the wall is not water or fines tight. However where the conditions allow, such as in cohesive soils, it can be the most economic form of retaining wall.

The choice of construction technique, CFA or Rotary, is dependent upon soil type but can range from 300-1200mm diameter. This can provide retained heights of up to 15m with propping and 10m in a cantilever situation.

Contiguous Walls

Secant Walls

Pile Diameter D

Male Pile

Pile Spacing D + 100-200mm

Female Pile

11ce

ntra

lpili

ng.c

omC

on

stru

ctio

n t

ech

niq

ues

Retaining walls We offer a variety of bored pile retaining walls when provision for temporary and permanent support for basement excavations is required. We have the expertise and technology to ensure that ground movements are controlled and an economic solution is found.

The most common methods, secant and contiguous walls are discussed on this page. However further guidance and explanation of different techniques can be found in CIRIA guide C580.

Page 12: Central Piling

Geothermal pilingThe temperature differential between the ground and soil provides a means of heating or cooling buildings during the winter and summer months respectively. Due to the thermal conductivity of concrete the energy can be transferred through plastic pipe loops fixed to steel reinforcement cages within CFA, rotary or driven piles.

Central Piling has experience of working closely with consultants and clients to ensure a problem free integration of the geothermal pipework into the structure.

Central Piling have experience of working closely with consultants and clients to ensure a problem free integration of the geothermal pipework into the structure.

12

cent

ralp

iling

.com

Co

nst

ruct

ion

tec

hn

iqu

es

Page 13: Central Piling

Grouting Central Piling offer permeation and infill grouting alongside piled solutions where solution features or man-made voids exist. A variety of machines can be used to install a relatively low strength mix to ensure the stability of the soil mass is achieved and that drilling of piles beyond the affected zone is possible.

AnchorsGround anchors and soil nails are commonly used to stabilise slopes and excavations, generally in conjunction with other geotechnical products.

using our restricted access equipment we can, for example, provide anchors to support retaining walls. This reduces the need for pile sizes, potentially increasing basement size and reducing costs. They are formed using high strength steel bars embedded to a predetermined depth with grout used to bond the anchor to the soil. Reduced wall settlements can be achieved by pre-stressing the anchor prior to the basement excavation.

Other products On selected contracts, in addition to the piling works, we offer a variety of other products. These include: piling platform installation and maintenance, ground beam and slab construction, aswell as spoil removal and pile trimming.

This can be supplemented by the provision of on-site engineering support and management, welfare units and toilet facilities.

13ce

ntra

lpili

ng.c

omC

on

stru

ctio

n t

ech

niq

ues

Page 14: Central Piling

14

cent

ralp

iling

.com

An

cilla

ry s

ervi

ces

Load testingLoad tests are used to either prove the maximum capacity of piles or verify predicted design values and settlement under pressure.

Where the ultimate load is to be determined the test should be conducted on a pile that is expendable to the main works. A working pile may be used as a test pile but the maximum test load should not generally exceed 1.5 x the safe working load.

Ancillary services/ In ADDITIOn TO THE COnSTRuCTIOn TECHnIQuES OFFERED, CEnTRAL PILInG CAn ALSO SuPPLY YOu WITH A RAnGE OF TESTInG METHODS FOR MATERIALS AnD PILES. THESE ARE CARRIED OuT BY InDEPEnDEnT COMPAnIES. HOWEvER, TO EASE THE PROCuREMEnT PROCESS, THEY ARE COORDInATED BY uS.

Where are they used?

Test piles are generally adopted where, for commercial reasons, a factor of safety of less than 3 using a British Standard (BS8004) design approach or 2 using a Eurocode (EC7) design approach has been adopted.

Where a factor of safety of 2.5 (BS8004) or 1.7 (EC7) is used working pile load tests are generally needed. Lower factors of safety will necessitate expendable pile load tests, however all approaches should be discussed and agreed with the relevant checking authorities.

Page 15: Central Piling

15ce

ntra

lpili

ng.c

omA

nci

llary

ser

vice

s

Integrity testingIntegrity testing is carried out in order to identify anomalies in piles that could be of a structural importance.

How do they work?

There are a variety of testing procedures available including the ‘impulse response’ and ‘sonic echo’ methods. They work by sending a stress wave down the pile after it has been struck by an impact device. The reflection, when analysed in conjunction with the knowledge of the soil conditions and pile dimensions, provides information on the structural quality.

Methods of testing

Central Piling carry out two types of load tests: static load tests with a reaction beam and tension anchor piles, or alternatively dynamic load tests where a weight is dropped on to the pile head by crane.

Static load testing is suited to high pile loadings or single test piles. Whereas, dynamic testing is more appropriate for sites with multiple test piles, low pile loads or where the subsoil is not suitable for tension anchor piles.

Tests are carried out in accordance with the ICE SPERW unless advised otherwise.

Cube testingAt Central Piling we obtain all concrete supplies from quality approved suppliers who work in accordance with BS En 8500. Part of this code of practice requires them to carry out compliance testing on concrete cubes to verify strength. As such, there is not a requirement for us to carry out testing. However, we can upon the clients request arrange sampling and testing.

When are tests carried out?

