CEGH Info Workshop I Vienna, 04th June 2013
Welcome!
Agenda
04.06.2013
Who is “the” Market Area Manager
What does the Market Area Manager do?
Experiences with the New Market Model
2
Who is “the” Market Area Manager
04.06.2013 3
Who is “the” Market Area Manager?
04.06.2013 4
Who is “the” Market Area Manager?
Market Area East Market Area
Tirol
Market Area
Vorarlberg
MAM DAM
BGC
DAM
BGC BGC
DAM
VTP
NO (1-n) BGR (1-n)
Storage Production
NO (1-n) NO (1-n)
BGR (1-n) BGR (1-n)
BGC: Balance Group Coordinator
DAM: Distribution Area Manager
NO: Network Operator
BGR: Balance Group Representative
VTP: Virtual Trading Point
MAM: Market Area Manager
Distribution System
operators
appoint the DAM
Transmission System
Operators appoint the
MAM
Concession of the
BMWJF
MAM appoints the
VTP
04.06.2013 5
What does the Market Area Manager do?
04.06.2013 6
Capacity Calculation Model
Capacity Allocation (Online platform)
Nomination Management
Balancing
Balance Group Management
Market Area Control
Coordinated Network Development Plan
Maintenance
An organization for the
coordination of the
Market Area
04.06.2013 7
Balance Group Management
• One-Stop-Shop / Online-platform as Point of Contact and registration
• EIC assignment
• Central data collection and provision to relevant market participants without any
additional administration for BGR
Coordinated Network Development Plan
CNDP 2013-2022
Approved on 11/01/2013
CNDP 2014-2023
Currently: Data analysis & establishment of the NDPs by TSOs
30/06/2013: submission of the 1st CNDP version by TSOs
July 2013: consultation of the market participants
30/09/2013: submission of the final version of CNDP by TSOs
Further information: www.gasconnect.at / Market Area Manager / Coordinated Network
Development Plan
04.06.2013 8
Capacity Calculation Model
Capacity Allocation (Online platform)
Nomination Management
Balancing
Balance Group Management
Market Area Control
Coordinated Network Development Plan
Maintenance
An organization for the
coordination of the
Market Area
04.06.2013 9
No oversupply possible
Standardised calculation
method
Maximization of firm
capacity on offer
Implementation by TSOs
Capacity Calculation Model
Baum garten
... MG E/E
... NKP TT
... vNKP
BOP 12 Entry/Exit
Zone TAG AZ
Entry/ExitBOP 11 Exit
BOP 13 Exit
Mosonmagyaróvár
Exit
Petrzalka
Exit
Murfeld
Exit
Arnoldstein
Entry/ExitWeitendorf
Exit
Sudal
Entry/Exit
ABG
Entry/Exit
BOP 14
Entry/ExitOberkappel
Entry/Exit
MAB Entry/Exit
WAG
PW
... GCA
... BOG
... TAG
vNKP PVS1
Entry/Exit
vNKP WAG Exit
7Fields
Entry/Exit
Überackern:
vNKP TAG Exit
TAG
PVS1PVS1
SOL
KIP
Baumgarten: TAG
Entry
GCA
Entry
BOG
Entry/Exit
Nicht separat dargestellt sind:
NKP TD je System (zusammengefasst über den jeweiligen vNKP)
Phys. Verbindungen zwischen WAG, PVS1 und TAG vor den Messstellen in Baumgarten („Kollektor“) für Pre-Border-Shifts
HAG
Development by MAM (in coordination with TSOs)
Update with effectiveness in 2014
04.06.2013 10
Capacity Allocation
• European initiative
• 23 TSOs (19 shareholders and
4 customers)
• Start of the first auctioning was
1st April 2013 (day-ahead
products)
• Further information: websites
of the respective TSOs
04.06.2013 11
Capacity Calculation Model
Capacity Allocation (Online platform)
Nomination Management
Balancing
Balance Group Management
Market Area Control
Coordinated Network Development Plan
Maintenance
An organization for the
coordination of the
Market Area
04.06.2013 12
Balancing
04.06.2013
+/- balanced hourly transaction quantities on VTP
+/- allocated nominations for Entry/Exits within the Market Area in the transmission system
network
+/- Distribution Area input/output incl. “kleiner Grenzverkehr”, Storage, Production
- Registered end-customer schedule
+/- Carry forward
Balance Area with
virtual trading point
Export „kleiner
Grenzverkehr“
Sell virtual
trading point
Export transmission
system
End-customer
Storage
Import „kleiner
Grenzverkehr“
Buy virtual
trading point
Import transmission
system
Storage
Production/
Biogas
13
Experiences with the new Market Model
04.06.2013 14
Balance Group Administration
04.06.2013
Current number of BGRs: 74*
Contract type
FL 36
FL+VG 9
FL+VG+EKV 29
Balance Groups
Balance Groups: 93
Sub-Balance Accounts: 30
* Status quo: 03.06.2013
15
19
10
21
9
2
5
1 2
1 2
1 1
0
5
10
15
20
25
Balance Group Administration
04.06.2013
Many “last-minute”-BGRs in December “iBGRs” (until 28/02/2013)
Support for special requests
Assignment of capacity contracts to
BGs/SBAs
Contracts from contractual partners directly
from the MAM online platform
Structure of BG/SBA incl. all capacity assignments
Agreement with BG-members
(Allocation authorization for network users)
“One-Stop-Shop” for BGRs
BGRs can make changes centrally and all the market operators
get the date from the MAM (changes of the company name, BG
structure, cessation of activity … )
© macgyverhh - Fotolia.com
16
Balancing
04.06.2013
January:
10 BGs Structuring fees 6,473,552 kWh
February:
7 BGs Structuring fees 6,774,638 kWh
March:
21 BGs Structuring fees 26,461,506 kWh
April
17 BGs Structuring fees 9,460,910 kWh
17
Changes of MAM‘s General Terms and Conditions (GTC) and Platform usage
Changes of the structuring fee
Old: 0.4 Cent/kWh
New: 0 – 400,000 kWh 0.1 Cent/kWh
400,001 – 700,000 kWh 0.2 Cent/kWh
700,001 - ∞ kWh 0.4 Cent/kWh
04.06.2013
Changes of the Carry Forward Account The separate IMBNOT_CF file is no longer required Now shown RFF
CF_ACCOUNT_EOD
D-1
Extension Renomination Reaction Time for MAM Balancing From 75 to 135 minutes
this extension of reaction time is only possible as long as the Market
Area East is in a technical manageable situation
18
Thank you for your attention!
Gas Connect Austria GmbH
Floridotower
Floridsdorfer Hauptstraße 1
1210 Wien
Phone: +43 (1) 27500-0
Fax: +43 (1) 27500-88490
Market Area Manager-Hotline: +43 664 88644319
http://www.gasconnect.at/en/Market-Area-Manager
19 04.06.2013
© 2012
GAS CONNECT AUSTRIA GmbH
floridotower
Floridsdorfer Hauptstraße 1
1210 Wien, Vienna, Austria
T +43 1 27500-88000
www.gasconnect.at
Goodbye!
04.06.2013 20