1 CE591 Fall 2013 Lecture 26: Moment Connections Explain basic design procedure for moment (FR) connections Explain considerations for connections in moment- resisting frames for seismic demands Describe problems observed with the “pre- Northridge” connection and detailing Describe some of the requirements for the “WUF-B” connection developed after Northridge Describe some other connections, including current AISC prequalified connections

Upload: haquynh

Post on 31-Jan-2018

222 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

1

CE591 Fall 2013

Lecture 26: Moment Connections

Explain basic design procedure for moment (FR)

connections

Explain considerations for connections in moment-

resisting frames for seismic demands

Describe problems observed with the “pre-

Northridge” connection and detailing

Describe some of the requirements for the “WUF-B”

connection developed after Northridge

Describe some other connections, including current

AISC prequalified connections

Page 2: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

2

Welded Moment Connections

Develop moment

(typically Mpbeam )

at joint

Prefer compact

sections

Specify Complete

Joint Penetration

Weld (CJP) with

“matching” weld CJP Weld

Shear Tab

Beam

Column

Page 3: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

3

Basic Design Assumptions

Bending Moment –

tension and

compression in flanges

Shear – web

connection

Eccentricity may be

ignored [AISC 12-3]

Column may require horizontal stiffeners

“Continuity Plates”

Page 4: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

4

Moment Connections (Seismic)

Adequate strength and stiffness for FR

connection

+ Considerations / detailing for ductile

behavior (moment frame)

Rotation (q)

Mom

ent

(M)

FR

PR

Simple

Page 5: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

5

DSS IV W

R

Special Moment Frame 8

Ordinary Moment Frame 3.5

V

D

Elastic

Inelastic

Dy Du

D

q

q

Note: R=3

Not specifically

detailed for

seismic

resistance

Page 6: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

6

Special Moment Frame 8

Ordinary Moment Frame 3.5

Note: R=3

Not specifically

detailed for

seismic

resistance

R = 3

Design according to AISC Specifications

(no special detailing required)

R>3

Must follow detailing requirements in AISC Seismic

Provisions

DSS IV W

R

Page 7: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

7

Strong Column – Weak Beam Concept

0.1*

*

pb

pc

M

M Mpb

Mpc

Includes reduction for axial force in column

Includes factors to

increase based on

expected yield

stress, etc.

AISC Seismic Provisions 2010, Section E3

Page 8: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

8

Expected Strength Factor, Ry

Hot-rolled

Shapes

Ry

A36 1.5

A992 1.1 nominaly

expectedy

F

F

AISC Seismic Provisions 2010, Table A3.1

Page 9: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

9

Page 10: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

10

Special Moment

Frames (SMF)

Expected to withstand significant inelastic deformations

Must have story drift rotation capacity of 0.04 radians

Flexural strength must be at least 0.8 Mpbeam at 0.04 radians

Must have qualifying cyclic test results or be “Prequalified”

Expected to withstand limited inelastic deformations

Must develop moment in connection of 1.1RyMpbeam or max Mu

Detailing requirements

FR or PR allowed

Ordinary Moment

Frames (OMF)

(Intermediate Moment Frames

(IMF) are “in between”)

AISC Seismic Provisions 2010, Chapter E

Page 11: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

11

A992 Specification (1997)

More scrap-based production of steel (recycling)

No upper limit on strength for A36, A572

“Strong Column – Weak Beam” therefore less reliable, “matching” weld metal less reliable

85.0u

y

F

F

A992 similar to Gr. 50, but with upper limit on Fy of

65 ksi, minimum Fu of 65 ksi, and

Recommended for steel moment frames

Now, preferred material specification for W-shapes

Page 12: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

12

Recommended b/t ratios

yf

f

F

E

t

b3.0

2

yw F

E

t

h45.2

Flanges in I-shaped Beams

Webs in Flexural

Compression in SMF

(zero axial load)

AISC Seismic Provisions Table D1.1

For “Highly Ductile”

For “Highly Ductile”

Page 13: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

13

Required Shear Strength, Vu

1.2D + 0.5L + 0.2 S (for example)

+ Vp resulting from 1.1RyFyZ

Mp Vp

Mp Vp L’

Distance between

plastic hinges For directly-welded flange moment connection,

hinge location typ. ~ db/2 from column face

Page 14: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

14

Northridge Earthquake

January 17, 1994

Brittle fractures of

welded moment

connections

Included sites with only

“moderate” shaking

SAC Joint Venture (SAC Steel Project) SAC = SEAOC, ATC, CUREE

Studies of connection performance, metallurgy, steel framing systems, etc.