When the concrete has reached two thirds of its design strength, or approximately seven days for most piling mixes, the pile may be trimmed. At this point, and prior to the placement of any reinforcement for the ground beams and pile caps, the piles may be tested. Please note that we require three working days notice to arrange the testing.

Page 16: Central Piling

16

cent

ralp

iling

.com

An

cilla

ry s

ervi

ces

EngineeringOur construction managers can advise on attendances, access requirements and contract sequencing. They will also provide health and safety documentation, generic versions of which can be found on our website.

When it comes to detailed design for retaining walls, piles and ground beams, we have an array of geotechnical, structural and CAD software packages.

Furthermore our quality assurance procedures and professional indemnity insurance cover gives peace of mind in our design and build service.

We have a team of highly skilled design engineers who are able to provide guidance on site investigation, foundation alternatives and budget estimates at the conception of projects.

Page 17: Central Piling

17ce

ntra

lpili

ng.c

omA

tten

dan

ces

& p

latf

orm

s

Attendances & platforms/ PREPARATIOn IS A KEY COMPOnEnT FOR SuCCESS On AnY PILInG COnTRACT. OuR COnTRACTS MAnAGEMEnT STAFF AnD EnGInEERS WILL BE PLEASED TO OFFER YOu ADvICE On FACILITIES, ATTEnDAnCES AnD THE DESIGn, MAInTEnAnCE AnD InSTALLATIOn OF TEMPORARY WORK SuRFACES FOR OuR EQuIPMEnT.

The ICE Specification for Piling and Embedded Retaining Walls suggests that a certificate is used as part of a quality assurance procedure.

To ensure the stability of construction plant a working surface needs to be provided that will not settle excessively under the weight and working pressures of the equipment.

This generally takes the form of a compacted crushed granular material with, in some instances, geotextiles used provide to additional support.

Where sufficient attention is not paid to the design, installation or maintenance of a working platform, piling rigs may become unstable and accidents occur.

Guidance on these issues can be found in BRE Report BR470; however, we can carry out the design of the working platform together with the provision of a method statement and a supervisory visit. This is offered free of charge as part of any piling contract. If required we can also install and maintain the working platform for the duration of our works.

Page 18: Central Piling

LONDON

Milton Keynes

Northampton

Luton

Cambridge

Peterbourgh

Oxford

BIRMINGHAM

CoventryRugby

Leicester

Bedford

Colchester

Chelmsford

Ipswich

Reading

Watford

SloughSwindon

Newbury

Braintree

Basildon

A131

A12

A120

A414

A14

A12

A120

A130

A130

M11

M25

A1M

M1

M2

M25

A2

M40

M4

M3

A1M

M5

M5

M1

M6

M6

M42

M25A406

A20A205

A1124

Halstead

18

cent

ralp

iling

.com

Ou

r cl

ien

ts

AD Bly Allenbuild Asprey Homes Banner Construction Barnes Barratt Homes Barroerock Bouygues Bowmer & Kirkland Brand Developments Brennan Bryen & Langley Bugler Developments Cala Homes Costain Cranbrook Basements Crest nicholson Crestel Crispin & Borst Croudace Cubitt Dean & Dyball Doyle Duffy Dyer & Butler Farnrise Feltham Forest Gate Construction

Frederick j French Frencon G F Tomlinson Galliford Try Partnerships Geoffrey Osborne Grehan Hague Construction Hill Partnerships Hutton ISG jackson j Breheny jackson Civil Engineering jDS Residential jenner jerram Falkus john Sisk & Son Kier Kilby & Gayford Kind & Co Knighton Homes Lakehouse Contracts Laxcon Leadbitter Construction Linden Homes Lovell Mansell Martin Grant Homes McArdle

McCann Mentmore Homes Moody Homes Morgan Sindall MY Construction natta neilcott Pellikaan Persimmon Homes Pj Carey Provian R. Durtnell & Sons RG Carter Rydon SDC SEH French Shanly Homes Sun Contractors Telford Homes Tnv Construction united House vascroft vaughan & Blyth volker Fitzpatrick WA Hills Warings Willmott Dixon Wj Baker

Our clients/

Page 19: Central Piling

LONDON

Milton Keynes

Northampton

Luton

Cambridge

Peterbourgh

Oxford

BIRMINGHAM

CoventryRugby

Leicester

Bedford

Colchester

Chelmsford

Ipswich

Reading

Watford

SloughSwindon

Newbury

Braintree

Basildon

A131

A12

A120

A414

A14

A12

A120

A130

A130

M11

M25

A1M

M1

M2

M25

A2

M40

M4

M3

A1M

M5

M5

M1

M6

M6

M42

M25A406

A20A205

A1124

Halstead

Where to find us/

Central Park, Colchester Road, Halstead, Essex, CO9 2Eu

T: 01787 474000 F: 01787 472113 E: [email protected]

19ce

ntra

lpili

ng.c

omW

her

e to

fin

d u

s

www.centralpiling.com

Designed by www.dinc.co.uk

A11

A14 HALSTEAD

Chapel H

ill

lliH t

nuo

M

A131

Colchester Rd

A1124

Colne Road

Tid

ing

s H

ill

A131

A13

1

A1124

Page 20: Central Piling

Central Piling LimitedCentral Park, Colchester Road, Halstead, Essex, CO9 2EUT: 01787 474000 F: 01787 472113 E: [email protected]