Order in petition No 25/TT/2014 Page 1 CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI PETITION NO. 25/TT/2014 Coram: Shri A.S. Bakshi, Member Dr. M. K. Iyer, Member Date of Hearing : 14.03.2016 Date of Order : 18.03.2016 In the matter of: Determination of transmission tariff from DOCO to 31.3.2014 for kV Salem Pooling Station-Salem 400 kV D/C Quad Line alongwith new 765/400 kV Pooling Station at Salem (initially charged at 400 kV) and Bay Extensions at Salem 400/200 kV existing Sub-station under Transmission System associated with Common System Associated with Coastal Energen Private Limited and Ind-Bharat Power (Madras) Limited LTOA Generation Projects in Tuticorin Area-Part-B in Southern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009. And in the Matter of: Power Grid Corporation of India Ltd, SAUDAMINI, Plot No.-2, Sector-29, Gurgaon-122001 (Haryana) .....Petitioner Versus 1. Karnataka Power Transmission Corporation Limited, (KPTCL), Kaveri Bhawan, Bangalore 560009 2. Transmission Corporation of Andhra Pradesh Limited, (APTRANSCO), Vidyut Soudha, Hyderabad- 500082

Upload: others

Post on 26-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CENTRAL ELECTRICITY REGULATORY COMMISSION NEW …cercind.gov.in/2016/orders/25.pdf · Tirupati-517 501, Chittoor District, Andhra Pradesh 8. Central Power Distribution Company of

Order in petition No 25/TT/2014 Page 1

CENTRAL ELECTRICITY REGULATORY COMMISSION

NEW DELHI

PETITION NO. 25/TT/2014

Coram: Shri A.S. Bakshi, Member Dr. M. K. Iyer, Member

Date of Hearing : 14.03.2016 Date of Order : 18.03.2016

In the matter of:

Determination of transmission tariff from DOCO to 31.3.2014 for kV Salem Pooling

Station-Salem 400 kV D/C Quad Line alongwith new 765/400 kV Pooling Station at

Salem (initially charged at 400 kV) and Bay Extensions at Salem 400/200 kV existing

Sub-station under Transmission System associated with Common System Associated

with Coastal Energen Private Limited and Ind-Bharat Power (Madras) Limited LTOA

Generation Projects in Tuticorin Area-Part-B in Southern Region under Regulation 86 of

Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999

and Central Electricity Regulatory Commission (Terms and Conditions of Tariff)

Regulations, 2009.

And in the Matter of:

Power Grid Corporation of India Ltd,

SAUDAMINI, Plot No.-2, Sector-29,

Gurgaon-122001 (Haryana) .....Petitioner

Versus

1. Karnataka Power Transmission Corporation Limited,

(KPTCL), Kaveri Bhawan, Bangalore – 560009

2. Transmission Corporation of Andhra Pradesh Limited,

(APTRANSCO), Vidyut Soudha,

Hyderabad- 500082

Page 2: CENTRAL ELECTRICITY REGULATORY COMMISSION NEW …cercind.gov.in/2016/orders/25.pdf · Tirupati-517 501, Chittoor District, Andhra Pradesh 8. Central Power Distribution Company of