“Prequalified” connections and other recommendations (FEMA-350 series)

Page 15: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

15

Pre-Northridge Connection

Backing Bar

Weld Access Hole

CJP Weld

Shear Tab

Beam

Column

Continuity Plate

Panel Zone

Page 16: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

16

Pre-Northridge Detail to “Prequalified”

WUF-B

WUF-B Welded Unreinforced Flange, Bolted Web

Detailing requirements, specified originally by FEMA-350

More stringent inspection requirements

Initially prequalified for Ordinary Moment Frames only; now, some WUF-B details are required for welded OMF (AISC Seismic Provisions 2010)

Page 17: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

17

Welds Pre-Northridge

Low notch toughness

WUF-B

Specified notch toughness

e.g. 20 ft-lbs @ 0°F

Downhand field weld

results in defects,

“crack initiators”

Page 18: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

18

Weld Access Holes

Pre-Northridge

Strain concentrations at

toes of weld access holes

WUF-B

Recommended geometries

for weld access holes

(+ shall be ground smooth)

Page 19: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

Improved Weld Access Hole

Notes:

1. Bevel as required for selected

groove weld.

2. Larger of tbf or ½ in. (13 mm) (plus ½

tbf, or minus ¼ tbf)

3. ¾ tbf to tbf, ¾ in. (19 mm) minimum (

¼ in.) ( 6 mm)

4. 3/8 in. (10 mm) minimum radius (plus

not limited, minus 0)

5. 3 tbf ( ½ in.) (13 mm)

Tolerances shall not accumulate to the

extent that the angle of the access

hole cut to the flange surface

exceeds 25.

Examples of requirements

Page 20: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

20

Backing Bar

Pre-Northridge

Typically left in place

“Crack initiator”

WUF-B

Bar removed, weld

back-gouged,

reinforcing fillet weld

added

Page 21: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

21

Typical: 3/8” root

30-degree bevel on beam

flange

Bottom flange

back-up bar tack

welded into place.

Page 22: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

Typical Pre-Northridge

Bottom Flange Weld

Page 23: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

Improved POST-Northridge Bottom Flange Weld

Weld tabs and

runoff regions

removed; ground

smooth

Back-up bar removed; root visually

inspected, defects removed; small

reinforcing fillet weld placed at

bottom of groove weld

Page 24: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

24

Beam Pre-Northridge

A572 Gr. 50 typically

WUF-B (original

requirements from

FEMA350)

A992 recommended Very DEEP

sections

W36 and shallower

beams only

+ minimum span to depth

ratio, L/d = 7

THICK flanges 1” thick flange,

maximum

Page 25: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

25

Tri-Axial Stress State

Distortion Energy

(Timoshenko Goodier p. 248)

In a pure tri-axial stress state, we do not have strain due

to distortion (slip/shear), but we have volumetric strain

So, theoretically, we can never be on the yield envelope,

but we can get enough strain to FRACTURE

222222

2

1

6

1yzxzxyxzzyyx

GE

Page 26: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

26

Panel Zone & Continuity Plates

Pre-Northridge

May have weak

panel zones WUF-B

Recommend

shear yield in panel

zone at same time

as yield in beam,

Or all yield in beam

Some connections

w/o continuity plates failed

New recommendations

for continuity plates

local kinking

Page 27: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

27

An experiment

(cover-plated

connection) where

the panel zone is

the primary

yielding element.

Page 28: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

Very weak panel

zone; localized

“kinks” cause

strain

concentrations,

ultimately leading

to fracture in

vicinity of beam

flange groove

welds.

