ccna discovery 2 - retooling session v1 0 (1)

Upload: jacoub11

Post on 10-Apr-2018

236 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    1/21

    2007 Cisco System s, Inc. All rights reserved. Cisco Public

    ITE PC v4.0

    Chapter 1 1

    CCNA Discovery 2

    Working at the Small-to-Medium Businesses orISP

    Retooling Session

    August 2007

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    2/21

    ITE PC v4.0

    Chapter 1 2 2007 Cisco System s, Inc. All rights reserved. Cisco Public

    Course Objectives

    The goal of this course is to assist the students indeveloping the skills necessary to provide customersupport to users of small-to-medium-sized networks

    and across a range of applications.

    The course provides an introduction to routing andremote access, addressing and network services.

    It introduces the servers providing email services, webspace, and Authenticated Access.

    This course prepares the students with the skillsrequired for entry-level Help Desk Technician andentry-level Network Technician jobs.

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    3/21

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    4/21

    ITE PC v4.0

    Chapter 1 4 2007 Cisco System s, Inc. All rights reserved. Cisco Public

    Chapter 1 -

    Instructors should explore the web links in the Lab1.2.3 - Mapping ISP Connectivity Using Traceroute

    Instructors may see increase bandwidth utilizationduring the lab time

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    5/21

    ITE PC v4.0

    Chapter 1 5 2007 Cisco System s, Inc. All rights reserved. Cisco Public

    CCNA Discovery 2 Chapter 2

    Help Desk

    Help Desk Technicians roles, responsibilities,customer interaction

    OSI Model Protocols, Technologies, use layerdmodel for troubleshooting scenarios.

    Common tools and diagnosing procedures used byISPs for Troubleshooting

    Describes on-site procedures to resolve issues

    No physical labs but a lot of activities included in thechapter

    NEW

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    6/21

    ITE PC v4.0

    Chapter 1 6 2007 Cisco System s, Inc. All rights reserved. Cisco Public

    CCNA Discovery 1 Chapter 3

    Planning aNetwork Upgrade

    Perform Customer Site Survey, document the existingnetwork including Physical and Logical Topology.

    Planning the Network Upgrade five phases:Requirement gathering, selection and design, implementation,operation, review and evaluation.

    Structural Cabling system: work area, distribution

    area, and telecommunication room area. Purchasing and Maintaining Equipment selecting

    Network, LAN, Internetwork Devices, Reliability

    NEW

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    7/21

    ITE PC v4.0

    Chapter 1 7 2007 Cisco System s, Inc. All rights reserved. Cisco Public

    CCNA Discovery 2 Chapter 4

    Planning the IP Addressing

    IP addressing implementation in the LAN

    class A, B, C ,D addresses;

    Classful and Classless Subnetting,

    IPv6

    NAT and PAT

    NAT terminology, Static and Dynamic NAT

    PATNAT issues

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    8/21

    ITE PC v4.0

    Chapter 1 8 2007 Cisco System s, Inc. All rights reserved. Cisco Public

    Chapter 4 New Concepts

    IPv6 is a new topic included in the course. Instructorsshould familiarize with the IPv6 addressing structureand IPv6 addresses hierarchy

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    9/21

    ITE PC v4.0

    Chapter 1 9 2007 Cisco System s, Inc. All rights reserved. Cisco Public

    CCNA Discovery 2 Chapter 5

    Configuring Networking Devices Physical setup of ISRs

    Initial ISR configuration

    Out-of-band Management and In-band Management

    CLI

    Config interface using SDM (Security Device Manager)

    Config Initial LANand WAN connection

    Config NAT using SDM

    Config a Default route and DHCP using CLI

    Initial 2960 switch configuration

    Installing the CPE (Customer Premise Equipment)

    NEW

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    10/21

    ITE PC v4.0

    Chapter 1 10 2007 Cisco System s, Inc. All rights reserved. Cisco Public

    SDM

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    11/21

    ITE PC v4.0

    Chapter 1 11 2007 Cisco System s, Inc. All rights reserved. Cisco Public

    Chapter 5 - Challenges

    The new tool introduced in the chapter is SDM.Instructors should allocate time to familiarizethemselves with the tool download, practice

    installation, initial configuration.