Order in petition No 25/TT/2014 Page 2

3. Kerala State Electricity Board (KSEB),

Vaidyuthi Bhavanam,

Pattom, Thiruvananthapurarn - 695 004

4. Tamil Nadu Generation and Distribution Corporation Limited,

NPKRR Maaligai, 800, Anna Salai,

Chennai - 600 002

5. Electricity Department,

Govt. of Pondicherry,

Pondicherry - 605001

6. Eastern Power Distribution Company of Andhra Pradesh Limited,

(APEPDCL) P&T Colony, Seethmmadhara,

Vishakhapatnam, Andhra Pradesh

7. Southern Power Distribution Company of Andhra Pradesh Limited,

(APSPDCL), Srinivasasa Kalyana Mandapam Backside,

Tiruchanoor Road, Kesavayana Gunta,

Tirupati-517 501, Chittoor District, Andhra Pradesh

8. Central Power Distribution Company of Andhra Pradesh Limited,

(APCPDCL), Corporate Office, Mint Compound,

Hyderabad - 500 063, Andhra Pradesh

9. Northern Power Distribution Company of Andhra Pradesh Limited,

(APNPDCL), Opp. NIT Petrol Pump,

Chaitanyapuri, Kazipet, Warangal - 506 004, Andhra Pradesh

10. Bangalore Electricity Supply Company Ltd. (BESCOM),

Corporate Office, KR.Circle

Bangalore - 560001, Karnataka

11. Gulbarga Electricity Supply Company Ltd (GESCOM)

Station Main Road, Gulburga, Karnataka

12. Hubli Electricity Supply Company Ltd, (HESCOM)

Navanagar, PB Road, Hubli, Karnataka

Page 3: CENTRAL ELECTRICITY REGULATORY COMMISSION NEW …cercind.gov.in/2016/orders/25.pdf · Tirupati-517 501, Chittoor District, Andhra Pradesh 8. Central Power Distribution Company of

Order in petition No 25/TT/2014 Page 3

13. MESCOM Corporate Office,

Paradigm Plaza, AB Shetty Circle,

Mangalore – 575001, Karnataka

14. Chamundeswari Electricity Supply Corporation Ltd.,

(CESC), # 927,L J Avenue, Ground Floor,

New Kantharaj Urs Road, Saraswatipuram,

MYSORE - 570 009, Karnataka

15. Coastal Energen Private Limited

5th Floor, Buhari Towers,

No. 4, Moores Road

Chennai – 600006

Tamil Nadu

16. Ind-Bharath Power (Madras) Limited

Plt No 30-A, Road No 1,

Film Nagar, Jubilee Hills,

Hyderabad – 500 033

Andhra Pradesh ....Respondent(s)

The following were present: For Petitioner: Shri Piyush Awasthi, PGCIL

Shri Pankaj Shah, PGCIL Shri Jasbir Singh, PGCIL Shri Rakesh Prasad, PGCIL Shri S.S. Raju, PGCIL Shri M.M. Mondal, PGCIL

For Respondents: None

ORDER

The petition has been filed by Power Grid Corporation of India Limited (hereinafter

referred to as “the petitioner”) for determination of tariff of 400 kV Salem Pooling

Station-Salem 400 kV D/C Quad Line alongwith new 765/400 kV Pooling Station at

Salem (initially charged at 400 kV) and Bay Extensions at Salem 400/200 kV existing

Page 4: CENTRAL ELECTRICITY REGULATORY COMMISSION NEW …cercind.gov.in/2016/orders/25.pdf · Tirupati-517 501, Chittoor District, Andhra Pradesh 8. Central Power Distribution Company of

Order in petition No 25/TT/2014 Page 4

Sub-station under Transmission System associated with Common System Associated

with Coastal Energen Private Limited and Ind-Bharat Power (Madras) Limited LTOA

Generation Projects in Tuticorin Area-Part-B in Southern Region under the Central

Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009

(hereinafter referred to as “the 2009 Tariff Regulations”) for the period starting from

COD to 31.3.2014.

2. The Investment Approval (IA) for the instant project was accorded by the Board of

Directors of the petitioner vide Memorandum Ref: C/CP/LTA Tuticorin Part-B dated

19.9.2011 at an estimated cost of rs 194013 lakh including IDC of Rs. 12092 lakh at the

price level of first quarter of 2011. As per the IA the instant assets were scheduled to be

commissioned within 36 months from the date of IA. Accordingly, the instant assets

were scheduled to be commissioned on 19.9.2014.

3. The instant petition was filed on 14.2.2014 and the assets were anticipated to be

commissioned on 1.3.2014. However, the assets have not been commissioned.....

During the hearing on 14.3.2016 the representative of the petitioner in response to our

query submitted that the asset covered in the instant petition has not yet been

commissioned due to severe ROW issues and the commissioning of the asset is not

certain. The representative of the petitioner sought permission of the commission to

withdraw the instant petition and file a fresh petition after commissioning of the asset.

