cdo architectural portfolio
DESCRIPTION
This covers more than 10 years work. Small projects or minimal work have been omitted.TRANSCRIPT
Architectural Portfolio
Summarized
Christian Overbey
ArchitectAIA LEED ap NCARB
303.995.1081
Commercial Program Development (Colorado, NM, WY)
Role: 2008- current; Architect (of record) – Program management, develop site design, construction documents, coordinate design consultants, coordinate building permit
Client: Jack in the Box, K&G Markets, McDonalds
Project type and size: New retail buildings; 2,400 SF typical
Timberline High School, Phase 2(Lacey, WA) Architect of Record: McGranahan Architects
Role: 2006-2008, Architect – construction observation, construction process tracking, process RFI’s, payment requests, change orders, Owner-Contractor liaison
Client: North Thurston School District
Project type and size: new school construction, 187,000 SF, $23,400,000
Smyth Landing (Olympia, WA)Architect of Record: Morton Safford James III AIA Architects Inc. PS.
Role: 2003-2006, Architect – develop schematic design, construction documents, coordinate design consultants, coordinate building permit, construction observation, construction process tracking, process RFI’s, payment requests, change orders, Owner-Contractor liaison
Smyth LandingClient: Smyth Landing LLC
Project type and size: New Mixed Use Building, Commercial Office & Residential Condominiums; 56,000 SF, $8,500,000 (+ Tenant Improvements)
Sixth Avenue Place(Lacey, WA)Architect of Record: Morton Safford James III AIA Architects Inc. PS.
Role: 2005-2006; Architect – develop Mort James’ conceptual design into schematic design, construction documents, coordinate design consultants, coordinate building permit
Client: The Molnar Group
Project type and size: New Mixed Use Building, Retail and Apartments; 110,000 SF, $10,400,000
Garst Residence (Olympia, WA www.thegarsts.com)Architect of Record: Morton Safford James III AIA Architects Inc. PS.
Role: 2005; Architect – develop Mort James’ conceptual design into schematic design, construction documents, coordinate design consultants, coordinate building permit
Client: The Garst Family
Project type and size: New sustainable residence; 2,400 SF
Cushing Residence (Bend, OR)Architect of Record: Morton Safford James III AIA Architects Inc. PS.
Role: 2004; Architect – develop Mort James’ conceptual design into schematic design, design development
Client: The Cushing Family
Project type and size: New residence; 4,300 SF
Alliance Office (Lacey, WA)Architect of Record: Morton Safford James III AIA Architects Inc. PS.
Role: 2004-2005; Architect – develop Mort James’ conceptual design into schematic design, construction documents, coordinate design consultants, coordinate building permit, construction observation
Client: Alliance Inc.
Project type and size: Office tenant improvement; 12,000 SF, $410,000
Danville Building (Danville, CA)Architect of Record: Maple, Dell, McClelland Architects, Inc.
Role: 2001; Architect – develop Jim McClelland’s conceptual design into schematic design, construction documents, coordinate design consultants, coordinate building permit, construction observation
Client: Branagh Development
Project type and size: New Mixed Use Building Office & Retail improvement; 6000 SF, $650,000
La-Z-Boy (Union City, CA)Architect of Record: Maple, Dell, McClelland Architects, Inc.
Role: 2001; Architect – develop conceptual design into schematic design, construction documents, coordinate design consultants, coordinate building permit
Client: La-Z-Boy Dealer
Project type and size: new retail building; 17,500 SF, $1,000,000
Desert Crossing (Las Vegas, NV)Architect of Record: Maple, Dell, McClelland Architects, Inc.
Role: 2001; Architect – develop conceptual design into schematic design, construction documents, coordinate design consultants, coordinate building permit, construction observation
Client: Sywest Development
Project type and size: tenant improvements & new retail building; 17,500 SF & 6,500 SF, $1,200,000
Baird Residence (Seattle, WA)
Role: 2000-2001; Architect of record - conceptual design, design development, construction documents, coordinate design consultants, coordinate building permit, construction observation
Client: Steve Baird
Project type and size: complete residential redesign & rebuild; 4,200 SF
front before rear before
front after rear after
Lakeside Mall Renovation (Homer, AK)Architect of Record: James M. Klontz Architect
Role: 2000-2001; Architect of record - construction documents
Client: Beachy Construction
Project type and size: Mall reimage, major tenant remodel & addition; 34,000 SF
Kodiak Inn Addition (Kodiak, AK)Architect of Record: James M. Klontz Architect
Role: 2000; Architect – develop conceptual building design
Client: J. Johnson
Project type and size: New Hotel and Conference Center Building; 40,000 SF
African NW Warehouse (Seattle, WA)
Role: 2000; Architect (of record) – schematic design, design development, construction documents, coordinate design consultants, coordinate building permit, construction observation
Client: African NW
Project type and size: Technical warehouse addition and new building; 23,000 SF, $1,400,000
Hotel at Small Boat Harbor (Seward, AK)Architect of Record: James M. Klontz Architect
Role: 2000-2001; Architect – develop conceptual site and building design
Client: J. Pruitt
Project type and size: New Waterfront Hotel and Restaurant; 43,000 SF
(Initial Design Study)
Lake Forest Park City Hall (Lake Forest Park, WA)Engineer of Record: Abacus Engineered Systems
Role: 1998; Engineering PM – coordinate building MEP engineering design
Client: City of Lake Forest Park
Project type and size: New City Hall, police & jail; 26,000 SF
Admiral Nimitz Dining Hall (Whidbey Island, WA)Engineer of Record: Abacus Engineered Systems
Role: 1997-1998; Engineering PM – coordinate building MEP engineering design
Client: US Navy/McCarthy Construction
Project type and size: Complete remodel kitchen & dining building ; 50,000 SF
Architectural Portfolio
Summarized
Christian Overbey
ArchitectAIA LEED ap NCARB
303.995.1081