    The SDM requires CCO access

    Instructors should prepare the tool for use in theclassroom in advance.

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    12/21

    ITE PC v4.0

    Chapter 1 12 2007 Cisco System s, Inc. All rights reserved. Cisco Public

    CCNA Discovery 1 Chapter 6

    Routing

    Routing Table, Static and Default routes

    Dynamic routing protocols: DV, Link State routing

    protocols.

    Routing protocols overview of RIP, EIGRP, OSPF

    Configure and Verify RIP

    Configure and Verify BGP operations

    NEW

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    13/21

    ITE PC v4.0

    Chapter 1 13 2007 Cisco System s, Inc. All rights reserved. Cisco Public

    Chapter 6 - Challenges

    BGP is a new protocol introduced in CCNA Discovery.Instructors should take a close look on the protocol andlabs before they go in the classrooms

    The BGP labs require very basic BGP configuration

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    14/21

    ITE PC v4.0

    Chapter 1 14 2007 Cisco System s, Inc. All rights reserved. Cisco Public

    CCNA Discovery 2 Chapter 7

    ISP Services

    Managed Services offered by the ISP

    Review of TCP/IP protocol

    TCP/UDP ports + IP addresses = socket pair

    Multiple Services at the Application Layer HostName, DNS, HTTP, FTP, SMTP, POP3

    DNS is discussed in detail

    DNS hierarchy, forward lookup, reverse lookup.

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    15/21

    ITE PC v4.0

    Chapter 1 15 2007 Cisco System s, Inc. All rights reserved. Cisco Public

    Chapter 7 - Challenges

    HOST file changes and DNS Lab requiresAdministrator privileges access to a Windows Serverwith DNS Services

    How to set up a Windows Server with DNS services?

    Need knowledge beyond this curriculum

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    16/21

    ITE PC v4.0

    Chapter 1 16 2007 Cisco System s, Inc. All rights reserved. Cisco Public

    CCNA Discovery 2 Chapter 8

    ISP Responsibilities

    ISP Security Best Practices

    AAA

    Data Encryption SSH, SSL, IPsec

    ACL and Port Filtering - Identify different methods ofattack and create ACL for security

    DoS, DDoS, DRDoS (Distributed Reflected DoS)

    Dynamic and Stateful Firewall IOS Firewall features PT comes with pre-configured FW

    (cont.)

    NEW

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    17/21

    ITE PC v4.0

    Chapter 1 17 2007 Cisco System s, Inc. All rights reserved. Cisco Public

    CCNA Discovery 2 Chapter 8 (cont.)ISP Responsibilities

    IDS and IPS

    Wireless Security

    MAC Address FilteringWired Equivalent Privacy (WEP) PT activities

    Wifi Protected Access (WPA) and WPA2

    Host Security Worms, Viruses, Trojans

    Service Level Agreement Monitoring Network Performance Wireshark Activities

    Backups and Disaster Recovery

    NEW

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    18/21

    ITE PC v4.0

    Chapter 1 18 2007 Cisco System s, Inc. All rights reserved. Cisco Public

    Chapter 8 - Challenges

    Lab 8.1.3 requires Windows XP Professional computerwith administrative access and NTFS File System. TheSimple File Sharing turned off (under the Folder

    Options of

    ACL doesnt go in details, used as a method toprotect the network

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    19/21

    ITE PC v4.0

    Chapter 1 19 2007 Cisco System s, Inc. All rights reserved. Cisco Public

    CCNA Discovery 2 Chapter 9 Summary

    Putting it All Together

    Use the knowledge and skills learned in this course to perform acase study lab activity.

    Implement a network upgrade .

    Review an existing customer network.

    Create an IP addressing scheme for the upgraded network.

    Create a physical diagram of the new network.

    Use a configuration checklist and configure networking devices.

    Use an installation checklist and connect the networking devices.

    Use a verification checklist and verify connectivity and routingtable updates.

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    20/21

    ITE PC v4.0

    Chapter 1 20 2007 Cisco System s, Inc. All rights reserved. Cisco Public

    Q & A

  • 8/8/2019 CCNA Discovery 2 - Retooling Session v1 0 (1)

    21/21

    ITE PC v4.0

    Chapter 1 21 2007 Cisco System s, Inc. All rights reserved. Cisco Public