He further requested that the filing fee paid in case of the instant petition be adjusted.

He further prayed that the expenditure incurred towards publishing the notice in the

Page 5: CENTRAL ELECTRICITY REGULATORY COMMISSION NEW …cercind.gov.in/2016/orders/25.pdf · Tirupati-517 501, Chittoor District, Andhra Pradesh 8. Central Power Distribution Company of

Order in petition No 25/TT/2014 Page 5

instant case be reimbursed and the requirement of publication of notice at the time of

filing fresh petition be waived.

4. In the instant case, the AFC was allowed vide order dated 23.6.2014 and the

assets have not been commissioned even after period of 19 months of granting AFC.

No use full purpose will be serve to award final tariff to the peititiner in respect of an

asset where commercial operation in near future is uncertain. Accordingly, after taking

into consideration the scheme of the representative of the petitioner deprive of the

petitioner as has withdrawal. The AFC allowed vide order dated 23.6.2014 shall be

withdrawn from the computation of POC charges, if not already withdraw. We direct that

the filing fees paid by the petitioner shall be adjusted against the filing fee payable for

the instant asset when the petitioner approaches by way of a fresh petition. As regards

petitioner’s request to waive of the requirement of publication of notice in the

newspapers, we are of the view that publication of notice is a mandatory requirement

and it cannot be waived off. The publication expenses incurred for filing the instant

petition shall be borne by the petitioner.

4. This order disposes of Petition No. 25/TT/2014.

Sd/- Sd/-

(Dr. M.K. Iyer) Member

(A.S. Bakshi) Member

Page 6: CENTRAL ELECTRICITY REGULATORY COMMISSION NEW …cercind.gov.in/2016/orders/25.pdf · Tirupati-517 501, Chittoor District, Andhra Pradesh 8. Central Power Distribution Company of

Order in petition No 25/TT/2014 Page 6

Annexure – 1

Asset 1:

DETAILS OF LOAN BASED ON ACTUAL LOAN PORTFOLIO (2009-14)

(` in lakh)

Particulars Interest Rate (%)

Loan deployed as on 1.4.2009

Additions during the tariff period

Total

BOND XIX-DOCO- 1-FEB-2008-

9.25 260.00 0.00 260.00

BOND XIX-DOCO- 1-MAY-2008-

9.25 10.00 0.00 10.00

BOND XIX-DOCO-01-JAN-2008 -01-JAN-2008-

9.25 130.00 0.00 130.00

BOND XX-DOCO- 1-FEB-2008-

8.93 930.00 0.00 930.00

BOND XX-DOCO- DRAWL ON 01-MAY-2008 -01-MAY-2008-

8.93 30.00 0.00 30.00

BOND XX-DOCO- 01-JAN-2008- 01-JAN-2008-

8.93 300.00 0.00 300.00

BOND XXI-DOCO- 01-JAN-2008-

8.73 200.00 0.00 200.00

BOND XXI-DOCO- DRAWL ON 01-FEB-2008- 01-FEB-2008-

8.73 1600.00 0.00 1600.00

BOND XXI-DOCO- DRAWL ON 01-MAY-2008- 01-MAY-2008-

0.00 200.00 0.00 200.00

BOND XXII-DOCO- 1-JAN-2008-

8.68 200.00 0.00 200.00

BOND XXII-DOCO- DRAWL ON 01-FEB-2008- 01-FEB-2008-

8.68 3860.00 0.00 3860.00

BOND XXII-DOCO- DRAWL ON 01-MAY-2008- 01-MAY-2008-

8.68 1700.00 0.00 1700.00

BOND XXIV-DOCO- 01-FEB-2008-

9.95 1690.00 0.00 1690.00

BOND XXIV-DOCO- 9.95 900.00 0.00 900.00

Page 7: CENTRAL ELECTRICITY REGULATORY COMMISSION NEW …cercind.gov.in/2016/orders/25.pdf · Tirupati-517 501, Chittoor District, Andhra Pradesh 8. Central Power Distribution Company of

Order in petition No 25/TT/2014 Page 7

Particulars Interest Rate (%)

