Operational Control in Cement Operational Control in Cement Quarry Operations Using RS and GISQuarry Operations Using RS and GIS
Safi Ur RehmanSafi Ur RehmanPhD StudentPhD StudentNWFP University of Engineering & Technology, PeshawarNWFP University of Engineering & Technology, Peshawar
OverviewOverview
• Cement production involves the processing of selected mineral raw materials to produce a synthetic mineral mixture (clinker) that can be ground to powder having the specified chemical composition and physical properties of cement.
• Raw material needed for cement manufacturing are extracted from earth’s surface through mining i.e. cement quarry operations
A Typical Cement Plant and Quarry Operations (Bestway Cement Hattar, NWFP)
Raw material Quarry
Cement Plant
A Typical Cement Quarry (Bestway Cement Hattar, NWFP)
Planning and operational tasks in cement quarry operationsPlanning and operational tasks in cement quarry operations
Long term planning and design Short term operational task
Truck / dumper fleet management Cost minimization to ensure lowest operating cost Data storage, visualization and reporting
Operational Control of Quarry EquipmentOperational Control of Quarry Equipment
Mining involves worlds largest earth moving machinery Optimum use of loading and haulage equipment.
Operational Control of Quarry EquipmentOperational Control of Quarry Equipment
Quarry operations involves a variety of machinery
Operational Control in Cement Quarry Operations Using Operational Control in Cement Quarry Operations Using Remote Sensing (GPS) and GISRemote Sensing (GPS) and GIS
GPS assisted mapping of quarry and truck operations Accounting efficiency of truck and shovel operations
GIS and RS Assisted Quarry OperationsGIS and RS Assisted Quarry Operations
Equipment details:Number of Loading equipments = 5Number of Dump trucks = 12Number of drilling units = 4Number of dozers = 2Number of oil and water tankers = 2
Total Machines = 23
Requirements:Satellite image (High resolution) of 10 Square KilometerTracking of all the equipment i.e. 25 unitsSending instructions to machine operators Data / Report to be generated includes:
Number of trips by each truckCycle time of each trip ( i.e. Loading + Haulage + Unloading + queue times)Hours of operation per shiftIndication after completion of a certain hours of operation
What would be the estimated cost of this system ?