ccs - epri | energy systems and climate analysis · 2019-03-05 · ccs: a roadmap to 2050 0 2,000...

17
Nick Welch North America Representative Global CCS Institute EPRI 2010 Global Climate Change Research Seminar 18 th May 2010 Overcoming Barriers to Deployment of CCS WWW.GLOBALCCSINSTITUTE.COM

Upload: others

Post on 08-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CCS - EPRI | Energy Systems and Climate Analysis · 2019-03-05 · CCS: A Roadmap to 2050 0 2,000 4,000 6,000 8,000 10,000 12,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Captured

Nick Welch

North America Representative

Global CCS Institute

EPRI 2010 Global Climate Change Research Seminar 18th May 2010

Overcoming Barriers to Deployment of CCSWWW.GLOBALCCSINSTITUTE.COM

Page 2: CCS - EPRI | Energy Systems and Climate Analysis · 2019-03-05 · CCS: A Roadmap to 2050 0 2,000 4,000 6,000 8,000 10,000 12,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Captured

The contribution of CCS to emissions reduction

Page 3: CCS - EPRI | Energy Systems and Climate Analysis · 2019-03-05 · CCS: A Roadmap to 2050 0 2,000 4,000 6,000 8,000 10,000 12,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Captured

CCS:  A Roadmap to 2050

0

2,000

4,000

6,000

8,000

10,000

12,000

2010 2015 2020 2025 2030 2035 2040 2045 2050

Captured

 CO

2(M

tCO

2/yr)

OECD PACIFIC

USA

OTHER OECD N AM

OECD EUROPE

ODA

ME 

INDIA

EEU + FSU

CSA

CHINA

AFR 

2020100 projectsOECD (50%)Non‐OECD (50%)

2030850 projectsOECD (49%)Non‐OECD (51%)

20503,400 projectsOECD (35%)Non‐OECD (65%)

20402,100 projectsOECD (40%)Non‐OECD (60%)

201518 projectsOECD (72%)Non‐OECD (28%)

Source:  IEA, CCS Roadmap .

A 2009 View : IEA 

Urgent need for early confidence to deploy CCS post 2020 at the scale necessary to make a 

difference – key role for large scale demonstration

Page 4: CCS - EPRI | Energy Systems and Climate Analysis · 2019-03-05 · CCS: A Roadmap to 2050 0 2,000 4,000 6,000 8,000 10,000 12,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Captured

Required developments to make CCS a reality

Notes:  O&G industry mass flowrates: (0.25Tbpdwater*160*365) + 3928.8 Mto + (3065.6 bcm gas)*0.7kg/t = 20.6Gt/yr; Learning rate of 8%Source: BP; Strategic Analysis of the Global Status of CCS; GlobalData “Global Oil and Gas Capital Expenditure Outlook"; IEA; "Global Onshore and Offshor Water Production" 

... to deliver average 110 full‐scale projects pa

... to handle 2050 flowrates equal to half of current oil industry 

flowrates

... to cover the US$2‐3 trillion of additional capex

0

1,000

2,000

3,000

4,000

2020 2030 2040 2050

# Projects

100 in 2020

3,400 in 2050

0

50

100

150

US$billion invested pa

2020 2030 2040 2050

Gas

Oil

ProducedWater

2009 O&G Industry

CO2

2050 CCS

Flowrate (Gt/yr)

Capacity and knowledge

Infrastructure and technology

Funding and financing

Page 5: CCS - EPRI | Energy Systems and Climate Analysis · 2019-03-05 · CCS: A Roadmap to 2050 0 2,000 4,000 6,000 8,000 10,000 12,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Captured

Global CCS Institute Strategic Framework

5

PROJECTS STRATEGY

Strategic Analysis of Projects

Project Support Program

Thematic Focus Groups

ENABLING STRATEGIES

MEMBERSServices ModelMember Charter

OVERARCHING OBJECTIVE“To accelerate the broad deployment of commercial CCS”

Regional Profiles and Global Services

Policy/Regulatory

Financial/Commercial

Public Awareness

Capacity Building

Technical

Knowledge Sharing

Page 6: CCS - EPRI | Energy Systems and Climate Analysis · 2019-03-05 · CCS: A Roadmap to 2050 0 2,000 4,000 6,000 8,000 10,000 12,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Captured

The Institute's membership and presence

Country members (26)

North America

South America

AfricaAsia Pacific

Current offices/representativesPlanned offices

Other Members (196), including state governments, industry participants, NGOs and government agencies

Europe

Page 7: CCS - EPRI | Energy Systems and Climate Analysis · 2019-03-05 · CCS: A Roadmap to 2050 0 2,000 4,000 6,000 8,000 10,000 12,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Captured

Projects Strategy composed of three elements

Strategic Analysis of ProjectsMaintain a comprehensive, global view of project progress and challenges

Project Support ProgramDirectly support member activities which address key project barriers

Thematic Focus Groups

Facilitate knowledge sharing between project proponents in order to promote best practice

1 2

3

Page 8: CCS - EPRI | Energy Systems and Climate Analysis · 2019-03-05 · CCS: A Roadmap to 2050 0 2,000 4,000 6,000 8,000 10,000 12,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Captured

Two core workstreams for Strategic Analysis of Projects

Projects Database and Analysis

Maintain comprehensive, accessible database which tracks status of all CCS projects

Develop annual 'report card' on advancement of CCS projects

Analyse and report on project barriers and drivers

Ideal Portfolio

Keep view of comprehensive portfolio with range of projects necessary to prove broad CCS deployment

• across geographies, technologies, industries

Compare Ideal Portfolio and Projects Database to identify gaps in project deployment