Page 29: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

Same specimen

as previous slide.

Connection failed

at moment well

below Mn

Page 30: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

FEMA 350

Moment connection

details -- “prequalified

connections”

Recommended design

procedures, limits of

usage (e.g., OMF only,

W36 beams and

shallower, flange

thickness limits, web

connection, etc.)

Not a standard; but

still a valuable

reference

Page 31: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

31

WUF-B

Page 32: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

ANSI/AISC 358-10

Page 33: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

33

Reduced Beam

Section (RBS)

Also called “Dogbone”

connection; less costly, simpler

than reinforced connections

Forces hinge formation to

occur within reduced section

Now one of the most

commonly used connections

Page 34: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

Connection at q 0.04 radian......

Page 35: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

-5000

-4000

-3000

-2000

-1000

0

1000

2000

3000

4000

5000

-0.05 -0.04 -0.03 -0.02 -0.01 0 0.01 0.02 0.03 0.04 0.05

Drift Angle (radian)

Be

nd

ing

Mo

me

nt

(kN

-m)

RBS Connection

Mp

Mp

Page 36: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

36

From Modern Steel Construction, January 2007

Examples of requirements from AISC 358-05

Page 37: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

37

Page 38: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

Bolted Unstiffened and Stiffened Extended End-Plate

Moment Connections

Page 39: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

Sumner, et al., 2000

End-Plate Connections

Page 40: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

Sumner, et al., 2000

End-Plate Connections

Page 41: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

End plate and column flange bending strengths are

determined using yield line analysis.

Page 42: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

Bolted Flange Plate (BFP)

Page 43: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

BFP-3

Sato, A., Newell, J.D., Uang, C.-M.

“Cyclic Behavior and Seismic Design of

Bolted Flange Plate Steel Moment

Connections,” AISC Engineering

Journal, Fourth Quarter, 2008.

Page 44: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

Welded Unreinforced Flange – Welded Web (WUF-W)

Page 45: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

Section 8.6

Beam Web-to-

Column

Connection

Limitations

Shear tab thickness

equal at least to that

of beam web;

overlap with weld

access holes as

specified

Page 46: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

Kaiser Bolted Bracket (KBB)

Page 47: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

“Steel Connections: Proprietary or Public Domain?” by P. Cordova & R.

Hamburger, Modern Steel Construction, October 2011

Page 48: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

Experimental Evaluation of Kaiser Bolted Bracket Steel Moment-Resisting Connections

Scott M. Adan and William Gibb

AISC Engineering Journal 2009

http://www.steelcastconnections.com/

Page 49: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

ConXtech ConXL moment connection

Page 50: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange
Page 51: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

http://dcm-designs.com/steel-prefabricated-moment-frame/

“This innovative

connection system

enables beams to be

simply lowered and locked

onto square columns in

the field, resulting in a

dimensionally accurate

structural chassis. The

system is often referred to

as a full-scale erector set.”

http://www.conxtech.com

/conx-system/

Page 52: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

Connections in process of prequalification

• Double Tee

• Simpson Strong Frame

• SENSE TSC

• Side Plate

• SOM Pin Fuse Joint

Page 53: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

Double Tee

http://www.aisc.org/uploadedcontent/2012NASCCSessions/N11/

Page 54: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

Simpson Strong Frame (Yield Link)

http://www.aisc.org/uploadedcontent/2012NASCCSessions/N11/

Page 55: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

SENSE TSC

http://www.aisc.org/uploadedcontent/2012NASCCSessions/N11/

Page 56: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

SidePlate

http://www.aisc.org/uploadedcontent/2012NASCCSessions/N11/

Page 57: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

SOM Pin Fuse Joint

“Steel Connections: Proprietary or Public Domain?” by P. Cordova & R.

Hamburger, Modern Steel Construction, October 2011

Page 58: CE591 Fall 2013 Lecture 26: Moment Connectionsjliu/courses/CE591/... · CE591 Fall 2013 Lecture 26: Moment Connections ... AISC prequalified connections . 2 ... hole cut to the flange

http://www.som.com/content.cfm/pin_fuse_joint