Loan deployed as on 1.4.2009

Additions during the tariff period

Total

DRAWL ON 01-MAY-2008- 01-MAY-2008-

BOND XXIV-DOCO- 01-JAN-2008- 01-JAN-2008-

9.95 400.00 0.00 400.00

BOND XXV-DOCO- DRAWL ON 01-FEB-2008- 01-FEB-2008-

10.10 2903.00 0.00 2903.00

BOND XXV-DOCO- DRAWL ON 01-MAY-2008- 01-MAY-2008-

10.10 1200.00 0.00 1200.00

BOND XXV-DOCO- 01-JAN-2008- 01-JAN-2008-

10.10 24.00 0.00 24.00

BOND XXVI-ADDCAP FOR 2007-2008 31-MAR-2008-

9.30 234.00 0.00 234.00

BOND XXVI-DOCO- DRWAL ON 01-MAY-2008- 01-MAY-2008-

9.30 1069.00 0.00 1069.00

BOND XXVIII-ADDCAP FOR 2008-2009- DRWAL ON 15-DEC-2008- 15-DEC-2008-

9.33 791.07 0.00 791.07

BOND XXVIII-ADDCAP FOR 2008-2009- DRWAL ON 29-SEP-2008- 29-SEP-2008-

9.33 763.81 0.00 763.81

BOND XXX-ADDCAP FOR 2009-2010- ADDCAP 2009-10 ACTUAL-

8.80 0.00 432.31 432.31

BOND XXX ADDCAP FOR 2010-2011 AOOCAP 2010-11- ACTUAL-

0.00 0.00 25.07 25.07

Total 19394.88 457.38 19852.26

Page 8: CENTRAL ELECTRICITY REGULATORY COMMISSION NEW …cercind.gov.in/2016/orders/25.pdf · Tirupati-517 501, Chittoor District, Andhra Pradesh 8. Central Power Distribution Company of

Order in petition No 25/TT/2014 Page 8

WEIGHTED AVERAGE RATE OF INTEREST ON LOAN DURING 2009-14 TARIFF

PERIOD

(` in lakh)

Particulars 2009-10 2010-11 2011-12 2012-13 2013-14

Gross Opening Loan 19394.88 19827.19 19852.26 19852.26 19852.26

Cumulative Repayments of Loans upto Previous Year

0.00 0.00 1034.17 2520.84 4137.08

Net Loans Opening 19394.88 19827.19 18818.09 17331.42 15715.18

Add: Draw(s) during the Year 432.31 25.07 0.00 0.00 0.00

Less: Repayments of Loan during the year

0.00 1034.17 1486.67 1616.24 1654.36

Net Closing Loan 19827.19 18818.09 17331.42 15715.18 14060.82

Average Net Loan 19611.04 19322.64 18074.76 16523.30 14888.00

Rate of Interest on Loan (%) 9.2993 9.3004 9.3075 9.3078 9.3088

Interest on Loan 1823.69 1797.08 1682.30 1537.96 1385.89

Page 9: CENTRAL ELECTRICITY REGULATORY COMMISSION NEW …cercind.gov.in/2016/orders/25.pdf · Tirupati-517 501, Chittoor District, Andhra Pradesh 8. Central Power Distribution Company of

Order in petition No 25/TT/2014 Page 9

Asset 2:

DETAILS OF LOAN BASED ON ACTUAL LOAN PORTFOLIO (2009-14)

(` in lakh)

Particulars Interest Rate (%)