Page 9: CCS - EPRI | Energy Systems and Climate Analysis · 2019-03-05 · CCS: A Roadmap to 2050 0 2,000 4,000 6,000 8,000 10,000 12,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Captured

Prepared for the Global CCS Institute by WorleyParsons

62 commercial scale integrated projects

STATUS OF CCS PROJECTS WORLDWIDE

Page 10: CCS - EPRI | Energy Systems and Climate Analysis · 2019-03-05 · CCS: A Roadmap to 2050 0 2,000 4,000 6,000 8,000 10,000 12,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Captured

Ideal Portfolio of CCS projects 

Source: L.E.K. Analysis

26 projects overall

Industry and Capture

Power GenerationPre‐combustion         4Oxy‐combustion        6Post‐combustion       7

Iron & Steel 3

Cement 3

Other Industries 3

Minimum of 26 projects

Transport

Point to point pipeline onshore      1

Point to point pipeline offshore 1

Backbone pipeline – cluster          1

Long distance ship – port‐to‐offshore site or port‐to‐port  1

Cross‐border pipeline 1

Including 5 solutions

Storage

Structured deep saline aquifers     1 

Unstructured deep saline aquifers 1

Depleted oil field  1

Depleted gas field        1

Oil field for EOR  1

Gas field for EGR  1

Including 6 configurations

+ Diversification principles to populate projects beyond this number

Different combinations needed for confidence

Page 11: CCS - EPRI | Energy Systems and Climate Analysis · 2019-03-05 · CCS: A Roadmap to 2050 0 2,000 4,000 6,000 8,000 10,000 12,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Captured

CCS Project Strategy: focus of funding and resources 

Project Generation and Feasibility

Local Support

FEED

Large Scale Financing

Construction and Operation

Key: Global CCS Institute focus Out of scope

Examples of Targeted Funding activities

Fund pre‐feasibility or feasibility studies

Fund contractors to add capability or capacity 

Fund the collection of safety data

Fund bespoke benchmarking or similar studies  to provide

objective fact base for public / government advocacy

Fund specific elements within FEED projects

Fund of specialist contractors

Project Lifecycle

Early stage and new projects Early stage and new projects 

Advanced projects  Advanced projects  

Page 12: CCS - EPRI | Energy Systems and Climate Analysis · 2019-03-05 · CCS: A Roadmap to 2050 0 2,000 4,000 6,000 8,000 10,000 12,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Captured

CCS project support: initial tranche response 

Over 50 applications for support

Targeting specific  barriers on specific projects

Initial concepts and new projects

Project support strategy will address an urgent need

Approximately 500m A$ requested over next 5+ years

Budget  level ~50mA$/year for 3 years

Rolling call process for proposals

Page 13: CCS - EPRI | Energy Systems and Climate Analysis · 2019-03-05 · CCS: A Roadmap to 2050 0 2,000 4,000 6,000 8,000 10,000 12,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Captured

Four preliminary Focus Group themes identified for member feedback

Technology Scale‐up

Storage – MMV

Stakeholder Engagement

Current thinking and new approaches to practically addressstakeholder engagement at the project level

The Hub ConceptCommon challenges and potential solutions for the development of CCS Hubs

 

Cost effective and practical approaches to give certainty of permanent and safe storage

Challenges in scaling up capture equipment to commercial levels

Page 14: CCS - EPRI | Energy Systems and Climate Analysis · 2019-03-05 · CCS: A Roadmap to 2050 0 2,000 4,000 6,000 8,000 10,000 12,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Captured

Global CCS Institute Strategic Framework

PROJECTS STRATEGY

Strategic Analysis of Projects

Project Support Program

Thematic Focus Groups

ENABLING STRATEGIES

MEMBERSServices ModelMember Charter

OVERARCHING OBJECTIVE“To accelerate the broad deployment of commercial CCS”

Regional Profiles and Global Services

Policy/Regulatory

Financial/Commercial

Public Awareness

Capacity Building

Technical

Knowledge Sharing

Page 15: CCS - EPRI | Energy Systems and Climate Analysis · 2019-03-05 · CCS: A Roadmap to 2050 0 2,000 4,000 6,000 8,000 10,000 12,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Captured

Uncertainty on the most effective funding modelsRange of mechanisms in place for early projects

Jurisdiction Program Funding modelAlberta Alberta CCS Fund

Australia CCS Flagships

EU European Energy Program for Recovery

Norway Gassnova

UK CCS DemonstrationCompetition

USA Clean Coal Power Initiative Round Three

N/A (to be negotiated)

Sequestration payment

Capital Grant

Govt Equity

Capital Grant CFD

Capital Grant Opex subsidy

Capital Grant Opex subsidy

Page 16: CCS - EPRI | Energy Systems and Climate Analysis · 2019-03-05 · CCS: A Roadmap to 2050 0 2,000 4,000 6,000 8,000 10,000 12,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Captured

Organisation type Organisation (e.g.) Activity descriptionIEA, CSLF Issues identification through workshops

World Bank (Proposed) Financial options development

World Coal Institute Issues identification through workshops

ZEP Funding structure recommendations

The Climate Group Issues identification through structured interviews

Clinton Climate Initiative

Financial structure development for specific projects

IEA GHG Evidence provision for CDM discussion

Universities, CO2CRC Research on various cost/financing aspects

New Energy Finance Green energy funds database compilation

Consulting Firms Cost and economic reports development

A range of work is ongoing globally around financial issues

Intergovernmental organisation

MDB

Industry body

Research organisation

NGO

Private company

Page 17: CCS - EPRI | Energy Systems and Climate Analysis · 2019-03-05 · CCS: A Roadmap to 2050 0 2,000 4,000 6,000 8,000 10,000 12,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Captured

17

www.globalccsinstitute.com