cdf run2b: ccr and cpr upgrade status

23
CDF Run2b: CCR and CPR Upgrade Michele_Giunta_INFN-Pisa_&_Università_di_Siena CDF Bologna_22_04_2005

Upload: myles-beck

Post on 30-Dec-2015

24 views

Category:

Documents


1 download

DESCRIPTION

CDF Run2b: CCR and CPR Upgrade status. Bologna _22 _ 04 _ 2005. Michele _ Giunta _ INFN-Pisa _ & _ Università _ di _ Siena. Position in the CDF detector is between Solenoid coil and calorimeter. Michele Giunta. 2. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

CDF Run2b: CCR and CPR Upgrade status

Michele_Giunta_INFN-Pisa_&_Università_di_Siena

CDF

Bologna_22_04_2005

Page 2: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 2

Position in the CDF detector is betweenSolenoid coil and calorimeter

Page 3: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 3

• CPR2 helps separating e/ from +-/0

Interested groups:

Top bEWKQCDSUSY

Soft Lepton TagSLThigh pt e, W, Zjet(s),e

• CDF preshower used in >100 papers, about 1/2 of all Run I publications, including:– Higgs searches– High pT photons– Top quark

Page 4: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 4

0 1 2 3 4 5 6 7 8 9

Central Crack Detectors behind 8 X0 Tungsten bar

More Gas Proportional Chambers with slow response

Gas Proportional Chambers with slow response

Central Preshower

NEW CPR/CCR

OLD CPR/CCR

CPR2 Scintillator TilesCCR

12.5 cm

12.5 cm

2cm

Splicing WS/CF

~5 m

10 480CCR

54 2,592CPR

Per Wedge TotalTILES

Total n. of channels = 3,072CPR tile: 12.5 x 12.5 x 2 cm 2x3 ()/tower

Page 5: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 5

CPR2_Goals1) Restore/mantain CPR performances (aging effects).

• by correcting EM information for dead material losses (magnet coil, ...)

4) Shower Max detector only resolves single photons from meson decay till 35 GeV. CPR extends this limit by ~100 GeV. (Photon background subtraction)

5) CPR could improve jet energy resolution:

• by measuring charged tracks energy before they enter the CEM

3) Improvement: finer segmentation, better S/N.

2) Overcome occupancy problems due to higher luminosity / avoid pileups

CDF

• being more segmented than CEM

Page 6: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 6

The Upgradetimetable

• CPR/CCR upgrade was first planned for autumn 2005• We did complete it one year in advance !!

• Oct-dec 2003 : Almost Hardware Material Ordered• March 2004 : Internal fibers Kuraray ready• May 2004 : All scintillator Tiles ready (From Dubna)• June 2004 : Pol.Hi.Tech delivers external fibers• May-July 2004 : CPR2 assembly at Argonne• First week Sept. 2004 : CDF is opened, installation begins• Third week Nov. 2004 : CDF is closed, start CR test• Second week Dec. 2004 : Re-start collisions• Summer 2005 :There will be a NIM article

CDFCDF

Page 7: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 7

UPGRADE parts , institutions & contributions

Scintillator Tiles : Dubna & INFN

Fibers : INFN

CPR2/CCR assembly : ANL, INFN , KCHEP, MSU, and installation Rockefeller, FNAL

Signal cables & transition cards : ANL

HV system & Control : INFN

PMT boxes & optical cables : MSU

R&D materials and PMT test : INFN

GEANT simulations : INFN

PMTs : Tsukuba

Page 8: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 8

UPGRADE_PEOPLE

INFN Pisa (7 tecnici per un totale di 4 MU tra assembl. e montaggio) S. Lami A. Menzione R. Paoletti A. Scribano N. Turini M. Giunta

Univ. Roma 1 ( 1 tecnico per un totale di circa 1 MU tra assembl. e montaggio) M. Iori

INFN Pavia G. Introzzi

Univ. Trieste & Udine (3 tecnici per un tot. di 2 MU tra assembl. e montaggio) A. Penzo G. Pauletta

Page 9: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 9

Installation 1

Page 10: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 10

Installation 2

3

2

1

Page 11: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 11

CPR2 detector :: photos

A

DC

B

125 mm

125 mm

Page 12: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 12

Delivered Photoelectrons

• Specification for phe delivery was to get at least 5 phe/MIP

•After scintillatior, green fiber (glued for farest tiles), splicing, clear fibers, cables, PMT we get in average ~ 14 phe/MIP

Pulse hight spectrum:10 ADC = 1 phe

NEW CPR

Cosmics

Page 13: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 13

OccupancyNEW CPR

Old

New

Page 14: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 14

e/ separationNEW CPR

Page 15: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 15

Linear Energy Response channel equalisation for tile gainNEW CPR

2 weeks

ratio

Page 16: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 16

The End

Page 17: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 17

BK slides begin now

Page 18: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 18

New_CCR

• Scintillator-based, has 1 tile / CEM tower.

• Each CCR module has 225 x 50 x 5 mm tiles

• Uses the same tungsten bar (8.5 X0).

• 80% of 50 GeV electrons energy from test-beam is lost in coil+tungsten bar

• Not yet calibrated nor simulated (CPR2 had priority in commissioning)

CDFCrack Detector detects photons in cracks (8% of coverage) that generates “fake” missing energy.

Page 19: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 19

12.5 cm

12.5 cm

2cm

Splicing WS/CF

~5 m

CPR2 OverviewTotal n. of channels = 3,072CPR tile: 12.5 x 12.5 x 2 cm 2x3 ()/tower

Photomultipliers 16 channels per PMT (R5900) 192 HV channels CAEN HV SY527

10 480CCR

54 2,592CPR

Wedge TotalTILES

WLS fiber into groove, spliced to clearfiber at tile exit, routed to optical connectorSpecs want CPR to give >5 pe per MIP at PMT (>10 pe at tile exit due to splicing + connector + 5m clear fiber) We get 16,

Page 20: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 20

The OLD CPR detector

Other arch wall

CPR

B

C

Green gas pipe

Tungsten

CPR

Tungsten / CCR

CPR

CPR

CPR

Criostat andcoil

Page 21: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 21

Page 22: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 22

CPR2 _ Calibration_1

LERS: (linear energy response)Equalizes tiles for uniform output to same signal

Absolute calibration: done, but there is no analisys using CPR2 because Production is not yet updated.

Eache tile il easily calibrated with MIP in 5 minutes of collider data.

Page 23: CDF    Run2b:                           CCR  and  CPR   Upgrade                         status

Michele Giunta 23

/0 separation

MC

MC