Loan deployed as on 1.4.2009

Additions during the tariff period

Total

BOND XIX-DOCO- 9.25 50.00 0.00 50.00

BOND XX-DOCO- 8.93 200.00 0.00 200.00

BOND XXI-DOCO- 8.73 200.00 0.00 200.00

BOND XXII-DOCO- 8.68 200.00 0.00 200.00

BOND XXIV-DOCO- 9.95 100.00 0.00 100.00

BOND XXV-DOCO- 10.10 300.00 0.00 300.00

BOND XXVI-DOCO- 9.30 519.00 0.00 519.00

BOND XXVIII-ADDCAP FOR 2008-2009 DRAWL ON 15-DEC-2008-

9.33 169.95 0.00 169.95

BOND XXX-ADDCAP FOR 2009-2010 ADDCAP 2009-10-ACTUAL

8.80 0.00 21.20 21.20

BOND XXX-ADDCAP FOR 2011-2012 ADDCAP 2011-12-ACTUAL-

0.00 0.00 9.02 9.02

Total 1738.95 30.22 1769.17

Page 10: CENTRAL ELECTRICITY REGULATORY COMMISSION NEW …cercind.gov.in/2016/orders/25.pdf · Tirupati-517 501, Chittoor District, Andhra Pradesh 8. Central Power Distribution Company of

Order in petition No 25/TT/2014 Page 10

WEIGHTED AVERAGE RATE OF INTEREST ON LOAN DURING 2009-14 TARIFF

PERIOD

(`in lakh)

Particulars 2009-10 2010-11 2011-12 2012-13 2013-14

Gross Opening Loan 1738.95 1760.15 1760.15 1769.17 1769.17

Cumulative Repayments of Loans upto Previous Year

0.00 0.00 62.51 193.27 338.19

Net Loans Opening 1738.95 1760.15 1697.64 1575.90 1430.98

Add: Draw(s) during the Year 21.20 0.00 9.02 0.00 0.00

Less: Repayments of Loan during the year 0.00 62.51 130.76 144.92 147.44

Net Closing Loan 1760.15 1697.64 1575.90 1430.98 1283.54

Average Net Loan 1749.55 1728.90 1636.77 1503.44 1357.26

Rate of Interest on Loan (%) 9.2945 9.2973 9.3024 9.3015 9.3024

Interest on Loan 162.61 160.74 152.26 139.84 126.26

Page 11: CENTRAL ELECTRICITY REGULATORY COMMISSION NEW …cercind.gov.in/2016/orders/25.pdf · Tirupati-517 501, Chittoor District, Andhra Pradesh 8. Central Power Distribution Company of

Order in petition No 25/TT/2014 Page 11

Asset 3:

DETAILS OF LOAN BASED ON ACTUAL LOAN PORTFOLIO (2009-14)

(` in lakh)

Particulars Interest Rate (%)

Loan deployed as on 1.4.2009

Additions during the tariff period

Total

BOND XX-DOCO- DRAWL ON 01-JUN-2008-01-JUN-2008

8.93 20.00 0.00 20.00

BOND XXI-DOCO DRAWL ON 01-JUN-2008-01-JUN-2008

8.73 50.00 0.00 50.00

BOND XXII-DOCO DRAWL ON 01-JUN-2008-01-JUN-2008

8.68 200.00 0.00 200.00

BOND XXIV-DOCO DRAWL ON 01-JUN-2008-01-JUN-2008-

9.95 200.00 0.00 200.00

BOND XXV-DOCO-01-JUL-2008-

10.10 220.00 0.00 220.00

BOND XXV-DOCO-DRAWL ON 01-JUN-2008-01-JUN-2008-

10.10 200.00 0.00 200.00

BOND XXVI-DOCO-DRAWL ON 01-JUL-2008-01-JUN-2008-

9.30 559.00 0.00 559.00

BOND XXVI-DOCO DRAWL ON 01-JUN-2008-01-JUN-2008-

9.30 996.00 0.00 996.00

BOND XXVIII-ADDCAP FOR 2008-2009 DRAWL ON 15-DEC-2008-15-DEC-2008

9.33 582.05 0.00 582.05

BOND XXX-ADDCAP FOR 2011-2012 ADDCAP 2011-12-ACTUAL-

0.00 0.00 60.80 60.80

Total 3027.05 60.80 3087.85

Page 12: CENTRAL ELECTRICITY REGULATORY COMMISSION NEW …cercind.gov.in/2016/orders/25.pdf · Tirupati-517 501, Chittoor District, Andhra Pradesh 8. Central Power Distribution Company of

Order in petition No 25/TT/2014 Page 12

WEIGHTED AVERAGE RATE OF INTEREST ON LOAN DURING 2009-14 TARIFF

PERIOD

(` in lakh)

Particulars 2009-10 2010-11 2011-12 2012-13 2013-14

Gross Opening Loan 3027.05 3027.05 3027.05 3087.85 3087.85

Cumulative Repayments of Loans upto Previous Year

0.00 0.00 39.18 242.94 495.20

Net Loans Opening 3027.05 3027.05 2987.87 2844.91 2592.65

Add: Draw(s) during the Year 0.00 0.00 60.80 0.00 0.00

Less: Repayments of Loan during the year 0.00 39.18 203.76 252.26 257.33

Net Closing Loan 3027.05 2987.87 2844.91 2592.65 2335.32

Average Net Loan 3027.05 3007.46 2916.39 2718.78 2463.99

Rate of Interest on Loan (%) 9.4069 9.4080 9.4022 9.3944 9.3937

Interest on Loan 284.75 282.94 274.21 255.41 231.46

Page 13: CENTRAL ELECTRICITY REGULATORY COMMISSION NEW …cercind.gov.in/2016/orders/25.pdf · Tirupati-517 501, Chittoor District, Andhra Pradesh 8. Central Power Distribution Company of

Order in petition No 25/TT/2014 Page 13

Annexure – 2

Asset-1:

DETAILS OF LOAN BASED ON ACTUAL LOAN PORTFOLIO (2014-19)

(` in lakh)

Particulars Interest Rate (%)

Loan deployed as on 1.4.2014

Additions during the tariff period (2014-19)

Total

BOND XIX-DOCO- 1-FEB-2008- 9.25 260.00 0.00 260.00

BOND XIX-DOCO- 1-MAY-2008- 9.25 10.00 0.00 10.00

BOND XIX-DOCO-01-JAN-2008 -01-JAN-2008-

9.25 130.00 0.00 130.00

BOND XX-DOCO- 1-FEB-2008- 8.93 930.00 0.00 930.00

BOND XX-DOCO- DRAWL ON 01-MAY-2008 -01-MAY-2008-

8.93 30.00 0.00 30.00

BOND XX-DOCO- 01-JAN-2008- 01-JAN-2008-

8.93 300.00 0.00 300.00

BOND XXI-DOCO- 01-JAN-2008- 8.73 200.00 0.00 200.00

BOND XXI-DOCO- DRAWL ON 01-FEB-2008- 01-FEB-2008-

8.73 1600.00 0.00 1600.00

BOND XXI-DOCO- DRAWL ON 01-MAY-2008- 01-MAY-2008-

0.00 200.00 0.00 200.00

BOND XXII-DOCO- 1-JAN-2008- 8.68 200.00 0.00 200.00

BOND XXII-DOCO- DRAWL ON 01-FEB-2008- 01-FEB-2008-

8.68 3860.00 0.00 3860.00

BOND XXII-DOCO- DRAWL ON 01-MAY-2008- 01-MAY-2008-

8.68 1700.00 0.00 1700.00

BOND XXIV-DOCO- 01-FEB-2008- 9.95 1690.00 0.00 1690.00

BOND XXIV-DOCO- DRAWL ON 01-MAY-2008- 01-MAY-2008-

9.95 900.00 0.00 900.00

BOND XXIV-DOCO- 01-JAN-2008- 01-JAN-2008-

9.95 400.00 0.00 400.00

BOND XXV-DOCO- DRAWL ON 01-FEB-2008- 01-FEB-2008-

10.10 2903.00 0.00 2903.00

BOND XXV-DOCO- DRAWL ON 01-MAY-2008- 01-MAY-2008-

10.10 1200.00 0.00 1200.00

Page 14: CENTRAL ELECTRICITY REGULATORY COMMISSION NEW …cercind.gov.in/2016/orders/25.pdf · Tirupati-517 501, Chittoor District, Andhra Pradesh 8. Central Power Distribution Company of

Order in petition No 25/TT/2014 Page 14

Particulars Interest Rate (%)

Loan deployed as on 1.4.2014

Additions during the tariff period (2014-19)

Total

BOND XXV-DOCO- 01-JAN-2008- 01-JAN-2008-

10.10 24.00 0.00 24.00

BOND XXVI-ADDCAP FOR 2007-2008 31-MAR-2008-

9.30 234.00 0.00 234.00

BOND XXVI-DOCO- DRWAL ON 01-MAY-2008- 01-MAY-2008-

9.30 1069.00 0.00 1069.00

BOND XXVIII-ADDCAP FOR 2008-2009- DRWAL ON 15-DEC-2008- 15-DEC-2008-

9.33 791.07 0.00 791.07

BOND XXVIII-ADDCAP FOR 2008-2009- DRWAL ON 29-SEP-2008- 29-SEP-2008-

9.33 763.81 0.00 763.81

BOND XXX-ADDCAP FOR 2009-2010- ADDCAP 2009-10 ACTUAL-

8.80 432.31 0.00 432.31

BOND XXX AOOCAP FOR 2010-2011 AOOCAP 2010-11- ACTUAL-

8.80 25.07 0.00 25.07

Total 19852.26 0.00 19852.26

WEIGHTED AVERAGE RATE OF INTEREST ON LOAN DURING 2014-19 TARIFF

PERIOD

(` in lakh)

Particulars 2014-15 2015-16 2016-17 2017-18 2018-19

Gross Opening Loan 19852.26 19852.26 19852.26 19852.26 19852.26

Cumulative Repayments of Loans upto Previous Year

5791.44 7445.80 9100.16 10754.52 12408.88

Net Loans Opening 14060.82 12406.46 10752.10 9097.74 7443.38

Add: Draw(s) during the Year 0.00 0.00 0.00 0.00 0.00

Less: Repayments of Loan during the year

1654.36 1654.36 1654.36 1654.36 1654.36

Net Closing Loan 12406.46 10752.10 9097.74 7443.38 5789.02

Average Net Loan 13233.64 11579.28 9924.92 8270.56 6616.20

Rate of Interest on Loan (%) 9.3107 9.3132 9.3165 9.3212 9.3282

Interest on Loan 1232.15 1078.40 924.66 770.92 617.17

Page 15: CENTRAL ELECTRICITY REGULATORY COMMISSION NEW …cercind.gov.in/2016/orders/25.pdf · Tirupati-517 501, Chittoor District, Andhra Pradesh 8. Central Power Distribution Company of

Order in petition No 25/TT/2014 Page 15

Asset-2:

DETAILS OF LOAN BASED ON ACTUAL LOAN PORTFOLIO (2014-19)

(` in lakh)

Particulars Interest Rate (%)

Loan deployed as on 1.4.2014

Additions during the tariff period (2014-19)

Total

BOND XIX-DOCO- 9.25 50.00 0.00 50.00

BOND XX-DOCO- 8.93 200.00 0.00 200.00

BOND XXI-DOCO- 8.73 200.00 0.00 200.00

BOND XXII-DOCO- 8.68 200.00 0.00 200.00

BOND XXIV-DOCO- 9.95 100.00 0.00 100.00

BOND XXV-DOCO- 10.10 300.00 0.00 300.00

BOND XXVI-DOCO- 9.30 519.00 0.00 519.00

BOND XXVIII-ADDCAP FOR 2008-2009 DRAWL ON 15-DEC-2008-

9.33 169.95 0.00 169.95

BOND XXX-ADDCAP FOR 2009-2010 ADDCAP 2009-10-ACTUAL

8.80 21.20 0.00 21.20

BOND XXX-ADDCAP FOR 2011-2012 ADDCAP 2011-12-ACTUAL-

8.80 9.02 0.00 9.02

Total 1769.17 0.00 1769.17

WEIGHTED AVERAGE RATE OF INTEREST ON LOAN DURING 2014-19 TARIFF

PERIOD

(`in lakh)

Particulars 2014-15 2015-16 2016-17 2017-18 2018-19

Gross Opening Loan 1769.17 1769.17 1769.17 1769.17 1769.17

Page 16: CENTRAL ELECTRICITY REGULATORY COMMISSION NEW …cercind.gov.in/2016/orders/25.pdf · Tirupati-517 501, Chittoor District, Andhra Pradesh 8. Central Power Distribution Company of

Order in petition No 25/TT/2014 Page 16

Cumulative Repayments of Loans upto Previous Year

485.63 633.07 780.51 927.95 1075.39

Net Loans Opening 1283.54 1136.10 988.66 841.22 693.78

Add: Draw(s) during the Year 0.00 0.00 0.00 0.00 0.00

Less: Repayments of Loan during the year 147.44 147.44 147.44 147.44 147.44

Net Closing Loan 1136.10 988.66 841.22 693.78 546.34

Average Net Loan 1209.82 1062.38 914.94 767.50 620.06

Rate of Interest on Loan (%) 9.3041 9.3062 9.3089 9.3128 9.3185

Interest on Loan 112.56 98.87 85.17 71.48 57.78

Page 17: CENTRAL ELECTRICITY REGULATORY COMMISSION NEW …cercind.gov.in/2016/orders/25.pdf · Tirupati-517 501, Chittoor District, Andhra Pradesh 8. Central Power Distribution Company of

Order in petition No 25/TT/2014 Page 17

Asset-3:

DETAILS OF LOAN BASED ON ACTUAL LOAN PORTFOLIO (2014-19)

(` in lakh)

Particulars Interest Rate (%)

Loan deployed as on 1.4.2014

Additions during the tariff period (2014-19)

Total

BOND XX-DOCO- DRAWL ON 01-JUN-2008-01-JUN-2008

8.93 20.00 0.00 20.00

BOND XXI-DOCO DRAWL ON 01-JUN-2008-01-JUN-2008

8.73 50.00 0.00 50.00

BOND XXII-DOCO DRAWL ON 01-JUN-2008-01-JUN-2008

8.68 200.00 0.00 200.00

BOND XXIV-DOCO DRAWL ON 01-JUN-2008-01-JUN-2008-

9.95 200.00 0.00 200.00

BOND XXV-DOCO-01-JUL-2008- 10.10 220.00 0.00 220.00

BOND XXV-DOCO-DRAWL ON 01-JUN-2008-01-JUN-2008-

10.10 200.00 0.00 200.00

BOND XXVI-DOCO-DRAWL ON 01-JUL-2008-01-JUN-2008-

9.30 559.00 0.00 559.00

BOND XXVI-DOCO DRAWL ON 01-JUN-2008-01-JUN-2008-

9.30 996.00 0.00 996.00

BOND XXVIII-ADDCAP FOR 2008-2009 DRAWL ON 15-DEC-2008-15-DEC-2008

9.33 582.05 0.00 582.05

BOND XXX-ADDCAP FOR 2011-2012 ADDCAP 2011-12-ACTUAL-

8.80 60.80 0.00 60.80

Total 3087.85 0.00 3087.85

Page 18: CENTRAL ELECTRICITY REGULATORY COMMISSION NEW …cercind.gov.in/2016/orders/25.pdf · Tirupati-517 501, Chittoor District, Andhra Pradesh 8. Central Power Distribution Company of

Order in petition No 25/TT/2014 Page 18

WEIGHTED AVERAGE RATE OF INTEREST ON LOAN DURING 2014-19 TARIFF

PERIOD

(` in lakh)

Particulars 2009-10 2010-11 2011-12 2012-13 2013-14

Gross Opening Loan 3087.85 3087.85 3087.85 3087.85 3087.85

Cumulative Repayments of Loans upto Previous Year

752.53 1009.86 1267.19 1524.52 1781.85

Net Loans Opening 2335.32 2077.99 1820.66 1563.33 1306.00

Add: Draw(s) during the Year 0.00 0.00 0.00 0.00 0.00

Less: Repayments of Loan during the year 257.33 257.33 257.33 257.33 257.33

Net Closing Loan 2077.99 1820.66 1563.33 1306.00 1048.67

Average Net Loan 2206.66 1949.33 1692.00 1434.67 1177.34

Rate of Interest on Loan (%) 9.3936 9.3934 9.3932 9.3929 9.3925